PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE HERE’S WHERE YOU ARE overview purchase orders Last updated: 1/4/2016 product samples quality assurance product information brand packaging & labeling • What We Do in Quality Assurance • QA Processes -36- shipping compliance PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE TABLE OF CONTENTS Quality Assurance (QA) Table of Contents Purpose and Objectives What We Do in Quality Assurance QA Process: Initial Product Evaluation QA Process: The QA Submission Components QA Process: Package Integrity QA Process: On-Site Inspections QA Process: Fulfillment Quality Assurance (FQA) Last updated: 1/4/2016 -37- 36 37 38 39 41 43 48 55 57 PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE PURPOSE & OBJECTIVES Our Purpose As HSN works to maintain a curated assortment of delightful, inspiring products, we also strive to maintain a reputation of trust and reliability with our customer. Quality Assurance (QA) is paramount to that reputation. We want to ensure our customer gets the highest quality and safest products available. To achieve this, QA employs a focused process designed to detect potential quality problems early, resolve issues quickly and keep the Supply Chain moving smoothly. HSN believes that this is the key to building a lasting relationship with every customer…and every Partner. How This Section is Set Up This section is designed to guide you through the full process of Quality Assurance and offer some tips on how to help us keep the system running effectively and efficiently as we bring quality products to the customer. There are six main sections, each detailing the people, processes and policies that are key to HSN’s QA Program: • What we do in Quality Assurance: an introduction to HSN’s proactive and continuous QA processes • QA Process: Initial Product Evaluations: a look at the first QA inspection your product will encounter • QA Process: The QA Submission Components: what we need from you to properly evaluate your product • QA Process: Package Integrity: how we assess and determine shipping container suitability • QA Process: On-Site Inspections: sometimes our QA program comes to you; here’s why and how • QA Process: Fulfillment QA: how we evaluate the finished product before it leaves our Fulfillment Center Key Contacts In Quality Assurance Matthew Demers | VP: Quality Assurance & Product Information | 727.872.7799 | [email protected] Randy Cigarran | QA Manager | 727.872.5098 | [email protected] Beauty | Health | Fitness | Infomercial | Personal Care | Culinary | Electronics | Housewares Kim Dixon | Sr. Manager of Fit | 727.872.7442 | [email protected] Apparel | Accessories Debbie Edmonds | QA Manager | 727.872.5099 | [email protected] Home Design | Online Only Rita Fontan | QA Manager | 727.872.5625 | [email protected] Apparel | Accessories Jan Radcliffe | QA Manager | 727.872.7278 | [email protected] Fine Jewelry | Fashion Jewelry | Watches Frank Ruotolo | Senior Manager: QA Operations | 727.872.7393 | [email protected] Packaging | Sample Receipt | Field Inspections Andrea Cajuste | OVP Purchasing & Logistics (IDL) | 631-274-6062 | [email protected] IDL Last updated: 1/4/2016 -38- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE WHAT WE DO IN QUALITY ASSURANCE HSN’s Approach to QA QA’s primary mission is to help ensure that each and every product meets HSN quality standards. Doing this effectively demands a system that not only prevents potential issues, but also continuously works to ensure the customer has an experience that is consistently enhanced through product quality. This is accomplished through two main processes: A proactive process that anticipates, identifies and resolves issues before products reach the customer A continuous improvement process that monitors customer feedback, identifies potential quality concerns and adapts to customer needs The Proactive Process HSN’s proactive approach to QA begins with the QA Submission Components. This submission consists of the product sample, specification sheet (spec sheet) and substantiation documents for any claims you make about your product. Your product will go through several critical quality checks before it reaches the customer. Here’s a basic overview of the people and processes involved in the proactive side of HSN’s QA Program: 1. Partner – puts together the QA Submission Components and forwards to Buyer 2. Buyer – reviews submission and forwards to Corporate Quality Assurance (CQA) Evaluator 3. CQA Evaluator – carefully inspects the complete QA Submission Components and assigns a disposition 4a. On-Site Inspector – compares finished product to the spec sheet and CQA report 4b. Fulfillment QA Inspector – compares finished product to the spec sheet and CQA report Step 4a: On-Site Inspector Step 1: Partner Partner develops and sends QA Submission Components to HSN Buyer for approval and sends samples directly to QA (except for Jewelry and Soft Home). Step 2: Buyer Buyer reviews and approves QA Submission Components and forwards spec sheet to CQA Evaluator. Step 3: CQA Evaluator CQA Evaluator inspects product and related information. If approved, the finished product inspection will occur either on-site or by the FQA Inspector. Initial Product Evaluation Last updated: 1/4/2016 Inspects the production goods in the Partner’s Warehouse before being shipped to HSN or being made available to the customer. Step 4b: FQA Inspector Inspects the production