Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 OVERVIEW OF CDM PLAN This CDM Plan must be used by the LDC in submitting a CDM Plan to the IESO under the Energy Conservation Agreement between the LDC and the IESO The CDM Plan will consist of the information provided in this document and any additional information and supporting documents provided by the LDC to the IESO in support of this CDM Plan. Capitalized terms not otherwise defined herein have the meaning ascribed to them in the Energy Conservation Agreement as may be applicable. Complete all fields within the CDM Plan that are applicable. Where additional space is required to complete a section of the CDM Plan, please append additional pages as required. The LDC should indicate that additional information has been attached in the related question field on the CDM Plan. Please refer to the CDM Plan Submission and Review Criteria Rules for further information. A. General Information 1. CDM Plan Submission Date: (DD-Mon-YYYY) CDM Plan Version 9-Jun-2016 Revised Submission 2. LDC INFORMATION LDC 1 LDC 2 LDC 3 Attawapiskat Power Corporation Fort Albany Power Corporation Kashechewan Power Corporation Name: Christina Kebokee Joslyn Nakogee Mary Williams Title: General Manager General Manager General Manager [email protected] [email protected] [email protected] 705-997-1164 705-278-1137 705-275-4127 LDC Name: LDC 4 LDC 5 LCD 6 LCD 7 LCD 8 LCD 9 LCD 10 Company Representative: Email Address: Phone Number (XXX-XXX-XXXX): 3. Primary Contact for CDM Plan Name: Craig Nootchtai LDC Name: APC/FAPC/KPC Title: Project Manager Email Address: Phone Number (XXX-XXX-XXXX): [email protected] om 705-929-6716 Estimated Start Date of CDM Plan: (DD-Mon-YYYY) 1-Jan-2016 LDC CONFIRMATION FOR CDM PLAN Each LDC to this CDM Plan has executed the Energy Conservation Agreement. Yes A completed Cost-Effectiveness Tool is attached and forms part of the CDM Plan. Yes A completed Achievable Potential Tool is attached and forms part of the CDM Plan. Yes All customer segments in each LDC's service area are served by the Programs set out in this CDM Plan. The CDM Plan includes all electricity savings attributable to all Programs and pilot programs that have in-service dates between Jan 1, 2015 and December 31, 2020. The CDM Plan Budget for each LDC includes all eligible funding under the full cost recovery and pay-for-performance mechanisms for Programs under its CDM Plan. Frequency of LDC Invoicing to IESO (subsequent changes to the frequency should be notified to us by email). Yes Yes Yes Monthly COMPLETE FOR CDM PLAN AMENDMENTS ONLY Select the reason(s) for CDM Plan amendment, as per ECA. One time each calendar year of the term LDC wishes to request an adjustment to the CDM Plan Budget The amendments to a provision of the ECA or any Rules will have a material effect on the CDM Plan LDC's actual spending under CDM Plan has exceeded (or is reasonably expected to exceed) the portion of the CDM Plan Budget allocated to the current year of the term Under a joint CDM Plan, LDCs that are parties to a joint CDM Plan reallocate any portion of their respective CDM Plan Targets and CDM Plan Budgets [Reallocation not subject to IESO approval ] IESO has triggered remedies under Article 5 of the ECA LDC seeking to change its selection of the type of funding that it wishes to receive for each Program in the CDM Plan [ECA, section 4.1] Other (Please specify reason) CDM Plan Template A. General Information Page 1 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 B. LDC Authorization LDC DECLARATION Please complete the declaration for each LDC that is listed in this CDM Plan. A separate page with each LDC's signed declaration should be included as part of the CDM Plan submission. LDC I represent that the information contained in this CDM Plan as it relates to the LDC is complete, true, and accurate in all respects. I acknowledge and agree to the following terms and conditions: (1) if this CDM Plan is approved by the IESO and accepted by each LDC to this CDM Plan, the CDM Plan together with any conditions to that approval is incorporated by reference into the Energy Conservation Agreement between the LDC and the IESO (2) the LDC will offer the Programs set out in Table 2 of this CDM Plan to customers in its service area; and (3) the LDC of will implement this CDM Plan