Wilding E n g i n ee r i n g WILDING ENGINEERING eBay METERING STATION AND TRANSMISSION LINE eBay METERING STATION AND TRANSMISSION LINE Project Location: West Jordan, Utah Project Description: Time of Project: May 2009 – February 2010 Performed Civil Inspections for the construction of a new metering station for the eBay Topaz Data Center, as well as the transmission line from the Oquirrh Substation in West Jordan, Utah Work included inspection and compaction testing of the site, the new metering station and full-time inspection during drilling and placement of concrete on the transmission line Metering Station consisted of various Drilled Shaft and Slab-on-Grade Foundations Transmission line consisted of 9 Drilled Shaft Foundations ranging from 5’-6” diameter by 30’ length to 12’-0” diameter by 46’-6” length Required daily inspection of excavation, concrete placement and finish, field concrete testing, and backfill Wilding Engineering soils lab generated all gradations, proctors, and atterberg limits for the excavation and material placement as well as compressive concrete strength testing for all foundation concrete 1 4 7 2 1 S . H ER I T A G E C R E S T W A Y * B L U F F D A L E, U T 8 4 0 6 5 * 8 0 1 . 5 5 3 . 8 1 1 2 * WI L D I N GE N G I N E E R I NG . C O M
© Copyright 2026 Paperzz