Summer Works School: St. George's Preschool Principal: Jana Pitcher # Revised: Submitted by: Agreed by: School /Task MOE 1 2 unbrellas requested for lunch benches drain issue in boy and girls restroom x 3 vanity needed for staff room water heater x 4 5 6 7 8 9 raise height of perimeter fencing touch up painting throughout address damp walls on northern side pest control treatment replace restroom faucet handles service water fountains x x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task W&E Comments Drill holes under table to lock in. x x x x x Parks To Be Addressed Summer Works School: East End Primary Principal: Julie Foggo # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Submitted by: Agreed by: School /Task Electrical Upgrade Assembly Hall leaks P2 Classroom leaks Windows need servicing throughout Resurface back area Renovate cottage Musty smell in library Clean A/C vents in library Clean library bathroom; new toilet needed Fencing on field side to be repaired Trash cans to be repaired Service fountain Renovate Boys' Upper School Restroom Awning Needed for playground Electrical Room needs a louvered door Vent needed for Custodians' room Clear trash area of vegetation and fence eastern side of school in lines for parking bays KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x x x x x x x Parks Comments Due to hole in ceiling asphalt for netball court Long-term get library air quality tested x x x x x x x Waste Management Cosmetic(longterm) x x x x On external wall(new works) To Be Addressed Summer Works School: St. David's Primary/Pre Principal: Gladstone Thompson # 1 2 3 4 5 6 7 8 Submitted by: Agreed by: School /Task Playground & fencing for pre-school service windows through out renovate restrooms in pilot station renovate restrooms in main building remove sink in P1 remove climbing apparatus in hall leak in learning support room closet rehang door by computer lab KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x x x x x x x x longterm longterm no longer neededneed space for storage To Be Addressed Summer Works School: Clearwater Middle School Principal: Keisha Douglas # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Submitted by: Agreed by: School /Task new a/c package unit science lab leaks lower level RM 127 connect pipes under sink counselor room has severe leaks service a/c's in media center service windows throughout tent music cottage top room on southwest side windows leak toilet to be repaired in media center get restrooms behind kitchen operable stove and deep frier to be connected light over stove to be covered high pressure sprayer for sink some lights not working in media center KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x x x x x x x x x x x x x x Parks Comments a/c to replace chiller unit that is now inoperable west side science lab termite issue water running down to first floor room(see#2) Health Dept requirement for kitchen use in cafeteria need light shades To Be Addressed Summer Works School: Lyceum Preschool Principal: Sarah DeSilva # 1 2 3 4 Submitted by: Agreed by: School /Task service windows and provide replacement metals grates for windows tighten taps in boys and girls restrooms fencing restroom renovations KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x x x Parks Comments in progress Back area To Be Addresses Summer Works School: Francis Patton Principal: Garita Coddington # 1 2 3 4 5 6 Submitted by: Agreed by: School /Task tighten taps in restroom service windows through out sensory room service exterior doors clear drains above Principal's office tiling of girls restroom KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x Parks Comments females re-tile pending funding from PTA and MoE approval x x x To Be Addressed Summer Works School: Harrington Sound Principal: Lisa Smith # 1 2 3 4 5 6 7 8 9 Submitted by: Agreed by: School /Task Remove carpet in Prinpals office repair fence New playground needed remove carpet in computer lab pedestrian light and traffic flow solution for main entrance clear bushes and debris to east of infant block check into fire alarm system troubles on panel KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks x x x x x longterm infant block car park longterm longterm to address with highways x x Comments To Be Addressed Summer Works School: Elliot Primary Principal: Kimberly Creighton # Revised: Submitted by: Agreed by: School /Task MOE W&E Parks Comments 1 Fumigate school x tent for termites 2 Traffic Flow improvement x liaise with works and engineering highways(longterm) 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 school to be painted P4 windows leak receptacle needed for stove in