in accordance with the CDM Plan Budget. LDC's Legal Name: Attawapiskat Power Corporation Company Representative: Christina Kebokee Signature I/We have the authority to bind the Corporation. Date (DD-Mon-YYYY) CDM Plan Template B. LDC Authorization Page 2 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 B. LDC Authorization LDC DECLARATION Please complete the declaration for each LDC that is listed in this CDM Plan. A separate page with each LDC's signed declaration should be included as part of the CDM Plan submission. LDC I represent that the information contained in this CDM Plan as it relates to the LDC is complete, true, and accurate in all respects. I acknowledge and agree to the following terms and conditions: (1) if this CDM Plan is approved by the IESO and accepted by each LDC to this CDM Plan, the CDM Plan together with any conditions to that approval is incorporated by reference into the Energy Conservation Agreement between the LDC and the IESO (2) the LDC will offer the Programs set out in Table 2 of this CDM Plan to customers in its service area; and (3) the LDC of will implement this CDM Plan in accordance with the CDM Plan Budget. LDC's Legal Name: Fort Albany Power Corporation Company Representative: Joslyn Nakogee Signature I/We have the authority to bind the Corporation. Date (DD-Mon-YYYY) CDM Plan Template B. LDC Authorization (2) Page 3 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 B. LDC Authorization LDC DECLARATION Please complete the declaration for each LDC that is listed in this CDM Plan. A separate page with each LDC's signed declaration should be included as part of the CDM Plan submission. LDC I represent that the information contained in this CDM Plan as it relates to the LDC is complete, true, and accurate in all respects. I acknowledge and agree to the following terms and conditions: (1) if this CDM Plan is approved by the IESO and accepted by each LDC to this CDM Plan, the CDM Plan together with any conditions to that approval is incorporated by reference into the Energy Conservation Agreement between the LDC and the IESO (2) the LDC will offer the Programs set out in Table 2 of this CDM Plan to customers in its service area; and (3) the LDC of will implement this CDM Plan in accordance with the CDM Plan Budget. LDC's Legal Name: Kashechewan Power Corporation Company Representative: Mary Williams Signature I/We have the authority to bind the Corporation. Date (DD-Mon-YYYY) CDM Plan Template B. LDC Authorization (3) Page 4 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 C. CDM Plan Summary TABLE 1: SUMMARY OF CDM PORTFOLIO SAVINGS AND BUDGET Allocated LDC CDM Plan Target (MWh) Indicate total CDM Plan Target allocated to LDC(s) CDM Plan MWh Savings b. Calculated as part of CDM Plan a. c. Allocated LDC CDM Plan Budget ($) Indicate total budget allocated to LDC d. Total CDM Plan Budget ($) Calculated as part of CDM Plan f. CDM Plan Cost Effectiveness CDM PLAN TOTAL LDC 1 LDC 2 LDC 3 1,370 510.0 340.0 520.0 1,370 558 374 438 $403,788 $148,832.00 $98,990.00 $155,966.00 $5,269,512 $1,846,142 1,682,107 1,741,263 Total Resource Cost (TRC) Indicate annual portfolio-level Cost Effectiveness for CDM Plan as determined by LDC(s) using output from Cost-Effectiveness Tool Program Year Benefits ($) Costs ($) 2015 2016 $537,844.00 $1,604,461.00 2017 $281,276.00 $1,407,787.00 2018 $287,743.00 $1,357,651.00 2019 $296,600.00 $1,369,832.00 2020 $244,826.00 $1,211,899.00 CDM Plan Total $1,648,289 $6,951,630 RATIONALE FOR NOT FULFILLING TRC REQUIREMENT LDC 4 LDC 5 LCD 6 LCD 7 LCD 8 LCD 9 LCD 10 Levelized Cost Program Administrator Cost (PAC) Ratio Benefits ($) Costs ($) Ratio ($/kWh) 0.3 0.2 0.2 0.2 0.2 0.2 $467,690.00 $244,588.00 $250,212.00 $257,913.00 $212,892.00 $1,433,295 $1,712,887.00 $1,729,001.00 $1,724,002.00 $1,729,742.00 $1,537,542.00 $8,433,174 0.3 0.1 0.1 0.1 0.1 0.2 $0.170 $0.347 $0.620 $0.655 $0.390 $0.351 g Plan Cost Effectiveness-Exceptions Rationale Complete this section if proposed plan does not meet minimum Our CDM Plan is not cost effective due to the remote locations of our service areas. All costs associated with the delivery of ANY program are Cost-Effectiveness Thresholds set out in CDM Plan Submission grossly inflated due to travel requirements, freight charges, lack of local professionals, and especially poor conditions of