TSI Assessment Danish OCL: Tests at 230 km/h The Danish Railway Conference 2016 – 17/05/2016 Carlos Guillemot Gascon, BDK, Project Manager Joanna Schneider-Tilli, Atkins, Technical Project Manager Co-financed by the European Union Trans-European Transport Network (TEN-T) Carlos Guillemot Project manager Banedanmark MSc Transport and Logistics at DTU CSM expert [email protected] Joanna Schneider-Tilli Technical Project Manager Atkins MSc Civil Engineering OCL expert [email protected] 17 May 2016 TSI Assessment BDK OCL Speakers 2 17 May 2016 TSI Assessment BDK OCL Why did we carry out this project? 3 Den nye bane – Kh.-Rg Trafik-og Byggestyrelsen - January 2015 ”All lines subject to upgrade need to be compliant to TSI” 17 May 2016 TSI Assessment BDK OCL Why did we carry out this project? 4 – BDK has many speed upgrading projects – – Ringsted & Vigerslev St. – Ringsted-Odense – Vamdrup-Vojens – More to come… Proving that existing OCL is TSI compliant would avoid changing the whole OCL system $ 17 May 2016 TSI Assessment BDK OCL Why did we carry out this project? 5 Agenda 1. Introduction: why this project? 2. TSI basis for the project 3. Test approval: CSM & Compatibility Certificate 4. Time Schedule and Organisation 5. Simulations 6. Tests and results 7. Conclusions 17 May 2016 TSI Assessment BDK OCL Agenda 6 PROJECT ENERGY SUBSYSTEM EC verification of the energy subsystem Voltage and frequency Geometry of the overhead contact line interoperability constituents INTEROPERABILITY Component (IC) OCL system Protective provisions against electric 17 May 2016 TSI Assessment BDK OCL Technical Specifications for Interoperability (TSI) 7 (Type) (∆CWh) Interoperability parameters (Fm) (CWh) * Contact wire height (CWh) (Config.) (∆CWh) * Contact wire gradient (∆CWh) (Sfmax) (Type) * Maximum lateral deviation (Sfmax) * Mean contact force (Fm) (Fm) DYNAMIC TEST * Uplift (So) (∆CWh) (So) * Pantograph spacing (Config.) * Pantograph gauge (Type) * Contact wire material M M L1 17 May 2016 TSI Assessment BDK OCL L1 L2 L2 Technical Specifications for Interoperability (TSI) 8 BDK 160 and BDK 200 CA module ‘EC’ DECLARATION OF CONFORMITY AND SUITABILITY FOR USE OF INTEROPERABILITY CONSTITUENTS ‘EC’ DECLARATION OF CONFORMITY AND SUITABILITY FOR USE OF INTEROPERABILITY CONSTITUENTS Technical documentation TECHNICAL DOSSIER general description general description of the IC Appendix 1 Parameter, interoperability element specification conceptual design and manufacturing drawings Appendix 2 Elements drawings descriptions and explanations necessary for the understanding of those drawings Appendix 3 Assembly drawings Appendix 4 Interface conditions Appendix 5 Standards list Appendix 6 Calculation Appendix 7 SIMULATION Technical Documentation Appendix 8 RUN Technical Documentation TEST conditions of integration of the IC a list of the harmonised standards and/or other relevant technical specifications results of design calculations test reports Manufacturing 17 May 2016 TSI Assessment BDK OCL Tests provided on existing subsystem If the system is placed in service for more than 20 years, there is no need for simulations CALCULATION SIMULATION TEST RUN Annex A General and specific work description (AAB, SAB and GAB) Technical Specifications for Interoperability (TSI) 9 TSI approval – we need a NoBo, right? COMMISSIONING REGULATION (EU) Nr. 1301/2014 TSI ENE Our OCL is introduced to the European market before this TSI enters into force CA modul Internal production control NoBo 17 May 2016 TSI Assessment BDK OCL Technical Specifications for Interoperability (TSI) 10 F 160 F 200 F 200 F 160 17 May 2016 TSI Assessment BDK OCL Technical Specifications for Interoperability (TSI) 11 Dynamic test & Transport (focus on vehicle at a higher speed) BEK 653 of 08/05/2015 Section 6 DeBo