staff room service all fountains signage "fire lane" outside assembly hall remove and replace blinds in assembly hall new desk for Mrs. Bowen's office upgrade upper school restrooms exit door to be installed Mr. Critchlow room leaks on east side Therapy room service a/c in book room and library healthroom RM1 leaks on north side Field has severe flooding Repair Mrs Paynter a/c school office lowerschool staff restroom doors rotting plexiglass for dispay boards air quality test for deputy principals old office upper school rafters need to be replaced gym floor questionable on eastern side, weak spots ventilation for lower storage room in upper school next to restrooms new lock for north gate x x x new works x x x x x lower level staff restroom across (upper school) airquality issue , out sick a lot remove and replace cabinets after tenting x x x x x drainage issue x x x x x x x x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus color change requested Priority Task Completed Task rotting new works To Be Addressed Summer Works School: Dellwood Principal: Tina Duke # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Submitted by: Agreed by: School /Task service windows throughout hot water heater needed for staff room admin block remove carpet in admin building repair a/c in Donville's room correct Wyatt building signage repair door lock to Wyatt building keys need for Charles Williams building leak in assembly hall and music teacher office tighten handrails on 1st floor steam clean carpet in drama room Window for door in drama room service water fountains throughout leaks in library hot water has stopped working in library/staffroom area ASD room moving to lower level of M1 block cover large hole in floor in computer room remove carpet in D&T room interior walls in D&T room saturated upper level family studies closet remediate (Ms. Swans room) KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x x Parks Comments all buildings on site longterm x x x x NOT Waytt x x x x practice closet needs window in door new works x x x x x x x x bubbling from water intrustion water damage To Be Addressed Summer Works School: West Pembroke Principal: Opal Wilson # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 School /Task Panic button requested Termites Rodents P4 Gaiton fans to be replaced P4 Gaiton floor board weak Service water fountains P4 Booth door rotting P4 Booth mold issue Windows need servicing and screens Toilet next to Staff Room leaks ASD Room needs new fan Service door closers Tile kitchenette in office Toilet out of order in girls' upper school restroom Elevator not in service P2 A/C out of order P2 Ming leaks Replace a supply line to toilet in Infant Block upper restroom Lighting needed at entrance to Infant Block Louvered storeroom door needed in Infant Block Repair cracking tile in Infant Block Rubber treading for steps needed in Infant Block Repair fence outside Art Room Computer Room A/C Repair toilet in Teachers' Restroom in P3 Block A frame ladders needed Fill in muddy area outside Assembly Hall Repair lock to P2 back door Repair Music Room door New playground needed Revised: Submitted by: Agreed by: MOE W&E Parks x x x complete longterm tent fumigation Pest control x x x x x x Near front of classroom All strong smell of mold in mornings, teacher getting sick Metal drain pipes x x x all x x x x x x x x x x x x x x x x x Rusting out Lower level Lower level Across from Room 4 Confirm with I.T. if it's working Constantly runs 12ft & 8ft longterm Not locking On field KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Comments Priority Task Completed Task To Be Addressed Summer Works School: Northlands Principal: Charles Joynes # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Revised: Submitted by: Agreed by: School /Task Check roof of Library & Computer Room Repair Upper Boys' Restroom Urinals Repair chipping tiles in Restroom stalls Repair falling gutter pipe Closer needed on North Exit Door Service water fountains throughout Service windows throughout Replace faucets in Women Teachers' Restroom Replace vent in Men Teachers' Restroom Repair leak in Learning Support Room Upgrade Lower School Boys' Restroom Repair major leaks in P5 Trimm Repair leak in P6 Daniels Repair locker in P6 Repair grate in book room Passage lock needed for Holdip's classroom Repair the hole in White Board Service Upper Girls' Restroom taps Service Restroom stall latches Bury exposed electrical pipes in front of office Tack-weld white fencing at front of school Playground maintenance Art Room leaks on Eastern side & holes on eastern exterior wall Service Main Gate slide lock Repair side cracks on exterior steps