goods in the HSN Fulfillment Center before they are made available to the customer. Finished Product Inspection -39- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE WHAT WE DO IN QUALITY ASSURANCE (CONT’D) The Continuous Improvement Process Though we strive to understand all potential issues and aspects of a product before it leaves the HSN Fulfillment Center or Partner’s warehouse, the most thorough testing a product can undergo is through our customer’s daily use. After all, she will spend more time with an item than we could ever invest. This makes a continuous improvement initiative especially important. We can gain an incredible amount of information about the quality of a product by monitoring: 1. Voice of the Customer (VOC) Feedback – what do customers say about the product when they call the HSN Sales and Service Center? 2. Returns Data – how many items were sent back to HSN by the customer? 3. HSN.com Ratings – what is our customer saying about the product online? As this information is being monitored, the quality performance of every item is held against specific standards or “Quality Complaint Thresholds.” If an item surpasses the designated number of complaints established for each metric, the item will be placed on a “Management Freeze” and will require one of the following dispositions: 1. Return to Vendor (commonly called an “RTV”): products are processed back to the Partner for a refund. 2. Re-work: an adjustment is made to the product either in-house or through a third party re-work center. 3. Destroy/Scrap: products are disposed of because they no longer meet HSN quality standards. This method usually pertains to perishable products or expiry products that have a limited shelf life. 4. Liquidate: products will be sold to a third-party liquidator. The remainder of this section will focus on how potential issues can be prevented through the proactive process of HSN’s Quality Assurance system. However, more detailed explanations of Quality Complaint Thresholds and Management Freezes can be found under the Compliance section of this manual. Last updated: 1/4/2016 -40- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: INITIAL PRODUCT EVALUATION The Initial Product Evaluation The proactive QA process begins with the Initial Product Evaluation. This is performed by the CQA Evaluator. This person is responsible for the Initial Product Evaluation and, at the basic level, will confirm that you've met HSN’s specification and quality requirements. During this process, the CQA Evaluator will evaluate your product for the following: 1. Functionality, workmanship and safety: • Does the product function as claimed? • Is the product constructed well? • Is it safe? • Will the product meet/exceed customer expectations? 2. Sample matches exactly with the product spec sheet, its labeling and all submitted documents • Does the sample hold up to all of the information in the QA Submission? 3. Validation of information: • Is there substantiation for any claims made about the product? 4. Packaging and brand labeling standards: • Will the product undergo normal shipping conditions without sustaining damage? • Does it meet branding guidelines as specified in the Brand Packaging section of this manual? 5. Regulatory and labeling compliance: • Does the product and all its labeling comply with state and federal guidelines (FTC, FDA, CPSC, Prop 65 and EPA)? Throughout the initial product evaluation, the CQA Evaluator takes careful note of every aspect of the evaluation and records their findings in a standard evaluation report. At the end of the evaluation, a disposition will be assigned. Last updated: 1/4/2016 -41- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: INITIAL PRODUCT EVALUATION (CONT’D) Dispositions or Results and Next Steps After the Initial Product Evaluation has been completed, the CQA Evaluator will always forward a standard evaluation report and the disposition status to the email address listed in the HSN Partner Portal. The disposition will include the verdict resulting from your product’s evaluation, as well as any requirements or recommendations that need to be accomplished to move to the next step in the Supply Chain. There are four possible dispositions that an Initial Product Evaluation can receive: 1. Pending: product remains in “pending” status until it is approved to ship to HSN and: • You have made the improvements required • Those improvements have been reviewed and approved by QA 2. Approved Pending On-Site Inspection: product approval is pending a passing of an On-Site Inspection. If OnSite indicates approved, and CQA Evaluator reviews and approves, product can ship. 3. Approved: product is approved to ship to HSN. 4. Rejected: product does not meet HSN quality standards and will not be made available to the customer. Do not ship product to HSN. If shipped: • We will returned the entire receipt to you at your expense • We may also charge back any cost incurred for freight and/or labor We’re Here to Help While you’re ultimately responsible for the quality of your products, the Initial Product Evaluation supports you in your efforts to produce quality merchandise. This process also protects you because it helps you avoid rejection of a shipment during the Finished Product Inspection. If your product doesn’t meet the criteria required in the Initial Product Evaluation, the CQA Evaluator will: 1. Provide a report on the deficiencies 2. Discuss opportunities for