PART FIVE – PLANNING ACTIONS Rutherford Industrial Investigation Area Physical Description The Rutherford Industrial Investigation Area is bounded by the railway line in the south, by properties fronting Winders Lane in the west, and by the existing Rutherford Industrial Estate in the east. It includes the site of the Rutherford Aerodrome and provides a flat, contiguous area of around 450 hectares, as shown in Figure 23 Rutherford Industrial Investigation Area. Existing Development The boundaries of the Investigation Area have included the whole of the Rutherford Aerodrome, despite the existence of runways and buildings used by the Royal Newcastle Aero Club. This does not imply that the Aero Club will cease operations or that industrial development will be undertaken across the whole of the Investigation Area. However, it will be necessary to consider the relationship between any proposed industrial development and the Aero Club. Assuming that the Aero Club remains, the potential for industrial development is likely to be limited in the area to the north of the Highway. Nevertheless, it is possible that industrial development could coexist with the Aero Club on an on-going basis. Considerations will include noise impacts and attenuation and obstacle limitations. To the south of the Highway, the Investigation Area contains a few existing dwellings with frontage to the New England Highway. The Investigation Area also adjoins dwellings with frontage to Winders Lane and the New England Hwy. These dwellings are situated above the site and any future industrial development will therefore be visible from the dwellings. Potential impacts such as noise and odour will also need to be considered. The future of existing uses on Kyle Street, including local motorcycle clubs and the stock saleyards will need to be considered in the context of future industrial development as well as access and environmental outcomes for the area. Access Access points to the New England Highway will need to be limited and should not include direct access to industrial buildings. The standard of the New England Highway will also be a key consideration. Access between the existing industrial estate and new industrial development will need to be considered to avoid the need for traffic to reenter the New England Hwy on local trips. Page 100 PART FIVE – PLANNING ACTIONS Page 101 PART FIVE – PLANNING ACTIONS Visual Impact The Investigation Area straddles the highway at one of the major gateway entries to the City. It is therefore imperative that the visual impact of development in the area is coordinated and designed so as to present a positive image of the City. The design of a new visual gateway should also consider potential to incorporate compatible improvements for existing development in the existing Rutherford Industrial Estate. Environmental A local catchment analysis will be required, including assessment of the potential for impacts on water quality and quantity and land degradation issues such as salinity and acid sulphate soils. Impacts on native flora and fauna will also need to be assessed. This includes an area of Hunter Lowland Redgum Forest, an endangered vegetation community, which has been mapped by Council (Hill; 2003) within the study area. The Investigation Area includes native vegetation with linkages to vegetation in the north and south and has been identified as an opportunity corridor in Council’s Greening Plan. The status of this vegetation and the potential to retain linkages will be a key consideration in future investigations. The integration of buffers within the area to supplement existing vegetation may be an appropriate outcome from a range of perspectives, including visual and environmental (e.g. water quality). Flooding Flooding will need to be addressed for the site including local overland flows and the availability of flood free access. Conclusion The Rutherford area displays the clearest opportunity for planning for future expansion of employment lands within the Maitland LGA. Regional supplies of industrial land and the changing nature of industrial activities will have an effect on the demand for additional industrial land. It is therefore proposed to stage the release of land in the Rutherford Investigation Area so that adequate supplies are available to meet the short-term demands for employment land, with options for land releases. The Category 1 area has a yield of approximately 60 ha of industrial land. Anambah Preliminary Investigation Area The Anambah area covers approximately 428 hectares to the west of Anambah Road, as shown in Figure 24 Anambah Preliminary Investigation Area. The approximate boundaries of this area are defined by natural water features and flooding in the south and west, and by topographical features (i.e. 50m contour) in the west and north. Page 102 PART FIVE – PLANNING ACTIONS The 50 metre contour coincides with the approximate limit of native vegetation on the visually significant ridgeline that extends North- South from Gosforth, via Windella to Winders Lane. This ridgeline provides the backdrop for the area and will help to ensure that any future development is not overly dominant in the landscape. The Anambah area is almost totally cleared of vegetation due to a history of low intensity grazing. There are a number of drainage lines throughout the undulating terrain, which show signs of erosion and potential for rehabilitation in conjunction with any future development. Land uses within the Anambah area include grazing, viticulture, tourist activities and equine establishments. Investigations will include the relationship to the Maitland Aerodrome, the provision of flood free access and the impact of development within the local catchment. The Anambah area is currently not serviced by reticulated water or wastewater, and the provision of these services will be essential for any residential development. Council will therefore commence early consultation with the Hunter Water Corporation. Early indications suggest that there could be capacity for a sustainable future community in the Anambah area and that Council should begin to consider the long-term future of the area in consultation with other stakeholders. However, given the extent of zoned land nearer to existing urban services and the recommended timing of investigations elsewhere in the City, the Anambah area should only be viewed as a long-term growth option with the possibility that detailed investigations may occur outside of the period of this strategy. Lochinvar Fringe Preliminary Investigation Area The Lochinvar Structure Plan identified the need to address the interface between the existing urban areas on the eastern front of Lochinvar and the expansion of