Invitation for Prequalification Date: 28 February 2017 Loan No. and Title: 3239-PAK: Federally Administered Tribal Areas Water Resources Development Project Contract No. and Title: 1- PQ-PMU-FWRDP: Construction of new irrigation infrastructure in Bajaur, Khyber and Mohmand Agency, including small dams with a maximum height of 15 meters, diversion weirs, with main and secondary irrigation channels, improved on-farm management through construction of lined (concrete) watercourses, terracing and land leveling in the command area, and watershed management works. Deadline for Submission of Applications: 11 April 2017, 11:00 am (local time) 1. This Invitation for Prequalification follows the Procurement Plan for this project that appeared on the Asian Development Bank (ADB) website on 14 February 2017. This contract will be jointly financed by ADB and the Government of Islamic Republic of Pakistan. The eligibility rules and procedures of ADB will govern the prequalification and the bidding process. 2. The Islamic Republic of Pakistan has received financing from ADB toward the cost of Federally Administered Tribal Areas Water Resources Development Project (FWRDP). 3. The Project Management Unit (PMU), FWRDP (the “Employer”) intends to prequalify firms for the following contract(s) under this project: “Construction of new irrigation infrastructure in Bajaur, Khyber and Mohmand Agency, including small dams with a maximum height of 15 meters, diversion weirs, with main and secondary irrigation channels, improved on-farm management through construction of lined (concrete) watercourses, terracing and land leveling in the command area, and watershed management works.” The sub-projects, packages, scope and cost will be finalized after detail design is complete as indicated in Section 6: Scope of Contract of the Prequalification Document. Scope Package Title Main Structure Baj/1 Kharkai Weir Salarzai-II & III Watersheds Surface 2 Weirs Tentative Lengths of Dam / Weir (Meters) 61.1 8 Weirs 169.2 Baj/2 Estimated Command Area (Ha) Estimated Channel Lengths (km) 303.0 6.4 531.8 18.7 Scope Package Baj/3 Baj/4 Baj/5 Khy/1 Khy/2 Khy/3 Khy/4 Khy/5 Khy/6 Moh/1 Moh/2 Moh/3 Title Water Irrigation Charmang & Kamagara Watersheds Surface Water Irrigation Arang & Alizai Watersheds Surface Water Irrigation Loi Mahmund & Salarzai-I Watersheds Surface Water Irrigation Shangde Dam Tarkho Kats Wier Tangi Dam Magoo Dand Dam Bara Kach Dam Qudum Irrigation Sub Project Jay Dam Qasim Khel & Ekka GhundIII Watersheds Surface Water Irrigation Umbar & Upper Pandiali Main Structure Tentative Lengths of Dam / Weir (Meters) Estimated Command Area (Ha) Estimated Channel Lengths (km) 9 Weirs 256.6 1393.2 22.6 2 Weirs 45.7 145.0 3.7 2 Weirs 57.9 164.7 5.0 Small Dam 86.1 172.0 3.0 1 Weir 30.5 100.0 6.1 91.4 500.0 24.4 45.7 199.0 4.6 97.5 76.0 2.3 1 Weirs 30.5 31.5 3.2 Small Dam 101.4 191.0 4.2 1 Weir and three small dams 200.3 131.0 8.1 6 Weirs 100.6 310.0 20.6 Small Dam Small Dam Small Dam Scope Package Moh/4 Title Watersheds Surface Water Irrigation Tanga Danish Cool Dam Main Structure Tentative Lengths of Dam / Weir (Meters) Estimated Command Area (Ha) Estimated Channel Lengths (km) Small Dam 39.3 88.0 3.1 4. It is expected that the Invitation for Bids will be made in May 2017. The results of prequalification shall be used for bidding within 6 months after approval or within 1 year from the deadline for submission of applications. 5. To obtain further information and inspect the Prequalification Document, interested eligible Applicants should contact: Employer’s Office: Name of the Officer: Postal address: Telephone: E-mail: Fax No.: 6. Fata Water Resources Development Project Project Director Adnan Khan, Directorate of Projects, FATA Secretariat, Warsak Road, Peshawar, Zip code 25000 +92-91-5200862 [email protected] +92-91-5200861 To purchase the Prequalification Document in English, eligible Applicants should: Contact the address above, requesting the Prequalification Document for 1- PQ-PMUFWRDP Procurement of FWRDP Works and: Pay a non-refundable fee of PKR 10,000/- through pay order or bank draft drawn on a scheduled bank of Pakistan in favor of Project Director, FWRDP. The document will be sent by courier. No liability will be accepted for loss or late delivery. 7. Deliver your Application: To the address above. On or before 11 April 2017 at 11:00 am (local time) The Employer reserves the right to accept or reject late Applications. 8. The Employer will not be responsible for any costs or expenses incurred by Applicants in connection with the preparation or delivery of their Applications. 9. The Employer will arrange a pre-application submission conference for the interested applicants on 21 March 2017 after publication of this invitation. 10. The Employer will notify all Applicants in writing of the names of those Applicants who have been prequalified.
© Copyright 2024 Paperzz