participant's homes. We and Review Criteria Rules. are requesting additional funding which would be for enhanced items such as salary for a staff person, a qualified Project Manager, qualified technical consultants, freight charges, vehicle and equipment purchases, and additional Health and Safety dollars. These are costs that are incurred in these remote communities and must be funded to successfully implement the energy efficiency measures necessary for each LDC to reach their specified targets set by the IESO. Also, each LDC is fully supported by the Chief and Council in their respective First Nation community and have committed themselves to supporting the CDM Program by pledging assistance in the form of labour, material, and equipment (see attached Memorandums of Understanding). As per their individual Community Energy Plans (CEP) which are currently under development, they understand the importance of this project and the part it plays in their overall CEP. CDM Plan Template C. CDM Plan Summary Page 5 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 D. CDM Plan Detailed List of Programs, Election of Funding Mechanism, and Annual Milestones NOTES Complete Table 2 for all Programs for which will contribute towards the CDM Plan Target. Province-wide LDC Program names are found in the applicable Program Rules. Regional & local Program names should be consistent with those included in approved business Include annual budgets for each Program to be allocated against the CDM Plan Budget by funding mechanism. Note: LDC Eligible Expenses incurred in 2014 for programs delivered in 2015 (and not funded as part of the 2011-2014 Master CDM Program Agreement) should be included in 2015 Annual anticipated budget amounts. Portion of the CDM Plan Target that the LDC reasonably expects, based on qualified independent third party analysis as accepted by the IESO could only be achieved with funding LDC 1: Attawapiskat Power Corporation Commercial (inc. Multi-Fam) 1. CDM Plan 2. Program Name 3. Anticipated Annual Budget 4. Target Gap TABLE 2. PROGRAM AND MILESTONE SCHEDULE Program Implementation Schedule (Annual Anticipated Budget & Incremental Annual Milestones by Program) Conservation on the Coast Home Assistance Program Conservation on the Coast Small Business Program 1-Jul-2016 1-Jul-2016 Yes Yes 2015 Industrial Institutional Program Start Date (DD-Mon-YYYY) Agricultural Proposed Pilots or Programs Small business Approved Local, Regional, or Pilot Programs Low-income Funding Mechanism Approved Province Wide Programs Residential Customer Segments Targeted by Program 2016 Anticipated Annual Budget ($) 2017 Energy Savings (MWh) Anticipated Annual Budget ($) 2018 Anticipated Annual Budget ($) Anticipated Annual Budget ($) Anticipated Annual Budget ($) 0.0 0.0 $0 0.0 $386,748 209.3 $337,342 85.7 $469,854 82.5 $451,082 94.0 $201,116 85.3 $1,846,142 557.8 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 0.0 0.0 $0 0.0 94.0 0.0 Energy Savings (MWh) Total CDM Plan Budget ($) Total Persisting Energy Savings in 2020 (MWh) 409.5 148.3 $0 $0 82.5 0.0 Energy Savings (MWh) Total 2015 - 2020 Energy Savings (MWh) 85.7 0.0 Energy Savings (MWh) 2020 Anticipated Annual Budget ($) 91.5 117.8 Energy Savings (MWh) 2019 55.8 29.5 Full Cost Recovery Programs FCR TOTAL Pay for Performance Programs P4P TOTAL 2011-2014 CDM Framework (and 2015 extension of 2011-2014 Master CDM Agreement) (Not funded through 2015-2020 CDM Framework) 2011-2014 CDM Framework (and 2015 extension) TOTAL TARGET GAP TOTAL CDM PLAN TOTAL MINIMUM ANNUAL SAVINGS CHECK 0.0 False CDM Plan Template $386,748 209.3 True $337,342 85.7 True $469,854 82.5 True $451,082 94.0 True $201,116 85.3 $1,846,142 557.8 True D. CDM Plan Milestone LDC1 APC Page 6 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 D. CDM Plan Detailed List of Programs, Election of Funding Mechanism, and Annual Milestones NOTES Complete Table 2 for all Programs for which will contribute towards the CDM Plan Target. Province-wide LDC Program names are found in the applicable Program Rules. Regional & local Program names should be consistent with those included in approved business Include annual budgets for each Program to be allocated against the CDM Plan Budget by funding mechanism. Note: LDC Eligible Expenses incurred in 2014 for programs delivered in 2015 (and not funded