EHS-CSP-04 1.0 Procedure for obtaining Certificate of Conformity – for Modification Works (COC-MW) Purpose The purpose of this procedure is to describe and outline the method, how the contractor working Under TRAKHEES jurisdiction will apply & obtain COC for Modification Works. 2.0 Scope This procedure will apply to the contractors involved in the modification Works Under TRAKHEES jurisdiction. 3.0 Procedure to be followed 3.1 All modification works carried out in areas under the jurisdiction of Trakhees, Environment, Health and Safety must take into consideration with the requirements of EHS regulations and standards. In order to ensure that Certificates of Conformity – Modification Works must be obtained before starting any modification activities at site. The flow charts provide a step by step guide to the contractors for familiarizing with the process. 3.2 Certificate of Conformity - COC Application for COC must be made by the Contractor of the modification works. Application must be made after the site has been established but before starting any construction activities. 3.3 Safety Advisor/Inspector Safety supervision is must for all types of modification works as per the attached selection matrix for safety advisor or Safety inspector. 3.4 Inspection Fees Inspection fees of AED 1000 should be paid and copy of the payment receipt should be submitted with the application form. 4.0 Attachments 4.1 Certificate of Conformity Form – Modification Works (CSF-04a) 4.2 Flow Chart for obtaining COC - Modification Works (CSF-04b) 4.3 Selection Matrix for COC Modification Works (CSF-04c) 4.4 Selection Matrix of Safety Advisor/Inspector (CSF-04d) 5.0 Applicable Regulations 5.1 EHS Environmental Control Rules & Regulations 5.2 Health, Safety & Fire Protection Regulations & Standards 5.3 EHS Environmental Nuisance Regulations 5.4 EHS Food Establishment Guidelines(If applicable) 5.5 Green Building Regulations for Dubai World Developments.(If applicable) 5.6 FZ/DM Regulations (where applicable) 6.0 EHS Contacts All queries with regard to above procedures to be addressed to EHS Administrator / Document Controller via email: [email protected] or Telephone 04 8811881 REVISION: 01 January 2012 PAGE Note: Please refer www.ehss.ae to ensure that this document is current and applicable 1 of 1 EHS-CSP-04 CSF-04b Flow chart for obtaining COC for Modification Works Contractor / Consultant / Client Contractor Contractor / Consultant / Client Contractor Contractor Contractor Contractor EHS Download COC form for Modification Works from www.ehss.ae Take adequate safety measures at site and complete COC for Modification works form Obtain Modification Permit from Trakhees CED Submit COC-MW form in PDF (signed & stamped by Contractor & Consultant) by email to [email protected] Reapply for COC Receive payment advice by email & take the letter copy to Cashier at EHS Main Office or dragon mart Trakhees office to pay inspection fees (AED 1000) Send the scanned copy of payment receipt along with the letter copy to [email protected] EHS will check safety compliance at site as per the COC-MW form (within 3 working days) after issuing the tracking number Are COC requirements complied on the site? No Yes EHS Issue COC on satisfactory compliance (within 2 working days from the inspection date) ) REVISION: 02 April 2014 Page 1 of 1 EHS-CSP-04 CSF-04c SELECTION MATRIX - COC MODIFICATION WORKS Applicable for all type of buildings with building completion certificate from Trakhees 2 Description Minor Modifications - Internal wall finishes, Furnishings, Low height partitions, Flooring, Replacing existing windows & doors (in dry walls) Work involving fixing of ready made units / items 3 Villa landscaping (Soft) No 4 Installation of A/c Units (Below 4 meter height) No 5 Relocation of movable furniture’s & Fixtures No 6 External cleaning of buildings Yes 7 Structural Modifications / Demolition / Refurbishment Yes 8 Work involving fixing of hoardings / big sign boards Yes 9 Commercial units with floor area size ≥ 80 Sq.mt Yes 10 Renovation of any structure Yes 11 Renovation of Mezzanine floor of any type Yes 12 Work involving Hot works Yes 13 Maintenance on Fragile roof / Warehouse roof Yes 14 Work in a Confined Space Yes 15 Work at Height (above 2.0 meter height) Yes 16 Yes 18 Work involving use of Mechanical Plants & Cranes, Cradles etc. Work carried out over water (Depth more than 500 mm & width more than 1 meter) Addition / en-routing, existing/new under ground or buried services 19 Widening / resurfacing of asphalt / concrete roads Yes 20 Construction of boundary wall / fencing Yes 21 Excavation with a depth ≥ 1.2 Meter Yes 22 Opening of concrete floors ≥ 4 Sq. mt Yes S. No 1 17 COC Required No No Yes Yes A special permission from EHS is required for any other type of construction other than the above selection matrix. Such requests need to be forwarded to [email protected] and necessary replies need to be obtained prior starting any construction activities. REVISION: 02 January 2012 PAGE 1 of 2 Note: Please refer www.ehss.ae to ensure that this document is current and applicable
© Copyright 2026 Paperzz