School Sanitation and Hygiene Education
Programme
School Toilet/Urinal
Design
and
Drawing
UNICEF, Nepal
March, 2006
School Toilet/Urinal
Design
and
Drawing
-v-
Note:A. Opening Details
1. Doors (D)
2. Collapsible Gate
3. Ventilations (V)
75 x 180cm = 2Nos.
90 x 180 cm = 2Nos.
75 x 45 cm = 4 Nos.
98.5 x 45 cm = 8 Nos.
B. Value of X
S.No.
No. of Students
1
2
Up to 200
201 to 400
Value of
X
326.75 cm
463.00 cm
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
water Supply and Sanitation Division
Office/UNICEF
Parsa/Chitwan/Nawalparasi/Kaptlvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SCHOOL TOiLET/URlNAL
(Capacity: students<400)
PLAN
Date: October 14, 2003
Drg.No.:
1 of 7
SECTION 7WV
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
water Supply and Sanitation Division
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SCHOOL TOILET/URINAL
(Capacity: students<400)
SECTIONAL VIEW
Date: October 14, 2003
Drg.No.:
5 of 7
40 x 40 x 4mm thk MS
anqle
25 x 25 x 4mm thk MS
angle frame for shutter
25 x 25 x 4 mm MS angle frame
750
95
100
250 mm long tower-bolt/
400
l\=
100,00
Hi
1000
12 mm diaMS rcd@ I
105 |
Ventilation
1800
5 mm thk MS plate
holdfast
Door Frame
Door Shutter
(AH measurements are in mm)
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Diciston
Office/UN ICEF
Parsa/Chitwan/Nawalparast/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January 2005
SCHOOL TOILET/URINAL
DETAILS OF DOORS & VENTILATIONS
Date: 14 October 2003
Drg.No.:
6 of 7
Note:Value of X
S.No.
1
2
Value of
X
326.75 cm
463.00 cm
No. of Students
Up to 200
201 to 400
X+287
X + 23
132
100
32
100
1—
188
288
253
188
l
i
r~
I
I
I
(X+23V2
32.
132
100
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
water Supply and Sanitation Division
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SCHOOL TOlLET/URiNAL
(Capacity: students<400)
LAYOUT PLAN
Date: October 14, 2003
Drg.No.:
7 of 7
23.00
A. Opening Details
1. Doors (D)
2. Collapsible Gate
3. Ventilations (V)
75x180cm = 4Nos.
90x145cm = 2Nos.
90 x 45cm = 6Nos.
100x 45cm = 2Nos.
Value of X
165 cm
240 cm
315 cm
390 cm
401 to 600
601 to 800
801 to 1000
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chttwan, Nawalparasi, Kapilvastu & Dang
1001 and above
SCHOOL TOILET/URINAL
(Capacity: students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
PLAN
Date: October 14, 2003
Drg. No.:
1 of 8
10 cm thk RCC roof
CGI Roof with 2 nos of transparent
sheets in each side
o
o
r
FRONT
LEFT
All me sure merits are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL TOILET/URINAL
(Capacity: students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
ELEVATIONS
Date: October 14, 2003
Org. Ho.:
2 of 8
ELEVATION (right)
Ver J ation
Urinal (Girls)
Separator
Urinal (Boys)
t-65,00-
SECTION 'B-B'
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL TOILET/URINAL
(Capacity: stuclents>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
ELEVATION & SECTION
Date: October 14, 2003
Drg. to.:
3 of 8
Floor Finishing Over 10 cm Ink
PCC (1:2:4)
"Flat Brick Soling
Sand Filing
SECTION 7WV
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL TOILET/URINAL
(Capacity: students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SECTION
Date: October 14, 2003
Drg. No.:
4ofi
10 cm thick RCC roof slab over
90 cm high Separators
o
nj
Natural Ground
-l-
1
o
d
SECTION 'C-C
All mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL TOILET/URINAL
(Capacity:stuctents>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SECTION
Date: October 14, 2003
Drg. No.:
5of8
Roof Truss
(Material: MS Circular Pipes, Span = 471 cm)
4 mm thk quesset plats
Details of A
Details of B
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan.Nawalparasi, Kapiivastu & Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Dale: January, 2005
SCHOOL TOILET/URINAL
TRUSS DETAILS
Date: October 14, 2003
Dr
9 NO
6
40 x 40 x 4mm thk MS
25 x 25 x 4mm thk MS
angle frame for shutter
2 5 x 25 x 4 m m MS ancte frame
g
£g
a
o
r c
J bJ
1 i
250 mm long tower-bolt/
100.00
-1000.00-
T\
Ventilation
25 x 4 mm MS strips
5 mm thk MS plate
holdfast
Door Frame
Door Shutter
(Alt measurements are in mm)
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Dicision
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January 2005
SCHOOL TOILET/URINAL
DETAILS OF DOORS & VENTILATIONS
Date: 14 October 2003
Drg.No.:
7 of 8
Note:ValueofX
S.No.
