Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 1 of 10
AeCON
TEST PACKAGE CHECKLIST
TEST PACKAGE NO: SET-LFL-2.17.M.01-003: PLM Flange TP-06
CWP NO: 2.17.M.01
ENBRIDGE
INITIAUDATE
AECON
INITIAUDATE
Drawings, RFI's & NCR's
1.
Review CWP current issue to ensure test package has latest drawing revisions
2.
Check that latest redline dwgs. are included.
3.
Verify RFI's are complete for isometrics in test. Verify drawings are updated. (M
drawings and Q drawings)
8v~
4.
Verify that any NCR's for ISO's in test packages are closed.
b -~
j"~~ lllt,~
¥
75.rt'e. \~he . .
G·e. s~ 12./'6~ -.Jk:".~1alt ""
8\J
ot~.r
fv/A
NIA
JV /A
}J/ft
NDE
5.
Review weld maps against weld log.
6.
Review NDE completed to verify acceptance.
7.
Review line class and welder percentages.
g\J,
&th!r<
e\J crh-er.s
B\J
of~
Verify welders with repairs have all required repairs completed & are accepted. tlu o~~.c
I
8.
fv/A
fv/A
j.JJ,:+
NIA
NIA
ll.J/A
Nfll
AliA-
Punching
9.
Verify test package punched to ISO. B.O.M. and weld maps.
10. Verify punch list 'A' items acceptable prior to test.
11 . Verify all permanent bolt-ups are complete and to spec.
12. Confirm Enbridge has completed pre-test walk down (if required).
6 ·R_ 3 ~ ~~~~"
14. Verify PTR test pressure correct as per Q drawing.
6 1{(
IV/A
s
tlll<
I(."
16. Confirm that any flange spools from shop have been hydro tested if required.
6' R :,.~ lVtC
6 .,_ .J.A-..e.. t2.hf:
6 .,_ .::J.vt, I;)};~
NJA
Nht
,j~~
,._
•
I
15. Verify test limits as per package.
~
N/A
fv!A
Release
13. Enbridge sign-off test release.
..,
I
~ ~~~/_
j ;.A
&'
Sii
""\::.....:>t:::l., I
~~~ JJ
~~~1'-1 ~
Jbs; "\.
11\1!.
J;
Comments:
RELEASE FOR HYDRO TEST: (All items above must be signed off or marked N/A)
Aecon QC Inspector:
Date:
Client QA Inspector:
Page 1 of 1
f.
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 2 of 10
Hydrostatic Test QA Checklist
MPFCS.CKL·HTQC-025-n:lO.docx
December 2010
Canadian Facility Construction Services
Aecon Industrial
Contractor:
Project:
Date:
Enbridge North Edmonton Terminal
Test No.:
Edmonton, AB
Location:
AFE#:
CWP#:
, )
e ENBRIDGE
June 12,2015
SET-LFL-2.17 .M.01..003:
PLM Flan_a_e TP-06
1241001C82 (LFL)
2.17.M.01
This checklist must be completed and attached to the hydrostatic test records prior to turnover. The following information
must be completed prior to the hydrostatic tests as per Operations and Maintenance Manual Book 3· Pipeline Facilities,
Section 07-02-01:
. ] Yes I N~- - -Date Task
NOTES
-Notifications
I 61Z_
-
-
Test Section Drawing
'l../15-
.J~
--
6 ·f._
~l.l"t'_ 12/1 C
I
Review Materials Documentation
Establishing intended maximum operating
pressure (MOP) , and for deviations to
existing MOP approval by Engineering
All NDE Reviewed
-
Equipment List
G·fL
.j.,.~
12/JL
~/A
:!~'<-
IllK-,
6·~
-
---
:r~
fv/A
-Pre Hydro-Package Approvals
r-
fv/A
Environmental Concerns / Issues
G·/!....
1.2/.C
-
11o\.'<.l1hC
'l"~KL \U1~
.J'""-- Jl-/Js
-
t-
Safety precautions specific to the
circumstances, including setback
distances for workers and the public
-
Pre-job Meeting with Workers
--
12./IS-.