Repair outlets on western wall in Staff Room New fridge needed Repair crossing lights upgrade upperschool restrooms MOE W&E Parks x x x x Cats getting in. Out of order x x x x Screens needed as well corroded x x x x x East side Above SmartBoard North side of building Lower level x x East side x x Room 33 x x x complete x x x x x x x x x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Comments Completed Task Southern Side Not working 29.5 x 65 measurement Not working To Be Addressed Summer Works School: Victor Scott Principal: Valerie Williams # School /Task Revised: Submitted by: Agreed by: MOE W&E 1 Termites throughout school 2 hallway floor between preschool and primary school needs to be stained 3 tile upper level hallway x 4 panic button needed for preschool x 5 contract area for garbage dumpsters x 6 service water fountains x 7 upper level restroom renovations boys and girls x 9 repair hole in assembly hall floor 10 11 12 new door needed for electrical meter space service windows throughout and provide screens (P1-P6,Science Lab, Library) P1 Benson: leaky ceiling, and floor to needs to be repaired 13 P1 Smith floor to be repaired x 14 School to be painted x 15 repair computer room floor(entrance area) 16 music room needs carpet tile x 17 re-line car park x 18 playground equipment to be serviced 19 mini blinds needed for P1-P6 20 custodian room needs windows and louvered door for ventilation 21 remediate custodian storage room 22 assembly hall leaks and ceiling tile to be replaced 23 remediate back storage room in assembly hall 24 storage room needs lighting x 25 steps outside of assembly hall to be pointed x 26 cameras needed on eastern side of building 27 assembly floor to be refinished and lined 28 bank behind assembly hall needs to be cleared 29 class rooms under assembly hall: repair floor tiles and repair toilets x 30 assembly hall doors should be repaired, if not replaced x 31 repair hall way light under assembly hall x 32 complete shelving project in lower staff room x 33 Pre school: service windows in restrooms x 35 Room 1 repair floor 36 Room 4, needs new faucets for sink 37 RM5 sink leaks and new ceiling tiles needed Parks x fumigation tenting x remove vinyl tile x x x x x x x x new works X x x new works x x x KEY x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Comments Priority Task Completed Task attracts rats and mosquitos strong sewage odor in restrooms To Be Addresses Summer Works Revised: School: Prospect Preschool Submitted by: Principal: Marion Dyer Agreed by: # School /Task MOE 1 Render and resurface floor next to Administrators office 2 3 4 5 6 7 8 service windows throughout Termite issue upper level classrooms power wash exterior rafters Tile Mrs. Trotts room roach issue in Ms. Trott and Ms Outerbridge room patch hole in floor back of assembly hall replace broken cupboards in Ms Pearmans room 9 service gate lower entrance x 10 11 12 13 14 15 16 17 18 19 repair damaged fencing around playground area replace wooden door to store room with PVC door parks to address shrubbery behind staff kitchen area A/C in hall and Ms. Pearmans room out of service relocate cctv monitor to adminstrators office x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task W&E Parks x Comments large divots in floor x x x x x x x door has swelled x x x To Be Addressed Summer Works School: Prospect Primary Principal: Holly Richardson # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 School /Task service all water fountains power wash walkways resurface southern play area for netball court outside tap for garden area outside P3 literacy room has leaks library room to be remediated, continues to leak ceiling tiles outside P3-P2 rooms black tiles from mold and water damage school to be taken off government water line and put on tank . Use of top up system requested. service windows throughout, screens needed P1 faucet repaired service a/c in therapy room leak in ASD room(in black room closet) where a/c lines come into building remove wall a/c in asd room remove 3 workstations in asd room wooden gates in ASD room install slide lock on ASD room door. urinal out of service main building ground floor improve traffic flow in upper car park breakfast room needs ventilation leak in sensory room P4 Cameron need outlets at fron tof class (surface mount) steam clean carpet of secretary office angled mirror outside secretary office to see guest entering replace fans in principals office and lower staff room (very noisy) new restroom fixture for principals office restroom remove vertical blinds n principals office replace corroded tabs in lower staff restroom KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: Submitted by: Agreed by: MOE W&E x x x x x x x Parks Comments pending capital new works strong mold odor x x x x x x x x x x x x MoE&Highways x x x x x x x x new works To Be Addressed Summer Works School: Devonshire Preschool Principal: Ruby Lambe # 1 2 3 4 5 6 7 8 9 10 11 12 School /Task Paint school service windows throughout and screens needed need new building number sign power wash middle entrance monitor needed for cctv system staff room ceiling coming down from water intrusion new door bell needed new lock for utility closet replacement storage shed needed grass to be place around paly area North restroom counter top has dropped slightly on right side pump room needs ceiling repaired KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: Submitted by: Agreed by: MOE W&E Parks x x x x x x x x x x x Comments To Be Addressed Summer Works School: St. Paul Preschool Principal: Nancy Manuel # Submitted by: Agreed by: School /Task KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments Duration Summer Works School: Gilbert Institute Principal: Coralita Dill # 1 2 3 4 5 6 7 8 9 10 11 12 Submitted by: Agreed by: School /Task New Playground needed remove climbing apparatus in assembly hall remove carpet and replace with alternative in hearing impaired room tighten restroom fixtures in lower school and upper school restrooms replace damaged glass in two assembly hall doors upper school restroom cubicles to small repave ramp on south side of school handrails on west side of assembly hall put vented cap or wire mesh over external pipes along building perimeter custodian store room need vented louvered door and light fixture inside service water fountains storage shed needed KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x x Comments pending capital x x x door closes and hit toilet front x north side new works x x x x x Parks 8 x 10 or 10 x 10 ft. To Be Addressed Summer Works School: Purvis Primary Principal: Judith Alexander # Revised: Submitted by: Agreed by: School /Task MOE W & E Parks 1 school to be painted x 2 Service windows throughout office area, boys restroom, staff room, girls restroom,P1-P6 east &west, stairway , lower hallway, upper hallway reading room, therapy room, music room, assembly hall, art room also screens needed x 3 4 office area a/c not working service all water fountains x 5 termites in Computer room, P6 west, music room, assembly hall x 6 Leaks in P6 west roof, p3 east window leaks, counselor room southern wall 7 shade structure for lunch bench area 8 repair vinyl tiles: P6 east &west, P5 west, P4east, P3 west, P2west x 9 ceramic tile repaired boys and girls restroom lower school, boys upper school x 10 11 12 13 repair fencing around lunch benches lower school door handle needed for upper meter room cover for lunch bench area lockers requested Rotted door and window frame: office area, ISS Room, girl restroom upperschool,East entrance to infant block 14 KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Comments x x x x x school to place furniture order To Be Addressed Summer Works School: Paget Primary Principal: Idonia Beckles # Submitted by: Agreed by: School /Task 1 2 3 4 5 6 7 8 9 10 11 water pump trips continuously in infant black upper level school south facing exterior wall leak along class p5,p6 tc Remove custodian items from electrical closet traction strips for steps leading to upper school termite and rodent issue change out waterless urinals in main building service VRV unit in infant block remove broken stone benches in infant block repair fencing around playground, upper school leaks in L bean classroom infant block point up steps to field 12 replace rotting baseboard in infant block after school is treated for termites 13 14 15 steam clean couches and chairs in staff room flat roof that overlooks field has leaks service exterior doors KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x x x x x x investigate tenting new works x x x x x x x x x infant block To Be Addressed Summer Works School: Warwick Preschool Principal: Jennifer DeRosa Holder # Revised: Submitted by: Agreed by: School /Task MOE W&E 1 2 3 4 5 6 7 8 9 10 School to be painted Front exterior door not closing properly parking bays requested pre school sign requested CCTV camera 3 not working Anderlin to check security panel window frosting requested in multi purpose area north side doors requested for reading loft storage area Ms. Bartley room, formica coming up at sink Bathroom renovation, shaky stalls, replace flooring 11 Annex ceiling water damaged and coming down from leakage, mold visible x 12 13 14 Stiff windows throughout.