1
2
3
4
Value of
X
165 cm
240 cm
315 cm
390 cm
No. of Students
401 to 600
601 to 800
801 to 1000
1001 and above
Ail mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SCHOOL TOILET/URINAL
(Capacity: students<400)
LAYOUT PLAN
Date: October 14, 2003
Drg.No.:
8 of 8
(X+194,50)77 77 77 77 /
-571.50-
23.00
' 77 7~\77 77
77 77 77 77 77 // // 77 //
1%slo
//
-148.50-
B
(-70.0DH
Urinal (Girls)
oXh dhh (Kh
1% slope
15.0077 77 7/
77 77
ilope
(-6o.(xH i
L__|^MO
iUrinal (Boys)
K
I. _
X
i slope
V 77 77KV 77 7J\ 77 77 77 77 /7 77 '7 77 77 7.
Note:-
_L
A. Opening Details
1. Doors (D)
2. Ventilations (V)
S. VaijeofX
S.No.
No. of Students
1
401 to 600
2
601 to 800
3
801 to 1000
Lavaf of Straw fPaf^>
-111.50
25.00
SECTIOM X-X
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
4
75x180cm =
100x 45cm = 4Nos.
Value of X
165 cm
240 cm
315 cm
1001 and above
390 cm
SCHOOL URiNAL
(Capacity: stuctents>401)
Designed By:
Water Supply and Sanitation Division Office/UNICEF
Yagya Shrestha
Consultant, UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
Revised Date: January, 2005
PLAN
Date: October 14, 2003
Drg. No.:
1 Of 7
CGI Roof
o
q
in
FRONT
LEFT
A I! mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL URINAL
(Capacity: students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
ELEVATIONS
Date: October 14, 2003
Drg. No.:
2 of 7
• •
^^
^^
^^
^M
^B
^H!
• •
MM
••§
••§
• •
HH
• •
ELEVATION (right)
SECTION 'A-A1
All mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNiCEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL URtNAL
(Capacity:students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
ELEVATION& SECTION
Date: October 14, 2003
Org. No.:
3 of 7
flH
MB
CGI Roofing cover
10
in
|t
Jl
90 cm high Separators
in
in
RCC Cover Slab
Eartti Bach Filling
Natural Ground
/
Leactimo Pit
RCCRirxi
in
•M-
-22.50
7.50-
-(45.00)-
SECTION 'B-B1
Ail mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division Office/UNICEF
Parsa, Chitwan, Nawalparasi, Kapilvastu & Dang
SCHOOL URINAL
(Capacity: students>401)
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SECTION
Date: October 14, 2003
Drg. No.:
4 of 7
I^B
^B
^H
^M
^M
^B
^B
^M
^M
^M
^»
^M
^M
^M
^M
Roof Truss
(Material: MS Circular Pipes, Span = 471 cm)
15,00
25 mm i|> MS Pipe
32 mm <(» MS Pipe
M10 Nut-bolts
4 mm thk guesset plate
50 mm ili MS Pipe
32 mm ifr MS Pipe
Details of A
Details of B
All mesurements are in centimeter
SCHOOL SANITATION PROGRAMME
Designed By:
Water Supply and Sanitation Division Office/UNICEF
Yagya Shrestha
Consultant, UNICEF
Parsa, Chitwan, Nawalparast, Kapilvastu & Dang
Revised Date: January, 2005
SCHOOL URINAL
TRUSS DETAILS
Date: October 14, 2003
Drg No :
s5,o( 7
^»»
«^
40 x 40 x 4mm thk MS
25 x25 x4mm thkMS
angle frame for shutter
25 x 25 x 4 mm MS anqte frame
250 mm long tower-bolt/
I2 mm 4a MS rod @ 100 DC
5 mm thk MS plate
holdfast
Door Frame
Door Shutter
(All measurements are in mm)
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Dicision
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January 2005
SCHOOL URINAL
DETAILS OF DOORS & VENTILATIONS
Date: 14 October 2003
Drg.No.:
6 of 7
Note:Value of X
S.No.
