WASTEWATER
Page
4.1
Introduction.................................................................................................... 4 - 2
4.2
Design Standards ............................................................................................ 4 - 3
4.3
Flooding ......................................................................................................... 4 - 5
4.4
Tradewaste .................................................................................................... 4 - 6
4.5
Watercare Services Limited.............................................................................. 4 - 7
4.6
Backflow Prevention ........................................................................................ 4 - 8
4.7
Network Upgrade Charge ................................................................................ 4 - 9
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
1
Section 4
Wastewater
4.1
Introduction
Refer also to:
• Section 3 Drainage, sub-section 3.14 Acquiring Access to Land;
• Appendix I, Gaining Access.
Definition of Wastewater
Wastewater is defined as any water that has been adversely affected in quality by
anthropogenic influence. This includes domestic, municipal, or industrial liquid
waste products disposed of via a pipe or sewer.
Wastewater Disposal
The objective of the wastewater drainage system is to convey wastewater from the
site efficiently and effectively while maintaining public health and minimising any
adverse effects on the environment. Wastewater is disposed of either by gravity
drains (public or private), pump stations (public or private), or on-site wastewater
treatment plants (formerly termed septic tanks). On-site wastewater treatment
plants still exist in some areas of the isthmus (Hauraki Gulf Islands excluded). As
new development occurs, these should be abandoned wherever possible. No new
wastewater treatment devices will be permitted on the Auckland City Isthmus.
Private Pump Systems
Pump systems are not generally permitted as an option for primary wastewater
disposal for new developments. Any proposed private pump system is subject to
Metrowater’s approval and conditions, and will only be accepted if no gravity
connection is possible. The wastewater from a new development must discharge to
a public wastewater pipe generally via a gravity connection. These connections
may be through neighbouring sites if no other options are available. Where the
proposed private gravity wastewater pipe passes through adjacent properties,
written consent from affected landowners must be obtained (by the applicant)
prior to Auckland City Environments (ACE) approval. Refer to Section 3 Drainage,
sub-section 3.14: Acquiring Access to Land and Appendix I: Gaining Access.
Key
Documents
•
Health and Safety in Employment Act 1992 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
•
Health and Safety in Employment Regulations 1995 (and Amendments)
•
AS/NZS 2865:2001: Safe Working in a Confined Space
•
Code of Urban Subdivision and Development 1999 [Auckland City]
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_regs
http://shop.standards.co.nz/productdetail.jsp?sku=2865%3A2001%28AS%2FNZS%29
http://www.aucklandcity.govt.nz/council/documents/subdivision/docs/codesurban.pdf
•
•
•
•
Site Hazard Identification and Controls: Overview – Working in a Confined
Space [Metrowater] [Hard copy only]
Wastewater Design Manual 2007 [Metrowater] [Hard copy only]
Draft Wastewater Pump Station Design Manual 1999 [Metrowater] [Hard
copy only] Until this Manual is operative, it must be consulted in conjunction with:
Foulwater Pump Station Design Manual 1989 [Auckland City] [Hard copy only]
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
2
Section 4
Wastewater
4.2
Design Standards
Refer
•
•
•
•
also to:
Section 3: Drainage, sub-section 3.7 Bedding, Laying and Cover;
Section 3: Drainage, sub-section 3.9 Manholes;
Appendix R: Approved Materials for Drainage;
Appendix T: Testing Requirements for New Public Assets.
Public wastewater drainage must be designed to the minimum standards outlined
below.
Policy
Minimum Requirements
The public wastewater system must be designed for Maximum Probable
Development (MPD) of the entire natural catchment and in accordance with the
Wastewater Design Manual 2007 and Appendix R: Approved Materials for Drainage
and Appendix T, Testing Requirements for New Public Assets. Provision must be
made where relevant for pumped flows from or to adjacent land.
Minimum Diameters
Minimum diameters of new public wastewater pipes:
• 150mm diameter: Residential areas;
• 225mm diameter: Business, Commercial and Industrial areas.
Approved Materials
Refer to Appendix R: Approved Materials for Drainage.
Reticulation Layout
Manholes and pipelines must be located to minimise interference with future
building, in particular:
• in Residential zones: within the front, rear and side yards;
• in Business zones: adjacent to road frontage boundaries;
• in All zones: within common access ways.
Public drains must connect, start or terminate at manholes only, unless otherwise
approved by Metrowater.
Design Criteria
• Minimum Gradient 150mm diameter:
1 in100 or 1% (at the discretion of Metrowater, 0.8% if population served
is less than 30, or at the top of the line) , refer Wastewater Design Manual
•
Minimum Fall Through of a Manhole:
Refer to Section 3: Drainage, sub-section 3.9: Manholes;
•
Minimum Cover:
− in private land and under footpaths: 900mm;
− in road carriageways: 1200mm.
