Task 125 - Silvertown Reference Design Scheme Proposals – Consultation Drawings Transport for London October 2014 Table of Contents Scheme Proposals – Consultation Drawings Document Number Document Title STWTN-ATK-GEN-XXXX-DR-Z-0001 Silvertown River Crossing - Scheme Layout STWTN-ATK-STU-TUXX-DR-D-0001 Silvertown River Crossing - Tunnel Plan & Profile STWTN-ATK-HGN-ANXX-DR-D-0009 Northern Tie-in Existing and Proposed Junction Arrangements STWTN-ATK-HGN-ASXX-DR-D-0011 Southern Tie-in Existing and Proposed Junction Arrangements STWTN-ATK-STU-TUXX-DR-C-0005 Silvertown River Crossing - Bored Tunnel Cross Section Through a Typical Cross Passage STWTN-ATK-STU-TUXX-DR-C-0011 Silvertown River Crossing - Cut-and Cover Tunnel Cross Section STWTN-ATK-GEN-XXXX-RP-Z-0018 Revision P01 1 Uncontrolled when printed LO DO ND CA CK ON NN LA UN IN ND DE G S TO LI RG W GH RO N T UN ST RA D AT IL IO WA N Y 100 SILVERTOWN TUNNEL - SCHEME LAYOUT Millimetres BLACKWALL TUNNEL NORTHBOUND BORE BLACKWALL TUNNEL SOUTHBOUND BORE A1020 LOWER LEA CROSSING 10 NORTH GREENWICH DO NOT SCALE 0 O2 ARENA MODIFIED TIDAL BASIN ROUNDABOUT LONDON UNDERGROUND JUBILEE LINE NORTH GREENWICH STATION A1011 SILVERTOWN WAY REALIGNED DOCK ROAD TUNNEL SERVICES AND VENTILATION BUILDINGS PROPOSED BLACKWALL SOUTHBOUND OVERBRIDGE SILVERTOWN LONDON UNDERGROUND JUBILEE LINE EDMUND HALLEY WAY OP AP EN C PR U OA T CH DOCKLANDS LIGHT RAILWAY VIADUCT TUNNEL SERVICES AND VENTILATION BUILDINGS SOUTH PORTAL GR ROT EENWIC ATIO N / R H TBM CHA E-LAUN MBE CH R Boro Co nst EMIRATES GREENWICH PENINSULAR STATION & Ward WE ST ter Mean High Wa ER ( C N EN LO TR SE A D ) NC E CABLE CAR NOR DOCKLANDS LIGHT RAILWAY BECKTON BRANCH Bdy N PO ORT RT H AL CUT-AND-COVER TUNNEL CUT O PE N ACH APPRO THBO UND R VE O C D- EL N N -A UN T U T PROPOSED BOORD STREET FOOTBRIDGE (REPLACING EXISTING) C A102 BLACKWALL TUNNEL APPROACH SOU THBO EMIRATES ROYAL DOCKS STATION A1020 SILVERTOWN WAY UND BOORD STREET MILLENNIUM WAY TUNNE L TBM LAUNCH RECEPTION CHAMBER HAM ES BORED ROYAL VICTORIA DOCK RIV E RT DOCKLANDS LIGHT RAILWAY WOOLWICH BRANCH VIADUCT 50m 0m 50m 100m 150m Scale 1:2500 c Crown copyright and database rights 2014 Ordance Survey 100035971 Plotted: Oct 10, 2014 - 8:56am by: BIRD7413 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). Construction Not Applicable Maintenance / Cleaning Not Applicable Drawing Status KEY WORK IN PROGRESS RETAINING WALL LANDSCAPING LONDON UNDERGROUND JUBILEE LINE DIAPHRAGM WALL TO UNDERSIDE OF CARRIAGEWAY EARTHWORK BRIDGE STRUCTURE DIAPHRAGM WALL WITH VERTICAL UPSTAND HARDENED VERGE NON MOTORISED USER ROUTE VEHICLE CROSSOVER P01 JC JC MK JC 10/07/14 JC JC MK 10/07/14 First Issue P03 DB MJC Client Rev Description Drawn / Des Drawing Title SILVERTOWN RIVER CROSSING SCHEME LAYOUT www.atkinsglobal.com Scale Designed / Drawn 1:2500 YD 08/10/14 Original Size A1 Issue for Public Consultation Decommissioning / Demolition Not Applicable SILVERTOWN TUNNEL