Final Magnox socio-economic plan Version: 1 Magnox Socio-economic Plan 2016-19 Magnox socio-economic plan Version: Draft 1 Contents 1. Introduction .......................................................................................................... 3 2. Stakeholder engagement and consultation .......................................................... 4 3. The Magnox Socio-economic Plan ...................................................................... 5 3.1. PBO/SLC socio-economic strategy .................................................................. 5 3.2. Prioritisation of interventions ............................................................................ 5 3.3. The Magnox socio-economic scheme .............................................................. 6 4. Socio-economic objectives .................................................................................. 7 4.1. Site socio-economic objectives ...................................................................... 13 4.2.1 Bradwell – high priority site ......................................................................... 14 4.2.2 Dungeness A – high priority site.................................................................. 16 4.2.3 Hunterston A – high priority site .................................................................. 19 4.2.4 Trawsfynydd – high priority site ................................................................... 21 4.2.5 Wylfa – high priority site .............................................................................. 24 4.2.6 Chapelcross – medium priority site ............................................................. 27 4.2.7 Hinkley Point A – medium priority site ........................................................ 28 4.2.8 Winfrith – medium priority site ..................................................................... 29 4.2.9 Berkeley, Harwell, Oldbury, Sizewell A – low priority sites .......................... 31 5 Care and maintenance (C & M) ......................................................................... 34 6 Monitoring and reporting .................................................................................... 34 Appendix 1 – Prioritisation matrix ............................................................................. 35 Appendix 2 – Client specification / contract .............................................................. 37 2 Magnox socio-economic plan Version: Draft 1 1. Introduction The Nuclear Decommissioning Authority’s (NDA) vision “to support the creation of dynamic, sustainable local economies for communities living near our sites” is underpinned by four thematic priorities and four geographical funding priority areas, two of which fall within the Magnox Ltd estate. NDA thematic principles: Employment - with a preference for higher value job creation Education / skills - both to support decommissioning and clean-up and diversification into other sectors Economic and social infrastructure - including environmental remediation and improvements and cultural and natural heritage Economic diversification Diversification into other industries and sector - including support for the local supply chain Geographical funding priorities, which fall within the Magnox estate: Anglesey and Meirionnydd in North Wales (Wylfa and Trawsfynydd sites) Gretna-Lockerbie-Annan (GLA) corridor in Dumfries and Galloway (Chapelcross site) Our socio-economic strategy and plan supports the NDA’s vision and thematic priorities. Whilst we are not directly accountable for regeneration in the areas around our sites, Cavendish Fluor Partnership (CFP) and Magnox recognise the important role we play in supporting the communities and partner agencies to develop plans and deliver initiatives which help mitigate the impact of decommissioning the sites. The Magnox contract places socio-economic commitments on CFP, and Magnox (see Appendix 2). A summary of the commitments are provided below. Socio-economic commitments (summary): Support the NDA’s strategy to take account of the socio-economic consequences of its plans, engaging with agencies for economic development, providing financial support to Magnox for socio-economic expenditure and providing direct socio-economic funding support, Support the NDA’s socio-economic objectives and policy through engagement with the NDA, Local Authorities, development agencies and other key stakeholders, Prepare and deliver a three-year rolling socio-economic development plan in partnership with NDA, consulted upon with stakeholders, Work/support local and national regeneration/economic development agencies through a complementary socio-economic plan, Plan will consider: local skills retention, workforce transition, apprentice schemes, supply chain/small-medium-enterprises (SMEs) optimisation, engagement with local educational establishments, re-use of land, Publish an annual review of socio-economic performance against the plan, and against specific, measurable, attainable, relevant and timely (SMART) targets, Prioritise socio-economic interventions; timescale to care and maintenance and prevailing socio-economic conditions. 3 Magnox socio-economic plan Version: Draft 1 2. Stakeholder engagement and consultation In developing the Magnox socio-economic plan, we are engaging with key stakeholders to seek views and feedback during a six week consultation period (12 January to 23 February 2016). The stakeholder groups engaged as part of this process are as follows: Nuclear Decommissioning Authority (NDA) Local Authorities in England, Scotland and Wales Members of Parliament (MPs), Members of the Scottish Parliament (MSPs) and Welsh Assembly Members (AMs). The UK, Scottish and Welsh Governments Site Licence Company management teams Site Stakeholder Groups (SSGs) / Local Community Liaison Council (LCLC) Non-government organisations Socio-economic partnerships Regional economic development agencies Local Enterprise Partnerships (LEPs) and Enterprise Zone Boards Magnox workforce EDF Energy and EDF new nuclear build Horizon Nuclear Power Trade Unions Supply Chain forums The Nuclear Legacy Advisory Forum (NuLEAF) and the Scottish Councils Committee on Radioactive Substances (SCCORS). Figure 1: Stakeholder engagement and consultation timeline Information gathering / preparatory period Consultation Period Stage 1 June 2015 July 2015 Aug 2015 Stage 2 Sept 2015 Dec 2015 12 Jan 2016 23 Feb 2016 Responses Considered Stage 3 23 Feb 2016 Final Plan Published Stage 4 30 April 2016 Post consultation report A summary of responses and comments to the draft Magnox socio-economic plan was published in May 2016. This includes the consultee’s name and describes how the responses/comments received were considered in developing the final document. 4 May 2016 Magnox socio-economic plan Version: Draft 1 3. The Magnox Socio-economic Plan 3.1. PBO/SLC socio-economic strategy Our socio-economic strategy and objectives cascade from the NDA’s Socio-economic policy, through the Parent Body Organisation (PBO) and Site Licence Company (SLC) to the sites ensuring consistency of messages and approach. The Magnox socio-economic scheme is a strategic tool which supports the strategy and objectives. More information on this scheme is provided in section 4.3. Socio-economic strategy: Key areas of our overarching socio-economic strategy include: Employing a holistic approach that enriches learning from experience across the sites yet still recognises individual site requirements Building upon existing stakeholder relationships and socio-economic initiatives Enhancing economic diversification and opening up new employment opportunities Leveraging the parent organisations’ experience in education and training to enhance the potential opportunities for people in the supply chain Developing opportunities for workforce redeployment into Cavendish Nuclear, Babcock International Group and Fluor at the appropriate time in the Magnox programme Achieving value for money through targeted use of funds for socio-economic initiatives that offer the biggest impact for the lowest cost at prioritised sites for funding. Our plans consider: Existing local socio-economic development plans; The prevailing socio-economic conditions in each Magnox site’s locality; Relevant Government policy, including in Wales and Scotland; Results of local stakeholder engagement; Skills retention in localities/skills transfer from each Magnox site to local communities; Transfer of learning from the PBO to Magnox; Apprentice scheme development; Maximising the potential/capacity of local supply chains to bid for work from each Magnox site; Engagement with local education establishments, supporting curricula and raising aspirations; Supporting the spin-out of functions from the Magnox sites to the local economy; and Availability of NDA-owned, proximate land to divest for socio-economic benefit; 3.2. Prioritisation of interventions The three-year rolling socio-economic development plan provides a rationale for prioritisation to ensure that socio-economic interventions are targeted where they can have the greatest impact, deliver the best value for money and are sustainable in the long term. Taking account of NDA thematic and geographical priorities, the sites have been prioritised according to the following factors: Workforce profile Lifecycle transition dates from generation to defueling or from decommissioning to care and maintenance 5 Magnox socio-economic plan Version: Draft 1 Working age population and employment statistics (2014) Regional Gross Value Added and Index for Multiple Deprivation statistics (compared to National average) (2013) Geographical distance to urban employment Results of the Magnox socio-economic scheme and direct NDA funding invested to date Development of the opportunities highlighted in the former Magnox socio-economic development plan (2011-15), the former Research Sites Restoration Limited (RSRL) socio-economic development plan and implementation of existing independent socioeconomic impact assessment report recommendations and action plans. External factors – inward investment employment opportunities, new nuclear build and sister nuclear site lifecycles. Prevailing socio-economic conditions in the surrounding area. The prioritisation of sites will be regularly reviewed and updated on an annual basis in order to take into account of changing factors. The output of this prioritisation exercise, the detail of which is summarised in Appendix 1, has categorised the sites as high, medium or low as follows. High priority areas/sites: Bradwell Dungeness A Hunterston Trawsfynydd Wylfa Mid priority areas/sites: Chapelcross Hinkley Point A Winfrith Low priority areas/sites: Berkeley Harwell Oldbury Sizewell A 3.3. The Magnox socio-economic scheme The Magnox socio-economic scheme provides funding to support activities that benefit the social or economic life of communities, in support of the NDA’s responsibilities under the Energy Act (2004) to mitigate the socio-economic impact of its work programme where it operates. The scheme has three funding aims: 1. Being a good neighbour 2. Helping to build sustainable communities 3. Supporting transformational projects that mitigate the impact of decommissioning Magnox sites. Funding is prioritised towards aims 2 and 3, where the biggest and most sustainable socio-economic benefit can be achieved. 