Locational Based Marginal Pricing …. NYISO Market Operations the cornerstone of the NYISO Market Operation LBMP Objectives to Understand: Basics of Locational Based Marginal Pricing (LBMP) LBMP and Impact of Congestion LBMP Specifics LBMP Energy Market (Load) Bid s s r e f f O Load Serving Entities (LSEs) provide bids to purchase energy. Power Suppliers/Generators (Gen) provide offers to sell energy. LBMP Energy Market (Load) Bid s s r e f f O Energy Sales and Purchases are scheduled directly through the NYISO Price of energy is based on the Market Clearing Price or Locational Based Marginal Pricing (LBMP). Locational Based Marginal Pricing …. 1. A methodology where the price of Energy at each location in the NYS Transmission System is equivalent to the cost to supply the next increment of Load at that location. 2. NYISO takes into account: • Generation Offer Prices • Physical aspects of the NYS Transmission System Let’s simplify the definition and use the following: The cost to serve the next MW of Load at a specific location in the grid Before we start let’s review the following definitions.. Definitions - Simplified Energy - A quantity of electricity that is bid, produced, purchased, consumed, sold, or transmitted over a period of time, and measured or calculated in megawatt hours. Load - Energy demands on the power grid. Load Serving Entity (LSE) - An entity that supplies Energy to retail customers. Generator or Power Supplier - A facility capable of supplying Electric Energy Definitions - Simplified Bus - A common connection of two or more electric circuits within a station. Transmission Line - Conductors for transmitting electric power Transmission Constraint - Limits on the ability of the Transmission Grid to transmit energy. Recognition of Transmission Constraints is necessary to maintain reliable operation of the Transmission System. Zone - Geographical areas reflecting the Transmission Owners traditional service territories and External Control Areas Next we are going to define and demonstrate …. Marginal Pricing the cost to serve the next MW of load Using Economic Dispatch Economic Dispatch: 1. Determine the least costly way of producing electric energy to meet the load 2. The price of producing an additional MW in a specific location in the grid is called the Locational Based Marginal Price (LBMP). 3. The LBMP will be the same at all buses when: Transmission limits are not reached Transmission Limits are not exceeded Losses are zero (Losses to be addressed later) West 2 Zones 2 Zones (Geographical Area): West and East Buffalo-Albany Line Buffalo Gen#1 MW $/MWh East 2 Buses, Buffalo & Albany, connected by a Transmission Line Albany Note the arrows, Generators supply energy Gen#2 MW $/MWh Transmission Line Load A MW of Load Load B Note the arrows, Load withdraws energy MW of Load The Generator MW capacity is displayed in black …. Gen#1 MW of Capacity Offer Price $/MWh When the Generator is selected to meet the load, the number of MW selected is shown in blue …. Gen#1 MW of Capacity MW selected to $/MWh meet Load Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô No Transmission Limits Ô No “Transmission Losses” - These will be discussed later West East Buffalo Gen#1 100 MW $25 Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 1: Determine the Total Load West East Buffalo Gen#1 100 MW Albany Gen#2 $25 100 MW $45 Load A Load B 10 MW 20 MW Total Load is 30 MW West Total Load 30 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 2: Select the most economic Generation West Total Load 30 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Gen #1 is the “cheapest” and can provide up to 100 MW West Total Load 30MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 3: Select the MW Gen#1 can provide to meet the load West Total Load 30MW Buffalo Gen#1 100 MW 30 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Gen #1 can provide up to 100 MW Gen #1 provides 30 MW to meet the Load West Total Load 30MW Buffalo Gen#1 100 MW 30 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 4: Determine if all of the Load is met. West Total Load 30MW Buffalo Gen#1 100 MW 30 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Total Load is 30 MW Gen #1 provides 30 MW Total Load is met West Total Load 30MW Buffalo Gen#1 100 MW 30 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 5: Determine the MWs that are transmitted over the Buffalo/Albany Line Total Load 30MW West Buffalo Gen#1 100 MW 30 MW $25 10 MW Load A 10 MW East Albany Gen#2 20 MW 100 MW $45 20 MW Load B 20 MW 20 MWs are transmitted over the Buffalo/Albany Line West Total Load 30MW Buffalo Gen#1 100 MW 30 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Step 6: Determining the LBMP ….. West Total Load 30MW Buffalo Gen#1 100 MW $25 30 MW East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Determine the cost to serve the next MW of load. West Gen#1 100 MW $25 30 MW Buffalo Albany East Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Let’s see which generator would be selected if the Total Load changed to 31MW …. Total Load 31MW West Buffalo Gen#1 100 MW 31 MW $25 11 MW Load A 11 MW East Albany Gen#2 20 MW 100 MW $45 20 MW Load B 20 MW If the load in the West increased by 1 MW Gen #1 will be dispatched to provide an additional MW at $25/MW Total Load 31MW West Buffalo Gen#1 100 MW 31 MW $25 10 MW Load A 10 MW East Albany Gen#2 21 MW 100 MW $45 21 MW Load B 21 MW If the load in the East increased by 1 MW Gen #1 will be dispatched to provide an additional MW at $25/MW West Total Load 31MW Buffalo Gen#1 100 MW East Albany Gen#2 $25 100 MW 30 MW $45 Load A Load B 10 MW 20 MW Regardless where the load increased Gen #1 will be dispatched to provide an additional MW at $25/MW LBMP = $25/MW West Total Load 30MW Buffalo Gen#1 100 MW $25 30 MW East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Generator #1 can provide the next MW of load at $25/MW LBMP = $25/MW for the West Zone and the East Zone Total Load 30MW West Buffalo Gen#1 100 MW $25 30 MW East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW LBMP (West) = $25/MWh LBMP (East) = $25/MWh Total Load 30MW West Buffalo Gen#1 100 MW $25 30 MW East Albany Gen#2 100 MW $45 Load A Load B 10 MW 20 MW Determine the Total Load. West + East = 10 MW + 20MW = Select the Most Economic Generation to meet the Load. Total Load = 30 MW Generator #1 $25 < $45 Determine the Cost of serving the “Next” MW of Load. Generator #1 can serve the next MW 30 MW $25/MWh Example 2 LBMP with No Congestion Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô No Transmission Constraints Ô No Transmission Losses (to be discussed later) West East Buffalo Gen#1 100 MW Albany Gen#2 $25 100 MW $45 Load A Load B 60 MW 90 MW What is the Total Load? 1. 