REFERENCE DESIGN Tel: +44 (0)1372 726140 Fax: +44 (0)1372 740055 Copyright C Atkins Limited (2014) First Issue With Minor Amendments Project Title S0 Woodcote Grove Ashley Road Epsom Surrey KT18 5BW P02 Use Not Applicable Suitability Checked Approved Date Checked DB Date 08/10/14 Approved MJC Date 08/10/14 Authorised YD Date 08/10/14 Drawing Number STWTN-ATK-GEN-XXXX-DR-Z-0001 Date --Revision P03 100 SILVERTOWN - NORTHERN TIE-IN PROPOSED LAYOUT Millimetres EXISTING LAYOUT A10 20 LO WE 10 RL RO SS LO DO NOT SCALE 0 A1 0 20 EA C ING WE RL EA CR O SS ING DOCKLANDS LIGHT RAILWAY BECKTON BRANCH TIDA L BA SIN ROA DOCKLANDS LIGHT RAILWAY BECKTON BRANCH TIDA L BA SIN D ROA D CLO S E MODIFIED TIDAL BASIN ROUNDABOUT (SIGNALISED) SIL AB SIL Y N LA CK SCAR AD WA RO AB CK N OW DO DO N LA CK Y WA DO AD RO N OW CK DO RT O CL RT VE SE VE AR SC DS DS CH WI OL WO CH WI OL WO AD AY RO ILW CK RA AY ILW RA DO HT LIG HT LIG TUNNEL SERVICES AND VENTILATION BUILDINGS AN BR AN BR CH CH VER -CO -AND EL N TUN CUT REALIGNED ROAD 10m 0m 10m 30m 50m 70m 90m 10m Scale 1:1250 Plotted: Oct 08, 2014 - 4:17pm by: BIRD7413 10m 30m 50m 70m 90m Scale 1:1250 c Crown copyright and database rights 2014 Ordance Survey 100035971 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION 0m BORED TUNNEL c Crown copyright and database rights 2014 Ordance Survey 100035971 Drawing Status KEY WORK IN PROGRESS In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). RETAINING WALL Construction None Not Applicable EXTENT OF CONCRETE GROUND SLAB Maintenance / Cleaning None Not Applicable SECANT PILE RETAINING WALL SILVERTOWN TUNNEL REFERENCE DESIGN S0 Woodcote Grove Ashley Road Epsom Surrey KT18 5BW EARTHWORK HARDENED VERGE Copyright C Atkins Limited (2014) ROADS RESTRAINT SYSTEM Use None Not Applicable Project Title LANDSCAPING VEHICLE CROSSOVER Client Drawing Title SILVERTOWN NORTHERN TIE-IN EXISTING AND PROPOSED JUNCTION ARRANGEMENTS Tel: +44 (0)1372 726140 Fax: +44 (0)1372 740055 www.atkinsglobal.com Scale Designed / Drawn 1:1250 NON MOTORISED USER ROUTE 10m LIGHTING COLUMN Decommissioning / Demolition None Not Applicable Suitability ANTI-RECIRCULATION WALL P01 DB MJC YD 08/10/14 Rev Description Drawn / Des Original Size A1 Issue for Public Consultation Checked Approved Date Checked DB Date 08/10/14 Approved MJC Date 08/10/14 Authorised YD Date 08/10/14 Drawing Number STWTN-ATK-HGN-ANXX-DR-D-0009 Date --Revision P01 BO TU R E NN D EL 100 GREENWICH PENINSULA - SOUTHERN TIE-IN PROPOSED LAYOUT LL EY HA ED M UN D DO NOT SCALE ED CU T-A ND TU -COV NN EL ER AY W HA LL EY M UN D 10 IDE KS 0 R PA ST WE E SID RK PA ST WE W AY Millimetres EXISTING LAYOUT PROPOSED SILVERTOWN TUNNEL NORTH BOUND PROPOSED SILVERTOWN TUNNEL SOUTH BOUND TUNNEL SERVICES AND VENTILATION BUILDINGS MILL ENN IUM MILL ENN WAY IUM WAY EL NN TU MILLENNIUM WAY UE EN AV EL NN TU UE EN AV BUS ONLY ROAD BLACKWALL GATEHOUSE BLACKWALL GATEHOUSE GAS HOLDER GAS HOLDER RE E T BO OR DS