6 Magnox socio-economic plan Version: Draft 1 Funding Magnox, the Cavendish Fluor Partnership and the NDA work together to manage a funding portfolio of up to £1million each financial year. Funding is available on a rolling programme to support our aims on three levels: 1. Up to £1,000 for small projects neighbouring Magnox sites (good neighbour funding) 2. Up to £10,000 capital expenditure towards a sustainable project 3. Over £10,000 to support large projects that make a significant contribution towards mitigating the impact of decommissioning your nearest Magnox site/s. More information on the scheme and funding criteria is available at https://magnoxsocioeconomic.com/ 4. Socio-economic objectives Our objectives for the three-year rolling Magnox Socio-economic Development plan cascade from the NDA’s Socio-economic policy, through the PBO and Site Licence Company to the sites. These objectives are detailed in Table 1. 7 Magnox socio-economic plan Version: Draft 1 TABLE 1 - Key: HR led - Green / Supply chain led – blue / All - Black CFP strategic objectives Magnox strategic objectives Site objectives SMART Targets Ref 1 NDA thematic priority Employment – with a preference for higher value job creation Establish a supply chain transformation programme: Establish a supply chain transformation programme, which improves the visibility and accessibility of supply chain opportunities to the SME community. Establish and deliver a supply chain transformation programme, which improves the visibility and accessibility of supply chain opportunities to the local SME community. Publish an annual procurement plan. Deliver the annual procurement plan To encourage opportunities for, and the use of, Small and Medium Enterprises (SMEs). To develop a robust and healthy supply chain. To develop a fully integrated Category Management approach. To develop a Magnox estate approach to supply chain management activities. To develop strategic supplier partnerships focused on added value for Magnox and its suppliers. Use parent organisation’s business experience to establish a programme for the supply chain and, in particular SMEs, to enhance their capability. 2016/17 Year 1 1. Develop the Magnox ‘supplier’ web pages, with particular attention to the development of SME content, update supplier Top 20 list, monitor web traffic and add a link to NDA website. Performance measures 2016/17 Year 1 1. No of contract opportunities posted annually on www.magnoxsites.com and the Achilles Utilities Vendor Database. 2. Publish the 2016 procurement plan on www.magnoxsites.com by 29 July 2016. 2. 2016/17 Procurement Plan published on time. 3. Provide an opportunity for the supply chain to engage Magnox on programme requirements at the annual NDA Estate Supply Chain Event. 3. No of Regional NDA SME Steering groups attended annually. 4. Deliver the first phase of the supply chain transformation plan by 29 July 2016. 4. Supply Chain transformation plan delivered on time. 2017/18 Year 2 1. Publish the 2017 procurement plan by 31 January 2017. Establish a structured approach to supplier development within the constraints of public procurement regulations. Establish and deliver a programme of local supply chain and SME mentoring to encourage sustainable growth and optimise their capacity to bid for work from the sites. 2017/18 Year 2 1. 2017/18 Procurement Plan published on time. 2016/17 Year 1 1. Establish a reporting mechanism to monitor the value and % overall supply chain spend with SMEs by 1 July 2016. 2016/17 Year 1 1. Value and % supply chain spend with SMEs reported on a quarterly basis. 2. Where there is opportunity to provide mentoring support, make available resources to support the NDA’s SME mentoring scheme. 2. No of mentoring opportunities supported via the NDA SME mentoring scheme. 2017/18 Year 2 1. Undertake a review of the way contracts and work is packaged/bundled. 2017/18 Year 2 1. Supplier development programme delivered on time. 2. Identify 12 spend categories and undertake a review of SME ability to participate by 30 September 2017. 3. Investigate the need and, where appropriate, develop a supply chain development programme for the high priority sites by 30 September 2017. 2018/19 Year 3 1. Where appropriate, deliver a supply chain development programme for the high priority sites by 31 March 2018. 8 2018/19 Year 3 1. No of suppliers participating in the supplier development programme annually. Magnox socio-economic plan CFP strategic objectives Version: Draft 1 Magnox strategic objectives Site objectives SMART Targets Performance measures 2016/17 Year 1 1. For staff in transition, work with Penna to develop support and workshops on how to start new businesses 2. Investigate whether there is opportunity to work with external business support agencies to provide support to high priority sites by 28 September 2016. 2016-18 Years 1-3 1. No. of people who attend a workshops/meeting/access support annually. 2. Value and number of new or spin off businesses supported annually via existing Magnox support schemes.. Ref 1 NDA thematic priority Employment – with a preference for higher value job creation Explore opportunities for spin-off businesses from site. Work with appointed career transition specialists ‘Penna,’ (see note 1) to explore opportunities to encourage the identification of new or spin off business. Work with Penna and employees, to explore opportunities to encourage the identification of new or spin off business. 2017/18 Year 2 1. Evaluate the performance and feedback of support being made available by 28 February 2017. 2. Explore opportunities to extend support to other sites as they near closure by 28 February 2017. 2018/19 Year 3 1. Explore opportunities to extend support to other sites as they near closure by 28 February 2017. Identify and optimise opportunities for local resource redeployment, secondment and training. Ensure staff are aware of opportunities for local redeployment, secondment and retraining. Make staff in transition aware of opportunities for local redeployment, secondment and retraining 2016/17 Year 1 1. Work with Penna to understand local employers’ skills requirements by 31 September 2016. 2. Work with Penna to establish a process for making staff in transition aware of local redeployment, secondment and retraining opportunities both within the parent companies and the wider supply chain by 29 July 2016. 3. Work with Penna to establish a Magnox skills database of staff in transition and local employer’s skills requirements by 30 September 2016. 2017/18 Year 2 1. Annual Resource Plan (anticipated workforce profiles) published by 31 January 2017. 2. Engage with local stakeholders so that employers have sight of talent, skills as staff become available, share Annual Resource Plans and the Magnox skills database by 31 March 2017 2018/19 Year 3 1. Annual Resource Plan published by 31 January 2018. 9 2016/17 Year 1 1. No of local employers contacted annually. 2. Process to communicate redeployment, secondment and retraining opportunities to staff in place on time. 3. Magnox skills/employers database created on time. 2016-18 Years 1-3 1. No of redeployment opportunities offered to staff annually. 2. No of staff redeployed and seconded locally annually. 3. No of staff in transition attending outplacement support/workshops annually. 4. No of staff in transition re-skilling annually. 2017-18 Years 2-3 1. Annual Resource plans published on time. Magnox socio-economic plan CFP strategic objectives Version: Draft 1 Magnox strategic objectives Site objectives SMART Targets Ref 2 NDA thematic priority Education/skills – both to support decommissioning and clean-up and diversification into other sectors Develop wide-ranging and accessible training and reskilling programmes, including apprenticeships, to support workforce transition to suitable employment. Consolidate SLCs’ training programmes and provide a single training gateway for SLC staff. Identify training requirements to the SLC. Publicise new training programme and transition support arrangements. 2. Develop a plan for combining the pre-existing Magnox and former RSRL training programmes into a single programme and gateway by 30 September 2016. Align this with existing Cavendish Nuclear and Fluor apprentice schemes to maximise opportunity and benefit of the nuclear industry. Align with the NDA and Magnox people strategy, particularly in respect to supporting reskilling and redeployment into other parts of the NDA estate and where possible, trying to retain skills and localities. 