Where minimum cover cannot be achieved, additional protection is required
which requires specific design and approval. It is essential that the lack of
cover will not compromise the future extension of the line;
•
Minimum Self-Cleansing Velocity:
0.75m/sec. Refer to Wastewater Design Manual 2007.
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
3
Section 4
Wastewater
4.2 (cont)
Design Standards
Policy
(cont)
Service Connections on New Public Wastewater Pipes
Where required, all new public wastewater pipes must have approved service
connections (with end caps) constructed at the time the wastewater pipe is laid.
Connection to these stubs will only be made under Building Consent after the
wastewater pipe is declared ‘public’.
Public Wastewater Pumping Stations
A new public wastewater pumping station may be considered if at least ten lots are
topographically unable to be drained by gravity means. Approval will be to the
standards required by Metrowater (at their discretion). A key requirement of
Metrowater accepting public pump stations will be a Net Present Value (NPV)
analysis by a Registered Valuer. The NPV analysis will allow Metrowater to assess
the maintenance costs for the economic life of the pump station. Prior to the
pump station being declared ‘public’ and being vested Metrowater may require a
contribution to maintenance costs from the developer based on the NPV analysis.
Key
Documents
•
Draft Wastewater Pump Station Design Manual 1999 [Metrowater] [Hard
•
•
•
Foulwater Pump Station Design Manual 1989 [Auckland City] [Hard copy only]
Wastewater Design Manual 2007 [Metrowater] [Hard copy only]
Standard Specification for Construction of Gravity Drain-Pipes November
2006, [Metrowater] [Hard copy only]
copy only] Until this Manual is operative, it must be consulted in conjunction with:
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
4
Section 4
Wastewater
4.3
Flooding
Refer also to:
• Section 7: Standard Drawings, 12908/244.
Policy
Key
Documents
Wastewater Surcharge
All wastewater pipe fittings from proposed dwellings must be of sufficient height
above the connection point to the public wastewater system, to minimise the
potential for backflow through the private drainage system. Minimum elevation
details (wastewater pipe to floor levels) are detailed in Section 7: Standard
Drawings, 12908/244. Refer also to Building Industry Authority approved
documents.
•
Building Act 2004
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
•
Building Regulations 1992 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_regs
•
Health and Safety in Employment Act 1992 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
•
Health and Safety in Employment Regulations 1995 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_regs
•
Resource Management Act 1991 (and Amendments)
http://www.legislation.govt.nz/libraries/contents/om_isapi.dll?clientID=2471096289&infobas
e=pal_statutes.nfo&record=%7BF82ABA07%7D&hitsperheading=on&softpage=DOC
•
Building Controls Approved Documents [Department of Building and Housing]
http://www.building.dbh.govt.nz/e/publish/publications/approved_docs/publications_approv
ed_documents.shtml
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
5
Section 4
Wastewater
4.4
Tradewaste
A Tradewaste Discharge Permit from Watercare Services Limited (WSL) is required
where a proposed wastewater discharge is classified as ‘tradewaste’ under the first
schedule of the Auckland Regional Council Tradewaste Bylaw 1991. WSL has the
delegated authority from Auckland Regional Council to administer the Tradewaste
Bylaw. Applications will specify a maximum flow rate (for example, 5 l/s) and
maximum daily discharge (for example, 6 m³) and details on the type of
contaminant and proposed pre-treatment systems etc.
Policy
Metrowater
Tradewaste applications are primarily processed by Watercare Services. Details on
maximum flow rates and volumes are however forwarded to Metrowater who will
advise the allowable flow rates thereby ensuring the public wastewater system has
sufficient capacity for the proposed tradewaste discharge. Any development work
resulting in connection of new or existing wastewater systems to Watercare
Service’s systems will be carried out by Metrowater. These costs will be met by
the applicant.
Grease Traps
All Building Consents which require the installation of a grease trap, or re-approval
of a grease trap, should be referred to Metrowater for approval. Generally, the
grease trap should be: outside the building (where practicable); located as far as
possible from the hot water source; and, should be sized as per New Zealand
Building Code G13.
Conditions
Conditions may be imposed by Metrowater, as appropriate.
Capacity Analysis
A capacity analysis will be required.
Environment Protection
As well as the discharge quantity and flow rate, Metrowater will also consider the
possible environmental effects of a proposed discharge. These include possible
impacts on: people; the pipe system (such as pumps in public pump stations);
proposed pre-treatment; and (in cases of overflow) the effect of the discharge on
the environment.