1 6·~
.:J~
6 ·/e..
~-4-1\(_ P-/J~-
t-ll...
s..weJlfrs
Pressure Recorder Set
6-f?-
(floU'C.
Test Acceptance Criteria
6 '1-
J s~~
Calibration of Test Instruments
-
--
-
Contractor Representative:
Name (Print):
Signature:
Date:
~
:fu~C?/1 5:
u;, ~-
'.V)1
---
Company Representative:
Name (Print):
6A~~._
Signature:
Date:
:sirre '~ J,~
If the contractor has the1r own form that meets all information on this form the Contractor's form may be used.
Page 1 of 1
Confidential and proprietary Information of Enbridge Pipelines Inc. and Its affiliates. Not for distribution or circulation by any Contractor
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 3 of 10
~
'{;1ENBRIDGE ..
PRESSURE TESTING FACLITY PPING
FAClUTY CONSTRUCTION SPECFCATON
FCS014 • 2011
Pressure Test Report
Canadian Facilities Construction Services
Page.1_of1
F-INSP-065-FPTR-R1 DOT
Contractor
Aecon Industrial West
Test Date
P roject
Enbrldge North Edmonton Terminal
Test No.
Edmonton, AB
AFE
SET-LFL-2.17.M.01-003:
PLM Flange TP-06
1241001C82 (LFL)
CWP#
2.17.M.01
l ocation
ID-217-3.01~1265-0-10LFU M900'0·217-3.01·J
Drawing No.
ISK1639B-0-10LFU 016399
June 12, 2015
PIPE DATA
Grade
Length
Manufacturer
Type
*THERE IS NO PIPI NG INC LUDED IN THIS HYD RO TEST*
TEST DATA
Test Medium
Fill Volume
WATER
REFERENCE INSTRUMENTS
Deadweight Pressure
Make
N VISION
Range
0 - 10000 PSI
Serial No.
TEST EQUIPMENT
Liquid in Glass
Thermometer
D URAC
- 35C
351904
to SOC
Pressure Recorder
Pressure Gauge
N VISI ON
N/A
N VISI ON
0 - 10000 PSI
N/A
0 -10000 PSI
363480
N/ A
363480
P1445 8
CALIDRA TlON VERIFICATION BEFORE TEST
Deadweight
Pressure Recorder
Pressure Gauge
Test
50%
T P.
1453 kpa
75%
T.P.
2181 kpa
100%
T.P.
2909 kpa
100%
T.P.
2887 kpa
75%
T.P.
2181 kpa
50%
T.P.
1453 kpa
25%
T.P.
723 kpa
717 kpa
1442 kpa
2168 kpa
2893 kpa
2879 kpa
2173 kpa
1449 kpa
718 kpa
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2180 kpa
Leak
CALIBRATION VERIFICATION AFTER TEST
2S%Test
Pressure(T.P)
728 kpa
Aim Test Pressure
2907 kpa
Strength
Temperature Recorder
2861 kpa
Minimum
Maximum
2909 kpa
1 hour 11 minutes
2181 kpa
2201 kpa
10 minutes
Duration
See Accompanying Pages for Pressure and Temperature Records
Contractor Representative:
Company Representative:
(Print)
{Print)
(Sign)
(Sign)
Date.
Date
REVISION3 3 JANUARY 11, 2011
COPYRIGHTe2011 EN BRIDGE PPELINES NC ALL RIGHTS RESERVED
PAGEI4
1
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 4 of 10
Pressure Test Data Report
Canadian Facilities Construction Services
F-INSP-066-FPTDR·Rl.OOT
CONTRACTOR NAME:
Aecon Industrial West
LOCATION:
Enbridge North Edmonton Terminal
PROJECT I AFE:
1241001C82 (LFL)
Page
TEST NO.:
SET-LFL-2.17.M.01-003.
PLM Flange TP-06
TEST DATE:
June 12/2015
b-217-3.61 061265:0-ioLFD M§oo'b-217-3.61 - ~
l
DRAW ING NO.:
TIME
_SK1639B-0-10LFU 016398
DEADWEIGHT
PRESSURE
kpa I psi
.