2016/17 Year 1 1. Create and implement a Talent Management Programme (TMP) and identify individuals to attend this by 30 September 2016. 2017/18 Year 2 1. Combine the pre-existing Magnox and former RSRL training programmes, where appropriate, into a single programme by 31 January 2017. 2. Augment single SLC training programme further by exploring synergies within the parent companies’ training portfolios by 31 May 2017. Working with Penna, establish a process for supporting individuals with their transition plans and access to transition support. Communicate with employees and trades unions to develop, at the appropriate time, workforce transition plans. 2016/17 Year 1 1. Work with Penna to provide access to appropriate information so that individuals can develop their transition plans i.e. appropriate resources, templates, and opportunities to transfer to parent organisations by 29 July 2016. Enhance workforce transition options by facilitating opportunities for the workforce to transition to one of the parent body organisations. 2. Establish an effective process for facilitating staff to transition to parent body organisations by 29 July 2016. Ref 2 NDA thematic priority Education/skills – both to support decommissioning and clean-up and diversification into other sectors Work with skills bodies, the National Skills Academy for Nuclear (NSAN), local authorities and local educational establishments to support community apprentice programmes and to provide mentoring and support to supply chain apprentice schemes. With PBO support and guidance. work with skills bodies, the NSAN, local authorities and local educational establishments to support community apprentice programmes and to provide mentoring and support to supply chain apprentice schemes. Work with skills bodies, the NSAN, local authorities and local educational establishments to support community apprentice programmes and to provide mentoring and support to supply chain apprentice schemes. Deliver and establish a process for transitioning Magnox staff into the parent body organisations at the appropriate time, when their work on the Magnox programme has concluded. Develop an appropriate communications plan for publicising the opportunities in the parent body organisations. Support and deliver the communications plan for publicising the opportunities in the parent body organisations which will include PBO roadshow, campaigns and intranet content. Performance measures 2016/17 Year 1 1. No of individuals identified for the Talent Management Programme. 2. Plan to create a single SLC training programme and gateway in place on time. 2017/18 Year 2 1. Single SLC training programme and gateway in place on time. 2. Parent companies’ training portfolios opened up on time. 3. No of training opportunities and qualifications aligned to industry standards created annually. 2016/17 Year 1 1. Evidence of resource support available to staff. 2. PBO transition plan and process in place on time. 3. No of people in transition offered alternative employment 2016/17 Year 1 1. Identify what industry apprentice programmes exist in Magnox communities, including PBO schemes by 30 April 2016. 2. Establish relationships with the relevant skills bodies and identify the support Magnox can provide to external apprentice programmes by 31 October 2016. 2016-18 Years 1-3 1. Number of industry apprentice-related meetings attended annually I.e. NSAN. 2016/17 Year 1 1. Deliver an appropriate process for communicating PBO transition opportunities in the parent body organisations throughout 2016. 2016-18 Years 1-3 1. No of opportunities made available in the parent organisation companies annually. 2. Number of apprentice placements taken at Magnox sites annually. This will include assessing the impact of the new government apprenticeship levy. 2. No of staff offered opportunities in the parent organisation companies annually 10 Magnox socio-economic plan CFP strategic objectives Version: Draft 1 Magnox strategic objectives Site objectives SMART Targets Performance measures Ref 3 NDA thematic priority Economic and Social infrastructure, including environmental remediation and improvement and cultural and natural heritage Support economic and social infrastructure regeneration initiatives through targeted use of the socio-economic fund and SLC support where appropriate. Identify economic, environmental remediation and social infrastructure projects that align with NDA policy and meet funding/prioritisation criteria. Identify and support local economic, environmental remediation and social initiatives that align with the SLC strategy. 2. Secure funding for at least one, transformational economic or social infrastructure project at each high priority site, subject to appropriate opportunities being submitted, by 31 December 2016. Support opportunities to divest land for socio-economic benefit. Work with local education establishments to support the curriculum and raise aspirations. Identify a programme for capturing, publishing and reporting on Magnox STEM activities/voluntary support. 2016/17 Year 1 1. Work with socio-economic partnerships to identify social infrastructure projects and opportunities to divest de-licensed land for socio-economic benefit throughout 2016. Work with local education establishments to support the curriculum and raise aspirations. Publicise staff volunteering opportunities and encourage staff to support appropriate social infrastructure initiatives. 2016/17 Year 1 1. No/value of social infrastructure projects supported through the socio-economic fund annually. 2. No of opportunities supported to divest land for socioeconomic benefit annually. 3. Gearing ratio of match funding achieved annually. 4. Socio-economic benefits delivered by the projects supported measured and reported annually. 2017/18 Year 2 1. Consider if new medium priority sites require a socio-economic impact assessment report and action plan commissioning, which can be supported through the socio-economic scheme via match funding, by 30 April 2017. 2017/18 Year 2 1. No of socio-economic impact assessment reports/action plans commissioned. 2. Consider if socio-economic partnerships need to be established at new medium priority sites by 30 April 2017. 2. No of new socio-economic partnership groups established. 2016/17 Year 1 1. Identify a process for capturing and reporting existing STEM/voluntary support (online form, booking code, line manager approval) by 29 July 2016. 2016/17 Year 1 1. Employee volunteering reporting mechanism in place. 2. Identify what resource is needed to support education activities by 31 March 2017. 2. STEM activity report published on time., which also includes the STEM activity supported through the Magnox socio-economic scheme 3. Identify what STEM activities are available locally and nationally e.g. Business in the Community (BITC), STEMNet, STEM workshops that require volunteer time or financial support and agree approach to maximise impact by 30 September 2016. 2017/18 Year 2 1. No of ‘active’ STEM Ambassadors, Nuclear Graduates and voluntary supporters. 2017/18 Year 2 1. Establish a programme to support the curriculum and encourage pupils to pursue STEM disciplines by 20 September 2017. 3. No of education visits and STEM initiatives delivered annually. 2. Publicise staff volunteering and encourage staff to support appropriate social infrastructure initiatives by January 2017. 11 2. No of education support programmes in place. 4. No of collaborative STEM activities supported annually e.g. Science Fairs, ECITB, NSAN events. Magnox socio-economic plan CFP strategic objectives Version: Draft 1 Magnox strategic objectives Site objectives SMART Targets Ref 4 NDA thematic priority Encourage diversification into other industries and sectors, including support for the local supply chain Encourage diversification and business development by working with local economic development agencies to encourage inward investment. Work in partnership with regional development agencies and local authorities to identify opportunities for inward investment and support these with appropriate SLC resource. Identify and make suitable socioeconomic resources from the site available to work alongside the lead stakeholders to secure investment into the Travel to Work Area. 2016/17 Year 1 1. Identify and attend meetings with all the regional economic development agencies and local authorities throughout 2016. 2. Work in partnership with regional development agencies and local authorities to identify opportunities for diversification at all high priority sites throughout 2016. 2016/17 Year 1 1. Identify and provide suitable resources to support economic development agencies in their pursuit of inward investment for all high priority sites throughout 2016. 2017/18 Year 2 2. Identify and provide suitable resources to support economic development agencies in their pursuit of inward investment for all medium priority sites throughout 2017. 2016/17 Year 1 1. Identify opportunities to encourage the provision of grants and loans at high priority sites through the business support schemes applied by the Marsh Million and Beyond Chapelcross initiatives throughout 2016. 2017/18 Year 2 1. Implementation of opportunities identified by 30 December 2017. 2018/19 Year 3 1. Identify opportunities to encourage the provision of grants and loans at new mid priority sites through the business support schemes like the Dungeness Marsh Million and Beyond Chapelcross. Performance measures 2016/17 Year 1 1. No of meetings supported by Magnox. 2. No of opportunities for diversification identified for high priority sites. 2016/17 Year 1 1. No of inward investment opportunities for high priority sites identified. 2017/18 Year 2 2. No of inward investment opportunities for medium priority sites identified. 