Plattegrond nieuwe situatie

1
2
3
4
600
250
250
600
20000
2800
10000
R01 10000
Ramp is 10 m.
(maximum of 5%)
R02 10000
Ramp is 10 m.
(maximum of 5%)
P-850mm
1400
1400
P-425mm
Peil
NOT ACCESSIBLE
Peil
1200
NOT ACCESSIBLE
F
F
1200
20000
E
E
1200
Peil
Peil
D
D
1200
8696
C
1200
C
B
B
,5%
1200
e: -1
slop
A
NOT ACCESSIBLE
1200
A
Peil
R03 10000
Peil
P-425mm
R04 10000
2800
Ramp is 10 m.
(maximum of 5%)
Ramp is 10 m.
(maximum of 5%)
P-850mm
1400
This part of the ramp is extra.
Only if the plot is lower than
Peil -850mm. This can be
caused by unequal leveling.
R01 6000
P-850mm
(maximum -1250mm)
all measurements are in mm
Awarding Institution
Executing Institution
%
Revisions
Project Location
LA CITÉ DU SOLEIL®, VERSAILLE, PARIS, FR
e: 0
slop
Project Phase
Participants
CONSTRUCTION DOCUMENTATION
4
3
2
1
--.--.---31.05.2014
29.04.2014
03.03.2014
Paper Size
Drawing Block
ARCHITECTURAL DRAWINGS
2500
1
4000
2
Project Title
4000
3
4
DESIGN, CONSTRUCTION & EXHIBITION
OF SOLAR POWERED HOUSE
Drawing Subject
Drawing Scale
Drawing Code
SITE PLAN
DEL #6
DEL #5
DEL #4
A3
1:100
AR-002
1
2
3
4
600
250
250
600
20000
1400
10000
P-850mm
1400
Ramp is 10 m.
(maximum of 5%)
2800
P-425mm
Peil
Ramp is 10 m.
(maximum of 5%)
1200
NOT ACCESSIBLE
F
F
1200
20000
E
1200
E
D
D
1200
8696
C
1200
C
B
1200
B
A
1200
A
Peil
P-425mm
2800
Ramp is 10 m.
(maximum of 5%)
Ramp is 10 m.
(maximum of 5%)
P-850mm
1400
This part of the ramp is extra.
Only if the plot is lower than
Peil -850mm. This can be
caused by unequal leveling.
P-850mm
(maximum -1250mm)
all measurements are in mm
Awarding Institution
Executing Institution
Revisions
Project Location
LA CITÉ DU SOLEIL®, VERSAILLE, PARIS, FR
Project Phase
Participants
CONSTRUCTION DOCUMENTATION
4
3
2
1
--.--.---31.05.2014
29.04.2014
03.03.2014
Paper Size
Drawing Block
ARCHITECTURAL DRAWINGS
2500
1
4000
2
Project Title
4000
3
4
DESIGN, CONSTRUCTION & EXHIBITION
OF SOLAR POWERED HOUSE
Drawing Subject
SITE PLAN
TOP VIEW
Drawing Scale
Drawing Code
DEL #6
DEL #5
DEL #4
A3
1:100
AR-003