Key
Documents
•
Local Government Act 1974 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_statutes&clientid=592831&viewtype=contents
•
Local Government Act 2002 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_statutes&clientid=592831&viewtype=contents
•
Catchment Management Plans [Auckland City Environments or Metrowater]
•
Trade Waste Bylaw 1991 [Auckland Regional Council] [Hard copy only]
[Hard copy only]
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
6
Section 4
Wastewater
4.5
Watercare Services Limited
WSL owns and operates the bulk trunk-water supply and wastewater drainage
systems. WSL provides supply of water as well as wastewater disposal services to
the Auckland region either through the territorial authority or the local city
councils.
Policy
Auckland City Council and Watercare Services Limited (WSL)
Liaison on drainage issues between Auckland City Council and WSL will be
undertaken by Metrowater.
Work Near Watercare Services’ Systems
No works shall take place within 10m of a WSL wastewater pipe (or watermain), or
20m if blasting, without specific prior written approval from WSL.
Auckland City Environments (ACE) advises all applicants of this requirement, and
will not be able to process any Consent until a WSL Building Approval Permit for
the proposed work has been received.
Direct Private Connections to Watercare Services’ Systems
No direct private connections to WSL systems are permitted.
Key
Documents
•
Building Act 2004
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
•
Building Regulations 1992 (and Amendments)
•
Local Government Act 1974 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_regs
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_statutes&clientid=592831&viewtype=contents
•
Local Government Act 2002 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_statutes&clientid=592831&viewtype=contents
•
Resource Management Act 1991 (and Amendments)
•
Auckland Metropolitan Drainage Act 1960 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_localprivate&clientid=592831&viewtype=contents
•
Consolidated Bylaw 1998 (and Amendments) [Auckland City]
http://www.aucklandcity.govt.nz/council/documents/bylaw/
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
7
Section 4
Wastewater
4.6
Backflow Prevention
Refer also to:
• Section 6: Water Supply, sub-section 6.25: Backflow Prevention.
Backflow or cross-connection contamination of the potable water supply must be
avoided in all cases.
Policy
Public Pump Stations
All public pump stations must have approved backflow prevention devices fitted to
any water supply servicing the pump station. ‘Backflow’ signs must be installed on
all pump stations. Flushing hoses connected (with backflow preventers) to the
water supply must not be able to be immersed in, or contaminated with
wastewater.
Private Pump Stations
Private wastewater pumping stations must have approved backflow prevention
devices installed on any external water supply fixture servicing the pump station.
Certification and Permits
Annual test certification of all backflow fittings is required, and will be arranged by
Metrowater’s Backflow Prevention Manager. A permit must be obtained from
Metrowater prior to installing any backflow prevention device. If other works are
involved however, this can form part of a Building Consent application to Auckland
City Environments (ACE). An ACE Building Inspector or Building Certifier will
inspect the installation of the new device. Details, including the location of the
new device, will be forwarded to Metrowater’s Backflow Prevention Manager.
Private Wastewater Ejector Station
Any pressurised tanks discharging wastewater into the public wastewater system
that utilise pumps primed with water from the public water supply system, must be
fitted with backflow devices.
Combined Wastewater and Stormwater Screens
Water Supplies connected to chambers used for cleaning of overflow or stormwater
screens must be fitted with backflow devices to ensure no contaminants may be
drawn back into the water supply system.
Key
Documents
•
Health and Safety in Employment Act 1992 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_statutes
•
Health and Safety in Employment Regulations 1995 (and Amendments)
http://www.legislation.co.nz/browse_vw.asp?content-set=pal_regs
•
Water Supplies Protection Regulations 1961 (and Amendments) (esp. § 3,
4, 5, 9)
http://www.legislation.co.nz/browse_vw.asp?contentset=pal_regs&clientid=592831&viewtype=contents
•
Health and Safety Policy Manual [Auckland City]
http://www.aucklandcity.govt.nz/council/documents/handbook/key.asp
•
Backflow Cross-Connection Policy [Metrowater] [Hard copy only]
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009
Page 4 -
8
Section 4
Wastewater
4.7
Network Upgrade Charge
Refer to:
• Section 2: Development, sub-section 2.14: Network Upgrade Charge.
The Network Upgrade Charge is imposed by Metrowater to recover a fair share of
infrastructure investment costs attributable to growth from those contributing to
increased growth and demand.
Policy
Key
Documents
The Trigger for Metrowater charging a Network Upgrade Charge typically occurs when
an authorisation for a new or upsized service connection (water or wastewater) is
approved by Metrowater, or when a Building Consent is approved by Auckland City
Council.
•
•
Network Upgrade Charge Policy (2007)
http://helios.metrowater.co.nz/SiteCollectionDocuments/Metrowater_NUC_Policy_Final_07_(3).pdf
Development and Connection Standards – Water, Wastewater and Stormwater Design and Policy Manual for Auckland City Isthmus, 4th Edition Mar 2009
Copyright © Mar 2009