CWP NO .:
2.17.M.01
REMARKS
(Weather, Volumes Added/Bled Off)
TEMPERATUREoCrF
AMBIENT
(Thermometer)
PIPE MEDIUM
(Recorder)
GROUND
Thermocouple)
12:15 PM
0
19
16
N/A
START ZERO HOLD
12:30 PM
0
19
16
N/A
END ZERO HOLD
12:34 PM
728
19
16
N/A
START 25% STRENGTH
12:49 PM
697
19
17
N/A
END 25% STRENGTH
12:53 PM
1453
19
17
N/A
START 50% STRENGTH
12:54 PM
1392
19
17
N/A
PLUG ADJUSTMENT
1:08PM
1359
19
18
N/A
END OF 50% STRENGTH
1:10PM
2181
19
18
N/A
START OF 75% STRENGTH
1:25PM
21 13
19
18
N/A
END OF 75% STRENGTH
1:29 PM
2909
18
START OF 100% STRENGTH
1:31PM
2862
18
NIA
ADD WATER (30ml)
1:32PM
2908
18
1:39PM
2861
18
1:40PM
2908
18
1:54PM
2861
18
17
17
17
17
17
17
17
18
18
18
18
18
N/A
1:55 PM
2909
18
2:22 PM
2863
18
2:23PM
2907
18
2:38 PM
2889
18
2:40PM
2887
18
2:45PM
2181
18
Contractor Representative
NIA
CLOSE SYSTEM
NIA
ADD WATER (30ml)
N/A
CLOSE SYSTEM
NIA
ADD WATER (30ml)
N/A
CLOSE SYSTEM
N/A
ADD WATER (28ml)
N/A
CLOSE SYSTEM
NIA
15 MIN READING
N/A
END OF 100% STRENGTH
NIA
START 75% LEAK TEST
Company Representative
Print
~
L!--
Sign
ru~
Date
Sign
l2fl[
Date
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 5 of 10
)
Pressure Test Data Report
NBRIDGE
Canadian Facilities Construction Services
F·INSP·066-FPTDR-Rl.DOT
CONTRACTOR NAME:
Aecon Industrial West
LOCATION:
Enbndge North Edmonton Terminal
PROJECT I AFE:
1241001C82 (LFL)
Page
T EST DATE:
TEST NO.:
CWP NO.:
DRAW ING NO.:
TIME
June 12/2015
DEADWEIGHT
PRESSURE
kpa I psi
REMARKS
(Weather, Volumes Added/Bled Off)
TEMPERATURE°C/°F
AMBIENT
{Thennometer)
PIPE MEDIUM
(Recorder)
2.17.M.01
GROUND
Thennocouple)
2:55PM
2201
19
18
N/A
END OF 75% LEAK TEST
2:59PM
1453
19
18
N/A
START 50% HOLD
3:09PM
1497
19
18
NIA
END 50% HOLD
3:11PM
723
20
18
N/A
START 25% HOLD
3:21 PM
767
20
18
N/A
END25%HOLD
3:24 PM
0
20
18
N/A
ZERO TEST START
3:34 PM
0
20
18
N/A
ZERO TEST END
Contractor Representative
Company Representative
S1gn
~J. r..q
Date
Sign
1¥1£
""S.re. t'6 I15
Date
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 6 of 10
Data Collection Report
I
Serial Number
Oatatype
Chassis
Left Scala
RlghfScala
363480
350693
257407
Lower
kPaG
Upper
Units
·c
u~
Lower
tp6 -12-Jun-15, 12:12:15, 12050
kPa G
3500
Si~·•
o(
•c
s•r"'9tl, t<st~J:l'lf/1'1
/f.r..l o( Str....,th
OW@ .l.'l.,q~pr>o. ~
3000
k;'
-
OV'@ J.t~T ~
19.00
~<!:sf 4i> 'l.' 'lo frt\
- 18.50
2500
2000
18.00
1500
• 17.50
1000
i
500
0
16.50
·500
r§'>~
"l'
<5S'Y
c:,<S·
~'>"'
,;.'?
ro't
c:."'Y
!-)~
c:."'?