Compatibility Report CSM procedure AsBo Rolling stock Risk analysis 17 May 2016 TSI Assessment BDK OCL Legislation 12 58 TECHNICAL REQUIREMENTS TO NOT TSI APPROVED ROLLING STOCK 230 km/h DeBo 53 TECHNICAL DESCRIPTIONS approx 600 pages 17 May 2016 TSI Assessment BDK OCL Compatibility Certificate – Rolling Stock 13 Electrical feeding sections affect by test activities ~56 km EMC 17 May 2016 TSI Assessment BDK OCL Compatibility Certificate – Rolling Stock 14 System Definition (s) 2 tests + transport Hazard Workshops Hazard log Participants with all competences Risk Assessment Safety requirements CSM Assessment report Authorisation NSA 17 May 2016 TSI Assessment BDK OCL CSM Process 15 112 hazards • 4 Power Supply • 16 Track and switches • 7 Constructions • 6 • 1 Clearance profile • 26 • 1 Soil and embankments • 32 Rolling Stock Accidents & Evacuation Operation & Traffic Management *** 10 Overhead contact line 17 May 2016 TSI Assessment BDK OCL CSM Process 16 Speed up procedure Vision F200 Vision F160 17 May 2016 TSI Assessment BDK OCL 240 Max. Test speed 230 km/h 230 215 km/h 220 210 km/h 210 200 km/h 200 190 180 km/h 180 Mission 170 TIB approved line speed 160 km/h 160 150 140 km/h 140 130 120 km/h 120 110 100 km/h 100 90 Test train configuration C35 80 80 km/h 70 60 50 40 30 Test train configuration C15 20 10 0 step 1 step 2 step 3 step 4 step 5 step 6 step 7 step 8 step 9 step 10 Mission F200 CSM: Speed step up procedure F160 17 Documentation Theoretical definition of OCL parameter based on TSI and EN standards Documentation BDK Consultation BDK Analysis and Analysis and modification of modification of existing OCL sections existing OCL sections Simulation Simulation Dynamic test CSM Dynamic test CSM Dynamic test Simulation TSI Intrerpretation Simulation Dynamic test 17 May 2016 TSI Assessment BDK OCL Time schedule 18 06/16 05/16 04/16 03/16 02/16 01/16 12/15 11/15 10/15 09/15 08/15 07/15 06/15 05/15 04/15 03/15 02/15 01/15 12/14 11/14 10/14 09/14 08/14 07/14 06/14 05/14 04/14 03/14 CSM BDK Documentation Theoretical definition of OCL parameter based on TSI and EN standards Analysis and modification of existing OCL sections Simulation Simulation Dynamic test CSM Dynamic test CSM Dynamic test TSI Assessment BDK OCL Dynamic test Simulation New TSI CR + HS TSI Intrerpretation Simulation 17 May 2016 Documentation BDK Time schedule 19 06/16 05/16 04/16 03/16 02/16 01/16 12/15 11/15 10/15 09/15 08/15 07/15 06/15 05/15 04/15 03/15 02/15 01/15 12/14 11/14 10/14 09/14 08/14 07/14 06/14 05/14 04/14 03/14 CSM BDK Analysis and modification of existing OCL sections CSM Compatibility Certificate Simulation Dynamic test Dynamic test Dynamic test 17 May 2016 TSI Assessment BDK OCL Dynamic test Simulation Rolling stock documentation New TSI CR + HS TSI Intrerpretation Simulation Documentation Theoretical definition of OCL parameter based on TSI and EN standards Documentation BDK Time schedule 20 06/16 05/16 04/16 03/16 02/16 01/16 12/15 11/15 10/15 09/15 08/15 07/15 06/15 05/15 04/15 03/15 02/15 01/15 12/14 11/14 10/14 09/14 08/14 07/14 06/14 05/14 04/14 03/14 CSM CSM Kompatibilitet certifikat CSM Analysis and modification of Compatibility certificate Documentation Theoretical definition of OCL parameter based on TSI and EN standards Documentation BDK existing OCL sections Simulation Dynamic test Dynamic test Dynamic test 17 May 2016 TSI Assessment BDK OCL Time schedule Simulation Compatibility Certificate + Who is applicant? Rolling stock documentation New TSI CR + HS TSI Intrerpretation Simulation Dynamic test 21 06/16 05/16 04/16 03/16 02/16 01/16 12/15 11/15 10/15 09/15 08/15 07/15 06/15 05/15 04/15 03/15 02/15 01/15 12/14 11/14 10/14 09/14 08/14 07/14 06/14 05/14 04/14 03/14 BDK Steering committee Kh-Rg project Storebælt Rg-Od project Vm-Oj project Technical