Funding for Innovation: Cooperative Intelligent Transport Systems Application Form Applicant Information Local authority name(s): Blackpool Council Bid Manager Name and position: David Simper: Group Leader (Transport Projects) Contact telephone number: 01253 476176 Email address: [email protected] Postal address: Planning, Housing and Transport P.O. Box 17 Corporation Street Blackpool FY1 1LZ Please specify the web link where this bid will be published: http://www.blackpool.gov.uk/Residents/Parking-roads-and-transport/Transport/Transportpolicy.aspx SECTION A - Scheme description and funding profile A1. Scheme name: Blackpool tourism traffic flow and enhanced car parking guidance programme A2. Headline description: Traffic management is economically crucial to the tourist economy. This now relies on adopting SMART technology. In a built-up area road-space cannot be increased. Most trips will be by car, with some rail and coach. Tourism growth must not compromise the public realm. Four programme areas are proposed: • • • Real time information – in-car guidance Queue management – enhancing traffic flow at controlled junctions Enforcement cameras at: o o o Bus hub – Market Street/Corporation Street/Church Street Talbot Road bus/tram lane Talbot Road tram/bus/rail interchange (planned scheme). This package will contribute to economic productivity, boost tourism, improve road safety, reduce emissions and attract investment. A3. Geographical area: Blackpool covers 35km² with 11.2km of seafront. Mainly urban, its heart is the 5km² resort core and town centre. The population is 143,000. Blackpool borders Wyre Borough to the north and Fylde Borough to the south. Measures proposed will be network-wide, but concentrated in the southerly M55 motorway access corridors. OS Grid Reference: SD 30663 36339 Postcode: FY1 1LZ A4. Type of bid (please tick relevant box): C-ITS: Connected Vehicle C-ITS: Real Time Information C-ITS: Smart Parking C-ITS: Vulnerable Road Users 2 Other (please specify) Queue management, enforcement cameras. A5. Equality Analysis Has any Equality Analysis been undertaken in line with the Equality Duty? Yes (appendix 4) SECTION B – The Business Case B1. The Scheme – Summary/History (Maximum 200 words) Blackpool must manage its peak-time congestion and accommodate visitor growth. Roads cannot be expanded and mass modal shift to train and coach is unlikely. Using SMART technology to improve traffic flow safely, increase productivity and reduce air pollution is the way forward. The programme planned would achieve the following: • • • • Provide in-car traffic information and car parking guidance using smart-phone app or satnav systems, including SMART parking management Establish network-wide traffic flow control Influence promenade traffic access outside the commuter peak Exclude private vehicles from priority areas. Removing Promenade traffic outside of the commuting peak is a key objective, to create a pedestrian focused sea-front area. The following scheme outcomes are anticipated: • • • • • • • • • Congestion costs on the Blackpool economy will be reduced An enhanced tourism gateway experience meaning return visits and GVA growth Reduced parking search trips means people will be out of their cars and spending sooner A resort operating with minimal congestion will attract potential inward investors The resort’s Promenade showcase can be a pedestrian public realm area The pressure to increase road-space will be reduced Public transport information will be integrated within the system’s data flow Polluting emissions will be ameliorated Economic diversification through inward investment will be promoted. 3 B2. The Strategic Case (Maximum 350 words) Blackpool must regenerate to reduce poverty. Its location defines it as a resort, but leaves it economically peripheral. Intelligent transport systems will support growth. The scheme’s objectives and outcomes are summarised in B1. Baseline data is provided at C1. All are predicated on economic enhancement. This table provides socio-economic context: Blackpool % 74.4 10.6 25.6 8.9 14.6 3.8 Economically active Unemployed Economically inactive Long-term sick Total benefit claimants Benefit claimants as a proportion of residents aged 16-64 England % 76.8 7.6 23.2 4.6 12.2 1.8 Source: 2011 ONS Census Heavy peak traffic must be controlled and scarce parking managed carefully; systems’ will help monitor network dynamics. The visitor’s vital gateway experience can currently be poor. Traffic is helping create air pollution. Events place strain on roads and new systems will help manage this. The economic growth needed to bring Blackpool to full employment is slowed. Air pollution has a significant health impact, the resort having a town centre air quality management area. In prioritising intelligent transport systems, the following options have been appraised: • • • • Provide additional road capacity: It is impossible to create new capacity Encourage sustainable transport modes: Previous initiatives have not achieved modal shift Park and Ride: management rather than the shortage of town centre parking is the issue Advanced directional signage: Recently upgraded signage has failed to reduce promenade traffic. If successful, the programme will be designed in detail in 2016/17 quarter 4, being implemented in 2017/18 to the following approximate timetable: • • • • Quarter 1 – queue management elements installed Quarter 2 – Bluetooth beacons installed and smartphone apps written and promoted Quarter 3 – enforcement cameras installed Quarter 4 – slippage, commissioning and system launch. The council has good relations with potential contractors, offering a fully co-operative approach with the private sector. This package will have a major economic impact, enabling a public realm, health and quality of life upgrade: residential areas close to tourism routes will benefit directly, but all areas will benefit at least indirectly, with no adverse effects. Blackpool is proactive in recognising intelligent transport systems’ value, particularly in a constrained situation like the resort. 