as part of the 2011-2014 Master CDM Program Agreement) should be included in 2015 Annual anticipated budget amounts. Portion of the CDM Plan Target that the LDC reasonably expects, based on qualified independent third party analysis as accepted by the IESO, could only be achieved with funding LDC 2: Fort Albany Power Corporation Commercial (inc. Multi-Fam) 1. CDM Plan 2. Program Name 3. Anticipated Annual Budget 4. Target Gap TABLE 2. PROGRAM AND MILESTONE SCHEDULE Program Implementation Schedule (Annual Anticipated Budget & Incremental Annual Milestones by Program) Conservation on the Coast Home Assistance Program Conservation on the Coast Small Business Program 1-Jul-2016 1-Jul-2016 Yes Yes 2015 Industrial Institutional Program Start Date (DD-Mon-YYYY) Agricultural Proposed Pilots or Programs Small business Approved Local, Regional, or Pilot Programs Low-income Funding Mechanism Approved Province Wide Programs Residential Customer Segments Targeted by Program 2016 Anticipated Annual Budget ($) 2017 Energy Savings (MWh) Anticipated Annual Budget ($) 2018 Anticipated Annual Budget ($) Anticipated Annual Budget ($) Anticipated Annual Budget ($) 0.0 0.0 $0 0.0 $345,251 197.2 $298,018 79.4 $428,572 39.3 $412,025 28.0 $198,240 29.5 $1,682,107 374.4 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 0.0 0.0 $0 0.0 28.0 0.0 Energy Savings (MWh) Total CDM Plan Budget ($) Total Persisting Energy Savings in 2020 (MWh) 226.1 148.3 $0 $0 39.3 0.0 Energy Savings (MWh) Total 2015 - 2020 Energy Savings (MWh) 79.4 0.0 Energy Savings (MWh) 2020 Anticipated Annual Budget ($) 79.4 117.8 Energy Savings (MWh) 2019 0.0 29.5 Full Cost Recovery Programs FCR TOTAL Pay for Performance Programs P4P TOTAL 2011-2014 CDM Framework (and 2015 extension of 2011-2014 Master CDM Agreement) (Not funded through 2015-2020 CDM Framework) 2011-2014 CDM Framework (and 2015 extension) TOTAL TARGET GAP TOTAL CDM PLAN TOTAL MINIMUM ANNUAL SAVINGS CHECK 0.0 False CDM Plan Template $345,251 197.2 True $298,018 79.4 True $428,572 39.3 True $412,025 28.0 False $198,240 29.5 $1,682,107 374.4 False D. CDM Plan Milestone LDC2 FAPC Page 7 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 D. CDM Plan Detailed List of Programs, Election of Funding Mechanism, and Annual Milestones NOTES Complete Table 2 for all Programs for which will contribute towards the CDM Plan Target. Province-wide LDC Program names are found in the applicable Program Rules. Regional & local Program names should be consistent with those included in approved business cases Include annual budgets for each Program to be allocated against the CDM Plan Budget by funding mechanism. Note: LDC Eligible Expenses incurred in 2014 for programs delivered in 2015 (and not funded as part of the 2011-2014 Master CDM Program Agreement) should be included in 2015 Annual anticipated budget amounts. Portion of the CDM Plan Target that the LDC reasonably expects, based on qualified independent third party analysis as accepted by the IESO, could only be achieved with funding in LDC 3: Kashechewan Power Corporation Commercial (inc. Multi-Fam) 1. CDM Plan 2. Program Name 3. Anticipated Annual Budget 4. Target Gap TABLE 2. PROGRAM AND MILESTONE SCHEDULE Program Implementation Schedule (Annual Anticipated Budget & Incremental Annual Milestones by Program) Conservation on the Coast Home Assistance Program Conservation on the Coast Small Business Program 1-Jul-2016 1-Jul-2016 Yes Yes 2015 Industrial Institutional Program Start Date (DD-Mon-YYYY) Agricultural Proposed Pilots or Programs Small business Approved Local, Regional, or Pilot Programs Low-income Funding Mechanism Approved Province Wide Programs Residential Customer Segments Targeted by Program 2016 Anticipated Annual Budget ($) 2017 Energy Savings (MWh) Anticipated Annual Budget ($) 2018 Anticipated Annual Budget ($) Anticipated Annual Budget ($) Anticipated Annual Budget ($) Total 2015 - 2020 0.0 0.0 $0 0.0 $358,436 209.3 $315,564 89.1 $443,757 62.6 $425,875 37.8 $197,630 39.4 $1,741,263 438.3 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 $0 0.0 0.0 0.0 62.6 0.0 Energy Savings (MWh) 37.8 0.0 Energy Savings (MWh) Total Persisting Total CDM Plan Budget Energy Savings in 2020 ($) (MWh) 291.0 147.3 $0 $0 89.1 0.0 Energy Savings (MWh) 2020 Energy Savings (MWh) 91.5 117.8 Energy Savings (MWh) 2019 Anticipated Annual