THE KENT H IL L M O R T O N L A N E RAILW AY LINE

NOTES
Key
Traffic signal equipment mounted on pole
E
HILLMORTON LAN
Traffic Signal Controller and Feeder Pillar
Vehicle Detector unit
All traffic signal equipment and road markings
shown are indicative and may be subject to change
during detailed design or during installation due to
site constraints.
New Kerb Line
REV DRN AMENDMENT
M
P
DATE
TRANSPORT
AND ECONOMY
.5
Design Services
Communities
Shire Hall Post Room
Warwick
CV34 4SP
Tel : 01926 410410
Web : www.warwickshire.gov.uk
24.2---227-002-.pdf
UNCONTROLLED
FS 26655
DRAWING - DO NOT PRINT
PROJECT
RA
IL
W
AY
TITLE
LI
NE
Drn
Ck'd
App'd
Date
Date
Date
Status
Scale
TH
E
© Crown Copyright and database right
2017. Ordnance Survey 100019520.
0mm
50mm
100mm
DRG. NO.
KE
NT
150mm
200mm
Sheet size
Rev.
This plot was produced from a digital source so may not be at true scale. It is the recipient's responsibility to confirm its accuracy.