you to correct the issues 3. Provide guidance on resubmitting the product, if required Please Remember… Re-orders of items that have already undergone the Initial Product Evaluation usually don’t require another QA Sample submission. However, a re-ordered item may require another evaluation or On-Site Inspection if deemed necessary by the CQA Evaluator. This is especially important if the product or packaging has been changed in any way from the original product approved by QA. Last updated: 1/4/2016 -42- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: THE QA SUBMISSION COMPONENTS Your QA Submission Components Ensuring a successful Initial Product Evaluation is impossible without a complete and accurate QA Submission Components. It’s one of the most important components of the entire HSN Quality Assurance process and weighs heavily on whether or not your product will be made available to the customer. In most cases, your QA Submission Components will consist of the following items: 1. QA Sample – a physical representation of final production of your product as it will be delivered to HSN and/or the customer 2. Complete spec sheets – all of the product information required within HSN’s Partner Portal 3. Supporting documents – substantiation for any claims made about your product 4. Packaging – product packaged and labeled as it will be delivered to HSN and/or the customer • Labeling: label the packaged product with the product identification (HSN item # or description) and mark as “QA Sample: Do Not Open.” • Overpacking: when items packaged in self-shippers are sent to us, the partner should overpack the item so we have pristine packaging to subject to our package testing. If you do overpack the packaged product, clearly mark the outer carton “Overpack for Shipping Only: Do Not Test.” • Polybags: when polybags are used as external protective packaging for product within a master carton, the bags must be closed/sealed. QA Samples QA Samples are a central part of the Initial Product Evaluation process. To properly inspect a product, HSN’s CQA Evaluators must have product samples that accurately represent the actual production run, as well as any future production runs of the product. This must include the same: • • • Materials Design Construction • • • Appearance Measurements Features • • Packaging Labeling Types of QA Samples Although, specific types of initial QA Product Samples can differ by product category, listed below is a general guideline of sample types. For a more detailed listing of QA Sample types, please refer to your QA Product Standards Manual: 1. Pre-production sample • May be a prototype of the product before it goes to production. • May or may not be an exact representation of the final product. • Pre-production samples are meant only as a preliminary representation of the actual QA Sample. A production sample will still be required to complete the QA process. 2. Production sample • Must be exactly the same as the product that’s shipped to HSN and its customers. • Any improvements made to the originally submitted QA sample must be inspected and approved by QA. • Must match the completed spec sheet and all other materials and information that will accompany the item, such as packaging, claims, literature and warranty. Last updated: 1/4/2016 -43- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: THE QA SUBMISSION COMPONENTS (CONT’D) How Many QA Samples Need to be Sent? You must submit, at your expense, at least one Initial QA Sample for each HSN item number. However, in some circumstances, more than one QA Sample may be requested for each color range, fit evaluations and other types of variants. There are often occasions when we must conduct destructive testing to properly evaluate your product. HSN reserves the right to dispose of damaged/destroyed samples at its sole discretion. QA Samples will not be returned. When Do QA Samples Need to be Sent? The timing of the Initial Product Evaluation depends on the production lead time and ship date detailed in the Purchase Order (PO). A detailed list of lead times according to the product category can be found in Appendix B in this manual. Where Do QA Samples Need to be Sent? In an effort to provide quick turnaround times for product evaluations, we ask that your QA Samples be sent to the following locations (unless directed to do otherwise): Please send all Jewelry QA Samples directly to your Buyer at: Please send QA Samples for all other categories to your CQA Evaluator at: HSN 1 HSN Drive St. Petersburg, FL 33729 Attn: (Buyer’s Name) HSN 2400 118th Avenue North St. Petersburg, FL 33716 Attn: (CQA Evaluator’s Name) Please Remember… For more detailed information on all required samples please reference the Product Samples section of this manual. Last updated: 1/4/2016 -44- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: THE QA SUBMISSION COMPONENTS (CONT’D) Spec Sheets The direct result of all of the information you enter into the HSN’s Partner Portal is the product spec sheet. It’s best to think of this as the definitive source of information for your product. HSN’s Partner Portal and the spec sheets it produces are designed to include nearly all details about an item, from the physical dimensions to clear description of all of the components. Without an accurate and complete spec sheet, evaluating the quality of your product will be compromised and/or delayed. Along with other key product details, CQA Evaluators