2016-7 Years 1-2 1. No/value of appropriate funding applications supported annually. 2. Gearing ratio of match funding achieved. 3. No of new businesses created annually 2016/17 Year 1 1. No of business support scheme opportunities identified for high priority sites. 2017/18 Year 2 1. No of SMEs supported. 2. Socio-economic benefits delivered by the SME’s measured and reported annually. 2018/19 Year 3 1. No of business support scheme opportunities identified for new mid priority sites. Note 1: Penna - Third party who provides redeployment and outplacement support to staff who are transitioning. This will include, but is not limited to, helping staff develop techniques for coping with change, identify skills and competencies in demand elsewhere in the organisation or wider. 12 Magnox socio-economic plan 4.1. Version: Draft 1 Site socio-economic objectives Recognising that the socio-economic development plan needs to focus on those sites identified as high or medium priority, additional objectives have been identified for these particular sites. These are in addition to the company-wide objectives outlined in Table 1. 13 Magnox socio-economic plan Version: Draft 1 4.2.1 Bradwell – high priority site Workforce numbers (as of April 2016): 127 Magnox staff Socio-economic stakeholders Maldon District Council Essex County Council Bradwell Working Group Bradwell Legacy Partnership Bradwell Site Stakeholder Group Where we were in 2012 Establishing and developing relationships between the site and key socio-economic stakeholders. 2012-16 achievements £401,168 Magnox socio-economic scheme funding was invested between 201216. Bradwell Legacy Partnership established in August 2014 o Magnox awarded £150,000 of NDA socio-economic funding over three years to support Maldon District Council’s efforts to raise the profile of the Dengie Peninsula, attracting tourism and new investment that will benefit the whole community. o The funding was invested to enable engagement of consultants where appropriate to carry out feasibility studies, produce specific reports and business plans as and when projects are identified. It is also to enable the work of the Bradwell Legacy Partnership. o A Bradwell socio-economic impact assessment has been undertaken and an action plan is now in place. o Free Business Support has been offered in the Maldon District at various venues in the area to encourage business development, diversification and potential new businesses. o Discussions are also currently ongoing to investigate the development of the tourism offer in the area, working alongside a number of partners and representatives from the industry. Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 2013/16 2015/16 Organisation Project West Mersea Town Council Maldon District Council Bradwell on Sea Community Shop Mersea Island Recreational Park Bradwell Socio-economic action plan Bradwell on Sea Community Shop Total 14 Funding awarded £50,000 £150,000 £25,000 £225,000 Magnox socio-economic plan Version: Draft 1 And what’s next? Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. Key area(s) of focus moving forward include: HIGH PRIORITY SITE - Bradwell Opportunities / objectives Continue to work with the Bradwell Legacy Partnership on their plans to mitigate the impact on the local economy of the future job losses at Bradwell, in alignment with the outputs from the Bradwell Socio-economic Action Plan and the Maldon District Economic Prosperity Strategy document. Key areas of focus for the area include: Tourism Skills Business and community support Business premises 15 Magnox socio-economic plan Version: Draft 1 4.2.2 Dungeness A – high priority site Workforce numbers (as of April 2016): 170 Magnox staff Socio-economic stakeholders Kent County Council Shepway District Council Ashford Borough Council Rother District Council Romney Marsh Partnership Group Dungeness Site Stakeholder Group Where we were in 2012 Facilitating the implementation of the Regeneris Socio-economic impact report recommendations. Exploring opportunities for the managed transfer of employees to Dungeness B. 2012-16 achievements £1,358,378 Magnox socio-economic scheme funding was invested between 2012-16. Romney Marsh Partnership Group established in 2012 to deliver the Romney Marsh Socio-Economic Plan - a new strategy to support the area's economy and community over the next decade. The plan focuses on: o highlighting some of the area’s significant economic and social challenges. o bringing people together and making the most of the excellent projects already being delivered on Romney Marsh. o involving local people and giving them more of a stake in their local community and local economy. o providing a framework and a strategy to bring new funding into the area through new projects and new approaches. Members of the partnership include Kent County Council, Shepway District, Ashford Borough and Rother District Councils, the NDA and Magnox amongst others. The Marsh Million Fund was established in 2013. It is a £1 million fund, cofinanced by Magnox/NDA, Kent County Council and Shepway District Council to help the Romney Marsh develop new job and business opportunities following the decommissioning of Dungeness A. It offers funding to projects which create jobs and support growth, delivered through a Business Loan Fund (making small-scale loans directly available to start-ups and small businesses) and an Economic Projects Fund offering grant or loan support for training, provision of business workspace and potentially some environmental improvement schemes where the economic benefits can be clearly demonstrated. The three-year scheme is administered by Kent County Council (KCC). Marsh Million Loan Scheme launched in 2013 offering interest free loans from £2,500 to £50,000. o As of April 2016, 27 loan applications have been approved totalling £368,443 creating 12 jobs. Marsh Million Economic Projects Scheme launched in November 2014 o 10 successful grant applications totalling £476,270 were approved creating 9 jobs in the first instance. 16 Magnox socio-economic plan Version: Draft 1 The Marsh Community Garden: Training and Skills Development, Kent Wildlife Trust (2012/13). The project’s aim was to develop a partnership of local communities, landowners and agencies in both Kent and Sussex to conserve the distinctive heritage, landscape and biodiversity of the Marsh, while at the same time providing new employment and businesses opportunities for local people. Through the support of the ‘Reaching Communities’ Funding and Magnox/NDA funding they have been able to offer their volunteers accredited training in subjects such as horticulture and countryside skills through the RSWT ‘AQA’ scheme. Outputs included: o Around 300 volunteers participated in the project o 19 people gained AQA (independent education charity) qualifications and continue to be involved with the project. o 6 formal workshops were held with at least 120 participants. o Other informal sessions were also well attended.(2012) o New Romney Business Incubator Centre £99,709 over three years. Based in one of the Romney Resource Units in New Romney it opened in May 2014 to give support to residents of the Romney Marsh who are looking to set up business and become self-employed. Offering office space, hot-desking facilities, a business address, admin support and professional business support as well as meeting space. The seven business spaces available for 12 months to support fledgling businesses have been fully occupied since it was opened and has a waiting list. It employs two apprentices and also facilitates Business Support/Training. This is also signposted via the Marsh Million for new businesses who receive loans as well as through the Romney Marsh Partnership Group Co-ordinator. Apprenticeships on the Marsh awarded £43,000 from the Magnox socio-economic scheme (2014) which resulted in several apprenticeships being achieved and individuals now employed because of the qualifications and skills gained. The Marsh Academy Community Hub continues to support the apprenticeship programme on the Romney Marsh and helps young people find opportunities to gain an apprenticeship within local organisations. The Marsh Academy has four assessors trained to develop and deliver apprenticeships in the Academy and have continued to employ apprentices and also local young Teaching Mentors. Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 2013/14 2013/14 2013/14 2014/15 2015/16 Organisation Kent County Council Romney Marsh Partnership Shepway District Council The Marsh Academy Project No applications Marsh Million Fund Romney Marsh Co-ordinator New Romney Business Incubator Units Sub total Apprentices on the Marsh Sub total No applications Sub total Total 17 Funding awarded £0 £500,000 £120,000 £99,709 £719,709 £43,000 £43,000 £0 £0 £762,709 Magnox socio-economic plan Version: Draft 1 And what’s next? Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. Key area(s) of focus for Magnox moving forward include: HIGH PRIORITY SITE – Dungeness Opportunities / objectives Work with the Romney Partnership Group to support it becoming a sustainable entity, recognized as a vehicle for stimulating business growth on Romney Marsh. Assess the impact of the larger projects to evaluate their effectiveness. 