,.r§>
c:,'f-'Y
,'>"'
~
c:,'f-.,'1,
qs't
:s"'
c:,~·
<:>
ElapSed lime hh:mm:ss
L
1
-
"'
0
17.00
_
,
N~e: tc.s't ~lit"' "'N
Mdt.4
Fac6Cy Cont.ttudlon
Prttturo Aecotdtt Chan
ldenlificellon SIMn<>
d...~"S'-S!'«!l~~-hs-t_to_C<2!!:tpro""'s for-f'/.!9 .Sett:li~
¥ ,q.\f.
9
".,,,,,,
Enbridga Test 11 01 ucense 11
SETI.Il-2 11' M0100:S
lo<aloon
Projed
AFE#
EDMONTON. A6
r..to•tt
JUNE 12, 2015
Ploono SoMce a Range •
I
CRUDE OIL PN 20
1900KPA
MIN 2861 KPA MAX 2909 KPA
1 HOUR 11 MINUTES
Enbr~e t-b1h Edf'T'IOnUin Ttrm•nli
1 2~1001C821LFL1
Maximum Operating Ptes:.uro
&rtngU'I Test Pretu.
Min J Mu I Outa1.ten
Tlmo On & lnil.lll (EnDnOge) Tlme
Off &Jnlll.tJ
Leak Test Ptetaurt
Min I OurabOn
Tlmo On & Initial (EIIbrid~) T~ma
Ol'f &IMUI!
TestMedkPn
Pressure Element Reno-
&Pen COir«
1:29PM
I MIN 2181
_i240PM
KPA
10 MINUTES
2:45PM
I 255 PM
WATER
0·10000 PSI
&Pen Color
BLUE
·30 · • 500EG C
REO
OtawJng NumbeR
G-21!' l 0'1 9(1c:JSI8.0 IOI,.Fl. 016396
r .._
Elomenc Range
Conu.cior I Job Numbtf
A4tc:on lndv.a.tnAI We'll. 802" COt
Contractor Tni Number
S!'r·LFL·2 J7 M OH)OJ
Contractor Rop
(printlliQ!I)
Enblldge R~
I"""'IIIGnl
Conwn..u
'i,"'f_J:l'""'j-- U/• ('
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 7 of 10
\
~\
~
~
............
~
____.....
~'
~
. . .. .
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 8 of 10
AlBERTA MEAIDIEMUT SERVICES llD.
5327. 91 STREET- EDMONTON, AlBERTA, T6E 2E6 - CANADA
Phone {780} 468· 6387 - Fax {780} 462-9387
CALIBRATION CERTIFICATE
CUSTOMER: Aec:on Industrial Western
MODEL: nVislon
CHASSIS SERIAL NUMBER: 351904
IOK MODULE SERIAL NUMBER: 351434
DATE: June 10, lOIS
TEMPERATURE: lOC
ASSET NUMBER: AMS-3026
RID MODULE SERIAL NUMBER: 258115
TECHNICIAN: Cedi Vogrinetz
INSTRUMENT
READING
ALLOWABLE
TOLERANCE
5.0000
5.000
0.020
wo.ooo o
too.ot n
0.035
200.000 n
200.01 n
0.050
4oo.ooo n
399.960
0.080
INSTRUMENT
READING
ALLOWABLE
TOLERANCE
0 PSI
0 PSI
2.0
2499.292 PSI
2499 PSI
2.5
4998.515 PSI
4998 PSI
5.0
7499.594 PSI
7499 PSI
7.5
9998.516 PSI
9998 PSI
10.0
MASTER INSTRUMENT
READING
MASTER DEADWEIGHT
READING
REMARK: DO NOT EXCEED 10000 PSI.
THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S
SPECIFICATIONS FOR NON IMPROVED ACCURACY.
THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A DH-BUDENBERG
CPBS800/CPS5800/CPMS800 DEADWEIGHT TESTER SIN J2SOJ/2S7NIB2704 TRACEABLE TO
UKAS ON CERJFICA TE 128141/STJ2SOJIJ SWB2704.
