PJM MISO Joint Common Market Initiative Meeting Modeling Interface between PJM and MISO May 27, 2015 Model • Two RTO network model • PJM’s network comprises 18 buses and MISO’s network comprises 8 buses • Overlapping regions: flow on the tie lines are affected by both PJM’s and MISO’s actions • Allows for applying shadow price convergence logic ©2015 www.monitoringanalytics.com 2 Model ©2015 www.monitoringanalytics.com 3 Model • Step 1 (MISO) • MISO is the monitoring RTO • Solve the dispatch model • Compare State Estimator (SE) flow against Model flow • Step 2 (MISO) • If SE flow exceeds the Model flow, MISO redispatches its generators to reduce the flow • Compute shadow price • Pass the shadow price and flow limit to PJM • Step 3 (PJM) • Solve the dispatch model using MISO’s shadow price and flow limit ©2015 www.monitoringanalytics.com 4 Example (Step 1) Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generators 18,050 18,050 N/A $471,392 MISO2 & PJM8 Joint Optimization 1,000 $ 33- $57 PJM’s World Load (MW) Gen (MW) Interchange (MW) Marginal Generator Load (MW) Gen (MW) Interchange (MW) Marginal Generator Load (MW) Gen (MW) Interchange (MW) Marginal Generator ©2015 225 12,500 12,500 0 PJM4 5,550 5,550 0 MISO3 18,050 18,050 N/A N/A $ 34 MISO’s World 900 $ 51 Reality www.monitoringanalytics.com $ 34 0 MW 0 MW 1125 5 $ 51 Example (Step 2) Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generators 18,050 18,050 N/A $471,392 MISO2 & PJM8 Joint Optimization 1,000 $ 33- $57 PJM’s World Load (MW) Gen (MW) Interchange (MW) Marginal Generator Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generator 5,550 5,550 0 $187,230 MISO3 & MISO5 Load (MW) Gen (MW) Interchange (MW) Marginal Generator ©2015 225 12,500 12,500 0 PJM4 18,050 18,050 N/A N/A $ 34 MISO’s World 800($31) MISO passes shadow price and flow limit to PJM $ 42 - $ 60 Reality www.monitoringanalytics.com $ 34 0 MW 0 MW 1025 6 $ 52 Example (Step 3) Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generators 18,050 18,050 N/A $471,392 MISO2 & PJM8 Joint Optimization 1,000 $ 33- $57 PJM’s World Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generator Load (MW) Gen (MW) Interchange (MW) Total system cost Marginal Generator 12,500 12,500 0 287,410 PJM5 & PJM12 5,550 5,550 0 $187,230 MISO3 & MISO5 Load (MW) Gen (MW) Interchange (MW) Marginal Generator ©2015 18,050 18,050 N/A N/A 200 ($30) PJM uses MISO’s shadow price and flow limit $ 43 MISO’s World 800($31) $ 42 - $ 60 Reality www.monitoringanalytics.com $33 - $51 0 MW 0 MW 1000 7 $ 52 MISO/Patton Proposed Interface Definition MISO’s PJM Price ©2015 www.monitoringanalytics.com 8 MISO/Patton Proposed Interface Definition PJM’s MISO Price ©2015 www.monitoringanalytics.com 9 PJM Proposed Interface Definition PJM’s MISO Price ©2015 www.monitoringanalytics.com 10 PJM Proposed Interface Definition MISO’s PJM Price ©2015 www.monitoringanalytics.com 11 Joint Optimization Results One M2M Constraint (MRTO: MISO) Shadow Price Converges Solution with Binding M2M Constraint with Shadow-Price Convergence - No transactions Patton's Design (all generator buses) Price difference prior to scheduling transaction LMP Shadow Price Load (MW) Gen (MW) Transaction (MW) Cost of Generation Marginal Generator(s) Flow on MISO5-MISO3 Solution with Binding M2M Constraint with Shadow-Price Non Convergence - 300 MW PJM-MISO transaction PJM Design (buses at the seams) $9.45 Binding at 1000 MW $33 - $57 $41.69 18,050 18,050 N/A $471,392 MISO2 & PJM8 1000 Patton's Design (zero out dfax) (all generator buses) Patton's Design ( zero out CLMP) (all generator buses) PJM Design (buses at the seams) $5.72 $1,716.00 $5.03 $1,509.00 $3.54 $1,062.00 $9.11 Transaction Settlement Difference in Prices Post Transaction Gross Profit to Market PJM+MISO Generation Costs $474,640 $472,399 $472,887 $471,761 Total Cost $474,640 $474,115 $474,396 $472,823 ©2015 www.monitoringanalytics.com 12 Appendix One M2M Constraint (MRTO: MISO) Shadow Price Converges MISO Model LMP Shadow Price (Passed to PJM) Load (MW) Gen (MW) Transaction (MW) Cost of Generation Marginal Generator(s) Flow on MISO5-MISO3 MISO's PJM Price Energy Component Congestion Component PJM Model LMP Shadow Price Load (MW) Gen (MW) Transaction (MW) Cost of Generation Marginal Generator(s) Flow on MISO5-MISO3 PJM's MISO Price Energy Component Congestion Component ©2015 Solution with Binding M2M Constraint with Shadow-Price Convergence - No transactions PJM Design Patton's Design (buses at the (all generator buses) seams) Binding at 800 MW $42 - $60 $31.28 5,550 5,550 0 $187,230 MISO1 & MISO3 800 $48.97 $51.88 $54.92 $54.92 ($5.96) ($3.04) Violation penalty beyond 200 MW $34 - $47 $33 - $51 $30.57 12,500 12,500 0 $287,410 PJM5 & PJM12 200 $39.52 $42.77 $39.52 $0.00 $3.25 www.monitoringanalytics.com Solution with Binding M2M Constraint with Shadow-Price Non Convergence - 300 MW PJM-MISO transaction Patton's Design ( zero Patton's Design (zero out dfax) out CLMP) (all generator buses) (all generator buses) Binding at 800 MW $37 - $61 $41.77 5,550 5,250 300 $172,899 MISO1 & MISO3 800 $46.27 $54.23 ($7.95) Violation penalty beyond 200 MW $37 - $45 $33 - $56 $19.49 $41.77 12,500 12,800 300 $299,500 $299,988 PJM4 & PJM12 PJM12 200 214.62 $40.55 $41.24 $40.55 $41.24 $0.00 $5.16 13 PJM Design (buses at the seams) $37 - $59 $37.58 $171,846 $48.85 $52.51 ($3.66) $34 - $55 $37.58 $299,915 PJM8 211 $45.31 $41.32 $3.99 Monitoring Analytics, LLC 2621 Van Buren Avenue Suite 160 Eagleville, PA 19403 (610) 271-8050 [email protected] www.MonitoringAnalytics.com ©2015 www.monitoringanalytics.com 14
© Copyright 2026 Paperzz