31 - Deep Well Protest

&
PO 8Dx i 293
A.lbuqucrque,NIr487 I 03
505 768-2500
vww.oh<wua.org
Berr-rillillo
Count.v
Alt:rrqrrerque
ffi WaterUtility Ar-rthority
May26, 2009
Chalr
TrudyJon€s
Cityof Albuquerqu€
Councillor,Distrht8
VlceChalr
Alan B. Arm[o
Countyof Bemalillo
District1
Commissloner,
MarljnJ. Chavez
City of Albuquerque
Mayor
tut De La Cruz
Countyof Bornalillo
District2
Commissioner,
Rey Garduno
Cityof Albugueque
District6
Counclllor,
Ken Sanchez
Cityof Albuquergue
Districl1
Councillor,
MaggioHartStebbins
3
Countyof tsernaEllo
District
Commissioner,
Ex-OfilcioMember
PabloR. Rael
Villageof Los Ranc-ttos
BoardTrustoe
ExocutivoDirectol
MarftS. Sanchez
Websile
www.aocwua.or9
Mr. NicholasHamm
HealthScientist
Environmental
Health
BernalilloCountyOfficeof Environmental
(505)314-0328
RE:
Water and SanltarySewer ServlceabilityStatement#90508
28'15Rio Bravo SW MRGCDMap 48-Lot2AlB, UPC
#101105322747611306 Zone Atlas Map: P'11
DearMr. Hamm:
The specifictype of developmentproposed(suchas singlefamilyresidential,
for
fire flow requirements
shoppingc€nter,office,etc.)as wellas the instantaneous
this
property
therefore,
request
for
availability;
in
the
were not submitted
the subject
statementmay not be completeand/or.validat the time of futureconstruction.Once
the specifictype of developmentand fire protectionrequirementshavebeen
establishedby the FireMarshal'sOffice,you will needto requestan updated
office.As such,onlygeneral
availabilitystatementfrom the UtilityDevelopment
may be issuedat this time.
of
serviceability
form
of
a
statement
informationin the
ProJectInformatlon: Serviceavailabilityfor this site was last addressedin a letter
datedApril29, 2005,AvailabilityStatement#50319.The subjectsite is t4.5 acresof
a developedparcellocatedon the northside of Rio Bravo,withinan unincorporated
area of BernalilloCounty. The site is currentlyzonedM-H and liesin the 0W
pressurezone withinthe Atriscotrunk.
in the area includestwo deadend 6 inch
Existing Conditions: Water infrastructure
(Project
# 09-011-76),one on the south and the otherto the
water linesin Rio Bravo
northside of the Street;Neitherline coversthe frontageof the site.Thereis alsoa 6
inch line (Project#26-2924-86)in Del Norte.
in the areaincludestwo I inch sewercollectionlinesin
Sanitarysewerinfrastructure
Rio Bravo,one on the north(Project#07-003-81)and one on the south(Project#07002-81)side of the street;Neitherlinecoversthe frontageof the site.Thereis also
an 8line (Project#26-2924-86)in Del Norte.
Serviceabilityto the site is contingentuponthe cornpletionof countyprojectRio
Bravo/DelRio#7365.61.The projectpurposesextendingthe existingwaterlinein
Rio Bravoacrossthe entirefrontageof the site,enablingthe site to takeservicefrom
the new line.lt alsopurposesextendingsewerfromthe lineon the Southsideof Rio
Bravo,acrossRio Bravo,in orderto provideserviceto this site.
Costs and Fees: Waterand sanitarysewerserviceaccountsmustbe established
costs,
and construction
with New Servicesat924-3920. ln additionto installation
Mr.Nlcholas
Hamm
Environmental
HealthScientist
Health
BemalilloCountyOfflceof Environmental
May26,2009
Page2
eachmeteredwaterservicewill besubjectto waterandsanitarysewerUtility
(UEC)payableat thetimeof serviceapplication.All charges
Expansion
Ciharges
andpoliciesin effectat thetime
andratescollectedwillbe basedon the ordinances
andauthorlzed.
servicels actuallyrequested
WaterUse: Meteredwaterserviceto thissftels obtalnable.TheWaterAuthorltyls
for the
alsoready,willing,andableto providethe maximumannualrequirement
a periodof at least70 yearsas requiredby the
subJect
subdMslon/proJectfor
is also
theWaterAuthority
Ordinance.However,
BemalllloCountySubdlvlslon
goalsand requirements.
Accordingly,
and
committedto meetlngwaterconservation
allnewresldentialdevelopmentwlll
annualrequirement
of the maximum
regardless
be requlredby the WaterAuthorityto meetthestandardwaterusageof 180gallons
to 75gellonsperepita day. Indoor
perdayper household
whichis equivalent
Where
of 7A%of totalusewithoutdooruselimitedto 30ol0.
wateruseshallconsist
water. All newcommercial
available,outdoorwaterusageshallutilizereclalmed
forwaterusageandwater
shallbe subjectto the requirements
developments
theWater
as definedbytheWaterAuthority,particularly
requirements
conservation
LargeUsersOrdinanceandWater
WaterConservation
WasteOrdlnance,
Waterby RequestOrdinance.
Conservatlon
wlll remainIn effectfor a periodof oneyear
Closure: Thisstatementof availablllty
identifiedherein.lts
fromthe dateof issueandappllesonlyto thedevelopment
accuracyof the infonnation
uponthecontinuing
valldityIs, in part,contlngent
mayreQuire
supplledby the developer.ChangesIn the proposeddevelopment
andshouldbe broughtto the attentionof the Utility
of avallabitity
reevaluatlon
as soonas possible.
Sectionof theWaterUtilityDepartment
Development
Offlceat (505)924€987,or by
the UtilltyDevelopment
Pleasefeelfreeto contract
presented
the information
fax at (505)924-3864if youhavequestionsregarding
information.
hereinor needadditlonal
Sincerely,
Z-fur-l
MarkS. Sanchez
ExecutlveDirector
Maps(2)
Encl: $ite and Infrastructure
Department
Coun$,Plannlng
E-mail: JimBest,Bemallllo
Department
Gounty,PublicWorks
SusanJones,Bernalillo
HealthDepartment
GountyEnvironmental
KelthChavez,Bernalillo
/WaterResourcres
Bernalillo
CountyPublicWorks
DanMcGregor,
Avallablllty M'12
tl