(service) boys urinal out of service annex building tile falling off of walls in annex restrooms x x x 15 ceiling crack in main building Ms. Berkley and Minors ceilings have water damage x 16 17 18 Door bell requested ceiling fan dangling in multipurpose area service water fountains KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Parks Comments x x x x x x x x x x new works needs to be glued TBD long-term check and service x x x replace To Be Addressed Summer Works School: TNTatem Middle School Principal: Francine McMahon # Revised: Submitted by: Agreed by: School /Task MOE W&E 1 2 3 4 5 6 7 Power wash steps throughout school large crack in wall outside IBM lab 2nd FL service all water fountains urinals out of order 2nd FL Boys restroom retile behind urinals 2nd FL boys restroom New taps needed for girls restroom 2nd FL East side cracked ceiling tile outside room 302 8 large crack in wall outside RM 328 and by water fountains on west side 9 10 11 12 13 14 15 Music room a/c job incomplete in teachers office music room : water leaks at entrance and trickles down to light switch RM 224 North side leaks RM 316 leak in southern corner Water not working in boys changing room D&T room leaks along southern wall Functional skills room needs hot water heater for restroom x x x x x x x 16 repair holes in gym floor, northern side, also replace rotted baseboards x 17 18 19 20 21 KEY counselor room a/c not working no hot water in counselor section restroom. trim and maintain shrubbery in courtyard counselor room needs blinds renovate front cottage for use Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Parks Comments x safety concern x x x x x x corroded taps safety concern new works x x x x x x long-term To Be Addressed Summer Works School: Heron Bay Principal: Lisa Swan # Submitted by: Agreed by: School /Task 1 2 3 4 5 Repair tile outside of assembly hall repair leaking ceiling , upper level southwest stairs P3 rooms leaks on the west side staff restroom have low water pressure Electrical needed for hot water heater in art room 6 assembly hall ceiling fans not operating correctly and are very noisy 7 8 9 10 11 New Playground cut back mexican peppers by netball court power wash netball court remove climbing apparatus in assembly hall Soap dispensers needed in restrooms 12 Repair wooden floors in upper classrooms, P3,P4,computer room 13 14 repair water tank top in front entrance service water fountains KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks x Comments trip hazard x x x x slow flushing x x x x x x to confirm with Principal x x x To Be Addressed Summer Works School: Port Royal Primary Principal: Joanne Dill # Revised: Submitted by: Agreed by: School /Task MOE W&E 1 Leak in principals office x 2 check windows operation through out and service as needed x 3 4 entrance outside P3 floods, soak away to be cleared Clear trees by computer room building 5 reading room has mold smell, investigate water intrusion x 6 7 8 9 10 11 12 13 14 15 P4 and P5 need blinds Move Mrs Sousa office to outside principals office P6 fans and windows inoperable shade structure for lunch area remove sink from upper conference room to make additional space repairs conference room floor power wash front of school additional water fountain for infant block requested replace playground repair vinyl tile in front of office x 16 convert room adjacent from changing rooms to storage room KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Parks Comments x x x x x long-term x x x x x holes in floor pending funding x x x long-term To Be Addressed Summer Works School: Dalton E Tucker Principal: Tajuana Dean # School /Task Revised: Submitted by: Agreed by: MOE 1 2 3 4 Parking bays and signs needed Traffic flow solution, round about requested leaky window in Principals office fix gate on field x x 5 Replace goal post on field (investigate PVC goal post use) x 6 7 8 9 10 Treat school for termites(resource room, custodian room, assembly hall, and computer room repair hole in ceiling on stage in assembly hall remove climbing apparatus in hall stumps on field to be removed 4 low 8ft team benches for assembly hall KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task W&E Parks Comments MoE to work with Highways x x x pending capital available x x x x furniture order To Be Addressed Summer Works School: Southampton Preschool Principal: Karen Joyiens Submitted by: Agreed by: # School /Task 1 2 3 4 Tint all windows on south side of gym Check operation of windows service as needed Tile Desilva Room Check exterior southern wall in Mrs Desilva Room 5 replace rusted sink in kitchen and replace cabinet spaces with shelves 6 7 8 9 remove fountain at entrance replace damaged vinyl tile in girls restroom at entrance. RM4 door handle to be repaired, 2 screens needed taps difficult to turn in boys and girls restroom KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x x x x x x x x x vinyl flooring oozing glue damp around window seals To Be Addressed Summer Works School: Lagoon Park Preschool Principal: Sheryce Raynor # Revised: Submitted by: Agreed by: School /Task MOE 1 Ceiling Tiles collapsing in Sheryce Raynor office. 