60 MW 2. 100 MW 3. 150 MW 4. 90 MW West East Buffalo Gen#1 100 MW $25 Albany Gen#2 100 MW $45 Load A Load B 60 MW 90 MW Total Load is 150 MW West Total Load 150 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 60 MW 90 MW Select the generator that is the most economic (cheapest): 1. Gen #1 2. Gen #2 3. Load A 4. Load B West Total Load 150 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 60 MW 90 MW Gen #1 is the “cheapest” and can provide up to 100 MW West Gen#1 100 MW $25 100 MW Total Load 150 MW Buffalo Albany East Gen#2 100 MW $45 Load A Load B 60 MW 90 MW If Gen #1 is selected for 100 MW how many MW will cross the Buffalo/Albany Line? 1. 40 MW 2. 60 MW 3. 100 MW 4. 90 MW West Gen#1 100 MW Total Load 150 MW Buffalo Albany Gen#2 $25 100 MW 100 MW 60 MW East 40 MW 100 MW $45 Load A Load B 60 MW 90 MW If Gen #1 provides 100 MW (Full Capacity); 60 MW to meet Load A 40 MW will go across the Buffalo/Albany Line West Gen#1 100 MW Total Load 150 MW Buffalo Albany Gen#2 $25 100 MW 100 MW 60 MW Load A 60 MW East 40 MW 100 MW $45 40 MW Load B 90 MW Continuing with the same example: • 40 MW cross the Buffalo/Albany Line to Load B • Load B is 90 MW. • Still need to serve 50 MW Load in the East West Gen#1 100 MW Total Load 150 MW Buffalo Albany $25 100 MW 100 MW 60 MW Load A 60 MW 40 MW East 50 MW Gen#2 100 MW $45 50 MW 90 MW Load B 90 MW Gen #2 can provide the 50 MW to meet the remaining 50 MW Load in East . Total Load of 150 MW is met West Total Load 150 MW Buffalo Gen#1 100 MW 100 MW $25 East Albany Gen#2 100 MW 50 MW $45 Load A Load B 60 MW 90 MW Let’s see which generator would be selected if the Total Load changed to 151MW …. West Gen#1 100 MW Total Load 151 MW Buffalo Albany $25 100 MW 100 MW 61 MW Load A 61 MW 39 MW East Gen#2 100 MW 51 MW $45 51 MW 90 MW Load B 90 MW If the load in the West increased by 1 MW Gen #2 would be dispatched to provide an additional MW at $45/MW West Gen#1 100 MW Total Load 151 MW Buffalo Albany $25 100 MW 100 MW 60 MW Load A 60 MW 40 MW East Gen#2 100 MW 51 MW $45 51 MW 91 MW Load B 91 MW If the load in the East increased by 1 MW Gen #2 would be dispatched to provide an additional MW at $45/MW West Gen#1 100 MW $25 100 MW Load A 60 MW Total Load 150 MW Buffalo Albany East Gen#2 100 MW $45 50 MW Load B 90 MW Regardless of where the load increased Gen #2 would have to provide an additional MW at $45/MW LBMP = $45/MW West Gen#1 100 MW Total Load 150 MW Buffalo Albany East Gen#2 100 MW $25 $45 50 MW 100 MW Load A Load B 60 MW 90 MW Determine the Total Load. West + East = 60 MW + 90 MW = Select the Most Economic Generation to meet the Load. Total Load = 150 MW $25 for first 100 MW $45 for next 50 MW Determine the Cost of serving the “Next” MW of Load. Generator #2 can serve the next MW 150 MW Generator #2 $45/MWh West Gen#1 100 MW Total Load 150 MW Buffalo $25 100 MW Load A 60 MW LBMP (West) = $45/MWh Albany East Gen#2 100 MW $45 50 MW Load B 90 MW LBMP (East) = $45/MWh West Gen#1 100 MW $25 100 MW Load A 60 MW Total Load 150 MW Buffalo Albany East Gen#2 100 MW $45 50 MW Load B 90 MW Total Load = 150 MW Generator #2 is the Marginal Unit Generator that would serve the next MW of load. The last two examples showed the “Marginal Pricing” of LBMP and the process of “Economic Dispatch” All of these examples had no Transmission Constraints on the Transmission Lines resulting in equal LBMPs for both buses. In the real world transmission limits exist! Now we are going to add “Transmission Limits” to the remaining examples. Marginal Pricing the cost to serve the next MW of load Using Economic Dispatch “Transmission Constraints” To maintain an efficient and reliable Transmission System we need to ensure Transmission System Limits are not exceeded. Example 3 LBMP with Transmission Limits And No Congestion Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô Transmission Constraint of 50 MW Ô No Transmission Losses West East Buffalo Albany Gen #1 $25 100 MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW What is the Total Load? 1. 80 MW 2. 140 MW 3. 200 MW 4. 220 MW West Total Load 220 MW Buffalo East Albany Gen #1 $25 100 MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load is 220 MW West Total Load 220 MW Buffalo East Albany Gen #1 $25 100 MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Select the generator that is the most economic (cheapest): 1. Gen #1 2. Gen #2 3. Gen #3 4. Gen #4 Total Load 220 MW West Buffalo Gen #1 100 MW East Albany $25 ??? MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 ??? MW Gen #1 is the most economic at $25/MWh. Can Gen #1 provide its full capacity to serve Load? Yes No Total Load 220 MW West Buffalo Gen #1 100 MW East Albany $25 100 MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Remaining Load 120 MW Gen #1 is selected for 100 MW Still need to select generation to meet the remaining Load of 120MW. Total Load 220 MW West Buffalo Gen #1 100 MW East Albany $25 100 MW Gen #2 $30 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Remaining Load 120 MW Select the next generator that is the most economic (cheapest) 1. Gen #2 2. Gen #3 