No. of Students
1
2
3
4
Value of
X
165 cm
240 cm
315 cm
390 cm
401 to 600
601 to 800
801 to 1000
1001 and above
All mesurements are in centimeters
SCHOOL SANITATION PROGRAMME
Water Supply and Sanitation Division
Office/UN ICEF
Parsa/Chitwan/Nawalparasi/Kapilvastu/Dang
Designed By:
Yagya Shrestha
Consultant, UNICEF
Revised Date: January, 2005
SCHOOL URINAL
(Capacity: students<401)
LAYOUT PLAN
Date: October 14, 2003
Drg.No.:
7 of 7
Single Unit Toilet Block
I
610 $$ 576 tt 578 (5 573 8V STB «f
8T5
Jt
krra
830
j |
I
i
831 " (
[-150 mm LEV
ELEVATION
ELEVATION
G1!
ELEVATION
OPENING SCHEDULE
40 Dm fjl
1
^
-
S.1M. D E S C R I P T I O N
^- ? i fjii LSI H(e
!
s
i
SIZE
NOs
Flower Bed
GROUND FLOOR PLAN
MATERIAL
REMARKS
1.
DOOR(D2)
900 XZ175
1
METAL FRAME
LEFT OPENING
2.
DOOR (D3)
592X2175
3
METAL FRAME
RIGHT OPENING
3
DOOR (D3)
592 X 2175
3
METAL FRAME
4.
ENTRANCE GATE (EG1) 12D0 X 1950
METAL FRAME
LEFT OPENING
RIGHT OPENING
5,
ENTRANCE GATE (E61J B75X 1950
1
METAL FRAME
LEFT OPENING
6
WINDOW GRILL (WG'i)
S75 X 450
9
METAL. FRAME
7.
WINDOW GRILL (WG2)
1250X450
6
METAL FRAME
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
Drawing no: A -
GROUND FLOOR PLAN
j Scale:
Dale: 25lh December. 2005
Drawn tiy: P.Thakur
|ctiecked by:
{Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
ELEVATION
ELEVATION
ELEVATION
..;
ELEVATION
GROUND FLOOR PLAN
OPENING SCHEDULE
SN. DESCRIPTION
SIZE
NOs.
MATERIAL
REMARKS
1
DOOR(D2)
1200X2575
1
METAL FRAME
LEFT OPENING
2.
DOOR (03)
592 X 2175
3
METAL FRAME
RIGHT OPENING
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
3
DOOR (D3)
592X2175
3
METAL FRAME LEFT OPENiNG
4.
ENlRANCEGATEfEG'j 875X195U
\
METAL FRAME
RIGHT OPENING
5
ENTRANCE GATE (EG 1) 875 X1950
1
METAL FRAME
LEFT OPEK1KG
6.
WINDOW GRILL (WG1)
875 X 450
9
METAL FRAME
Dale: 2Sir December. 2005
WINDOW GRILL (WG2)
1250X 450
METAL FRAME
Drawn py P Thakur
Single Unit Toilet Block (Alternate)
Drawing no: A -
GROUND HOOR PLAN
] Scale:
[checked by.
|Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
M iimMi'iiuiuiLniim^iuiiiirjjiiiiimiiiiiiiimiiiiiiiiiiiii
iiiiiminriiiiuiin
vzr-\ . - _ n - . :.T~TI:
ELEVATION 1
r ' "i ~ r~ 1
T~
T
; r;-r|-T-p-|r; r , r r T t T i T i : Y:i
(B)
ELEVATION 2
ELEVATION 4
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
g)
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
El. EVAT1ONS
Draw-r,g no: A -
Scale:
Dare: 25th December, 2005
Drawn by: P.Thakur
[CnecKed by:
JApproved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
7^ _
Cement Plaster at Iraide wall
- B 0 BAR @150 C/C
4 NO5 100 BAR
_ Qernent Plaster
al (op of partition
Bk. Facta wrih
Header Finisl
- - Nr -
Lintel Detail for
openings above 1200mm
DETAIL 1
DETAIL 2
+3710 RIDGE LVL.
+2100 LINTEL LVL
+ 1650 SILL LVL.
v \
•
Bk. faced wall
t>5rnm Ttik. Side Wcill for Urinal
(1in Vlicjh for Girls B." 1 2HIHLI# lor Boys)
Epoxy Paint upto 1M Hl.(ForGi is)
& f.2M Hi- (for Boys) from Flo±r Level
+0 PLINTH LVL.
-450 GROUND LVL
J Cemeni Piaster ui
2!iO
40 MM CEMENT SCREED[NGQ:6
75MMPCC (1:2:4)
SAND AND GRAVEL
COMPACTED EARTH
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
T
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
Single Unit ioilet Block
SECTION AT AA
SECTION AT A A'
Scale:
j nn: A Uate: 2bta Decemuef. 2005
wn ny: P Thakur
|Chfecke:i
JApproved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
Cement Plas^ei ai ir>5ide waN
fi / } -80 BAR @I50 C/C
JQR-4NOS1O0BAR
Bfc. Facra witfi
Heads* Finish
+3710 RIDGE LVL
Lintel Detail for
openings above 1200mm
DETAIL 1
+2100 LINTEL LVL.