2 Clean ceiling fans in multi purpose room 3 Remove accordion dividers in multi purpose room 4 Replacement cctv system to go into Sheryce Raynor office x 5 Separate fire alarm system from Somerset primary x 6 7 8 9 10 11 12 Paint bike path on back asphalt area Boys restroom needs lock for stall Service water fountain Repair window in girls restroom Two screens needed for Mrs Durrant's room New storage shed required Remove playground apparatus x KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task W&E Parks Comments x leak related x replace with louvered doors x outside Mrs. Lowe Room outside Mrs. Lowe Room near professional learning room x x x x x x damaged roof to slide To Be Addressed Summer Works School: West End Primary Principal: Trina Cariah # Submitted by: Agreed by: School /Task 1 2 3 Round about for traffic flow clean up trees behind library Leaks and mold outside learning support room 4 Remediate custodian store room (needs more ventilation) 5 6 7 8 9 10 11 Clear out electrical closet Storage shed requested Service water fountains Repave and mark netball court Repair gate on field Check window operation and service as needed Install a/c system for school KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E x x Parks Comments Long term solution x x upper level x below steps x x x x x x x To Be Addressed Summer Works School: Somerset Primary Principal: O'Brien Osbourne # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Submitted by: Agreed by: School /Task Hot water heater needed for staff restroom Repair pothole in main entrance Erect school signs Difficulty viewing traffic when exiting Relocate cctv system into principals office Tile P5,P6, Library Reset principals Toilet Storage shed needed for chemicals Service water fountains Check window operation throughout Check fire alarm monitoring Repair door & lock to secretary's office Remove birds in assembly hall Service boys restroom urinals in upper schools Repair roof leaks along P1-P3 southeastern side Repairs to western fence KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x per.O.O per.O.O x x x x x x To Be Addressed cut hedges per.O.O Long Term leaking per.O.O x x x x x service were necessary BSG damaged from break in x x x x currently out of order per.O.O per.O.O Summer Works School: CDP Principal: Sherri Bucci # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Submitted by: Agreed by: School /Task Wireless panic buttons Floor mats needed and wet floor signs needed Porch ceiling rotting and portions coming down Occupancy signs for lower rooms Water leaking from light fixture in portage room Audio Visual equipment for observation room Scheduled maintenance for park/play area Non skid surface for steps New faucet needed for lower restroom Asphalt car parking lot Block up fire place in meeting room Shelf needed for dvd player in in lower play room Point up and repair exterior northern steps a/c drain pump to be serviced KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x x x x x x x x x TBD pending capital x x x x x To Be Addressed Summer Works Special School: Dame Majorie Bean Hope Academy Administrator: Mrs. Margaret Phillips # School /Task 1 2 3 4 5 6 7 8 9 Repair playground surface Purchase new swings for playground create drain for dehumifier in telephone closet repair fencing southside of playground hdryotherapy pool needed Rearrange shelving in nothwestern class. water intrusion under door into therapist room leak in red birds room doorway storage shed needed KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: Submitted by: Agreed by: MOE W&E x x x x x x x x x Parks Comments school to order rolling storage in furniture order southern side of building To Be Addressed Summer Works Special School: Out of school Suspension Administrator: Mrs. Doars # 1 2 3 4 5 6 7 Submitted by: Agreed by: School /Task repair computer room a/c service windows throughout leaks in kitchen area powerwash walkways service taps and fossets throughout replace a/c in RM2 office a/c not working KEY Short Term = O - 4 months Medium Term = 5 - 12 months Long Term = 12 months plus Priority Task Completed Task Revised: MOE W&E Parks Comments x x x x x x x codes have already been provided To Be Addressed
© Copyright 2026 Paperzz