3. Gen #4 Total Load 220 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 100 MW $30 100 MW ??? MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 ??? MW Gen #2 is the most economic at $30/MWh. Can Gen #2 provide its full capacity to serve load? Yes No Total Load 220 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Remaining Load 20 MW Gen #2 is selected for 100 MW Still need to select generation to meet the remaining Load of 20MW. Total Load 220 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Remaining Load 20 MW Select the next generator that is the most economic 1. Gen #3 2. Gen #4 Total Load 220 MW West Buffalo Gen #1 100 MW Gen #4 100 MW Albany Gen #2 100 MW $25 100 MW $40 ??? MW East X $30 100 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Gen #4 ??? MW Gen #4 is the most economic at $40/MWh. Can Gen #4 provide its full capacity to serve load? Yes No Total Load 220 MW West Buffalo Gen #1 100 MW Albany Gen #2 100 MW $25 $30 100 MW 100 MW Gen #4 100 MW East Gen #3 $50 100 MW $40 20 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Gen #4 20 MW To meet the remaining load of 20 MW, Gen #4 is selected for 20 MW. Total Load of 220 MW is met West Total Load 220 MW Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Based on the Generators/MWs selected, how many MW will cross the Buffalo/Albany Line? 1. 40 MW 2. 60 MW 3. 100 MW 4. 90 MW Total Load 220 MW West Buffalo Gen #1 100 MW East Albany Gen #2 100 MW $25 100 MW 100 MW Gen #4 100 MW 20 MW 40 MW 100 MW 20 MW 80 MW 80 MW 100 MW Gen #3 $50 100 MW $40 Load A $30 140 MW Load B 140 MW 100 MW (Gen #1) + 20 MW (Gen #4) - 80 MW (Load A) = 40 MW 40 MW will cross the Buffalo/Albany Line. The Transmission Limit is not reached or exceeded. Total Load 220 MW West Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Gen #4 20 MW What is the LBMP? 1. $25 2. $30 3. $35 4. $40 5. $45 6. $50 Total Load 220 MW West Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW LBMP (West) = $40/MWh LBMP (East) = $40/MWh Generator #4 can provide the next MW of Load at $40/MW regardless if the load increases in the West or in the East. Total Load 220 MW West Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Gen #4 20 MW Which generator is the “Marginal Unit”? Gen #1 Gen #2 Gen #3 Gen #4 Total Load 220 MW West Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Total Load 220 MW Gen #1 100 MW Gen #2 100 MW Gen #4 20 MW Gen #4 is the “Marginal Unit”. The generator that would serve the next MW of load. Total Load 220 MW West Buffalo Gen #1 100 MW $25 Albany Gen #2 100 MW $30 100 MW 100 MW Gen #4 100 MW East $40 20 MW Gen #3 $50 100 MW Load A Load B 80 MW 140 MW Determine the Total Load. West + East = 80 MW + 140 MW = Select the Most Economic Generation to meet the Load. Total Load = 220 MW $25 for first 100 MW $30 for next 100 MW $40 for next 20 MW Determine the Cost of serving Generator #4 can the “Next” MW of Load. serve the next MW 220 MW Generator #4 $40/MWh Total Load 220 MW West Buffalo Gen #1 100 MW East Albany Gen #2 100 MW $25 100 MW 100 MW Gen #4 100 MW 20 MW 40 MW 100 MW 20 MW 80 MW LBMP (West) = $40/MWh 80 MW 100 MW Gen #3 $50 100 MW $40 Load A $30 140 MW Load B 140 MW LBMP (East) = $40/MWh In this example 40 MW is transmitted over the Buffalo/Albany Line. The Transmission Limit of 50 MW is not exceeded. When Transmission Limits are not reached or exceeded the LBMP for West and East are the same. Congestion occurs when the Power flow reaches the Transmission Limit. NY Bulk Power System is: • Tightly Interconnected • Operationally Complex Congestion …. ◘ A Characteristic of Transmission System ◘ Occurs when the Transmission Limit is reached When Transmission Limits are reached Generators from a different bus are dispatched to meet the load. When there is congestion LBMPs can differ between buses. Locational-Based at a specific location in the grid Let’s address the “Locational Based” aspect of LBMP and see when the LBMP at the buses would be different…. Example 4 LBMP with Congestion Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô Transmission Constraint of 50 MW Ô No Transmission Losses West East Buffalo Gen#1 100 MW Albany Gen#2 $25 100 MW $45 Load A Load B 10 MW 60 MW What is the Total Load? 1. 10 MW 2. 70 MW 3. 60 MW 4. 100 MW Total Load West 70 MW Buffalo Gen#1 100 MW East Albany Gen#2 $25 100 MW $45 Load A Load B 10 MW 60 MW Total Load is 70 MW Total Load West 70 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 60 MW Select the generator that is the most economic (cheapest): 1. Gen #1 2. Gen #2 3. Load A 4. Load B Total Load West 70 MW Buffalo Gen#1 100 MW $25 East Albany Gen#2 100 MW $45 Load A Load B 10 MW 60 MW Gen #1 is the “cheapest” and can provide up to 100 MW Total Load West Gen#1 100 MW $25 70 MW Buffalo Albany East Gen#2 100 MW $45 Load A Load B 10 MW 60 MW What is the transmission limit for the Buffalo/Albany Line? 1. 10 MW 2. 60 MW 3. 50 MW 4. 100 MW Total Load West Gen#1 100 MW $25 70 MW Buffalo Albany East Gen#2 100 MW $45 Load A Load B 10 MW 60 MW The transmission limit for the Buffalo/Albany Line is 50 MW. Total Load West Gen#1 100 MW 70 MW Buffalo Albany Gen#2 $25 70 MW East 100 MW $45 ?? MW Load A Load B 10 MW 60 MW If Gen #1 is selected to serve 70 MW of Load how many MW will have to cross the Buffalo/Albany Line? 1. 10 MW 2. 60 MW 3. 50 MW 4. 100 MW Total Load West Gen#1 100 MW 70 MW Buffalo $25 70 MW Albany East Gen#2 60 MW 100 MW $45 70 MW 10 MW Load A Load B 10 MW 60 MW If Gen #1 is selected for 70 MW, 60 MW will cross the Buffalo/Albany Line…. Total Load West Gen#1 100 MW 70 MW Buffalo $25 70 MW Albany Limit Exceeded 60 MW East Gen#2 100 MW $45 70 MW 10 MW Load A Load B 10 MW 60 MW 60 MW exceeds the 50 MW Transmission Limit across the Buffalo/Albany Line Total Load West Gen#1 100 MW $25 ?? MW 70 MW Buffalo Albany East Gen#2 100 MW $45 Load A Load B 10 MW 60 MW Without exceeding the Buffalo/Albany Transmission Line Limit, Gen #1 is selected for: 1. 