use the spec sheet to confirm: • Type and quantity of components • Partner contact information • Weight • Nutritional data (if applicable) • Physical dimensions • Material composition/Ingredients • Features and benefits • Country of origin • Warranty information • Shipping information Here are some helpful tips to keep in mind as you complete your product spec sheets: • Be complete: Fill out each and every field…it’s the only way to paint a complete picture of your product and tell the entire story. • Be accurate: All of the information included in the product spec sheet must match up flawlessly with your QA Sample. This gives our CQA Evaluators all the information they need to authenticate the QA Sample as an accurate representation of the exact product the customer will receive. • Don’t be afraid to ask for directions: HSN CQA Evaluators can answer any question you may have about the Partner Portal or your product spec sheets. Please Remember… The importance of your product spec sheets goes well beyond QA. Accurate and complete information in the product spec sheets is used by Product Information to create HSN.com product descriptions, Host Cards for HSNtv and technical notes for Sales and Service Representatives. It is essential to the success of your product that spec sheets be properly entered and that all information about your product be included. Last updated: 1/4/2016 -45- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: THE QA SUBMISSION COMPONENTS (CONT’D) Supporting Documents The trust and confidence of our customers is critical to the success of HSN and its Partners. In addition, because HSN's programming is considered commercial speech (advertising) we are regulated by consumer protection agencies such as, the Federal Trade Commission (FTC), Food and Drug Administration (FDA), Consumer Product Safety Commission (CPSC) and Environmental Protection Agency (EPA). This makes it especially imperative that your QA Submission Components includes all relevant documentation that supports all of the information you enter in HSN’s Partner Portal or print on your product packaging. Such supporting documents include, but are not limited to: • Third-party certifications • Government certifications • Product testing done by third-party organizations (such as cosmetics, electrical or safety testing) More detailed and category-specific requirements on substantiation of claims can be found in the category-specific QA Product Standards Manual located on HSN’s Partner Portal. Last updated: 1/4/2016 -46- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: THE QA SUBMISSION COMPONENTS (CONT’D) Product Labeling and Packaging Your product’s packaging plays a big part in the customer’s experience. Not only does it help ensure that the product arrives in pristine condition, but the information on your primary packaging also communicates valuable information to the customer. For this reason, your product’s labeling and packaging is an essential part of the QA process. While product labeling and packaging requirements vary according to product category, our CQA Evaluators use the package submission to assess the following: 1. Functionality • Shipping integrity - will the item arrive safely to the customer? • Described in more detail in “QA Process: Package Integrity” 2. Visual Elements • Is it a presentation that will surprise and delight our customer, and does it follow the guidelines addressed in the Brand Packaging section of this manual? • Does all the information on the product label match exactly what is on the product spec sheet? 3. Compliance • Is the product and product packaging labeled with all applicable warnings, disclaimers and other required regulatory information? Last updated: 1/4/2016 -47- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY Package Integrity Testing One of the most important evaluations required in the QA process is the package integrity testing. Designed to identify any potential shortcomings in the strength or effectiveness of your packaging, this testing ensures that the product still exceeds the customer’s expectations - even after going through multiple channels of shipping. These tests will be conducted by an HSN Packaging Evaluator. You are greatly encouraged to conduct or contract testing on your packaging before submitting your product to HSN. This will allow you to discover and correct any packaging deficiencies prior to submitting the sample for packaging evaluation, which will help ensure that there are no delays in the HSN QA process. Please ensure that, when choosing your shipping cartons, you are following the Carton Requirements as outlined later in this section of the manual. Package Integrity Test Methods HSN uses the following industry-standard test protocols to validate packaging Covered Hazards Test Method Application • Shock • Vibration • • • Compression • ASTM D4169-DC 2, (Assurance Level 1) • Shock • or • Vibration NMFA Rule 180 • Compression ISTA 3A Test Procedure Parcel Distribution (UPS, USPS, FedEx) Historical damage concerns (VOC feedback, stoppages) High Risk Products (i.e. appliances, multi-piece kits; 4piece or larger in the ceramic/decorative tabletop categories) Less Than Load (LTL) Distribution Upon completion of the packaging review , HSN QA will provide feedback as part of the QA Evaluation Report: • Packaging is Approved – An Approved Pack Recipe will be provided • Failed Package Testing – Corrective action suggestions will