THE ABOVE EQUIPMENT HAS BEEN COMPARED TO AN AMETEK AMC910 SIN 2594163
TRACEABLE IN ACCORDANCE WITH DSIENIISO/IEC I 7025, TRACEABLE TO REGOGNIZED
NATIONAL OR INTERNATION STANDARDS.
WITNESSED BY:
-~r:Je
~~----·SIGNATURE: ----i!~
; ; ,. ..-.-:::::____
:.......__
_ _ _
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 9 of 10
IIIIITI MEAIOIEIEIIT SUIICES ltD.
5327 • 91 STREET- EDMONTON. AlBERTA. T6E 2E6- CANADA
Phone {780} 468- 6387- Fax {7BOl462·9387
CALIBRATION CERTIFICATE
CUSTOMER: Aecon Industrial Western
MODEL: nVlslon
CHASSIS SERIAL NUMBER: 363480
IOK MODULE SERIAL NUMBER: 350693
DATE: June 10,2015
TEMPERATURE: 20C
ASSET NUMBER: AMS.3052
RTD MODULE SERIAL NUMBER: 257407
TECHNICIAN: Cecil Vogrinetz
INSTRUMENT
READING
ALLOWABLE
TOLERANCE
5.0000
4.990
0.027
100.0000
too.oo o
0.035
200.0000
200.00 n
0.050
400.0000
399.97 n
0.080
INSTRUMENT
READING
ALLOWABLE
TOLERANCE
0 PSI
0 PSI
2.0
2499.292 PSI
2498 PSI
2.5
4998.515 PSI
4997 PSI
5.0
7499.594 PSI
7498 PSI
7.5
9998.516 PSI
9997 PSI
10.0
MASTER INSTRUMENT
READING
MASTER DEADWEIGHT
READING
REMARK: DO NOT EXCEED 10000 PSI.
THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S
SPEC! FICATIONS FOR NON IMPROVED ACCURACY.
THE ABOVE EQUIPMENT HAS BEEN COMPARED TO A DH-BUDENBERG
CPB5800/CPS5800/CPM5800 DEADWEIGHT TESTER SIN J250J/257NIB2704 TRACEABLE TO
UKAS ON CERIF/CATE J2814115TJ2503115WB2704.
THE ABOVE EQUIPMENT HAS BEEN COMPARED TO AN AMETEK AMC910 SIN 2594163
TRACEABLE IN ACCORDANCE WITH DS/ENIISOIJEC 17025, TRACEABLE TO REGOGNJZED
NATIONAL OR JNTERNATION STANDARDS.
'
WITNESSED BY:
-""""~~
~...:;..._---SIGNATURE: -~~
: : : ~~!!!••11!:~
~----
Enbridge Pipelines Inc.
Edmonton to Hardisty Pipeline Project
Leave to Open Application No. 3
Attachment No. 5 - Piping Test Package 2
Filed on June 14, 2016
Page 10 of 10
IIIDITI fmiUBIMEIIT SI.BVICES ltl
5327 • 91 STREET - EDMONTON. ALBERTA. T6E 6E2- CANADA
Phone {780} 468-6387 .. Fax (780} 462-9387
THERMOMETER CALIBRATION C&RTIFICATE
AMBIENT TEMP: lOC
ACCURACY: :t:1.5°C
SERIAL NUMBER: PI4458
TECHNICIAN: Cedi Vogrinetz
CUSTOMER: Aecon Industrial Western
MODEL: Durac
RANGE: -35 TO 50°C
DATE: June 10, lOIS
MASTER THERMOMETER
READING
CUSTOMER
AS FOUND
THERMOMETER
AS LEFT
SO"C
REMARKS: THE ABOVE EQUIPMENT HAS BEEN COMPARED TO CRYSTAL NV/SION SIN
J6I916/360JJJ/360JJ2 TRACEABLE TO THE NATIONAL INSTITUTE OF STANDARDS AND
TECHNOLOGY (NIST).
THE ABOVE INSTRUMENT WAS FOUND TO BE ACCURATE WITHIN THE MANUFACTURER'S
SPECIFICATIONS FOR NON IMPROVED ACCURACY.