70 MW 2. 10 MW 3. 50 MW 4. 60 MW Total Load West Gen#1 100 MW 70 MW Buffalo $25 60 MW Albany East Gen#2 50 MW 100 MW $45 60 MW 10 MW Load A Load B 10 MW 60 MW Gen #1 provides 60 MW. 10 MW to meet Load A. 50 MW will cross the Buffalo/Albany Line. Total Load West Buffalo Gen#1 100 MW $25 60 MW 70 MW Congestion At Limit 50 MW East Albany Gen#2 100 MW $45 60 MW 10 MW Load A Load B 10 MW 60 MW 50 MW crosses the Buffalo/Albany Line. 50 MW is the Transmission Limit. Congestion occurs when Power flow reaches the Transmission Limit. Total Load West 70 MW Albany Buffalo Gen#1 100 MW Congestion At Limit $25 60 MW East 50 MW Gen#2 100 MW $45 60 MW 10 MW Load A 10 MW 50 MW Load B 60 MW Gen #1 provides 60 MW. Still need to meet the remaining Load of 10 MW in the East Total Load West Buffalo Gen#1 100 MW $25 60 MW 60 MW 10 MW Load A 10 MW 70 MW Congestion At Limit 50 MW East Albany Gen#2 100 MW $45 10 MW 10 MW 60 MW Load B 60 MW Gen #2 can serve the next 10 MW. The Total Load of 70 MW is now met. Total Load West 70 MW Buffalo Gen#1 100 MW 60 MW $25 East Albany Gen#2 100 MW 10 MW $45 Load A Load B 10 MW 60 MW To determine the LBMP let’s see which generator would be selected if the Total Load changed to 71MW …. Total Load West Buffalo Gen#1 100 MW $25 61 MW 61 MW 11 MW Load A 11MW 71 MW Congestion At Limit 50 MW East Albany Gen#2 100 MW $45 10 MW 10 MW 60 MW Load B 60 MW If the load in the West increased by 1 MW Gen #1 will be selected to serve the next MW of Load in the West at $25/MW Total Load West Buffalo Gen#1 100 MW $25 60 MW 60 MW 10 MW Load A 10 MW 71 MW Congestion At Limit 50 MW East Albany Gen#2 100 MW $45 11 MW 11 MW 61 MW Load B 61 MW If the load in the East increased by 1 MW Gen #2 will be selected to serve the next MW of Load in the East at $45/MW Total Load West Buffalo Gen#1 100 MW $25 60 MW 70 MW East Albany Gen#2 100 MW $45 10 MW Load A Load B 10 MW 60 MW Congestion creates a “Locational Based” Marginal Pricing resulting in different LBMPs for the West and the East …... Total Load West Buffalo Gen#1 100 MW $25 60 MW 70 MW East Albany Gen#2 100 MW $45 10 MW Load A Load B 10 MW 60 MW LBMP (West) = $25/MWh LBMP (East) = $45/MWh Total Load 70 MW West Buffalo Gen#1 100 MW 60 MW East Albany Gen#2 100 MW $25 10 MW $45 Load A Load B 10 MW 60 MW LBMP (West) = $25/MWh Determine the Total Load. Select the Most Economic Generation to meet the Load. LBMP (East) = $45/MWh West + East = 10 MW + 60 MW = 70 MW Total Load = 70 MW Meet Load without exceeding Transmission Limits West $25 for 60 MW Gen #1 East $45 for 10 MW Gen #2 Determine the Cost of serving the “Next” MW of Load. West $25/MWh East $45/MWh Example 5 LBMP with Congestion Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô Transmission Constraint of 150 MW Ô No Transmission Losses West East Buffalo Albany Gen #1 $25 100 MW Gen #2 50 MW $30 Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW What is the Total Load? 1. 200 MW 2. 270 MW 3. 200 MW 4. 220 MW West Total Load 270 MW Buffalo Gen #1 $25 100 MW East Albany Gen #2 50 MW $30 Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Select the generator that is the most economic (cheapest): 1. Gen #1 2. Gen #2 3. Gen #3 4. Gen #4 Total Load 270 MW West Buffalo Gen #1 100 MW $25 ??? MW East Albany Gen #2 50 MW $30 Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load Gen #1 270 MW ?? MW Gen #1 is the most economic at $25/MWh. Can Gen #1 provide its full capacity to serve load? Yes No Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW East Albany Gen #2 50 MW $30 Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Remaining Load 170 MW Gen #1 is selected for 100 MW Still need to select generation to meet the remaining load of 170 MW. Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW East Albany Gen #2 50 MW $30 Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Remaining Load 170 MW Select the next generator that is the most economic (cheapest) 1. Gen #2 2. Gen #3 3. Gen #4 Total Load 270 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW $30 100 MW ??? MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 ??? MW Gen #2 is the most economic at $30/MWh. Can Gen #2 provide its full capacity to serve load? Yes No Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW East Albany Gen #2 50 MW $30 50 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Remaining Load 120 MW Gen #2 is selected for 50 MW Still need to select generation to meet the remaining load of 120 MW. West Total Load 270 MW Buffalo Gen #1 100 MW $25 100 MW East Albany Gen #2 50 MW $30 50 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Remaining Load 120 MW Select the next generator that is the most economic 1. Gen #3 2. Gen #4 West Total Load 270 MW Buffalo Gen #1 100 MW $25 100 MW East Albany Gen #2 50 MW $30 50 MW Gen #4 $40 100 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 ?? MW Before we determine the amount of MW of load Gen #4 can serve, let’s take a look at the: • Flow of MW • Impact of the Transmission Limit. Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW Gen #4 100 MW 100 MW $40 100 MW 20 MW Albany Gen #2 50 MW ?? MW 100 MW Load A East 20 MW 50 MW $30 50 MW Gen #3 $50 100 MW Load B 250 MW If Gen #4 is selected for 100 MW how many MW will cross the Buffalo/Albany Line? 1. 100 MW 2. 200 MW 3. 180 MW 4. 50 MW Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW Gen #4 100 MW East Albany Gen #2 50 MW 180 MW 50 MW 100 MW 100 MW 100 MW 20 MW 50 MW Gen #3 $50 100 MW $40 Load A $30 20 MW 20 MW Limit Exceeded Load B 250 MW 100 MW (Gen #1) + 100 MW (Gen #2) – 20 MW (Load A) = 180 MW If Gen #4 were selected for 100 MW, 180 MW would have to cross the Buffalo/Albany Line. This would exceed the 150 MW Transmission Line Limit. Total Load 270 MW West Buffalo Gen #1 100 MW Gen #4 100 MW 100 MW ??? MW $40 ?? MW Load A 20 MW Albany Gen #2 50 MW $25 100 MW East 20 MW $30 50 MW Gen #3 $50 100 MW Load B 250 MW How many MWs can Gen #4 provide without exceeding the Buffalo/Albany Transmission Line Limit? 