be provided Package Testing Laboratories If you don’t already have a package integrity testing lab, HSN recommends that you consult with an International Safe Transit Association (ISTA) certified laboratory to assist you in the development and testing of your product to adequately withstand the appropriate distribution environment. ISTA Certified Laboratory Search: http://www.ista.org/members/labs.php HSN Recommends the use of the following testing laboratory within the United States UPS Customer Solutions - Package Design & Test Lab 108 South Lombard Road Addison, IL 60101 Phone: 877-877-7229 Website: http://www.ups-psi.com Packaging that has been subjected to third-party package testing and certified by a qualified test laboratory will NOT replace package testing by HSN QA during the evaluation and inspection process. Last updated: 1/4/2016 -48- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Packaging Development (Drop Test Procedure) While not a substitute for the ISTA 3A packaging test that HSN will perform, the following drop test procedure can be used to help guide your packaging development. 1. Determine the drop height by comparing the weight of the packaged product to the following table: Packaged Product Weight Drop Height Equal To or Greater Than But Less Than Free Fall Pounds Pounds Inches Mm 0 21 38 970 21 41 32 810 41 50 26 660 2. Drop the packaged product onto a hard surface (from the height determined in step 1) using the following sequence: Sequence # Orientation Specific Face, Edge or Corner 1 Corner 2 Edge Shortest edge radiating from the corner tested 3 Edge Next longest edge radiating from the corner tested 4 Edge Longest edge radiating from the corner tested 5 Face One of the smallest faces 6 Face Opposite small face 7 Face One of the medium faces 8 Face Opposite medium face 9 Face One of the largest faces 10 Face Opposite large face Bottom/front/right corner 3. Examine the product for damage and make corrective actions as necessary Last updated: 1/4/2016 -49- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Shipping Hazards Your product will have to be protected from shock, vibration, and compression throughout the distribution cycle. Shock damage occurs with manual handling and during transportation. Vibration damage generally occurs during transportation. Compression damage occurs when other units or items are stacked on top of the packaged product either in the warehouse or during transportation. Protecting Your Product from Shock Your packaged product will be exposed to shock events throughout its distribution cycle. Every product has a critical shock that if exceeded, the product will be damaged. Since you cannot control the shipping environment (the shock that the packaged product will see), the key to protective packaging is to decrease the shock that is transmitted to the product through the packaging. Protective packaging for shock is referred to as cushioning. The most common types of cushioning are foam (EPS, EPE, EPP, etc) and air products (air pillows, bubble-wrap, etc). Bubble-wrap can be effective for small, light items. Foam cushions are generally the best choice for most type of products. All sides of the package should be protected from shock. Protecting Your Product from Vibration Vibration is encountered during the transportation phase of a product’s distribution cycle. Vibration damage is usually in the form of abrasion and scratching to cosmetic surfaces, but components can break if a resonant frequency is excited (more typical with electrical components). The abrasion can occur with any objects that are in contact with another (product to packaging, product to product, etc). A non-abrasive barrier layer is usually used to protect cosmetic surfaces of a product. PE foam sheeting, abrasion film, and polybags are used as this barrier. Any cosmetic surface that can come into contact with anything else should be protected. Protecting Your Product from Compression Compression forces affect the packaged product when the product is unitized for storage or shipping. Compression damage can affect the cartons ability to stack correctly and ultimately lead to product damage. Environmental factors, such as humidity, have an adverse effect on a carton’s compression strength. In fact, a carton can lose 40% of its compression strength in only ten days in a high humidity environment (container ship). It is very important that the correct carton construction and board strength are used in order to lessen the occurrence of compression damage. Last updated: 1/4/2016 -50- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Carton Requirements: Choose The Right Carton Whether it’s a re-shipper or a master carton, choosing the appropriate corrugated container is the first step in ensuring your product ships and arrives in perfect condition and that the packaging passes the Package Integrity Testing as outlined earlier in this manual. HSN has established the following requirements to help ensure that the size and construction of your cartons is appropriate for the product your shipping: A. All cartons must be constructed of A-, B-, or C-flute corrugate. E- and F-flute corrugate is not permitted for reshipper or master cartons. B. The corrugation of the carton should run vertically (up and down) when the carton is in its intended shipping/stacking orientation. Additionally, no flaps should be on a side face of the carton while in this orientation. C. Re-shipper