\
+ 1650 SILL LVL.
8k. faced wall
65mm Thk. Side wali for Urinal
{1m High lor Girls 8,12m Hign for Soys)
Epoxy^ainljijplo 1M Ht.(forGi Is)
-&'1'.2MHI. (foFEoys) from Floi r Level
±0 PLINTH LVL.
L500 200
450 GROUND LVL
;
^A\N ^>Cv>>>y'N-vr-.Av^
EPOXY LAYER
CEMENT PUNNING
40 MM CEMENT SCREEDING(1:6
75MM PCC (1:2:4)
150 MM SAND FILLING
RAMMED EARTH FILLING
SECTION AT AA'
</^0&P"~
SAND AND GRAVEL
COMPACTED EARTH
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block (Alternate)
SECTION ATA-A 1
Drawing no: A -
| Scale:
Date: 25lh December. 2005
Drawn ay: P.Thakur
|Checkecl by:
|Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CER1D, NLA and BTTC
900
40 NB (M) RAFTER PIPE
REF, DETAIL 4,
FOR CGI SHEET FIXING
40 NB (M) PURLIN PIPE
TOILET ROOM TRUSS
WHEREVER PURLINS ARE CONNECTED
TRT-1
900
22 GAUGE 900mm PLAIN Gl SHEET
.,-
25 NB (M) PURLIN PIPE
40 N6 (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
81 0" LONG CGI SHEET
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
TOILET ROOM TRUSS
WHEREVER PURLIN CONTINUE.
TRT-2
j
TYPE DESIGN
I
Truss Details (Toilet Block)
f Drawing no:
Date: 3rd Jan. S006
Drawn by S Upreti
j Scale: 1:20
[checked by:
iApprc.'Od tjy
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERIO, NLA and BTTC
900
25 NB(M) PURLIN PIPE
40 NB (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
HEADER HIGH INC LINED GABLE B W D
ONEBK. HEADER HIGH HORIZONTAL GABLE BAND
4979
TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS
\- 250 4
WHEREVER PURLINS ARE CONNECTED
22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
NPIPE
81 0" LONG CGI SHEET
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND
TYPE DESIGN
~
Truss Details (Toilet Block)
! Drawing no:
Scale: 1:20
Date: 3nJj_ar>, 2006
250
4
TOILET BLOCK GABLE TRUSS
WHEREVER PURLIN CONTINUE.
Drawn by: S. Upreti
250
4
[checked by:
Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
IPS FLOOR FINISH
40 MM CEMENT SCRE£DING(1:6)
150MM SANO FILING
RAMMED EARTH FILLING
CEMENT PUNNING
40 MM CEMENT SCRE£DING(1:6>
75MM PCC (1:2:4)
75 MM THICK DPC
200
40 MM CEMENT SCREED1NG(1:6
r
8mm b a r ® 175o'c
- ~ - Levelling for PCC with Sand
4 nos 10mm bar @ 200 cfc
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
DETAIL OF STEPS
Single Unit Toilet Block
TRENCH PLAN & FOUNDATION DETAILS
Dale: 21 si Nov. 2005
Drawn py: P.Thakur |checked ay:
SILT Consultanls (P) Ltd IN ASSOCIATION
WITH CFRID. NLA and BTTC
250 mm brie* Wall
0 1 6 x 100 mm Pivot hinge
125 mm Nickel
plated sleel hinges
(IS 1541 heavyduly)\
-120ft-B75-
I
I
I
I
I
T
f
1
1
I
I
I
—I—I—i—I—Shutter frame main 4 secondary -•—I—•—1—•—"—r—<-!—•—I—i—I—rtmemher 40 x 5 mm
flat
-I—•—'——•—•—L
016 «lOOmmPrvothuirje
40 x 5 mm Flal Hold fasl
H
Secon. member
1^
I
Top View: Hold fasl & Hinoe arranqemenl
Scale:-1:4
250mmbnckWall
Internal member
20 x 3 mm Rat
One end ol hofd 'astweloed to lower
part arid door shutter frame welded to
upper part ol 1 6 m m 0 pivot hing
on top of internal member
& 3mm Ihk. MS plate welded
on 5 r i Omm MS tat
Kote:
1. Complete fabricated (loot 1o be hot dip galvanized
Hinge lixing delail
Scale:-1:4
Scale:-1:16
TOILET ENTRANCE MS GATE
Dimensions are in mm
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF -Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Entrance Gale Detai.s ( E G 1 )
Drawing no: A Date: 26lr> Dec. 20K
Prawn by: P Aryal
Icheck&d by
Approved hy:
SILT Consultants (P) Lid IN ASSOCIATION
WITH CERID, NLA and BTTC
-75-
-432-
-65-
I-12-Door Fiamemadaof
25 x 25 x '-.2 mm
/Galvanized MS
Rectangular Pipe
10x10x0.5mm
ehannei
25x50x1.2 mm
recta hgulaf
galvanised
simile!