18 Magnox socio-economic plan Version: Draft 1 4.2.3 Hunterston A – high priority site Workforce numbers (as of April 2016): 146 Magnox staff Socio-economic stakeholders Scottish Government North Ayrshire Council Scottish Enterprise Irvine Bay Regeneration Company Hunterston Site Stakeholder Group North Ayrshire Hunterston Regeneration Steering Group Where we were in 2012 Supporting the Hunterston Steering Group to develop. Exploring opportunities for the managed transfer of employees to Hunterston B. 2012-16 achievements £756,440 Magnox socio-economic scheme funding was invested between 201216. Marine Biological Station at Millport. The UK’s oldest marine research centre reopened after the NDA joined new funding partners to ensure its long-term future. In July 2015 a £300,000 cheque was presented from the Magnox Socio-Economic Scheme for Phase Two of the Project. The NDA’s £300,000 award is part of a £4 million package for Millport Field Centre, on the small island of Cumbrae, North Ayrshire, which lies just across the water from the NDA’s decommissioning site Hunterston creating 4,000 training opportunities and 20 new jobs. An additional 8 jobs will be safeguarded and £300,000 economic benefit delivered to the local economy. Ardrossan Quayside Offices. In August 2014 £375,000 was awarded, funded by Magnox/NDA to provide the final piece of a financial jigsaw to develop a £3 million project to provide office accommodation at Ardrossan Quayside. The project is one of a suite of projects being developed by Irvine Bay Regeneration Company to regenerate Ardrossan. The high quality, 2,000 sqm three-storey building will house offices on the upper two levels, with the ground floor also flexible for a restaurant, retail or leisure use. Anticipated outputs include: o attract new businesses into the area o create 110 full time equivalent jobs o deliver additional £2.5m per annum to local economy West Kilbride Community Centre’s west wing development (2012/13) was awarded £20,000 Magnox/NDA funding towards their project. The project involved the restoration, reconfiguration and refurbishment of the first and second floors of the East Wing of the Community Centre to provide a fitness suite and dance suite. The project also significantly improved disabled access and provided new changing and toilet facilities for users. 20 jobs were created or safeguarded. 19 Magnox socio-economic plan Version: Draft 1 Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 Organisation Project West Kilbride Community Centre West Wing Development Sub total Ardrossan Quayside Offices Sub total Marine Biological Station at Millport 2013/14 Ardrossan Quayside Offices 2014/15 Field Studies Council Sub total 2015/16 No applications Sub total Total Funding awarded £20,000 £20,000 £375,000 £375,000 £300,000 £300,000 £0 £0 £695,000 And what’s next? Key opportunities on the horizon include: Youth Employment Scheme (YES) (2015). NDA is providing £250,000 towards the £1M North Ayrshire Youth Employment Support (YES) Project. The project has been designed, with business community’s involvement and guidance, to provide new opportunities for unemployed young people (16-24) of North Ayrshire. The innovative three year pilot programme will work with employers to ensure that the young people accessing employment opportunities have the attitude and skills required to sustain employment. The YES project will target key sectors in the local economy, beginning with hospitality and moving onto engineering/manufacturing, care and retail. Target outputs for the project include: o 125 young unemployed people supported by the project. o 100 young people progressed onto a wage subsidised job. o 75 local companies supported. o 70 young people placed in sustainable employment. o 20 young people moved on to other positive outcomes. o 100 new jobs created within the local economy o £647,010 generated within the local economy. Key area(s) of focus for Magnox moving forward Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. HIGH PRIORITY SITE – Hunterston A Opportunities / objectives Work with North Ayrshire Hunterston Economic Steering Group to mitigate the impact on the local economy of the future job losses at Hunterston A. 20 Magnox socio-economic plan Version: Draft 1 4.2.4 Trawsfynydd – high priority site Workforce numbers (as of April 2016): 156 Magnox staff Socio-economic stakeholders Welsh Government Gwynedd County Council Menter Môn North Wales Economic Ambition Board Trawsfynydd Oversight Group Traws-Newid Snowdonia National Park Authority Snowdonia Enterprise Zone Board Grŵp Llandrillo Menai Trawsfynydd Site Stakeholder Group Where we were in 2012 Looking to support development agencies to progress projects focussed on tourism development, low carbon generation and the future use of NDA assets. Implementing the Shaping the Future project to support Trawsfynydd and Wylfa sites’ employees and contractors to develop their skills and engage in career transition planning activities. 2012-16 achievements £816,334 Magnox socio-economic scheme funding was invested between 2012-16. Gwynedd Arloesi LEADER programme (2015) Menter Môn Ltd, a third sector not for profit company set up to develop the economy of Anglesey and Gwynedd was awarded £285,000 funding from Magnox to deliver Gwynedd’s Local Development Strategy through the Gwynedd Arloesi project. The programme will support small and medium-sized enterprises growth, business community development and economic diversification. A £4.335 million EU LEADER programme bid to deliver this project has also been approved in principal. The EU LEADER programme supports innovative solutions to the long-term challenges facing rural economies. Antur Stiniog ‘Y Siop’ Blaenau Ffestiniog (2013-2015). A £40,000 contribution towards the £372,200 cost of acquiring and refurbishing a three unit commercial building in a prime location adjacent to the railway station. A tourist information point, art gallery, outdoor clothing and mountain bike accessory/parts shop have been created. Outcomes included: o 4 new jobs o 18 training opportunities in the retail/customer service sector in partnership with Coleg Meirion Dwyfor o 30 work experience placements for local secondary school pupils o £300,000 local supply chain spend o 1 new enterprise created Gwesty Seren, Llan Ffestiniog. In 2013/14, £50,000 Magnox scheme contribution towards the £836,761 cost of developing a former residential care home into a 3 star, ten bedroom hotel for people with learning difficulties, their families and carers. Outcomes included: 21 Magnox socio-economic plan o o o o o Version: Draft 1 12 new jobs 34 work experience placements within the hospitality and care sectors in partnership with Coleg Meirion Dwyfor 2 ‘GO Wales’ graduate employment opportunities £750,000 local supply chain spend 1 new business created Snowdonia Enterprise Zone established by the Welsh Government in 2012 with the aim of encouraging the development of a hub for innovative low carbon technology enterprises and associated research and development uses. It includes two sites: one centred on Trawsfynydd site and another at Snowdonia Aerospace Centre. Coleg Meirion Dwyfor, Dolgellau (2013-2015). A £360,000 contribution towards £4.5m investment to provide training facilities at ‘CaMDA’ engineering and built environment skills centre on the Marian Mawr Industrial Estate. The centre is a key resource in responding to Snowdonia Enterprise Zone skills requirements and meeting the needs of young people and employers in the Meirionnydd area and beyond. Outcomes included: o 700 training opportunities for 14-19 year old learners o 250 training opportunities for Adult learners o Ongoing discussions regarding opportunities for Magnox employees to gain employment at CaMDA. Shaping the Future project (2012-15) aimed to improve the skills and adaptability of the 1,200 employees of Wylfa and Trawsfynydd nuclear power stations, to mitigate the closure of these facilities over the next five to seven years. The project supported career transition into non-nuclear sectors of the knowledge economy in Wales, focusing on the Welsh Government's target industry sectors and Enterprise. o 1402 people signed up to develop their skills and prepare for the future. o 775 people engaged in career transition planning activities o 494 gained qualifications or certified learning outcomes Trawsfynydd Transition programme Phase 2 (2012-2015). In 2010, a partnership project was established between the NDA, Gwynedd Council, Welsh Government and Natural Resources Wales to address the development of Trawsfynydd Site, especially considering the future loss of high quality employment on site. The project total cost was £855,000, of which £445,000 was NDA funded, The Trawsfynydd Transition Programme worked to investigate and develop future opportunities for the site. The scheme is now entering into its second phases. Outcomes to date include: - Developing the leisure offer afforded by the lake, including the completion of a full-loop cycle path, and supporting the renovation of the former site social club into a lakeside cafe and outdoor pursuits centre. - Developing a bid to include the site in Welsh Government’s Enterprise Zone programme, resulting in the establishment of Snowdonia Enterprise Zone in 2012. - Supporting the work to develop the site in the longer term, including: o Commissioning significant studies and technical site appraisals o Using the information gained to engage with key developers, industry bodies and academics to promote the site for future innovative development opportunities, with a key emphasis on the creation of high value jobs 22 Magnox socio-economic plan Version: Draft 1 Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 Organisation Project Coleg Meirion Dwyfor CaMDA Sub total Y Siop, Blaenau Ffestiniog Gwesty Seren, Llan Ffestiniog Llwyddon Lleol (Anglesey & Gwynedd) National Eisteddfod 2014, Meirionnydd Sub total Bryncrug Business Centre Trawsfynydd Lake Development Phase II Sub total Digital cinema project Y Traeth Skills Academy Sub total Total 2013/14 Antur Stiniog Gwesty Seren Cyf Gwynedd County Council Urdd Gobaith Cymru 2014/15 Bryncrug Community Centre Prysor Angling Association 2015/16 2015/16 Cellb Porthmadog Football Club Funding awarded £360,000 £360,000 £40,000 £50,000 £36,000 £35,000 £161,000 £14,459 £25,825 £40,284 £21,280 £40,373 £61,563 £622,847 And what’s next? Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. Key area(s) of focus for Magnox moving forward include: HIGH PRIORITY SITE - Trawsfynydd Opportunities / objectives Work with Gwynedd County Council, Welsh Government and regional partners regarding future socio-economic interventions for North West Wales to mitigate impacts of end of work at Trawsfynydd and end of generation at Wylfa. 23 Magnox socio-economic plan Version: Draft 1 4.2.5 Wylfa – high priority site Workforce numbers (as of April 2016): 494 Magnox staff Socio-economic stakeholders Welsh Government Isle of Anglesey County Council Menter Môn North Wales Economic Ambition Board Grŵp Llandrillo Menai Wylfa Site Stakeholder Group Where we were in 2012 Continuing our involvement in the community to build a skills base in readiness for new nuclear build and exploring the potential for the managed transfer of staff to Wylfa Newydd. Implementing the Shaping the Future project to support Trawsfynydd and Wylfa Site’s employees and contractors to develop their skills and engage in career transition planning activities. 2012-16 achievements £671,926 Magnox socio-economic scheme funding was invested between 2012-16. Mentor Môn Morlais- (2015-17) awarded £300,000 Magnox socio-economic scheme funding to support developing a marine energy hub at Morlais - West Anglesey Demonstration Zone. Menter Môn was appointed third party manager of one of six seabeds leased by the Crown Estate to accelerate wave and tidal energy technology development. The Anglesey zone was selected for its tidal energy resource and access to the required infrastructure such as Holyhead port and potential grid connections. The 37 square kilometre zone will be sublet to global marine energy developers to support the demonstration of up to ten underwater turbine installations with a cumulative renewable energy production capacity of 120MW – enough to power 25,000 homes. Môn Communities First (Môn CF), journey to work (2015) - Magnox has awarded over £99,000 to Môn CF’s Vocational Training Academy in Holyhead, which provides practical, hands-on vocational training for people who are the furthest away from employment. Môn CF will use the funding to become Anglesey’s only Construction Skills Certification Scheme test centre and Construction Plant Competence Scheme accredited centre. The funding will also be used to develop a driving programme offering practical driving lessons and theory test training to committed trainees who have completed their vocational training and are almost ready for work. Shaping the Future project (2012-15) aimed to improve the skills and adaptability of the 1,200 employees of Wylfa and Trawsfynydd nuclear power stations, to mitigate the closure of these facilities over the next five to seven years. The project supported career transition into non-nuclear sectors of the knowledge economy in Wales, focusing on the Welsh Government's target industry sectors and Enterprise. o 1402 people signed up to develop their skills and prepare for the future. o 775 people engaged in career transition planning activities o 494 gained qualifications or certified learning outcomes 24 Magnox socio-economic plan Version: Draft 1 £20.1m Welsh Government/EU funding to develop Llangefni Industrial Estate, regenerate Holyhead and the Menai Science Park, Gaerwen (2014). Anglesey Council Enabling Projects – Energy Island Programme (EIP) (2012present). The Anglesey Energy Island vision hopes to create jobs through both nuclear and renewable energy projects. NDA Socio-economic funding to the sum of £300,000 capital funding was awarded to the EIP. This has helped progress key elements of the EIP including: o developing a labour force with the skills to take advantage of future employment opportunities; o maximising local supply chain opportunities; o encouraging behavioural change o and improving local awareness and aspirations. £180,000 revenue funding was also awarded to employ a Project Commissioning Officer for three years. Anglesey Enterprise Zone created (2013) across 13 sites focussing on energy, environment and science. Cwmni Prentis Menai apprentices (2012). Magnox’s Wylfa site supported taking on 8 apprentices from Cwmni Prentis Menai. Magnox Learning & Development Centre (2012) transferred to Canolfan Ynni at Coleg Menai’s Llangefni campus creating 1 spin-off business and safeguarding employment for 10 Wylfa employees. £8.7m project to regenerate Holyhead, Llangefni and Amlwch Port (2010) Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 Organisation Project Anglesey County Council Energy Island Apprentices Sub total Vocational Training Academy Joinery Skills Programme Ysgol y Môr Phase II (Anglesey & Gwynedd ) Sub total Anglesey Cycling Festival Llanfechell Community Shop and Post Office Sub total Infrastructure improvements 2013/14 Môn Communities First 2013/14 North Wales Watersports 2014/15 2014/15 Anglesey County Council Menter Mechell 2015/16 Anglesey Agricultural Showground Menter Mon Morlais Mon Communities First 2015/16 2015/16 Tidal Energy Development Mon Communities First - Driving Skills Programme and Construction Skills Test Centre Sub total Total 25 Funding awarded £16,000 £16,000 £140,533 £32,970 £173,503 £60,000 £21,754 £81,754 £40,000 £300,000 £99,282 £439,282 £710,539 Magnox socio-economic plan Version: Draft 1 And what’s next? Key opportunities on the horizon include: £120m Land & Lakes holiday village, Penrhos, which is expected to create 600 jobs £600m Lateral Power Biomass Plant , Penrhos, which is expected to create 400 jobs £8bn Hitachi Wylfa Newydd Nuclear Power Station, which is expected to create 5,000 jobs during construction phase, 1,000 thereafter. Off shore marine development opportunities Enterprise zone developments and infrastructure enhancements Key area(s) of focus for Magnox moving forward Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. HIGH PRIORITY SITE – Wylfa Opportunities / objectives Work with Anglesey Council, Welsh Government and regional partners regarding future socio-economic interventions for North West Wales to mitigate impacts of end of work at Trawsfynydd and end of generation at Wylfa. 26 Magnox socio-economic plan Version: Draft 1 4.2.6 Chapelcross – medium priority site Workforce numbers (as of April 2016): 225 Magnox staff Socio-economic stakeholders Scottish Government Dumfries & Galloway Council Scottish Enterprise Corridor Regeneration Steering Group (CoReS) Chapelcross Site Stakeholder Group Annan Regeneration Steering Group Gretna Regeneration Steering Group Chapelcross Site Stakeholder Group Where we were in 2012 Supporting the effective management of the five year Beyond Chapelcross transition project through ongoing engagement with the CoReS group. 2012-16 achievements £176,702 Magnox socio-economic scheme funding was invested between 2012-16. Beyond Chapelcross project. 5-year, £1.2m programme launched in 2012. Managed by Magnox in partnership with local delivery organisations Dumfries & Galloway Council, Princes Trust Youth Board etc.. Key objectives include: o o o o Enhance existing loans and grants schemes for start-up/growing businesses with new business advice based in Gretna-Lockerbie-Annan corridor Support members of Chapelcross workforce whose jobs are at risk into local, alternative employment Unlock £9m of regeneration projects in Gretna, Lockerbie and Annan Early success in supporting business start-ups and expansion Key achievements to date include: o 159 businesses receiving intensive support o 90 new business start-ups o 51 new jobs created Annan Industrial park (2012 – present) – Scottish Enterprise, the Nuclear Decommissioning Authority and the European Regional Development Fund worked together to create a £4.5million industrial park in Annan and develop business units in Annan and Gretna. Chapelcross Site Development Framework, Marketing Strategy and Economic Baseline (2014/15). This project is concerned with the production of a Development Framework to enable the re development of the Chapelcross site into a location for significant new sustainable employment opportunities. The project will also see the production of an Economic Baseline and Marketing Strategy and Action Plan. The key targets include: o the creation of new high value and sustainable employment opportunities, high quality and well planned development, 27 Magnox socio-economic plan o Version: Draft 1 bring forward an initial 58 ha of brownfield land for development and improved local economic infrastructure in terms of sites, premises and access. Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 2013/14 2014/15 Organisation Project Dumfries & Galloway Council No applications No applications Chapelcross Site Masterplan No applications Total Funding awarded £0 £0 £20,000 £0 £20,000 And what’s next? Key area(s) of focus for Magnox moving forward Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. MEDIUM PRIORITY SITE - Chapelcross Opportunities / objectives Work with the Corridor Regeneration Steering (CoReS) Group to mitigate the impact on the local economy of the future job losses at Chapelcross. 4.2.7 Hinkley Point A – medium priority site Workforce numbers (as of April 2016): 162 Magnox staff Where we were in 2012 Implementing the managed transfer of staff agreement with EDF Energy. 