ADDENDUM No. 4 Renovation of Restrooms - 4th and 6th Floors Camden Yards Warehouse MSA Project No. 17-052 Date Issued: February 21, 2017 This Addendum is hereby made a part of the Contract Documents dated February 6, 2017 on the subject work as though originally included therein. The following amendments, additions, and/or corrections shall govern this work. This form shall be acknowledged below and submitted with the bids. This Addendum incorporates the following items: 1. Question and Answer There is a punch-down block that is shown on drawing ED-102, note 9 that needs to be relocated. The drawings and bid documents do not provide any information directing what equipment/devices are terminated on this block nor do not indicate what cables (if any) are associated. Can you provide this information? Contractor shall relocate two (2) existing terminal blocks, one (1) duplex receptacle, one (1) data jack, and one (1) telephone system equipment box to new location indicated on plans. The existing cables have enough slack to relocate the telephone equipment without the need to run new cables. Issued by: Maryland Stadium Authority 333 W. Camden Street, Suite 500 Baltimore, MD 21201 Sandra Fox, Procurement Officer Company Acknowledgment (Name and Title) _________________________ Date
© Copyright 2026 Paperzz