125 nun Bride wall
125 mm long Hinge
0.58 mm cote sheet
rivelerj with 10X10X0.5mm
chanrvel
Section at "A-A"
Q.5B mm thk plain
863
Section at "Y-Y"
color Gl sheet Panel
150 mm heavy duty
/Aluminium HJIKIIG
Door Frame made of
25 x 25 x 12 mm
3x20«200MS
75 mm long Aluminum Lrxk
MSFIat!tel(IFasl
2 75
Shutter Frame made of
25x50x1.2 mm
Plan of
MS Flat Holdfast
Rectangular Pipe
25x5Q(!.2 mm Galvanized
MS Shutter frame riveted wish
Ox 10(0.5mm galvanized
channel
0,58 mm thk plain
color Glsheel Panel
863
Refer dimensions as mentioned in drawing.
Dimensions are not to measure onlytoread.
10x10x0.5mm
channel
•12J—25—
\
\I , ll
-4
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Neoal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Section a; "Fj-u!1
TOILFT BLOCK
;5x25x1.2mrnG^:aniz«i
MS rectangular pipe riveted
Dooi Delails (03)
S;ale:
Drawing no: A Floor i.Ev
Toilet Dour Elevation
Date: 21a Dec. 2005
Uiitwn by: V. Aryal
_
]ciiucktitl >jy:
JA|jjj,svti! B/
Wall OmilterJ
StLT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
-900-620-
-80-
60-
X
10x10x0.5 mm
Channel
75
-10
IIP
in»in»n
ril
12 0
4—40-4-20 •
Gunnel
OSS m m cclQr sheet
I12HKH
SO-
FramB Profile Detail
Section at A-A
Scale:-1:4
Scale:-1:4
nvetedwiih 10XiDXO|5m
cnannel
Seclion at B-B
Scale:-1:4
•-- Holes la welding
Metal ftal for fixing
hinge
Section at C-C
V
Scale:-1:4
2to
/
^ Holes (or safewing
Hinge
AidrapFastener
6 9
Hinge fixing
detail of Door Shutter
ISO
Floor Level
25-
Oi
Section at Y-Y
Scale:-1:16
Wall and dole fast omitted
Dimensions are in mm
25-I
- Mela! Oal welded on
frame for fixing hinge
p. Holes for screwing
Hinge
3 Nos. 7mm Torxari reinforcing bar
Hold last on both side^2 Nos. @ ZOO mm from both ends1 No. @ center (length-140 mm)
Note:
1- Frame Profile to be made from l.Bmmthk
Galvanized US sheel
2.Shu!tertobe made from 1.2 mm Galvanised MS
Sheet.
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
-660-
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOU FT BLOCK
-8204ttiM5-|—
Aldrop Kaslenei /
-630SeclionalY-V
Scale:-V.10
-JDS-t40l
Hinge fixing
detail of Door Frame
Door DetaLis"(D2]T
Drawing no: A -
Scale:
rials ?1sl Dm:, ?M>
Drawn by: P. Atyil
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and 8TTC
3x20 MS flat wetded
on MS Angle Frame
3x20 MS flat welded
on MS Angle Frame
25x25mmX2.5mm
MS Angle Frame _
25x25mmX2.5mm
MS Angle Frame
r
ID
7mm ROO in
HOLD FAST
200
HOLD FAST
7mm ROD
————
il
200
tn
IT)
CM
CM
125
125
125
125
125
125
875
WINDOW GRILL (WG1)
125
if)
CM
CM
CM
CM
• 125
125 I 125
125
125 I 125
i
>
125 | 125
125
125
-
1250
WINDOW GRiLL (WG2)
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Single Unit Toilet Block
Window Grill Details
nu: A
Date: 2Sin December. 2005
Drawn iiy: PThaktif |cneck&tl by
I Scale:
ed by:
SILT Consuitants (P) Ltd IN ASSOCIATION
WITH CER1D, NLA and BTTC
1200mmdia.
Leaching Pit
2.5"PVC
Perferated Pipe
12Q0mmdia.
Leaching Pit
5"PVC
1.25
Manhole
450x450
2.5"PVC
Perferated Pipe
K
Manhole
450x450
+0.00 mm LEV.