2012-16 achievements £87,756 Magnox socio-economic scheme funding was invested between 2012-16. The Changing Life Opportunities enabled over 120 training opportunities and volunteer opportunities for individuals to help support young people in the area. It also gave over 1,200 work related experiences to students from local schools whilst working with numerous local businesses in the area. The Spaxton Community Shop were supported in buying equipment for their shop once it had been built which in turn offers some employment and a number of volunteer placements in running the shop to support the immediate communities and others in the area. 28 Magnox socio-economic plan Version: Draft 1 Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 2013/14 2015/16 Organisation Project Bridgwater Education Trust Spaxton Community Shop Changing Life Opportunities Development project No applications Total Funding awarded £37,550 £20,000 £0 £57,500 4.2.8 Winfrith – medium priority site Workforce numbers (as of April 2016): 182 Magnox staff Socio-economic stakeholders Purbeck District Council Dorset County Council Winfrith Site Stakeholder Group Bridgwater/Weymouth College Dorset Local Enterprise Partnership (LEP) Winfrith Site Stakeholder Group Where we were in 2012 Prior to 1 April 2015, when the Winfrith and Harwell sites (previously known as Research Sites Restoration Limited (RSRL)) were relicensed to Magnox, the two sites ran a small community programme at each site. Each site contributed £5,000 to help improve the local communities. The main strands of these community activities were: donations to local groups and charities reflecting themes such as the environment, youth, sport and culture support for local schools through gifts in kind, for example computer equipment and resources 2012-16 achievements Dorset LEP’s Strategic Economic Plan, ‘Transforming Dorset’, was submitted in March 2014 and was used for negotiations with Government on the Dorset Growth Deal. Dorset LEP was awarded £66.4 million from the Local Growth Fund in July 2014, with a further £12.6 million awarded in January 2015 - bringing the total to £79 million. From April 2014 to April 2015, the Winfrith site awarded £5,000 good neighbourhood funding to over 30 groups. The groups supported ranged from a community flag making event to help towards the local school swimming pool refurbishment. From April 2015, since becoming Magnox, RSRL sites have joined the Magnox socio economic scheme which has enabled the local community to apply for larger amounts of money to support sustainable projects. 29 Magnox socio-economic plan Version: Draft 1 And what’s next? Key area(s) of focus for Magnox moving forward Recognising that the socio-economic development plan needs to focus on those sites currently identified as high or medium priority, additional objectives have been identified for this site below. These are in addition to the company-wide objectives outlined in Table 1 on page 9. MEDIUM PRIORITY SITE – Winfrith Opportunities / objectives Identify socio economic leads at local councils and at the Dorset LEP and work with them to identify potential socio-economic projects which would benefit the local area. 30 Magnox socio-economic plan Version: Draft 1 4.2.9 Berkeley, Harwell, Oldbury, Sizewell A – low priority sites Low priority sites are typically supported at good neighbour level (applications up to £1,000), but this isn’t exclusive and a number of mid to high applications have been awarded in recent years. The following provides a summary of the support that has been awarded in recent years. Applications will continue to be considered on a case by case basis by their own merit and alignment with the Magnox socio-economic criteria. Berkeley – low priority site Workforce numbers (as of April 2016): 134 (site) /385 (Berkeley centre) Magnox staff Where we were in 2012 Supporting Energy Severn Vale’s aspiration to bring the different parts of the nuclear industry together and develop a skills base. 2012-16 achievements £64,918 Magnox socio-economic scheme funding was invested between 2012-16. The projects have resulted in a number of people finding work due to the support given and many people attended training sessions to enhance their skills in supporting the communities and community events. o During 2014/15 two STEM projects were supported across a number of schools in the area with support from Magnox Graduates; over the weeks that this took place around 400 children took part in workshops to develop their interest in science subjects. Business in the Community - Rednock School, Dursely. Established in 2013/14, Magnox has been involved in a partnership with Rednock School in Dursley providing STEM support to the school’s curriculum. This support has involved mentoring sixth form students and providing STEM ambassadors to help student plan for their future careers, sharing business knowledge, procedures and best practice and advice. South Gloucestershire and Stroud College (SGS) Green Skills Training Centre (2015). Part of Berkeley Centre, which adjoins the Berkeley decommissioning site, is being transformed into an engineering training centre for young people, after £5 million funding was announced by the Government. In a pioneering use of some of the NDA-owned ex-research facilities, South Gloucestershire and Stroud College will refurbish an old rig hall and a range of office buildings to create a state-of-the-art campus providing training in the renewable energy and nuclear sectors. Large investment to develop the site into a prestigious further education establishment to meet the needs of businesses in South Gloucestershire and Bristol by training people locally. Having applied to Magnox for equipment for the machine shop, the application was successful with the NDA deciding to fund this project directly for £206,792. 31 Magnox socio-economic plan Version: Draft 1 Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2015/16 Organisation Project Funding awarded No applications £0 Harwell – low priority site Workforce numbers (as of April 2016): 178 Magnox staff Where we were in 2012 Harwell Innovation and Science Park development Prior to 1 April 2015, when the Harwell and Winfrith sites (previously known as Research Sites Restoration Limited (RSRL)) were relicensed to Magnox, the two sites ran a small community programme at each site. Each site contributed £5,000 to help improve the local communities. The main strands of these community activities were: o donations to local groups and charities reflecting themes such as the environment, youth, sport and culture o support for local schools through gifts in kind, for example computer equipment and resources 2012-16 achievements Harwell Innovation and Science Park development continues to expand (established in 2000) and now over 5000 people are part of this fast-growing community, working in some 200 organisations that focus on a range of commercial applications including healthcare, medical devices, space, detector systems, computing, green enterprise and new materials. 25% of the original Harwell licensed area has now been delicensed (2014), which equates to around 30 football pitches. One area lies on the Eastern boundary, next to land already released for new uses, and it has been identified for building new science/technology facilities by the Harwell Oxford Campus joint venture, as part of the Science Vale UK Enterprise Zone. £5,000 good neighbour level funding (2014/15) reaching approximately 20 groups, which ranged from donation to a football summer tournament to providing funding for books for a Primary School library. Single Magnox socio-economic scheme implemented. From April 2015, since becoming Magnox, RSRL sites have joined the Magnox socio economic scheme which has enabled the local community to apply for larger amounts of money to support sustainable projects. 32 Magnox socio-economic plan Version: Draft 1 Oldbury – low priority site Workforce numbers (as of April 2016): 193 Magnox staff Where we were in 2012 Exploring the potential for the managed transfer of employees with new nuclear build developer Horizon Nuclear Power. 2012-16 achievements £67,214 Magnox socio-economic scheme funding was invested between 2012-16. This has created skills development in music and STEM subjects for dozens of young people in the area. There was also support for the volunteer sector to improve their social media skills to help publicise their charities and highlight fundraising events. Projects awarded Magnox socio-economic scheme funding over £10k Fiscal Year 2012/13 2015/16 Organisation Project Bristol Storm Basketball Club Storming the Streets No applications Total Funding awarded £15,000 £0 £15,000 Sizewell A – low priority site Workforce numbers (as of April 2016): 191 Magnox staff Where we were in 2012 Implementing the managed transfer of staff agreement with EDF Energy. Establishing relationships between the site and the Energy Coast initiative covering Essex, Norfolk and Suffolk. 2012-16 achievements £39,971 Magnox socio-economic scheme funding was invested between 2012-16. This included projects to support events in promoting the area to visitors who in turn boost the local economy. Projects awarded Magnox socio-economic scheme funding over £10k - none 33 Magnox socio-economic plan 5 Version: Draft 1 Care and maintenance (C & M) In line with the NDA’s strategy, the appropriateness, availability and level of socio-economic support for sites as they enter C&M will be agreed on a case by case basis and discussed with NDA and stakeholders. The socio-economic support and arrangements as sites move towards and enter C&M will be assessed and: Take in to account each site’s local area, timescales to quiescence. Describe what options and support will/will no longer be available. Identify the point at which we will engage with stakeholders e.g. ~12mths before the site’s C&M date. 6 Monitoring and reporting As part of the development of the three-year rolling socio-economic plan, appropriate performance measures and reporting arrangements will be agreed with the NDA to track progress against the objectives and targets outlined in this socio-economic plan. The socio-economic plan will be reviewed annually as a minimum . 