Budget ($) 9.9 29.5 Full Cost Recovery Programs FCR TOTAL Pay for Performance Programs P4P TOTAL 2011-2014 CDM Framework (and 2015 extension of 2011-2014 Master CDM Agreement) (Not funded through 2015-2020 CDM Framework) 2011-2014 CDM Framework (and 2015 extension) TOTAL TARGET GAP TOTAL CDM PLAN TOTAL MINIMUM ANNUAL SAVINGS CHECK 0.0 $0 0.0 False CDM Plan Template $358,436 209.3 True $315,564 89.1 True $443,757 62.6 True $425,875 37.8 True $197,630 39.4 $1,741,263 438.3 True D. CDM Plan Milestone LDC3 KPC Page 8 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 E. Proposed Local and Regional Pilot CDM Programs Notes Complete the following Table(s) for each proposed local and regional Program or Pilot Program in the CDM Plan for which a business case has NOT previously been approved by the IESO. Please refer to the Program Development and Rule Revision Guideline and the Business Case Template for full details on requirements and submission of a business case for approval of a local or regional Program. For the process for receiving funding for a Pilot Program, refer to the LDC Program Innovation Guideline. TABLE 3a. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) Conservation on the Coast Home Assistance Proposed Local Program TABLE 3b. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 7-Dec-2015 c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) Low Income Attawapiskat Power Corporation Kashechewan Power Corporation Fort Albany Power Corporation Program designed to have a Basic, Extended, and Weatherization audit conducted on every home in each community. Basic Measures will be provided to all homes in each community, with Extended Measures to those that qualify. Provide overview of key objectives and elements of proposed Weatherization measures including draftproofing, attic insulation, exterior wall insulation, and crawlspace insulation will be installed in 125 units in Attawapiskat, 125 units in Kashechewan, and 80 units in Fort Albany. All of these measures are program or pilot. required to meet the energy targets for each corresponding LDC. e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. TABLE 3c. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. Kashechewan Power Corporation New efficient lighting will be installed in every small business where they qualify. Will be installed in 2016 and 2020 to capture any new businesses that may open. Most small businesses have already received lighting in 2011-2014 CDM Program. Use same "Program name" included in other worksheets TABLE 3f. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. Use same "Program name" included in other worksheets Provide overview of key objectives and elements of proposed program or pilot. TABLE 3g. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS TABLE 3h. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. Use same "Program name" included in other worksheets Provide overview of key objectives and elements of proposed program or pilot. TABLE 3i. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Attawapiskat Power Corporation Provide overview of key objectives and elements of proposed program or pilot. TABLE 3e. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) 7-Dec-2015 Small Business TABLE 3d. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets d. Participating LDCs (if applicable) a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Use same "Program name" included in other worksheets Fort Albany Power Corporation e. Overview of Proposed Program or Pilot a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) Conservation on the Coast Small Business Lighting Proposed Local Program TABLE 3j. PROPOSED LOCAL AND REGIONAL CDM PROGRAMS / PILOTS Use same "Program name" included in other worksheets a. Program Name b. Program Type b. Estimated Business Case Submission Date (DD-Mon-YYYY) c. Customer Segment(s) Served by Programs c. Customer Segment(s) Served by Programs d. Participating LDCs (if applicable) d. Participating LDCs (if applicable) e. Overview of Proposed Program or Pilot e. Overview of Proposed Program or Pilot Provide overview of key objectives and elements of proposed program or pilot. Use same "Program name" included in other worksheets Provide overview of key objectives and elements of proposed program or pilot. CDM Plan Template E. Proposed