Building our Regions — Round one Application Should you have any questions or require any assistance, please contact the Building our Regions program team on (07) 3452 7377 or 13 QGOV (13 74 68). PROJECT DETAILS Project title Project description Indicate which best describes the project: Water/sewerage/waste infrastructure (e.g. water supply, sewerage systems, landfills, recycling) Social infrastructure (e.g. health, education) Economic development infrastructure (e.g. headworks on council owned industrial land, commercial or tourism precincts) Roads and transport infrastructure (e.g. airports, marine infrastructure, flood mitigation road works, road upgrades) Flood mitigation infrastructure (e.g. levees, floodgates, causeways, drainage improvements) Cultural, sports and recreational infrastructure (e.g. museums, parks, sporting facilities) Other infrastructure (e.g. agricultural, communications, energy) Is this project: New infrastructure Upgrade of existing infrastructure Replacement of existing infrastructure Other (please specify): 1 The following information is required for road projects only: Why was TIDS funding not allocated to this project? Why is the project still considered a priority for the region? Road Classification Road Chainage Please describe the current road conditions: Crash History AADT (per cent of Heavy Vehicles) (Date): Deficiencies Future safety assessment Other Information 2 PROJECT CONTACT Please provide a contact person from the council for correspondence and enquiries regarding this project and application for funding. Title First name Surname Position Phone Mobile Fax Email Postal address Street address Town/suburb Postcode 3 ESTIMATED PROJECT TIMEFRAME Project start date: Project completion date: Construction commencement date To be eligible for Building our Regions funding, projects must be ready to commence construction by 30 September 2016. PLEASE NOTE THAT PROJECTS THAT DO NOT COMMENCE CONSTRUCTION WITHIN THIS TIMEFRAME MAY HAVE APPROVED FUNDS WITHDRAWN Please indicate which of the following documents have been attached as evidence that construction can be expected to commence during the required period. A Gantt Chart or Detailed Project Delivery Schedule must be provided as a minimum, along with any other documentation that demonstrates the project’s readiness. You may attach more than one document. Gantt Chart showing the project’s delivery Detailed project delivery/works schedule Please indicate if any additional documentation is attached to demonstrate the project’s readiness. professional designs (‘for tender’ or ‘for construction’) tender documents other (please specify): What stage has the project reached at the time of application? Detailed designs have been prepared Tender documentation has been prepared A contractor has been appointed Ready to commence construction Other (please answer question below) If the project is not ready to proceed to construction, please describe what action is being taken to ensure the project will be able to commence construction within the required timeframe. 4 PROJECT COSTINGS Financial Contributions Identify the proposed financial contributions to fund the project Total Estimated Project Cost (ex GST) Building our Regions funding sought (ex GST) Please note that only eligible expenses will be reimbursed up to a maximum of the approved funding — refer to the Program Guidelines for eligible and ineligible expenditure. Council’s financial contribution (ex GST) Not including in-kind contributions or ongoing costs such as maintenance and repair costs Please detail all other proposed and confirmed financial contributions that will be provided to the project by other organisations. Category Industry Qld Govt Aust. Govt Other Funding contributor Contribution description Amount (ex GST) Funding status Funding status details Name of Organisation Name of government grant or purpose of funding. Financial contributions only – no in-kind to be included Confirmed or Not confirmed Please provide details of any special conditions that apply or when funds are likely to be confirmed Total other financial contributions (ex GST) e.g., industry and/or other government Not including in-kind contributions If financial contributions are not being made by other organisations, please describe any actions taken to attract financial contributions and any reasons why they are not available. Please detail any funding the Queensland Government has provided for any component of this project, including earlier stages? Do not include financial contributions identified under ‘Other financial contributions’ in this section. 5 In-kind contributions Please detail all proposed or confirmed in-kind support that will be provided by council and other organisations and include an estimated value if known. Funding Contributor Name of organisation or proponent In-Kind contribution description Please detail the nature of the contribution. Value (ex GST) Funding Status Confirmed Not confirmed Status Details Please provide details of any special conditions that apply or when the in-kind contribution is likely to be confirmed. $ $ $ Total in-kind contributions $ Cost breakdown Please provide a breakdown of the project costs. Provide a breakdown of all project costs, including a contingency of up to 15%, and indicate how these costs will be distributed between the financial contributors. How have the project costs been calculated or determined? Cash flow forecast Please provide a Project Cash Flow. A Project Cash Flow template is available as part of the application package. The cash flow must identify total revenue and list all expenditure items to show net cash flow related to the project. All project costs lists should be exclusive of GST. Please note that Building Our Regions funding will generally be paid in arrears at Milestones determined by the Department in negotiation with Councils. A Project Cash Flow has been attached 6 PROJECT SITE Project site address Street address Town/suburb Postcode Real Property description of the project site If there are multiple sites, please provide details for all sites. Provide details of the primary site below and include details of additional project sites in the Project Plan. Lot Parish Registered Plan County Title Reference Longitude and Latitude Please provide relevant longitude and latitude coordinates for all work sites relevant to this project, i.e. start and finish coordinates. Provide details of the primary site below and include details of additional project sites in the Project Plan. Longitude Start: 151.278061 Longitude Finish: 146.716967 Latitude Start: -19.289074 Latitude Finish: -19.292566 Mapping For GIS spatial mapping purposes, please attach either an ESRI Shape File or MapInfo Tab File for this project site if available. Please attach ALL file layers. ESRI Shape file attached File description: MapInfo TAB file attached File description: Other GIS file attached File description: Federal and State Electorates Please select the Federal and State electorates the project is located within. If a project site crosses electoral boundaries (e.g. water pipeline, road upgrade) please select all that apply. Federal Electorates State Electorates 7 LAND OWNERSHIP Who currently owns the land where the project will be located? Council Queensland Government Please specify the agency responsible for