Lochinvar into the rural fringe area in the west. A Preliminary Investigation Area is shown in Figure 24A Lochinvar Fringe Preliminary Investigation Area. In the east, land between the proposed urban expansion of Lochinvar, the proposed expansion of Rutherford Industrial area, and the existing rural residential estate of Windella, comprises small rural lot development. The future zoning and expected land uses within this area are not known and will be investigated in conjunction with a review of Council’s Citywide LEP. It is likely that parts of this area are suited to small rural lot development to maintain appropriate buffers between the urban interfaces, taking into account the proximity of the industrial land development and the local aerodrome. Noise constraints from the New England Highway and maintaining appropriate setbacks and buffers will be a key consideration for future development. Page 103 PART FIVE – PLANNING ACTIONS Page 104 PART FIVE – PLANNING ACTIONS Land to the north of the New England Highway in this location is to address the visual impacts of development on the site and its effect on the approaches both into Lochinvar and into Rutherford. A small area of land on the western front of Lochinvar has been identified incorporating land already identified in the Settlement Strategy, existing small lot development along Windemere Road and following topographical features linking this area to the St Helena development on the southern side of the highway. The land is constrained by flooding, drainage to the Hunter River, visually significant corridors, and heritage issues. Kaludah House is located on the adjoining lot, and part of the Investigation Area is located within the visual catchment of this regionally significant heritage item. This matter must be considered in any investigations. The intersection to be provided at the St Helena site is on the crest of the basin defining the urban built up area of the Lochinvar township. Any development of this area needs to be considered in its context as the gateway entry to Lochinvar. A number of properties identified on the limit of this investigation area may only achieve limited development potential in the immediate time frame or may not proceed. Land beyond this boundary to the west is defined by the Greta escarpment and undulating to the flood plain. As such, development further west cannot be included or considered until such times as a review of the land capabilities and the housing demand has been reassessed for the current study area. Access from the New England Highway in this location is currently restricted and as such relies on access through properties fronting Luskintyre Road. It is proposed to further investigate both these precincts in conjunction with a review of the Rural Lands Strategy for the western rural area of the LGA, to ensure the proper management and protection of rural lands. A review of Heritage Items in rural areas is also to be undertaken to provide guidance for appropriate land use zoning and planning controls to ensure the accurate identification, protection and management of both the buildings or items and their cartilages. These will have implications for the expansion of development west of Lochinvar. Maitland Vale Preliminary Investigation Area Initial constraints analysis has identified land north of the Bolwarra/ Largs locality as a potential long-term investigation for the future urban development of Maitland. The Maitland Vale Preliminary Investigation Area is defined by the North Coast rail line, flood prone land, existing development, topographical limitations and areas of significant vegetation coverage. A Preliminary Investigation Area is shown in Figure 25 Maitland Vale Preliminary Investigation Area. Page 105 PART FIVE – PLANNING ACTIONS Page 106 PART FIVE – PLANNING ACTIONS It is unlikely that residential development at Maitland Vale would be necessary during the lifespan of the Settlement Strategy, however, if a high population growth is sustained, initial investigations may be commenced in the next 10 years. This Preliminary Investigation Area has been included in the Settlement Strategy to give an indication of Council’s long-term growth patterns and to inform land use activities in the Maitland Vale area over the next 10 years. Whilst the land is currently not serviced by adequate infrastructure to support urban development, the Investigation Area is adjacent to the Mindaribba train station and Paterson Road, and will be serviced by the third crossing of the Hunter River. Investigations at Maitland Vale may also warrant a re-examination of land development within the Bolwarra/ Largs area. Infill development areas A review of residential approval statistics over the five year period between 2001 and 2005 shows that a number of dual occupancy and medium density housing proposals are relatively small as a proportion of the total approvals for residential buildings. The greatest concentration of medium density development is in the Eastern Sector, especially in East Maitland and Raworth. In recent times, Council has approved number of multi unit development within the CBD area which indicate a growing interest in this type of development within the LGA. Urban consolidation helps to lower the need for new physical infrastructure, utilises existing facilities more efficiently, and reduces urban sprawl into agricultural areas and areas that might otherwise become conservation areas. The Settlement Strategy has identified a number of existing urban areas where consolidation should be investigated. These areas have been identified as preferred sites for consolidation and redevelopment as they are located around transport nodes and have a possible surplus capacity for human and physical services. It is initially suggested to focus higher density development and redevelopment in centres at Rutherford, East Maitland and Thornton, as well as the commercial areas of Greenhills and Central Maitland. Careful planning is required to determine a coordinated suite of urban design criteria, infrastructure and service provision and suitable development objectives and incentives. It will be necessary to prepare a structure plan for each infill site prior to major new development. Council will determine the priorities for the infill sites based on demand and resources. A target of 3,000 dwellings is set for the six infill sites. Five infill areas have been identified and are shown in Figures 26, 27, 28, 29 and 30. Page 107 PART FIVE – PLANNING ACTIONS Page 108 PART FIVE – PLANNING ACTIONS Page 109 PART FIVE – PLANNING ACTIONS Page 110 PART FIVE – PLANNING ACTIONS Page 111 PART FIVE – PLANNING ACTIONS Page 112 PART FIVE – PLANNING ACTIONS Page 113
© Copyright 2026 Paperzz