Operation Project Manager / Safety manager Carlos Ernesto Guillemot Gascon Teknisk Drift OCL Technical Project Manager Joanna Schneider-Tilli DB Test Run + Loco owner OCL test Jørgen Gade Contract manager DB Simulation OCL analysis Jesper Henrichsen Jernbanesikkerhed 17 May 2016 TSI Assessment BDK OCL Project Organization 22 Railway Undertaking Applicant Loco owner / Freight Operator Consultancy services Petter Hyden Bjørn T Hansen Steering committee Chairman Jan Schneider-Tilli Kristian Madsen (Storebælt) Martin Munk Hensen (Rg-Od project) Trafik- og Byggestyrelsen Flemming Folkersen CSM Assessor, DeBo Per Lauritzen (Ricardo DK) Thomas Elklint (Ricardo DK) Najla Knidiri (Ricardo DK) TSI Assessor Chris Liu (Ricardo NL) Marianne Rasmussen (Vm-Oj project) Søren Thrane (Technical Operation) Project Manager / Safety manager Carlos Ernesto Guillemot Gascon Technical Project Manager Joanna Schneider-Tilli Test manager/consultancy Finn Jensen DB Test Run + Loco owner Joerg Heland Benjamin Reffay OCL test Jørgen Gade DB Simulation Michael Kolbe OCL analysis Jesper Henrichsen 17 May 2016 TSI Assessment BDK OCL Storebælt Constructions Svend Gjerding (Construct.) Bente Madsen (ENE) Flemming Saxtorph (Track/IL) Christina Wurtz (Safety) Klaus B Bendtsen (Traffic) Contract manager Niels Sørensen Running time calculations Erik Mørck Jacobsen Project Organization Kvalitet & Sikkerhed Steen Cavour Nielsen Jens Vestergaard Trafikal Drift Lars Høeg Kok Rasmussen Teknisk Drift Mads Søndergaard (HO) Bo Nielsen (Track) Mikkel Esser Smith (Soil) Jan Johannsen (Construct.) Bao Trong Tran (IL) Jørgen Bille Hansen (EMC) Niels Erik Glud (ENE) SP Fjernbane On-board David Chabanon 23 17 May 2016 TSI Assessment BDK OCL Simulations 24 17 May 2016 TSI Assessment BDK OCL Train configuration and speed profile 25 17 May 2016 TSI Assessment BDK OCL The test team 26 17 May 2016 TSI Assessment BDK OCL The test team 27 17 May 2016 TSI Assessment BDK OCL The test runs 28 17 May 2016 TSI Assessment BDK OCL The test runs - Incidents 29 – Intense 10-12 working days – We reached the maximum speeds – always under safe limits – Massive skills from the drivers – We got lots of data – Waiting time… – Improvisation, flexibility and creativity 17 May 2016 TSI Assessment BDK OCL The test runs 30 We broke speed record in Denmark: 235,8 km/h 17 May 2016 TSI Assessment BDK OCL The test runs 31 17 May 2016 TSI Assessment BDK OCL 200km/h 200km/h 200km/h 200km/h Results 32 17 May 2016 TSI Assessment BDK OCL Results 33 Conclusions – Approval of tests can take a long time (rolling stock) Be flexible in your descriptions! – Get NoBos make interpretations of TSI as soon as possible – Large organisation and contracts – Huge logistic work: transport, staff, hotels… – Tests will give surprises compared to simulations & calculations 17 May 2016 TSI Assessment BDK OCL Conclusions 34 Questions? Carlos Guillemot Gascon Joanna Schneider-Tilli [email protected] [email protected] +45 9139 9782 +45 5251 9917 17 May 2016 TSI Assessment BDK OCL Questions 35 Back up Co-financed by the European Union Trans-European Transport Network (TEN-T) NoBo archiv e ‘EC’ declaration of conformity and suitability for use of interoperability constituent OCL TECHNICAL DOCUMENTATION OCL Directive 2011/18/EU IC EC(IC) 2008/57/EU Annex IV §2.4 2010/713/EU Annex I Module CA § 4 SUBSYSTEM ENERGY SUBSYSTEM ENERGY SUBSYSTEM ENERGY SUBSYSTEM ENERGY TECHNICAL FILE ‘EC’ CERTIFICATE OF VERIFICATION ‘EC’ DECLARATION OF VERIFICATION ‘EC’ DECLARATION OF VERIFICATION OF THE ENERGY SUBSYSTEM OF THE ENERGY SUBSYSTEM OF THE ENERGY SUBSYSTEM Energy subsystem EC(IC) OCL Annex III §2.4 archiv e Annex III §2.3.1 Part of this project 17 May 2016 TSI Assessment of DK OCL Annex II §1 Annex III §2.6 Not a part of this project END 37
© Copyright 2026 Paperzz