Program&Pilots Page 9 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 F. Detailed Information on Collaboration and Regional Planning ADDITIONAL DETAILED INFORMATION Regional LDC(s) Collaboration Description of how the LDC(s) will collaborate with other LDCs. If collaboration will not occur, description of why it will not occur. Attawapiskat, Fort Albany, and Kashechewan Power Corporations will be cost-sharing freight charges, consultant fees, and consultant travel disbursements. Each LDC will be repsonsible for their own targets but will lend resources to help their neighbouring community where possible i.e. labour, equipment, material, and expertise. There is also potential for the three LDC's to share fees for hosting a regional Energy Conservation Forum to educate and inform local and regional customers. The LDC's will also work with HydroOne to share decommissioning costs for refrigerators and freezers. Gas Collaboration Description of how the LDC(s) will collaborate with other gas utility programs delivered in service area (if applicable). If collaboration will not occur, description of why it will not occur. There are no gas companies in the region. CDM Contribution to Regional Planning Description of how the CDM Plan considers the electricity needs and investments identified in other plans or planned initiatives, completed or underway within the LDC(s)' service area or region. This may included Integrated Regional Resource Plans or Municipal Community Energy Plans. The CDM program currently provides information and feedback to their respective local First Nations to assist with the development of a Community Energy Plan. The goal is to further modify existing programs and identify potential pilot programs that will meet the energy needs of the community as identified in their energy plan. There are many synergies currently at work and will continue as the CDM programs are rolled out over the next 6 years. CDM Plan Template F. Detailed Information Page 10 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 G. Additional Documentation for CDM Plan (If applicable) ADDITIONAL INFORMATION AND DOCUMENTATION See supporting documents Programs Opportunity to provide any additional information on assumptions used for budgets and/or savings for approved 2015-2020 province-wide programs Approved Local and/or Regional Programs and Pilot Programs Opportunity to provide any additional information on assumptions used for budgets and/or savings for approved 2015-2020 local or regional programs or pilot programs See supporting documents Proposed Local and/or Regional Programs and Pilot Programs Opportunity to provide additional information on assumptions used for forecast budgets and/or savings for proposed programs or pilot programs See supporting documents Programs from 2011-2014/2015 CDM Framework Opportunity to provide any additional information on assumptions used for budgets and/or savings from existing 2011-2014/2015 CDM Programs Programs funded through Pay-for-Performance Opportunity to provide any additional information on assumptions used for budgets and/or savings for Pay for Performance Programs Other Additional assumptions used in the CDM Plan See supporting documents CDM Plan Template G. Additional Documentation Page 11 of 12 Conservation First Framework LDC Tool Kit Final v2 - Janurary 23, 2015 Summary of Changes to CDM Template Version No. 2 Date Tab 20-Jan-15 Change Summary Inclusion of "Company Name" for Primary Contact Inclusion of frequency of invoicing (monthly vs. quarterly) A. General Information Update date format to eliminate confusion Change reference to OPA Additional LDCs for joint plan B. LDC Authorization Update date format to eliminate confusion Additional line items for FRC program names Additional LDCs for joint plan Update on the program names Update date format to eliminate confusion D. CDM Plan Milestone LDC 1-10 Update column headers: - "Province Wide Program Name" - "Proposed Regional or Local CDM Program or Pilot Program Name" Change reference to OPA Update Header and Footer Additional boxes for proposed programs E.. Proposed Program&Pilots Update date format to eliminate confusion O. Detailed Information Clarity if it is primary LDC or all LDCs in a joint CDM Plan. CDM Plan Template Summary of Version Changes Page 12 of 12
© Copyright 2026 Paperzz