BOYS
-150 mm LEV
//
//
GIRLS
.i
±0.00 mm LEV.
±0.00 mm LEV
s\f-S\f
S\fW
'////Ar
•W>/
s\/\rv
Flower Bed
-450 mm LEV.
4"PVCSoj[Pi&e_
Ramp
-450 mm LEV,
GROUND FLOOR PLAN
HBUAJBBTVS
BWHBf
NEML
PWMAflY SCHOOL MPROfflMBIT
PROJECT (PfflP)
WITH
Ltd M AMOCUTKM
M A n d BTTC
2.5TVC
Perforated
Waster Pipe
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
PLAN
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Scale: 1:20
Double Unit Tdiet Block
Manhole & Leaching Pit Detail
[ Drawing no: SAI Dale: 11 Ih July. 2005
[Drawn by: P. Aryal
[checksd by:
] Approved by:
SILT Consullanls (P) Lid IN ASSOCIATION
WITH CER1D, NLA and BTTC
Double Unit Toilet Block
Unit A and Unit B
1 Sl-t
600
(75,
1200
360
1250
. 62i i 8"i 5
250
B75
250
875
250
875
90° Elbow 150x25x5
MS Plate
3'
1•A]
Details of fixing Grab Bar
in Handicapped Toilet
40 DiaG! Pipe
- welded on
150x25x5fnm
MS Plate
V
25 Dia Gl Pipe
o
mi
Ftoor Level
Section at 1-1'
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Delail Plan {Toilet Block)
Drawing no: A Dale: 25ih December, 2005
Drawn by: P. Arya]
ICrtecked by:
©
Scale:
| Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
2SQ
875
250
875
250
875
3
150x25x5 ,
MS (Plate \
+ O.0 mm LVL;
i
Details of fixing Grab Bar_
in Handicapped Toilet
YA
4D0ia Gt Pipe
welded on
150x25x5 mm
MS Plate
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSiP)
5
25tp
B75
E5
Double Unit Toilet Block
Detail Plan (Toilel Block) Alternate
f
4625
Drawn by: P. Arya]
ICfieckarJ by:
[Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
'
;
UNIT A
<•>
UNITB
CD
(5>
EAST ELEVATION
©
(§
0
(3) NORTH ELEVATION
(|)
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
DoutJIe Unit Toilet Btock
E le rations (Toilet Block)
Drawing no: A -
Scale:
Date: 25th December, 2005
Drawn by: P. Aryal
I
[Checked by:
(Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and BTTC
j
i
Cemer.t Piaster at inside wad
'—as BAR @
al lop of pavilion v
" V r 1 4 HOS 100 BAR
DETAIL 2
Lintel Detail for
openings above 1200mm
DETAIL 1
Scale 1:20
UNIT A
D O O H f RAME 150 mm CLEARANCE
FROM Ft OOrl MID SHUTT E R 1 ? S
mm CLEARANCE FROM F LOOP
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
_ DoubieJJnit Toilet Block
Section at A-A' (Toilet Block) Alternale
Orawinij tio: A
1" Scaia:
I Oats^_25tri December, 2005_
- Sirawn by: P. Aryal
|
[
[Clieckbd by:
JApproued by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
UNITB
+371ORIDGELVL.
21M LIMTEL LVL.
H650 SILL LVL
±0 PLINTH LVL.
L450 GROUND LVL
- SAND AND GRAVEL
COMPACTED EARTH
SECTION AT BB'
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepa!
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Section at B-8' (Toilet Block)
Drawing no: A Dale: 25th December, 2005
Drawn by: P. A^al
_Jcheckect by:
j Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and BTTC
900
40 NB (M) RAFTER PIPE
REF. DETAIL 4,
FOR CGI SHEET FIXING
40 NB (M) PURLIN PIPE
TOILET ROOM TRUSS
WHEREVER PURLINS ARE CONNECTED
J-2SCl4
I-250 4
TRT-1
22 GAUGE 900mm PLAIN Gl SHEET
900
— 25 NB (M) PURLIN PIPE
40 NB (M) RAFTER PIPE
<e
'°"cG/
40 NB (M) PURLIN PIPE
81 0" LONG CGI SHEET
L
32 N8 (L) BOTTOM TIE PIPE
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
TOILET ROOM TRUSS
WHEREVER PURLIN CONTINUE.