the land Other (please identify the owner of the land): If council does not own the land: a) Does Council have control over the land? (e.g. crown reserve) Yes — Please provide details and attach supporting documentation No b) Does Council intend to acquire ownership or control over the land? (e.g. purchase, lease, be granted an easement) Yes — Please provide details No — Please provide details c) Has the owner approved the development on the proposed site? Yes — Please provide details and supporting documentation (e.g. if Queensland Government agency, a letter from DG/CEO) No — Please provide details Is there any third party interest in the land? (e.g. easement, lein, lease) Yes — Please provide details and supporting documentation No Are there any land issues that need to be addressed before construction can commence? Issues to be addressed could include road reserve, native title, cultural heritage, strategic cropping land, etc. Yes — Please provide details, explain how these issues are being addressed or resolved, and attach supporting documentation No 8 REGULATORY REQUIREMENTS Local governments are responsible for complying with relevant legislative requirements, and securing the necessary licences and development approvals with the appropriate regulatory agencies. Please provide details of all licences and/or development approvals required to deliver this project and indicate current status. Licence/development approval Regulatory agency Approval status Details Licence Required / Development Approval Required Name of Regulatory Agency Approved / Not Approved Please provide detail on likely timeframe of approval. 9 RESPONSE TO CRITERIA Project Demand and Solution What is the critical need or opportunity to be addressed? How will the proposed project address or respond to the identified need or opportunity? Why is this project the most appropriate way to address or respond to the need or opportunity? Have other solutions been considered? Please provide details of other options considered or explain why other options were not considered. Yes No RESPONSE TO CRITERIA continued Value for money assessment Each application must attach either a Cost Benefit Analysis (CBA) or a Benefits Assessment to enable consideration of the project’s value for money and benefit to the community. Completion of a CBA will be required where the total project cost is $500,000 or over. A Cost Benefit Analysis template, with instructions, is available as part of the application package. A Cost Benefit Analysis has been attached Completion of a Benefits Assessment will be required where the total project cost is less than $500,000. A Benefits Assessment template, with instructions, is available as part of the application package. A Benefits Assessment has been attached How many direct jobs will be supported by the project’s construction phase? Provide an estimate of the number of Full Time Equivalent (FTE) positions directly supported by the construction phase. 10 What assumptions have been used to identify the number of direct jobs supported by the construction phase? Provide details of assumptions and source of information used to estimate direct jobs supported by construction phase. Identify the duration of employment in days or months. How many direct jobs (if any) will be supported by project facilities on an on-going basis? Provide an estimate of the number of Full Time Equivalent (FTE) positions that will be directly supported as a result of the project on an ongoing basis. What assumptions have been used to identify the number of direct jobs that will be supported by the project on an ongoing basis? Provide details of assumptions and source of information used to estimate direct jobs supported by project facilities as a result of the project. RESPONSE TO CRITERIA continued Project Delivery and Management How is council planning to deliver the project? (e.g council staff, building contractor, etc) Please provide relevant details on key personnel below and attach copies of CVs. The project key personnel must have the capabilities, skills and expertise to successfully deliver the project. Please note date of birth is required for due diligence purposes. Full Name Date of birth Role Key skills Fred Jones 5/05/1966 Project Manager (Council Manager Infrastructure Services) Mary Smith 14/09/1971 Site Supervisor Engineer with extensive experience in project managing major infrastructure project Engineer with 15 years construction industry experience, project management 11 Please explain how council will fund the ongoing (whole-of-life) operation, maintenance and replacement costs of the infrastructure? Please attach copies of the relevant documentation and identify the relevant sections/page numbers. Please provide any further information to support the application. 12 PROJECT PLAN Applicants must provide a detailed project plan as part of their application. A detailed project plan template is available. If applicants choose not to use the template they will still be responsible for ensuring that all the required information is provided. As a minimum, Project Plans must address the following: • Executive Summary • List of technical terms and acronyms • Project scope − provide a detailed scope of all works associated with the project − identify components of the works that are in scope and out of scope. • Project management, including: − Project delivery − Specialist expertise − Project constraints − Cost management • Risk Management Plan • Reference Materials (where relevant, such as site designs, maps and photos) 13 APPLICANT CHECKLIST All sections have been completed Mandatory attachments I have attached: A signed certification form Evidence of local government support and approval for the application (e.g. council resolution or minute) Evidence of local government commitment to management and costs associated with the ongoing operation and maintenance of the infrastructure (e.g. council resolution or minute) Project Gantt Chart or Detailed Delivery/Works Schedule showing timeframes for all project stages up to and including project completion Project Cost Breakdown Project Cash Flow Cost Benefit Analysis or Benefits Assessment Detailed Project Plan Copies of all supporting documents referred to and relied on as evidence in the application form (unless web addresses have been provided in the relevant response field). CVs for key project personnel For Road Projects Letter of support from the Chair of Regional Road and Transport Group (RRTG) or a copy of RRTG minute stating that the project was considered, not funded, but is a priority and worthy of funding Where the local government does not own or control the land Letter from land owner confirming the local government has approval to build on and use the land for a period of at least 10 years Additional / optional attachments I have attached: Additional documentation supporting project readiness such as professional designs (‘for tender’ or ‘for construction’), tender documents, etc Letters from other contributors confirming financial or in-kind contributions Mapping files (ESRI Shape File or MapInfo Tab File) attaching ALL file layers Copies of all supporting documents referred to and relied on as evidence in the application form (unless web addresses / hyperlinks have been provided in the relevant response field) 14
© Copyright 2026 Paperzz