cartons should measure no less than 8"L x 5"W x 4.5"W; however, if the width is greater than 6"W, the minimum height is reduced to 3"H. D. Master cartons for all products except Jewelry should measure: E. F. • no less than 12"L x 12"W x 12"H +/- 2" • no more than 23"L x 16"W x 14"H +/- 2" Master cartons for Jewelry should measure: • no less than 8"L x 5"W x 5"H • no more than 24"L x 15"W x 13"H All cartons should be of the appropriate size and shape to the items being shipped. Do not over-pack or underpack cartons. Last updated: 1/4/2016 -51- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Carton Requirements: Carton Strength Along with meeting the appropriate construction and dimension standards, HSN also requires that your cartons meet or exceed specific burst strength and crush strength standards. To determine the appropriate strengths required for your cartons, please use the following steps: 1. Weigh the items to be shipped and compare the weight to column A in the table below. 2. Measure the length, width and height of the re-shipper or master carton. Add these dimensions together and compare the sum to column B. 3. Select the appropriate row in the chart where the criteria in both columns A and B are met (the weight and size calculation are less than the numbers listed in Columns A and B). 4. Column C identifies the most appropriate Mullen Burst Strength corrugate carton for your product. Column D identifies the most appropriate Edge Crush Test (ECT) strength corrugate carton for your product. A B C D Weight Limit of Box & Contents (lbs.) Box Size Limit L + W + H (in.) Mullen Burst Strength (psi.) Edge Crush Test (lbs./in. width) Single-wall Corrugate Cartons 20 40 200 32 30 55 250 44 Double-wall Corrugate Cartons 30 45 200 42 40 60 250 48 60 75 275 51 100 95 350 61 160 115 450 71 >160 135 500 82 These carton strengths are minimum requirements only. Depending on the distribution cycle (example: products that originate overseas), the necessary carton strength may be higher than what is shown in the chart. To further ensure your packaging meets HSN Package Integrity Standards, you are encouraged to follow the Package Integrity Testing as outlined earlier in this section of the manual. Note: It is the vendor’s responsibility to ensure that their chosen box maker is using the appropriate box strength. The vendor will be responsible for all stoppage and/or rework fees when damage occurs at the HSN Fulfillment Center due to insufficient box strength. Last updated: 1/4/2016 -52- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Carton Requirements: Carton Strength (CONT’D) The following is an example of how to choose the appropriate board strength for your product. In this example, the packaged product (or master pack) is 20” x 20” x 24” and weighs 37 lbs. Weigh the items to be shipped and compare the weight to column A in the table below. Example: 37 lbs. This weight exceeds the allowable limit of the first three rows. A B C D Weight Limit of Box & Contents (lbs.) Box Size Limit L + W + H (in.) Mullen Burst Strength (psi.) Edge Crush Test (lbs./in. width) Single-wall Corrugate Cartons 20 40 200 32 30 55 250 44 Double-wall Corrugate Cartons 30 45 200 42 40 60 250 48 60 75 275 51 100 95 350 61 160 115 450 71 >160 135 500 82 Measure the length, width and height of the re-shipper or master carton. Add these dimensions together and compare the sum to column B. Example: 20 + 20 + 24 = 64; the size exceeds the allowable limit of the first four rows. A B C D Weight Limit of Box & Contents (lbs.) Box Size Limit L + W + H (in.) Mullen Burst Strength (psi.) Edge Crush Test (lbs./in. width) Single-wall Corrugate Cartons 20 40 200 32 30 55 250 44 Double-wall Corrugate Cartons 30 45 200 42 40 60 250 48 60 75 275 51 100 95 350 61 160 115 450 71 >160 135 500 82 Select the appropriate row in the chart where the criteria in both columns A and B are met. You should use at least 275 psi burst strength or 51 ECT double-wall corrugate for your carton. Last updated: 1/4/2016 -53- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: PACKAGE INTEGRITY (CONT’D) Carton Requirements: Box Manufacturer’s Certificate (BMC) HSN also requires that every corrugate shipping carton has a Box Manufacturer’s Certificate (BMC) printed on the surface. The BMC is a guarantee of the board strength used in the construction of the carton stated as either a Burst Strength or Edge Crush Test number. Please contact your corrugate supplier to make certain that every carton has the stamp. The following are examples of correct BMC labeling: Note: It is the Partner’s responsibility to ensure that their chosen box maker is using the appropriate box strength. The Partner will be responsible for all stoppage and/or rework fees when damage occurs at the HSN Fulfillment Center due to insufficient box strength. Packaging Guidelines for Various Product Categories Additional guidance for packaging specific product categories can be found within that product’s quality assurance manual: Apparel: https://view.hsn.net/WebDocuments/documents/10_Apparel_QAManual.pdf Cosmetics: https://view.hsn.net/WebDocuments/documents/13_Cosmetics_QAManual.pdf Fashion Accessories: https://view.hsn.net/WebDocuments/documents/07_Accessories_QA%20Manual.pdf Food: https://view.hsn.net/WebDocuments/documents/17_Food_QAManual.pdf Footwear: https://view.hsn.net/WebDocuments/documents/20_Footwear_QAManual.pdf Handbags & Luggage: https://view.hsn.net/WebDocuments/documents/23_Handbags_QA%20Manual.pdf