1. 100 MW 2. 50 MW 3. 70 MW 4. 0 MW Total Load 240 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 100 MW Gen #4 100 MW East 100 MW 150 MW 50 MW 70 MW 70 MW 20 MW 50 MW Gen #3 $50 100 MW $40 Load A $30 200 MW 20 MW Load B 250 MW 100 MW (Gen #1) + 70 MW (Gen #2) – 20 MW (Load A) = 150 MW Gen #4 is selected for 70 MW Total Load 240 MW West Buffalo Gen #1 100 MW $25 100 MW 100 MW 70 MW #4 Gen 100 MW East Albany Congestion At 150Limit MW Gen #2 50 MW 50 MW Gen #3 $50 100 MW 70 MW 20 MW 20 MW 50 MW 150 MW $40 Load A $30 200 MW Load B 250 MW Congestion occurs when Transmission Constraints are Reached Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW Gen #4 100 MW $40 70 MW East Albany Congestion At Limit Gen #2 50 MW $30 50 MW Gen #3 $50 100 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 70 MW Remaining Load 50 MW Still need to meet the remaining load of 50 MW . Total Load 270 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 ??? MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 70 MW Remaining Load 50 MW How many MWs will Gen #3 have to provide to meet the remaining load? 1. 100 MW 2. 50 MW 3. 80 MW 4. 70 MW Total Load 270 MW West Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 50 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 70 MW Gen #3 50 MW Gen #3 will have to provide 50 MW to serve the remaining load. Total Load 270 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 50 MW 50 MW 70 MW 50 MW $40 20 MW Gen #3 100 MW $50 50 MW 70 MW Load A $30 250 MW 20 MW Congestion At Limit Load B 250 MW Total Load is met. There is Congestion across the Buffalo/Albany Line. West Total Load 270 MW Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 50 MW Load A Load B 20 MW 250 MW To determine the LBMP let’s see which generator would be selected if the Total Load changed to 271MW …. West Total Load 271 MW Buffalo Gen #1 100 MW East Albany Gen #2 50 MW $25 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 50 MW Load A Load B 21 MW 250 MW If Load A (West) increases by one MW …. West Total Load 271 MW Buffalo Gen #1 100 MW East Albany $25 Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 50 MW Load A Load B 21 MW 250 MW Gen #4 still has capacity to serve 30 MW Total Load 271 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 71 MW $40 50 MW 50 MW 50 MW Gen #3 100 MW $50 50 MW 71 MW Load A $30 21 MW 250 MW 21 MW If Load A (West) increases by one MW Gen #4 provides the additional MW Gen #4 provides a total of 71 MW without exceeding the Transmission Limit Load B 250 MW Total Load 271 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 71 MW $40 50 MW 50 MW 50 MW 21 MW Gen #3 100 MW $50 50 MW 71 MW Load A $30 21 MW 250 MW Load B 250 MW Gen #4 can serve the next MW of load in the West at …. 1. $25/MWh 2. $30/MWh 3. $40/MWh 4. $50/MWh Total Load 270 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 70 MW $40 50 MW 50 MW 50 MW 20 MW Gen #3 100 MW $50 50 MW 70 MW Load A $30 20 MW 250 MW Load B 250 MW Gen #4 can serve the next MW of load in the West at $40/MWh The LBMP for the WEST is $40/MWh West Total Load 271 MW Buffalo Gen #1 100 MW East Albany Gen #2 50 MW $25 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 70 MW $30 $50 50 MW Load A Load B 20 MW 251 MW If Load B (East) increases by one MW …. Total Load 271 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 100 MW Gen #4 100 MW East 100 MW 50 MW 150 MW 50 MW 70 MW 51 MW $40 20 MW Gen #3 100 MW $50 51 MW 70 MW Load A $30 20 MW Congestion At Limit 251 MW Load B 251 MW The system is at Transmission Constraints - Congestion Transmission Limits cannot be exceeded. Gen #4 cannot serve the next MW of load in the East without exceeding the Transmission Limit. Gen #3 will have to serve the next MW of load in the East. Total Load 271 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 70 MW 50 MW 50 MW 51 MW Gen #3 100 MW $40 20 MW $50 51 MW 70 MW Load A $30 20 MW 251 MW Load B 251 MW Gen #3 can serve the next MW of load in the East at …. 1. $25/MWh 2. $30/MWh 3. $40/MWh 4. $50/MWh Total Load 270 MW West Buffalo Gen #1 100 MW Albany Gen #2 50 MW $25 150 MW 100 MW Gen #4 100 MW East 100 MW 70 MW $40 50 MW 50 MW 50 MW 20 MW Gen #3 100 MW $50 50 MW 70 MW Load A $30 20 MW 250 MW Load B 250 MW Gen #3 can serve the next MW of load in the East at $50/MWh The LBMP for the East is $50/MWh Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW Gen #4 100 MW $40 70 MW East Albany Congestion At Limit Gen #2 50 MW $30 50 MW Gen #3 100 MW $50 50 MW Load A Load B 20 MW 250 MW LBMP (West) = $40/MWh LBMP (East) = $50/MWh When transmission limits are reached there is congestion, resulting in unequal LBMPs in the West and East. Total Load 270 MW West Buffalo Gen #1 100 MW $25 100 MW Gen #4 100 MW $40 70 MW ◘ Albany Congestion At Limit Gen #2 50 MW $30 50 MW Gen #3 100 MW $50 50 MW Load A Load B 20 MW 250 MW LBMP (West) = $40/MWh ◘ East LBMP (East) = $50/MWh The Cost of Congestion is the difference between the West & East LBMPs Congestion for this example is equal to [$50/MWh-$40/MWh=$10/MWh] West Total Load 270 MW Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 $30 $50 50 MW 70 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 70 MW Gen #3 50 MW Which generator is the “Marginal Unit” in the West? Gen #1 Gen #2 Gen #3 Gen #4 West Total Load 270 MW Buffalo Gen #1 100 MW $25 East Albany Gen #2 50 MW 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 $30 $50 50 MW 70 MW Load A Load B 20 MW 250 MW Total Load 270 MW Gen #1 100 MW Gen #2 50 MW Gen #4 70 MW Gen #3 50 MW Which generator is the “Marginal Unit” in the East? Gen #1 Gen #2 Gen #3 Gen #4 Total Load 270 MW West Buffalo Gen #1 100 MW East Albany Gen #2 50 MW $25 100 MW 50 MW Gen #4 100 MW Gen #3 100 MW $40 $30 $50 50 MW 70 MW Load A Load B 20 MW 250 MW Determine the Total Load. West + East = 20 MW + 250 MW = Select the Most Economic Generation to meet the Load. Total Load = 270 MW $25 for first 100 MW $30 for next 50 MW 270 MW Meet Load without exceeding Transmission Limits ….. West $40 for next 70 MW Gen #4 East $50 for next 50 MW Gen #3 Determine the Cost of serving the “Next” MW of Load. West $40/MWh East $50/MWh Example 6 LBMP with Congestion Assumptions: Ô Simple 2 Bus, 2 Zone Examples Ô Transmission Constraint of 150 MW Ô No Transmission Losses West East Buffalo Gen #1 100MW Albany $55 Gen #4 $75 100 MW Gen #2 $50 100 MW Gen #5 50 MW $45 Gen #3 $40 100 MW Gen #6 50 MW $60 Load A 40 MW Load B 270 MW What is the Total Load? 1. 