TR EE T PROPOSED BLACKWALL SOUTHBOUND OVERBRIDGE ST A1 OR D 02 BO PROPOSED RE-CONNECTION OF TUNNEL AVENUE BL AC K W AL A1 02 BL LT UN PROPOSED BOORD STREET FOOT BRIDGE (REPLACING EXISTING) NE LA AC PP RO KW AL AC LT UN NE L H AP PR OA CH 10m 0m 10m 30m 50m 70m 90m 10m Scale 1:1250 Plotted: Oct 08, 2014 - 4:14pm by: BIRD7413 30m 50m 70m 90m c Crown copyright and database rights 2014 Ordance Survey 100035971 Drawing Status KEY Suitability WORK IN PROGRESS In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). RETAINING WALL Construction Not Applicable EXTENT OF CONCRETE GROUND SLAB Maintenance / Cleaning Not Applicable SECANT PILE RETAINING WALL LANDSCAPING NON MOTORISED USER ROUTE Project Title SILVERTOWN TUNNEL REFERENCE DESIGN S0 VEHICLE CROSSOVER Woodcote Grove Ashley Road Epsom Surrey KT18 5BW EARTHWORK HARDENED VERGE Tel: +44 (0)1372 726140 Fax: +44 (0)1372 740055 Copyright C Atkins Limited (2014) Use Not Applicable ROADS RESTRAINT SYSTEM Client Drawing Title GREENWICH PENINSULA SOUTHERN TIE-IN EXISTING AND PROPOSED JUNCTION ARRANGEMENTS www.atkinsglobal.com Scale Designed / Drawn 1:1250 BUS LANE 10m LIGHTING COLUMN Decommissioning / Demolition Not Applicable 10m Scale 1:1250 c Crown copyright and database rights 2014 Ordance Survey 100035971 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION 0m DB MJC YD 08/10/14 Rev Description Drawn / Des Original Size A1 Issue for Public Consultation BRIDGE STRUCTURE ANTI-RECIRCULATION WALL P01 Checked Approved Date Checked DB Date 08/10/14 Approved MJC Date 08/10/14 Authorised YD Date 08/10/14 Drawing Number STWTN-ATK-HGN-ASXX-DR-D-0011 Date --Revision P01 100 Millimetres BORED TUNNEL TYPICAL CROSS SECTION AT A CROSS PASSAGE 75 7300 1200 75 1200 650 75 100 2500 600 2300 3000 4550 2300 2500 600 5100 (5030+70 FOR SAG CURVE) CLEARANCE 250 ADDITIONAL CLEARANCE A DO NOT SCALE 0 10 APPROXIMATELY 24250 VARIES ALONG THE TUNNEL ( LESS NEAR THE CUT-AND-COVER TUNNEL SECTIONS ) 9400 A TYPICAL EMERGENCY / ESCAPE CROSS PASSAGE ( VIEW UP THE CHAINAGE ) SCALE 1;50 3000 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION CROSS PASSAGE SECTION A-A SCALE 1: 50 Plotted: Oct 08, 2014 - 4:20pm by: BIRD7413 In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). Construction HAZ 012. Tunneling shallow under the River Thames bed, (applicable to some cross passages only) HAZ 015. Tunnelling in land possibly contaminated by former gasworks. Contaminants could be coal tars and it's derivatives, spent oxide, foul lime, benzene, sulphur, cyanide and the solid fuel resides such as coke, clinker and ash. HAZ 016. Hand mining in possibly contaminated land. HAZ 017. Risk of encountering historical man made obstructions buried deep below the ground level while tunnelling. Maintenance / Cleaning Not Applicable NOTES Drawing Status WORK IN PROGRESS 1. ALL DIMENSIONS ARE IN MILLIMETRES. 