Hardlines: https://view.hsn.net/WebDocuments/documents/26_Hardlines_QAManual.pdf Jewelry: https://view.hsn.net/WebDocuments/documents/29_Jewelry_QAManual.pdf Textiles: https://view.hsn.net/WebDocuments/documents/36_Textiles_QAManual.pdf Last updated: 1/4/2016 -54- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: ON-SITE INSPECTIONS On-Site Inspections Our QA On-Site Inspection Program has had a tremendous impact on improving the quality of the products we sell. Designed to facilitate early detection of quality issues upstream in the factories, the program has enabled the proactive management of product failures before the order is shipped to HSN, or worse, our customers. On-Site inspections are fairly common and are conducted by a third-party inspector or qualified HSN Inspector. On-Sites are initiated by one or more of the following criteria: 1. Products scheduled to be an HSN “Today’s Special” (TS - the primary featured item of the day) 2. Key Items as defined by merchandising; this typically entails item orders valued over $75,000 3. Products purchased as direct Import PO, including Letter of Credit (LOC) and Wire Transfer payment terms 4. Products from Partners who have been identified by QA as requiring close quality management (Quality Focus) 5. Products from new Partners preparing for their first shipment to HSN 6. Key brand or product launches On-Site Inspections are typically conducted as a Finished Product Inspection and act as a follow-up to the Quality Assurance (CQA) Evaluator’s Initial Product Evaluation. As part of the Finished Product Inspection an On-Site’s purpose is to: • Assess the product’s conformance to Initial Product Evaluation • Evaluate the presentation and functionality of the product labeling and packaging • Identify any potential issues before the product ships to the customer • Verify that the packaging and labeling meet HSN standards as outlined in the Brand Packaging and Labeling sections of this manual. On-Site inspectors may also perform in-process inspections on TS items and products where a productions issue may be of concern. This is usually performed at 10 to 20% of production, depending upon the type of product. Your CQA Evaluator will advise when this is required. Arranging The On-Site If you meet one or more of the above criteria, you will be informed of the need for inspection through the QA evaluation process and/or through email request to submit the inspection request (booking) form. After electronic submission of the booking form, the facility contact indicated on the form will be contacted by HSN and/or its third-party inspection service provider to confirm the inspection date. Please note that inspections are conducted in business locations (factories, packing houses, business offices, etc) ONLY. Inspections cannot take place at a residential location (home, apartment, condo, storage unit, etc.) We will work with you to schedule the most opportune inspection date. However, to ensure the completion of the OnSite Inspection in time to meet the purchase order ship date, HSN requires that: 1. The inspection must be scheduled no less than seven business days before the On-Site inspection date. 2. The final inspection date should be no less than three business days before the PO ship date. 3. The inspection service provider will contact you directly to confirm the inspection. 4. If you have any changes or must cancel for any reason, you must submit an update to the booking form (with the new requested inspection date) at least two business day in advance of the original confirmed inspection time. Please note that Monday inspections must be cancelled by Thursday morning. Last updated: 1/4/2016 -55- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: ON-SITE INSPECTIONS (CONT’D) Preparing for Your On-Site The following steps will help you ensure that you are prepared for the On-Site and that the process goes smoothly and efficiently and yields a positive outcome for everyone: 1. Complete and submit the booking form set up on the Partner Portal or create a new form if one is not available a. Please see the Onsite Inspection Learning Materials provided on the Partner Portal for information on completing the booking form and preparing for the inspection. 2. Ensure that your production mirrors the QA Samples approved by the HSN QA during the Initial Product Evaluation. 3. Verify that your products are completed with minimum percent packed. 1. Jewelry:100% produced and 5% packed and labeled 2. All Other Products: 100% Produced and ≥80% packed and labeled 4. Ensure there is a well-lit area (with chair and table, if possible) for the inspector to conduct the inspection. On-Site Inspection Results and Dispositions Upon immediate completion of the inspection, a draft report is sent to HSN for review. Within one full business day following the inspection, the full report with photos will be reviewed by your HSN QA Evaluator. They will then contact you to discuss one of the following dispositions: • Accepted – product can move on to the next step in the Supply Chain • Rejected - Partner cannot ship the product until the issue has been resolved and product re-inspected • On Hold - Partner cannot ship until certain requirements specified by the QA Evaluator are accomplished, reviewed and approved. In some cases, re-inspection may be required. • Missed Inspection – Partner was not ready for inspection; product cannot be shipped