230 MW 2. 310 MW 3. 150 MW 4. 320 MW West Total Load 310 MW Buffalo Gen #1 100MW $55 East Albany Gen #4 100 MW $75 Gen #2 100 MW $50 Gen #5 50 MW $45 Gen #3 100 MW $40 Gen #6 50 MW $60 Load A 40 MW Load B 270 MW Select the generator that is the most economic (cheapest): Gen #1 Gen #2 Gen #3 Gen #4 Gen #5 Gen #6 Total Load 310 MW West Buffalo Gen #1 100MW $55 Gen #2 $50 100 MW Gen #3 100 MW ?? MW $40 Load A 40 MW Gen #3 is selected for: 150 MW 50 MW 100 MW 40 MW East Albany Gen #4 $75 100 MW Gen #5 50 MW $45 Gen #6 50 MW $60 Load B 270 MW Total Load 310 MW West Buffalo Gen #1 100MW $55 Gen #2 100 MW $50 Gen #3 100 MW 100 MW $40 Load A 40 MW East Albany Gen #4 100 MW $75 Gen #5 50 MW $45 Gen #6 50 MW $60 Load B 270 MW Total Load 310 MW Gen #3 100 MW Remaining Load 210 MW Gen #3 is selected for 100 MW Still need to select generation to meet the remaining load of 210 MW. Total Load 310 MW West Buffalo Gen #1 100MW $55 Gen #2 100 MW $50 Gen #3 100 MW $40 100 MW Load A 40 MW Total Load 310 MW Gen #3 100 MW Remaining Load 210 MW East Albany Gen #4 100 MW $75 Gen #5 50 MW $45 Gen #6 50 MW $60 Load B 270 MW Select the next generator that is the most economic (cheapest) Gen #1 Gen #2 Gen #4 Gen #5 Gen #6 Total Load 310 MW West Buffalo Gen #1 100MW $55 Gen #2 100 MW $50 Gen #3 100 MW $40 100 MW Load A 40 MW Gen #5 is selected for: 1. 150 MW 2. 50 MW 3. 100 MW 4. 40 MW East Albany Gen #4 100 MW $75 Gen #5 50 MW $45 ?? MW Gen #6 50 MW $60 Load B 270 MW West Total Load 310 MW Buffalo Gen #1 100MW $55 Gen #2 100 MW $50 #3 Gen 100 MW $40 100 MW Load A 40 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Remaining Load 160 MW East Albany Gen #4 100 MW $75 Gen #5 50 MW $45 50 MW Gen #6 50 MW $60 Load B 270 MW Gen #5 is selected for 50 MW Still need to select generation to meet the remaining load of 160 MW. Total Load 310 MW West Buffalo Gen #1 100MW $55 Gen #2 100 MW $50 Gen #3 100 MW 100 MW $40 Load A 40 MW Albany Gen #4 100 MW $75 Gen #5 50 MW 50 MW Gen #6 50 MW $45 $60 Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Remaining Load East 160 MW Select the next generator that is the most economic (cheapest) Gen #1 Gen #2 Gen #4 Gen #6 West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW 100 MW Gen #3 100 MW 100 MW $55 $50 East Albany Gen #4 100 MW $75 Gen #5 50 MW 50 MW $40 Load A 40 MW Gen #6 50 MW $45 $60 Load B 270 MW Let’s see what happens if Gen #2 is selected for 100 MW….. Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW 100 MW Gen #3 100 MW 100 MW East Albany Gen #4 100 MW $75 $55 100MW Gen #5 50 MW $50 100MW Gen #6 50 MW $40 Load A 40 MW 50 MW $45 $60 40MW Load B 270 MW If Gen #2 is selected for 100 MW how many MW will cross the Buffalo/Albany Line? 1. 200 MW 2. 160 MW 3. 150 MW 4. 140 MW Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW 100 MW Gen #3 100 MW 100 MW Albany Limit Exceeded $55 East Gen #4 100 MW $75 100MW 160 MW $50 100MW 50 MW Gen #6 50 MW $40 Load A 40 MW Gen #5 50 MW $45 $60 40MW Load B 270 MW If Gen #2 is selected for 100 MW ... 200 MW are provided by Generators in the West. Subtracting the West Load of 40 MW from the 200 MW generated leaves 160 MW to cross the Buffalo/Albany Line. This will exceed the transmission limit of 150 MW. West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW ??? MW Gen #3 100 MW 100 MW $55 $50 East Albany Gen #4 100 MW $75 Gen #5 50 MW 50 MW $40 Load A 40 MW Gen #6 50 MW $45 $60 Load B 270 MW Without exceeding the Buffalo/Albany Transmission Line Limit, Gen #2 is selected for: 1. 70 MW 2. 50 MW 3. 90 MW 4. 150 MW Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW 90MW $50 100MW 150MW Gen #4 100 MW $75 Gen #5 50 MW $45 50 MW Gen #6 50 MW $40 100 MW Albany Congestion At Limit $55 East $60 40MW Load A 40 MW Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Remaining Load 70 MW Gen #2 is selected for 90 MW. 190 MW is generated in the West. Subtracting the West Load of 40 MW leaves 150 MW to cross the Buffalo/Albany Line. West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Albany Gen #4 100 MW $75 $55 Gen #5 50 MW $50 $45 50 MW #3 Gen 100 MW East Gen #6 50 MW $40 100 MW Load A 40 MW $60 Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Remaining Load 70 MW Can Generation from the West continue to be selected to meet the remaining load in the East? Yes No Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW 90MW $50 90 MW Gen #3 100 MW 100MW 150MW Gen #4 100 MW $75 Gen #5 50 MW $45 50 MW Gen #6 50 MW $40 100 MW Albany Congestion At Limit $55 East $60 40MW Load A 40 MW Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Remaining Load 70 MW Any further generation from the West would increase the MW crossing the Buffalo/Albany Line. Generation from the West cannot be selected to meet the remaining load in the East since the Buffalo-Albany Transmission Line is at the Limit. Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW East Albany Gen #4 100 MW $75 $55 90MW 150MW Gen #5 50 MW $50 100MW 50MW 100 MW 50 MW Gen #6 50 MW $40 40MW Load A 40 MW $45 $60 200MW Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Remaining Load 70 MW Still need to select generation to meet the remaining load of 70 MW in the East . West Total Load 310 MW Buffalo Gen #1 100MW Albany $55 150MW Gen #2 100 MW Gen #4 100 MW $75 Gen #5 50 MW $50 90 MW Gen #3 100 MW East $45 50 MW Gen #6 50 MW $40 100 MW Load A 40 MW $60 Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Remaining Load 70 MW Select the next generator that is the most economic (cheapest) without exceeding the transmission limits: Gen #1 Gen #4 Gen #5 Gen #6 West Total Load 310 MW Buffalo Gen #1 100MW Albany $55 150MW Gen #2 100 MW Gen #4 100 MW $75 Gen #5 50 MW $50 90 MW Gen #3 100 MW East $45 50 MW Gen #6 50 MW $40 100 MW ?? MW Load A 40 MW $60 Load B 270 MW Total Load 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Gen #6 ?? MW Remaining Load 70 MW Gen #6 is selected for: 70 MW 50 MW 30 MW 40 MW Total Load 310 MW West Buffalo Gen #1 100MW Albany $55 150MW Gen #2 100 MW $50 $45 50 MW Gen #6 50 MW $40 100 MW 50 MW Load A 40 MW Total Load Gen #4 100 MW $75 Gen #5 50 MW 90 MW Gen #3 100 MW East $60 Load B 270 MW 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Gen #6 50 MW Remaining Load 20 MW Gen #6 is selected for 50 MW. Still need to select generation to meet the remaining load of 20 MW in the East. Total Load 310 MW West Buffalo Gen #1 100MW Albany Gen #4 100 MW $55 150MW Gen #2 100 MW $50 $75 $45 50 MW Gen #6 50 MW $40 100 MW 50 MW Load A 40 MW Total Load 20 MW Gen #5 50 MW 90 MW Gen #3 100 MW East $60 Load B 270 MW 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Gen #6 50 MW Remaining Load 20 MW Gen #4 can serve the remaining load of 20 MW. Total load is met. Total Load 310 MW West Buffalo Gen #1 100MW Albany Gen #4 100 MW $55 ?? MW Gen #2 100 MW $50 $75 $45 50 MW Gen #6 50 MW $40 100 MW 50 MW Load A 40 MW Total Load 20 MW Gen #5 50 MW 90 MW Gen #3 100 MW East 310 MW Gen #3 100 MW Gen #5 50 MW Gen #2 90 MW Gen #6 50 MW Gen #4 20 MW $60 Load B 270 MW Based on the Generators and MWs selected, how many MWs will cross the Buffalo/Albany Line? 1. 100 MW 2. 150 MW 3. 180 MW 4. 160 MW Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW East Albany Gen #4 100 MW $55 90MW 150MW 20 MW 20MW $50 90 MW Gen #3 100 MW 100MW $40 100 MW Load A 40 MW Total Load 50MW 40MW 50MW 270MW Gen #5 50 MW 100 MW Gen #5 50 MW Gen #2 90 MW Gen #6 50 MW Gen #4 20 MW $45 50 MW Gen #6 50 MW 50 MW $60 Load B 270 MW 310 MW Gen #3 $75 150 MW will cross the Buffalo/Albany Line. Transmission Limit is not exceeded. West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW $55 Albany Gen #4 100 MW 20 MW $50 90 MW Gen #3 100 MW East Gen #5 50 MW $75 $45 50 MW $40 100 MW Load A 40 MW Gen #6 50 MW $60 50 MW Load B 270 MW To determine the LBMP let’s see which generator would be selected if the Total Load changed to 311MW …. West Total Load 311 MW Buffalo Gen #1 100MW Gen #2 100 MW $55 Albany Gen #4 100 MW $75 20 MW $50 90 MW Gen #3 100 MW East Gen #5 50 MW $45 50 MW $40 100 MW Gen #6 50 MW 50 MW Load A 41 MW If Load in the West increases by one MW …. $60 Load B 270 MW West Total Load 311 MW Buffalo Gen #1 100MW Gen #2 100 MW $55 Albany Gen #4 100 MW $75 20 MW $50 90 MW Gen #3 100 MW East Gen #5 50 MW $45 50 MW $40 100 MW Load A 41 MW Gen #6 50 MW $60 50 MW Load B 270 MW Which generator (most economic) can serve the next MW of Load in the West, without exceeding transmission limits? Gen #1 Gen #2 Gen #3 Gen #4 Gen #5 Gen #6 Total Load 311 MW West Buffalo Gen #1 100MW Gen #2 100 MW 91 MW Gen #3 100 MW East Albany Gen #4 100 MW $55 91MW 150MW 20 MW 20MW $50 100MW 50MW $40 100 MW Load A 41 MW 41MW 50MW 270MW $75 Gen #5 50 MW $45 50 MW Gen #6 50 MW 50 MW $60 Load B 270 MW If Load in the West increases by one MW Gen #2 can serve the next MW of load in the West without exceeding the Transmission Limit Total Load 311 MW West Buffalo Gen #1 100MW Gen #2 100 MW East Albany Gen #4 100 MW $55 91MW 150MW 20 MW 20MW $50 91 MW Gen #3 100 MW 100MW 50MW $40 100 MW Load A 41 MW 41MW $75 50MW 270MW Gen #5 50 MW $45 50 MW Gen #6 50 MW $60 50 MW Load B 270 MW Gen #2 can serve the next MW of load in the West at …. 1. $25/MWh 2. $30/MWh 3. $40/MWh 4. $50/MWh Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW East Albany Gen #4 100 MW $55 90MW 150MW 20 MW 20MW $50 90 MW Gen #3 100 MW 100MW 50MW $40 100 MW Load A 40 MW 41MW $75 50MW 270MW Gen #5 50 MW $45 50 MW Gen #6 50 MW $60 50 MW Load B 270 MW Gen #2 can serve the next MW of load in the West at $50/MWh The LBMP for the WEST is $50/MWh West Total Load 311 MW Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW $55 East Albany Gen #4 100 MW 20 MW $50 Gen #5 50 MW $75 $45 50 MW $40 100 MW Gen #6 50 MW 50 MW Load A 40 MW If Load in the East increases by one MW …. $60 Load B 271 MW West Total Load 311 MW Buffalo Gen #1 100MW Gen #2 100 MW 90 MW $55 East Albany Gen #4 100 MW 20 MW $50 $45 50 MW #3 Gen 100 MW Gen #5 50 MW $75 $40 100 MW Load A 40 MW Which generator (most economic) can provide the additional MW of Load in the East? East Gen #1 Gen #2 Gen #3 Gen #4 Gen #5 Gen #6 Gen #6 50 MW 50 MW $60 Load B 271 MW Total Load 311MW West Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW East Albany Gen #4 100 MW $55 90MW 150MW 21 MW 21MW $50 100MW 50MW $40 100 MW Load A 40 MW 40MW 50MW 271MW Gen #5 50 MW $75 $45 50 MW Gen #6 50 MW 50 MW $60 Load B 271 MW If Load in the East increases by one MW Gen #4 can serve the next MW of load in the East without exceeding the Transmission Limit Total Load 311 MW West Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW East Albany Gen #4 100 MW $55 90 MW 150MW 21 MW 21MW $50 100MW 50 MW $40 100 MW Load A 40 MW 40MW 50MW 271MW Gen #5 50 MW $75 $45 50 MW Gen #6 50 MW 50 MW $60 Load B 271 MW Gen #4 can serve the next MW of load in the East at … 1. $75/MWh 2. $45/MWh 3. $50/MWh 4. $60/MWh Total Load 310MW West Buffalo Gen #1 100MW Gen #2 100 MW 90 MW Gen #3 100 MW East Albany Gen #4 100 MW $55 90 MW 150MW 20 MW 20 MW $50 100MW 50 MW $40 100 MW Load A 40 MW 40MW 50MW 271MW Gen #5 50 MW $75 $45 50 MW Gen #6 50 MW 50 MW $60 Load B 270 MW Gen #4 can serve the next MW of load in the East at $75/MWh The LBMP for the EAST is $75/MWh Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW $55 100 MW Albany Gen #4 100 MW 20 MW $50 90 MW Gen #3 100 MW East Gen #5 50 MW $75 $45 50 MW $40 Load A 40 MW LBMP (West) = $50/MWh Gen #6 50 MW 50 MW $60 Load B 270 MW LBMP (East) = $75/MWh Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW $55 $50 Gen #4 100 MW Gen #5 50 MW $75 $45 50 MW #3 100 MW Albany 20 MW 90 MW Gen 100 MW East $40 Load A 40 MW LBMP (West) = $50/MWh Gen #6 50 MW 50 MW $60 Load B 270 MW LBMP (East) = $75/MWh Ignoring losses what is the cost of Congestion? 