TRT-2
~ '
^
DESIGN
Truss Details (Toilet Block)
; Drawing no.
| Scale: 1:20
| Date: 3rd jan, 2006^
! Drawn by: S. Upreli
[checked by:
[Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
900
25 N8 (M) PURLIN PIPE
40 NB (M) RAFTER PIPE
40 NB(M} PURLIN PIPE
HEADER HIGH INQLINED GABLE BftND
BK. HEADER HIGH HORIZONTAL GABLE BAND
,ONg BK. HEADER HIGH
LINTEL BAND
\- 250 4
TOILET BLOCK GABLE TRUSS IN BETWEEN TWO WALLS
[-250 4
WHEREVER PURLINS ARE CONNECTED
22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
1034 •
40 NB (M) PURLJN PIPE
8'0'LONG CGI SHEET
HEADER HIGH I NOUN ED GABLE BfcND
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT <PSIP)
ONE BK. HEADER HIGH HORIZONTAL GABLE BAND
TYPE DESIGN
Truss Details (Toilet Btack)
ONEBK. HEADERHIGH
LINTEL BAND
Drawing no:
i Scale: t:20
Date: 3rdjan, 2006
J"- 250 4
TOILET BLOCK^GABLE TRUSS
WHEREVER PURLIN CONTINUE.
Drawn by: S. Upreti
250
4
ICheckecl by:
I Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
BK. OM EDGE ON 250MM SQUARE (Ref Delail I)
I PS FLOOR FINISH
STEP 2- Filling IheSquateby Incompressible Wasla Materials
HIS MAJESTVS
GOVERNMENT OF
NEPAL
COMPOSITE OF BRICK AND COMCRETE
( Detail I )
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Trench Plan & Foundation Details (Toilet Block)
Drawing no: S Scale:
Dale: 21st Nov. 2005
Drawn by: P. Aryal
Checked by:
Approved by;
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERtD, NLA and BTTC
3x20 MS flat welded
on MS Angle Frame
3x20 MS flat welded
on MS Angle Frame
25x25mmX2.5mm
MS Angle Frame
25x25rrtmX2.5mm
MS Angle Frame
HOLD FAST
7mm ROD
— — —
Of
mi
7mm ROD
t-:
HOLD FAST :
m
CM
200
C\J
If)
CM
CM
o
200
IT
in
CM
CM
CM
125 I 125
;
125
125
125
125
875
WINDOW GRILL (WG1)
125
125
125
125 ; 125 ; 125 j 125
1250
125 : 125 , 125 j 125 .
;
WINDOW GRILL (WG2)
HIS MAJESTrS
GOVERNMENT OF
NgPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Double Unit Toilet Block
Window Grill Details
Drawing no: A Date: 251h DecembeF, 2DO5
Drawn by: P. Aryal
TcrTecfced by:
Scale:
j Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
/
2'i GAUGE gOOmm PLAIN Gl SHEET
25 NBfM) PURLIN PIPE
j ^
40 NB (M) RAFTER PIPE
40 NB (M) PURLIN PIPE
LONG CGI SHEET
32 NB <L> BOTTOM TIE PIPE
TOILET BLOCK TRUSS DETAIL
^250 4
22 GAUGE 900mm PLAIN Gl SHEET
25 NB (M) PURLIN PIPE
10W
1
1034
064 -••--
40 NB (M) RAFTER PIPE
40 NB (M) PURL N PIPE
A-- 81 0" LONG CGI SHEET
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
HIGH INCLINED GABLE BAND
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
8 mm0 Plain Rotf\
ONE BK HEADER HIGH HORIZONTAL GABLE BAND
1
:
ONE BK. HEADER HIGH
TOILET BLOCK TRUSS DETAIL AT GABLE WALL
SARASWOTI PRIMARY SCHOOL, Sirsiya, Parsa
Truss Details (Toilet Block)
Drawing no: Parsa 1: SI3-027
; Scale: 1:20
; Dale: Slh August. 2005
Orawn by: S. Upretj Checked by:
;
\~ 250 4
UNICEF-Nepal
'.
;Approved
by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
250 mm bricfc Wall j
I
125 mm Nicksj
plated sleelhinoes
[IS 1341 heavydij|y}\
I 0 1 6 x 100 mm Ptvot hinge
frame Main member
40 x 5 mm Fial Hold fast
Int. member
Secon. member
I
.
