City of Cocoa Beach P.O. Box 322430, 2 South Orlando Avenue Cocoa Beach, Florida 32932-2430 www.cityofcocoabeach.com CB15-001 Minutemen Causeway Streetscape/Stormwater Improvements Addendum #1 – February 27, 2015 Pre-Bid Meeting Additional Information 1. Bid Documents – revised 00200 Proposal and 00500 Agreement (A1 & A2) Revised Completion Time of Contract and Supplemental Requirements 2. Bid Documents – revised 00331 Experience (A3) 3. List of Permits: State ERP & CCCL permits, City of Cocoa Water Main (A4) 4. Geotechnical Soils Exploratory (A5) 5. Schedule Constraints for use in Proposed Schedule required submittal Business, particularly Beach Plaza (between Atlantic Av & beach), have their lowest season between September-November and their peak season from March through July. School (Roosevelt Elementary & CBHS at west end of Minutemen) is out midlate May and back in late August so summer months would be easiest for west Minutemen construction activity. 6. A Certified MOT Inspector must be onsite during construction activity. Contractor is responsible for all MOT and required to submit MOT plan prior to construction. 7. REMOVE QUANTITIES for trash/recycle receptacles as they will be provided by the City waste management contractor – see Schedule of Unit Pricing, provided in Excel and PDF. (A6 & A7) 8. Alternate Bid Items – minor Outside of Rights-of-Way work including pavement removal, paver installation and minor landscape installation - CB15-001 Alternate Items Construction Plans and Unit Pricing. (A8, A9 & A10). Please note that plans calling for Hunter irrigation components are “or equal” in all plan references. 9. MOT Considerations – primary corridor Business and School traffic (ped, bike, schoolbuses) CB15-001 Addendum #1, March 3, 2015 Page 1 of 4 Each block along the corridor can be shut down to vehicular traffic - one block at a time for construction ease and time productivity (see below) as there are alternate routes around each section. Intersections must be left open as necessary to allow the flow of critical traffic but most intersections (except for Sunset Drive) can be closed down temporarily for critical construction but should be opened as soon as possible. MOT is the responsibility of the Contractor and will be discussed further at the Pre-Con Meeting to assist in MOT plan submittal. 10. February 17, 2015 Mandatory Pre-Bid Meeting Minutes (A11) 11. City will add ten (10) days to Bid Question Period. Bid Question Period will end on Friday, March 6, 2015 at 5PM. 12. City agrees to add fourteen (14) days to Bid Opening Date. Bid Opening Date is Friday, March 27, 2015 at 2PM. Bidder Questions (provided via email to City CFO) Certified General Contractors: 1. Is there a requirement for this project that the contractor has to be FDOT Prequalified? If so, is there a specific category? This project does not require FDOT Prequalification. 2. Will the City be responsible for hiring a 3rd party testing company to perform materials testing on this project? Sections 014500 and 014529 of the Technical Specifications define who pays for testing. MASCI General Contractor 1. Will the list of bid items (bid form) be provided in Excel format? Yes, both the Schedule of Unit Pricing and Alternate Item pricing will be emailed to those firms in attendance at the Mandatory Pre-Bid Meeting. City respectfully requests that you confirm receipt of these two (2) Excel spreadsheets. (A7 & A10) CB15-001 Addendum #1, March 3, 2015 Page 2 of 4 Gibbs & Register, Inc. 1. Would the Owner please extend the contract completion by 100 calendar days; from 200 calendar days to 300 calendar days for final completion. City will extend contract completion by 60 days so that final completion will be required within 260 calendar days. See #1 of Pre-Bid Meeting Additional Information. 2. Does the City have special holidays in addition to those listed on page 800-2 of supplementary general conditions for years 2009-2010? 2015 City Holidays are given the same as provided in Section 00800-2. 3. Could the Engineer provide a larger print size of the issued plans? They are difficult to read in the 11”x17” format? High resolution PDF construction plans are now provided on City Bid Webpage. Bidders are responsible for printing out hard copies of this document as necessary for review. 4. Could the Owner please clarify the statement made during the pre-bid meeting concerning closing certain blocks completely, one at a time, but still maintaining one-way traffic clear to Woodland? Which blocks are not eligible for closure? Does the one way traffic pass through the closed block or is it detoured onto other routes? See #9 of Pre-Bid Meeting Additional Information 5. Will a construction permit be required from the City of Cocoa Beach? No, project is fully permitted through the City of Cocoa Beach. 6. Will infiltration and exfiltration testing still be required for the RCP with the storm chamber system being installed? No watertight tests will be required of the actual stormwater exfiltration vaults but all pipes/fittings up to these tanks will be required to be tested per Section 334000. 7. Could the Owner provide a list of alternate approved trench-drain systems in lieu of ACO Polymer Products for use at the time of bid? Contractor may provide equal product alternates for City review/approval. CB15-001 Addendum #1, March 3, 2015 Page 3 of 4 8. If not, we respectfully request an extension to the question cut-off date of 7 calendar days to submit alternate manufacturers. See #10 of Pre-Bid Meeting Additional Information 9. We respectfully request a one-week bid date extension. See #11 of Pre-Bid Meeting Additional Information List of Addendum #1 Attachments A1 - Revised 00200 Proposal A2 - Revised 00500 Agreement A3 - Revised 00310 Experience A4 - List of Project Permits A5 - Geotechnical Report A6 - Revised Schedule of Unit Pricing (PDF) A7 - Revised Schedule of Unit Pricing (Excel) A8 - Alternate Bid Construction Plans A9 - Alternate Bid Unit Pricing (PDF) A10 - Alternate Bid Unit Pricing (Excel) A11 - Pre-Bid Meeting Minutes CB15-001 Addendum #1, March 3, 2015 Page 4 of 4
© Copyright 2026 Paperzz