and the Partner is required to have the product re-inspected when the product is completed and ready. If the disposition is anything other than an “Accepted,” another On-Site inspection may be scheduled, at the Partner’s expense, and the goods will be re-inspected to confirm that any issues have been resolved. The Partner is responsible for submitting a re-inspection request to HSN via the HSN Partner Portal. On-Site Fee Structure HSN employs a shared cost fee structure in its management of its onsite inspection program. Under this structure, POs that require an on-site inspection will be charged an amount based upon the total purchase order value being inspected for that day. HSN defines an inspection as one inspector per location per day. The detailed on-site fee structure can be found within the Compliance section of the HSN Supply Chain Requirements Manual Last updated: 1/4/2016 -56- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: FULFILLMENT QUALITY ASSURANCE (FQA) Fulfillment Quality Assurance (FQA) Just like the On-Site inspection, the FQA inspection is part of the Finished Product Inspection process and acts as a follow-up to the CQA Evaluator’s Initial Product Inspection. This means that our FQA Inspectors, like the On-Site Inspector, must: • Assess the product’s conformance to Initial Product Evaluation • Evaluate the presentation and functionality of the product labeling and packaging • Identify any potential issues before the item ships to the customer FQA Inspectors conduct their inspections solely from their respective Fulfillment Centers, pulling random product samples from the same stock of items from which the customer receives her items. This affords HSN a prime opportunity to view the finished product, packaging and all, in the same state as the customer receives it. FQA Results If the FQA Inspector approves your product, the merchandise is released into inventory and made available for sale. If the product is rejected, the merchandise is placed on “Stoppage” through the Stoppage Tracking System (STS) and is not released into inventory. When the product is placed on Stoppage, the system alerts the Buyer and the CQA Evaluator to investigate the issue(s) and to determine one of the following dispositions: • Process: issues do not warrant any changes to the product; product can be made available to the customer • Process with Note Change: description needs to be updated by Product Information Writer; product will be made available to customer once update has been made • Re-work (Internal or External): an adjustment is made to the product either in-house or through a third-party re-work center, then will be made available to the customer • Return to Vendor (commonly called an “RTV”): products are processed back to the Partner for a refund • Liquidate: products will be sold to a third-party liquidator Please note that the Partner is responsible for all costs associated with Re-work, Return to Partner, and Liquidation dispositions. There will also be a Stoppage fee charged for all goods that are “stopped” within the HSN Fulfillment Center. Please refer to the Compliance section in this manual for an up-to-date fee schedule. Last updated: 1/4/2016 -57- PARTNER SUPPLY CHAIN REQUIREMENTS MANUAL: QUALITY ASSURANCE QA PROCESS: FQA (CONT’D) Avoid Stoppages Here are some tips on how to ensure a Stoppage does not occur with your product: • Once the CQA Evaluator has approved your product in the Initial Product Evaluation, make certain the products that go to the Fulfillment Center exactly mirror the approved QA Sample and product spec sheet. • If any changes to the product or packaging are necessary after the CQA Evaluator has approved your product in the Initial Product Evaluation, notify your CQA Evaluator at once to have the proposed changes reviewed and approved before making the changes. Listed below are the most common causes of Quality Stoppages: Apparel and Accessories Home Hardlines • • • • • • • • • • • Stains/dirt on item Incorrect/illegible labels Excessive glue Missing or loose embellishments Poor workmanship/loose threads/open seams Measurements out of tolerance Item received doesn’t match the description Wrong item was sent to the Fulfillment Center Product labeled wrong Leaking container Cracks, chips and/or breakage Health and Beauty Jewelry • • • • • • • • • • • Wrong item was sent to the Fulfillment Center Items missing from a configuration Expiry labeling Leaking container Tamper seal missing Poor workmanship Stone color out of range approved by QA Box or packaging incorrect/damaged Wrong gram weight Finger size/product length incorrect Tarnish Home Design/Improvement Packaging • • • • • • • • • • Item received doesn’t match the description Wrong item was sent to the Fulfillment Center Poor workmanship Cracks, chips and/or breakage Incorrect/illegible labels Polybag is not sealed Polybag missing child suffocation warning Item does not match approved pack recipe Packaging has changed since the last shipment Inadequate packing material Please Remember… If our QA Evaluators encounter any QA issues with your product, you will be contacted immediately. Therefore, it’s critical that you provide HSN with your accurate contact information, including your email address in the HSN’s Partner Portal. If your contact information changes, you’re responsible for updating your contact information in HSN’s Partner Portal. Last updated: 1/4/2016 -58-
© Copyright 2026 Paperzz