I
Top View. Hold fast & Hinge arrangement
Scale:-1:4
250 mm brick Wall
Internal member
20* 3 mm Flat
One end of hold fasl welded to lower'
part and door shutter frame welded to
upper part of 16 rmn0 prvot hing
on top or internal member
&3mmlhJc MS plate weWed
on 5x40mm MS flal
Note:
1. Coraplele fabricated door lo tie hot dip galvanized
Hinge fixing detail
Scale:-1:4
Scale:-1:16
TOILET ENTRANCE MS GATE
Dimensions are in mm
HIS MAJESTTS
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS!P)
TOILET BLOCK
Entrance Gate Details (EG1)
Drawing no: A -
Seals:
Dais: 26th Dec, 2005
Drawn by: P.Aryal
IChKtsd Uy:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CER!D,NLA and BTTC
-592-432-
-12—
-95Ocjor frame made of
25x25x1.2 n an
/Gililvanized MS
iectangular Pipe
"I
10x10x0.5mrn
channel
^
:
25 x 50 x1.2rnm
reclancufar
galvanised
shultef
\
-692125 mm Brick wall
-75-
•
0.58 mm cotar sheet
I
riveted with 10X1OX0-5mm
channel
Section at "A-A"
0.68 mm Ihk plan
color Gl sheet Panel
3x20*200 MS
150 mm heavy duly
/Aluminium Handle
Shutter Frame made of
25 x 50x1.2 mm
Galvanized MS
Rectangular Pipe
Plan of
MS Flat Holdfast
25x50x1.2mm Galvanized
VIS Shutter frame riveted with
0x10x0.5mm galvanized
;hannei
0.58 mm ink plain
color Gl sheel Panel
10x5 0x0.5mm
channel \
.
_
12-
_\_....
—25—
L—
Refer dimensions as mentioned in drawing.
Dimensions are not to measure only to read.
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
Seciion at "B-B"
Sea e:-1:2
25x25x1.2 mm Galvanized
'^S rectangular p,pe nveted
.vim 10x10x0.5 mm galvanized channel
Floor Level
Toilet Door Elevation
Wall OmiifaJ
Gracing no:A -
I Scaie:
Dale: 21sl Dec, 2005
Dimensions are >ri mm
•a
TOILET BLOCK
Door Details (D3)
Drawn by: P.
Checked by:
Approved by:
SILT Consultants (P) Lid IN ASSOCIATION
WITH CERID, NLA and BTTC
p40
IF
-900-«20a-33-j
ar>
10* 10x0.5 mm
Channel
1
57 5
4-1-10
40
1WM
chanm
csttv Gi siuM Var*
4—W-4-2O--
t-3M
¥-
80-
Frame Profile Detail
Seclion at A-A
Scale:-1:4
Scale:-1:4
Section at B-8
Scale:-1:4
- Holes for welding
Metal flat for fixing
hinge
SecBon at C-C
Scale:-1:4
> Holes lor screwing
Hinge
2K)
Aldrap Fastener
89
Hinge ftxino
detail of Door Shutter
Floor Level
25- 1
Dimensions are in mm
Section at Y-Y
Scale:-1:16
Wall and hole fast omitted
r<U
- Mstal flat welded on
frame lor fixing hinge
^ Holes for screwing
3 Nos. 7mm Torkari reinforcing bar
Hold (asi on both sides2 Mos. @ 200 nvn from both ends1 No. @ center (lenglh-140 mm)
Mole:
1. Frame Profile to be made from 1.6 mm thk
Galvanized MS sheet
2. Shutier lo be made from 1.2 mm Galvanised MS
Sheet.
HIS MAJESTTS
GOVERNMENT OF
NEPAL
-660-
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
TOILET BLOCK
Door Details (D2)
Hinge fa ing
Aktrop fastener /
-630SeclionatV-V
Scale:-1:10
delail of Door Frame
Drawing no: A -
State:
Bate: 21S1O8C, 2005
Drawn by: P A r j S
Crwctedby
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID. NLA and 8TTC
1000
- "2.5"PVCPerferated
Pipe
•
1000
0001KJitn
TOIJO
1200mmdia.
Leaching Pit
HIS MAJESTY'S
GOVERNMENT OF
NEPAL
Manhole
450x450
lOOOmmdia.
Leaching Pit
f
I
UNICEF-Nepal
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PS1P)
Double Unit Toilet Biock
\ lOOOmmdia
/Leaching Pit
Waste & Sewerage Pipe Line Diagram
Drawing no: SA:_Da1e: 11th J j y 2005
I D'ii'.vn by: P hr-jh- ^Chccised by
2.5"PVCPerferateH
Pipe
I Scaie:
lApproje
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
2.5"PVC
Perforated
Waster Pipe
HIS MAJESTY'S
GOVERNMENT O f
NEPAL
PLAN
PRIMARY SCHOOL IMPROVEMENT
PROJECT (PSIP)
Scale: 1:20
Double Unit Toilet Block
Manhole & Leaching Pit Detail
Drawing no: SADrawn by: P. Aryal
Scale:
Checked by:
] Approved by:
SILT Consultants (P) Ltd IN ASSOCIATION
WITH CERID, NLA and BTTC
© Copyright 2026 Paperzz