34 Appendix 1 – Prioritisation matrix Magnox socio-economic funding prioritisation matrix May 2016 Site Hunterston A Chapelcross Dungeness A Bradwell Sizewell A Oldbury Berkeley Hinkley P A Wylfa Trawsfynydd Harwell Winfrith Previous Site Ranking 2012-15 Mid Mid High High Low Low Low Low Mid High n/a n/a Existing workforce profile as at April 2016 146 225 170 127 191 193 134 site 385 centre 162 494 156 178 182 Care & Maintenance Interim End State date *1 2022/3 2028 2027 2016-19 2027 2027 2021-22 2025-27 2025-26 2027-28 2027-28 2022-23 2 1 1 3 1 1 2 1 1 1 1 2 84,600 90,200 65,200 37,700 71,100 171,800 35,000 34,300 41,000 74,100 76,800 26,300 9.3% 4.4% 4.9% 3.4% 2.6% 3.6% 3.1% 2.8% 5.7% 5.3% 2.6% 2.5% 3 1 1 1 1 1 1 1 2 2 1 1 £13,546 £17,343 £20,006 £19,585 £20,750 £24,342 £24,342 £19,648 £13,162 £18,608 £30,485 £19,719 3 3 1 2 1 0 0 2 3 2 0 1 3953 6505 4363 6505 9822 32,844 18,085 32,844 13,426 32,844 21,562 32,844 23,249 32,844 11,380 32,844 980 1909 1174 1909 27,839 32,844 18,034 32,844 60.76% 67.07% 29.90% 55.06% 40.87% 65.64% 70.78% 34.64% 51.33% 61.49% 84.76% 54.90% 1 1 3 1 2 0 0 3 2 1 0 2 Glasgow 37 miles Sellafield 63 miles Canterbury 36 miles Chelmsford 25 miles Ipswich 28 miles Bristol 20 miles Bristol 22 miles Bristol 47 miles Chester 93 miles Chester 60 miles Oxford 15 miles Southampton 52 miles 2 3 2 1 1 1 1 2 3 3 1 3 £756,440 £250,000 £1,006,440 £176,702 £3,900,000 £4,076,702 £1,358,378 £41,250 £1,399,628 £401,168 0 £401,168 £39,971 £25,000 £64,971 £67,214 0 £67,214 £64,918 £206,782 £271,700 £87,756 £450,000 £537,756 £671,926 £3,870,000 £4,541,926 £816,334 £2,285,000 £3,101,334 £15,000 N/A £15,000 £15,000 N/A £15,000 High/Medium priority sites only Up to £500k = 4 points Up to £1.5M = 3 points £1.5 - £3.5M = 2points Over £3.5M = 0 points 3 0 3 4 N/A N/A N/A N/A 0 2 N/A N/A Sub Total 14 9 11 12 6 3 4 9 11 11 3 9 2016 -19 = 3 points 2020 -23 = 2 points 2024 + = 1 point Working age population 2014 % unemployed 2014-15 7.00% + = 3 points 5.00 - 7.00% = 2 points Under 5.00 % = 1 point Regional GVA per head National Average (NA) £24,958 30-50% below NA = 3 points 20% below NA = 2 points 10% below NA = 1 point Multiple Index of Deprivation Ranking 1 being most deprived Regional % 10-35% = 3 points 35-55% =2 points 55-65% = 1 point Distance from major employment Up to 30 miles = 1 point 30 – 50 miles = 2 points Over 50 miles = 3 points Magnox/RSRL funding 2012-16 *2 Direct NDA funding 2005-16 Total Site Sub Total carried forward External factors/ opportunities Hunterston A Chapelcross Dungeness A Bradwell Sizewell A Oldbury Berkeley Hinkley P A Wylfa Trawsfynydd Harwell Winfrith 14 9 11 12 6 3 4 9 11 11 3 9 Youth Employment Scheme Beyond Chapelcross Project Marsh Million Fund Bradwell Socioeconomic impact assessment Action Plan Sizewell C Oldbury B Stroud & South Gloucester College Hinkley Point C Wylfa Newydd Snowdonia Enterprise Zone UK Science Vale Enterprise Zone Purbeck Enterprise Zone Stroud & South Gloucester College Biomass plant Irvine Enterprise Zone Annan Industry Park Chapelcross Site Development New nuclear build generating date EDF B site C & M date Total Points New Site Ranking 2016-19 Romney Marsh Partnership Stroud & South Gloucester College Oldbury B Leisure Village Small Modular Reactors Morlais Tidal Energy Snowdonia Aerospace Centre Bradwell B Romney Marsh Business Centre Bradwell Power Station Legacy Partnership N N N Not known 2025 Not known N 2025 2020-25 N N N 2023 N 2028 N 2035 N N 2023 N N N N 14 9 11 12 6 3 4 9 11 11 3 9 Hunterston A High Chapelcross Mid Dungeness A High Bradwell High Sizewell A Low Oldbury Low Berkeley Low Hinkley P A Mid Wylfa High Trawsfynydd High Harwell Low Winfrith Mid * 1 Subject to future funding and validation of the programme by the NDA. *2 including future year commitments for multi-year projects Magnox Socio-economic Plan 2016-19 site ranking High priority funding sites (11-15 points) Bradwell, Hunterston A, Dungeness A, Trawsfynydd, Wylfa Medium priority funding sites (7-10 points) Chapelcross, Hinkley Point A, Winfrith Low priority funding sites (1-6 points) Berkeley, Harwell, Oldbury, Sizewell A Data source: Scotland Index of Multiple Deprivation 2012, Welsh Index of Multiple Deprivation 2014, English Index of Multiple Deprivation 2015 – Lower Super Output Area for site postcode Office of National Statistics - Regional Gross Value Added NUTS3 Data 2014. Nomis Official Labour Market Statistics – Working age population (16 – 64) in the site postcode’s County in 2014, % of working age population unemployed January – December 2015 RAC Route Planner Appendix 2 – Client specification / contract 6.8 Critical Enablers: Socio Economics: To support the creation of dynamic, sustainable local economies for communities living near Sites SOD Reference: SMS/TS/F4/SOD001 (Version V2 February 2012) To support the Authority’s Strategy to take account of the socio-economic consequences of its plans, engaging with agencies for economic development, providing financial support to the Contractor for socio-economic expenditure and providing direct socio-economic funding support, the Contractor shall commit sufficient human and financial resources to do the following, to the Authority’s reasonable satisfaction: 6.8(a) apply the principles and approval systems as previously agreed by the Authority for any socio-economic support; 6.8(b) work to support the Authority’s socio-economic objectives, as set out in the Authority’s Socio-Economic Policy, through engagement with the Authority, Local Authorities, development agencies and other appropriate bodies ensure that three year rolling SocioEconomic Development Plans are prepared in partnership with the Authority, consulted upon with stakeholders and submitted to the Authority and are in line with the requirements detailed in the Authority’s Socio-Economic Policy and in the socio-economic section(s) of the LTP Performance Plan; 6.8(c) prepare, consult upon and publish an annual review of socio-economic performance against the LTP Performance Plan detailed in 6.8(b) above; the plan should include clear objectives, desired outcomes, SMART targets and performance measures; 6.8(d) influence, work with and support local and national regeneration/economic development agencies in the delivery of their objectives through the development and execution of a complementary socio-economic plan; 6.8(e) prioritise its socio-economic interventions according to both the timescale towards Quiescence at sites and the prevailing socio-economic conditions in the travel to work area; 6.8(f) Whilst cognisant of 6.8(e) above, plans should consider, as a minimum: [i] skills retention in localities/skills transition from the sites to jobs in local communities; [ii] the transfer of learning from the PBO to the Magnox Contractor and the RSRL Contractor in order to engender a more diversified and skilled workforce; [iii] apprentice scheme development, including community apprentices; [iv] optimising the potential/capacity of local supply chains to bid for work from sites; [v] engagement with local education establishments - supporting curricula and raising aspirations; [vi] supporting the spin-out of functions from the sites to the local economy as new SMEs; and [vii] re-location of associated staff/offices/businesses within the travel to work area for individual sites; 6.8(g) communicate with employees and trades unions to develop, at the appropriate time, workforce transition plans; 6.8(h) develop individual transition plans and transition training/support programmes as appropriate; 6.8(i) work with the supply chain to inform and support them in their own workforce transition plans; 6.8(j) make available to appropriate stakeholder organisations the Annual Resource Plans produced; and 6.8(k) jointly develop and enter into a stakeholder and Socio-Economic Partnering Agreement with the Authority to support development and delivery of the Socio-Economic Development Plan. This agreement will provide clarity on how the parties intend to collaborate and co-operate in order to deliver stakeholder and socio-economic activity requirements. 6.8.1 SLC Programme Requirement (Magnox) Develop plans suited to Magnox sites 6.8.2 SLC Programme Requirement (RSRL) The Contractor shall: 6.8.1(a) prioritise areas for support. The plan(s) prepared and maintained by the Contractor pursuant to Requirement 6.8 above should take into account: [i] Magnox socio-economic plans; [ii] local Socio-Economic Development Plans; [iii] availability of Authority-owned, proximate land to divest for socio-economic benefit; [iv] the prevailing socio-economic conditions in each Magnox Site’s locality; [v] results of local stakeholder engagement; [vi] skills retention in localities/skills transfer from each Magnox Site to local communities; [vii] transfer of learning from the PBO to the Magnox Contractor; [viii] apprentice scheme development; [ix] maximising the potential/capacity of local supply chains to bid for work from each Magnox Site; [x] engagement with local education establishments, supporting curriculum and raising aspirations; [xi] supporting the spin-out of functions from the Magnox sites to the local economy; and [xii] re-location of associated staff/offices/businesses to locality around the Magnox Site(s). The Contractor shall: 6.8.2(a) prioritise areas for support. The plan(s) prepared and maintained by the Contractor pursuant, Develop plans suited to RSRL sites to Requirement 6.8 above, should take into account: [i] local Socio-Economic Development/Regeneration Plans; [ii] availability of Authority-owned, proximate land to divest for socio-economic benefit; [iii] the differing stages of each RSRL Site’s life-cycle; [iv] the prevailing socio-economic conditions in each RSRL Site’s locality; [v] results of local stakeholder engagement; [vi] skills retention in localities/skills transfer from each RSRL Site to local communities; [vii] transfer of learning from the PBO to the RSRL Contractor; [viii] apprentice scheme development; [ix] maximising the potential/capacity of local supply chains to bid for work from RSRL sites; [x] engagement with local education establishments, supporting curriculum and raising aspirations; [xi] supporting the spin-out of functions from each RSRL Site to the local economy; and [xii] re-location of associated staff/offices/businesses to locality around the RSRL Site(s).
© Copyright 2026 Paperzz