2. CLEARANCES AND TOLERANCES IN ACCORDANCE WITH ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-C-0002 '' TUNNEL SPACE PROOFING '' 3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE FOLLOWING DRAWINGS: a. STWTN-ATK-STU-TUXX-DR-D-0001 b. STWTN-ATK-GEN-XXXX-DR-Z-0001 Copyright C Atkins Limited (2014) SILVERTOWN TUNNEL REFERENCE DESIGN Drawing Title SILVERTOWN RIVER CROSSING BORED TUNNEL CROSS SECTION THROUGH A TYPICAL CROSS PASSAGE Tel: +44 (0)1372 726140 Fax: +44 (0)1372 740055 www.atkinsglobal.com Scale Designed / Drawn 1:50 P01 AP MK MK 08/10/14 Rev Description Drawn / Des Original Size A1 Issue for Public Consultation Decommissioning / Demolition Not Applicable Project Title S0 Woodcote Grove Ashley Road Epsom Surrey KT18 5BW Client Use Not Applicable Suitability Checked Approved Date Checked AP Date 08/10/14 Approved MK Date 08/10/14 Authorised MK Date 08/10/14 Drawing Number STWTN-ATK-STU-TUXX-DR-C-0005 --Date --Revision P01 100 Millimetres CUT-AND-COVER TUNNEL CROSS SECTION 500 9850 500 4925 1200 TBC VARIES 1200 TBC 500 9850 500 1200 TBC 4925 80 1800 ( 1720+80 ) DO NOT SCALE 1200 TBC 0 10 1200 TBC 75 1200 3145 75 1200 TBC 75 1200 2300 600 600 7801 5100 ( 5030+70 FOR SAG CLEARANCE ) CLEARANCE 250 ADDITIONAL CLEARANCE 7300 SAFETY, HEALTH AND ENVIRONMENTAL INFORMATION In addition to the hazards/risks normally associated with the types of work detailed on this drawing, note the following significant residual risks (Reference shall also be made to the design hazard log). Construction Plotted: Oct 08, 2014 - 4:24pm by: BIRD7413 Contaminants could be coal tars, it's derivatives, spent oxide, foul lime, benzene, sulphur, cyanide and the solid fuel resides such as coke, clinker and ash. facilities i.e. Rotors, possibility of encountering left in situ deep buried foundations water NOTES 1. 2. 3. 4. a. b. Drawing Status Suitability WORK IN PROGRESS ALL DIMENSIONS ARE IN MILLIMETRES. CLEARANCES AND TOLERANCES IN ACCORDANCE WITH ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-C-0002 '' TUNNEL SPACE PROOFING '' CUT-AND-COVER TUNNEL ENGINEERING COVERED IN ATKINS REPORT No. STWTN-ATK-STU-TUXX-RP-0008 "CUT-AND-COVER TUNNEL STRUCTURES REPORT". THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE FOLLOWING DRAWINGS: STWTN-ATK-STU-TUXX-DR-C-0001 STWTN-ATK-STU-XXXX-DR-Z-0001 Maintenance / Cleaning Not Applicable Copyright C Atkins Limited (2014) Client Use Not Applicable Drawing Title SILVERTOWN RIVER CROSSING CUT-AND-COVER TUNNEL CROSS SECTION Tel: +44 (0)1372 726140 Fax: +44 (0)1372 740055 www.atkinsglobal.com Scale Designed / Drawn 1:50 P01 AP MK MK 08/10/14 Rev Description Drawn / Des Original Size A1 Issue for Public Consultation Decommissioning / Demolition Not Applicable SILVERTOWN TUNNEL REFERENCE DESIGN S0 Woodcote Grove Ashley Road Epsom Surrey KT18 5BW works Project Title Checked Approved Date Checked AP Date 08/10/14 Approved MK Date 08/10/14 Authorised MK Date 08/10/14 Drawing Number STWTN-ATK-STU-TUXX-DR-C-0011 --Date --Revision P01
© Copyright 2024 Paperzz