1. $50/MWh 2. $40/MWh 3. $25/MWh 4. $75/MWh Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW $55 $50 Gen #4 100 MW Gen #5 50 MW $75 $45 50 MW #3 100 MW Albany 20 MW 90 MW Gen 100 MW East $40 Load A 40 MW LBMP (West) = $50/MWh Gen #6 50 MW 50 MW $60 Load B 270 MW LBMP (East) = $75/MWh Ignoring losses, the cost of Congestion is the difference between the LBMPs [$75/MWh - $50/MWh = $25/MWh] $25/MWh is the Cost of Congestion West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW $55 Albany Gen #4 100 MW $75 20 MW $50 90 MW Gen #3 100 MW East Gen #5 50 MW $45 50 MW $40 100 MW Load A 40 MW Gen #6 50 MW $60 50 MW Load B 270 MW Which generator is the “Marginal Unit” for the West? West Gen #1 Gen #2 Gen #3 Gen #4 Gen #5 Gen #6 West Total Load 310 MW Buffalo Gen #1 100MW Gen #2 100 MW 90 MW $55 100 MW Albany Gen #4 100 MW 20 MW $50 Gen #5 50 MW $75 $45 50 MW #3 Gen 100 MW East $40 Load A 40 MW Gen #6 50 MW 50 MW $60 Load B 270 MW Which generator is the “Marginal Unit” for the East? East Gen #1 Gen #2 Gen #3 Gen #4 Gen #5 Gen #6 Total Load 310 MW West Buffalo Gen #1 100MW Gen #2 100 MW Albany Gen #4 100 MW $55 20 MW Gen #5 50 MW $50 90 MW Gen #3 100 MW 100 MW East $75 $45 50 MW Gen #6 50 MW $40 50 MW Load A 40 MW $60 Load B 270 MW Determine the Total Load. West + East = 40 MW + 270 MW = Select the Most Economic Generation to meet the Load. Total Load = 310 MW $40 for first 100 MW $45 for next 50 MW West East Determine the Cost of serving the “Next” MW of Load. 310 MW Meet Load without exceeding Transmission Limits ….. $50 for next 90 MW Gen #2 $60 for next 50 MW Gen #6 $75 for next 20 MW Gen #4 West $50/MWh East $75/MWh Recognize: To maintain an efficient and reliable Transmission System a departure from economic dispatch may be necessary to ensure Transmission Limits are not exceeded. Congestion occurs when the transmission limit is reached Congestion results in unequal LBMPs at different locations. The previous examples show how the LBMP consists of the cost of Energy as well as Congestion when Transmission Limits are reached. LBMP consists of three components …. (1) Energy LBMP Locational Based Marginal Pricing (2) Congestion (3) Losses (1) Energy: Selecting the generation that is the most economic (cheapest) to meet the Load 1. The price of producing an additional MW of Load is called the marginal price. price 2. The Energy component of LBMP is called marginal cost of energy. 3. The Energy component is the same for all buses. 4. LBMP will be the same when: 5. Transmission Limits are not reached Transmission Limits are not exceeded Losses are zero Energy costs are usually positive. (2) Congestion: Ensuring transmission limits are not exceeded. 1. Generation schedules may cause one or more transmission lines, or other transmission equipment, to carry more power than their rating allows. 2. To maintain an efficient and reliable Transmission System a departure from economic dispatch may be necessary to ensure Transmission Limits are not exceeded. 3. Congestion results in unequal LBMPs at different locations. 4. Congestion is one of the components of LBMP called the marginal cost of congestion. 5. The congestion component is zero when: 6. Transmission Limits are not reached Transmission Limits are not exceeded Congestion can be zero, negative or positive. (3) Losses: Accounting for the Generation lost. ◘ Transmission losses are one of the components of LBMP called the marginal cost of losses ◘ Transmission losses is the power lost as dissipated heat when power flows in transmission lines and transformers. ◘ Losses can be zero, negative or positive. (3) Losses: Accounting for the Generation lost. Example determining the marginal cost of losses: losses Need 100 MW to be delivered There is a 2% Loss of Generation or 2 MW To deliver 100 MW need 102 MW Total Generation to account for losses 102 MW Generated 2 MW Lost At $20/MW Losses: (2 MW) x ($20/MW) = $40 Cost of losses is ($40)/100 MW = $0.40/MW See Day Ahead Scheduling Manual, Attachment A 100 MW delivered. Generators are Paid the LBMP (where they inject power) at the Generator Bus. The New York Control Area (NYCA) has over 400 Generator Buses. Load is charged based on the Zone where the Load is located Zonal LBMP is a Load Weighted Average for the Zone. NYCA Zones A West B Genesee C Central D North E Mohawk Valley F Capital G Hudson Valley H Millwood I Dunwoodie J New York City K Long Island 4 External Zones Hydro Quebec PJM ISO New England IMO NYCA Zones: ◘ 11 Internal ◘ 4 External Locational Based Marginal Pricing …. 1. A pricing methodology for the cost of Energy at each location in the NYS Transmission System. 2. LBMP is equal to the cost to serve the next MW of Load at a specific location in the grid. 3. Taking into account: • Generation Offer Prices • Physical aspects of the NY Transmission System including Congestion and Losses For More Information refer to NYISO Web Site: Market Participant’s User's Guide (MPUG) Technical Bulletins regarding LBMP: 6, 7, 20, 28, 30, 37, 45, 52, 56, 62, 69, 86, 89 NYISO Market Training Online Resources Market Participant’s User's Guide (MPUG) Technical Bulletins Regarding LBMP: 6, 7, 20, 28, 30, 37, 45, 52, 56, 62, 69, 86, 89 Market Training – Online Resources Locational Based Marginal Pricing …. Generator Bus Zone Energy Congestion LBMP Losses the cornerstone of the NYISO Market Operation Please provide feedback/comments to [email protected]
© Copyright 2026 Paperzz