4 B3. The Financial Case – Project Costs Please complete the following tables. Figures should be entered in £000s (i.e. £10,000 = 10). Table A: Funding profile (Nominal terms) An initial cost breakdown is provided in appendix 8. £000s DfT funding Sought LA Contribution 2016-17 20 0 2017-18 214 26 Total 234 26 Other third party funding 0 0 0 Notes: (1) Department for Transport funding must not go beyond 2017-18 financial year. (2) A local contribution of 5% (local authority and/or third party) of the project costs is required. B4. The Financial Case - Local Contribution / Third Party Funding Please provide information on the following points (where applicable): a) The non-DfT contribution may include funding from organisations other than the scheme promoter. Please provide details of all non-DfT funding contributions to the scheme costs. This should include evidence to show how any third party contributions are being secured, the level of commitment and when they will become available. The council’s match funding contribution would be drawn from the Local Transport Plan programme, within which there is a budget for traffic control enhancements. A scheme of this magnitude cannot be funded from the latter budget and the programme proposed will not happen without the additional resources requested. b) Where the contribution is from external sources, please provide a letter confirming the body’s commitment to contribute to the cost of the scheme. The Department for Transport is unlikely to fund any scheme where significant financial contributions from other sources have not been secured or appear to be at risk. Not applicable. There is no local body that could support the bid in this way. Have you appended a letter(s) to support this case? N/A c) Please list any other funding applications you have made for this scheme or variants thereof and the outcome of these applications, including any reasons for rejection. There have been no previous applications for this proposed programme. 5 B5. The Financial Case – Affordability and Financial Risk (maximum 300 words) The project will be split into discrete work packages, which will be let on the basis of fixed price contracts. Blackpool’s procurement team works closely with project managers to ensure that projects achieve value for money. The implementation team is experienced and accustomed to working with co-operatively with a wide-range of contractors. The project has received a risk assessment and this is attached as appendix 1. The project manager will monitor the expenditure profile throughout implementation. Although fixed price contracts will be used, should over-spend issues emerge the project scope can generally be adjusted to compensate, provided that the objectives stated would be met. The project manager will report to the project board monthly and will liaise with a nominated accountant to monitor actual and projected expenditure. The council accepts the risk of cost-over-runs that might occur, despite project management and procurement processes to minimise this risk. The council’s Section 151 officer has provided a letter to this effect (appendix 9). Please provide evidence on the following points (where applicable): a) What risk allowance has been applied to the project cost? A 10% risk allowance has been applied. b) How will cost overruns be dealt with? The Local Transport Plan will accommodate any cost over-runs that might arise, despite the approach described above. It is noted that there will be no further recourse to DfT funds. c) What are the main risks to project delivery timescales and what impact this will have on cost? A detailed risk assessment (appendix 1) using the P50 figure has been provided collating all reasonably foreseeable risks and this will be maintained throughout the implementation process. Principal risks can be anticipated to be: • • • Unforeseen cost Cost of equipment increases Delays to the scheme leading to non-delivery within the funding limitations. The council and its contractors do not have total control of market costs therefore this is a risk, but one that the procurement process can address and mitigate if necessary. This remains the principal risk of cost-escalation. The project board will seek to manage the project to the cash limit as described above, any over-spend being minimised. 6 B6. The Economic Case – Value for Money A comparable variable message signage system to be implemented with Local Growth Deal funding has demonstrated an adjusted benefit cost ratio of 2.38. A scheme-specific benefit cost ratio cannot be developed within the time and resources available and would not be proportionate to the resources requested. It should be noted that a mere £1 per capita increase in spend by the resort’s 2015 visitors resulting from this programme would generate close to an extra £18m for the Blackpool economy and this sum might very well be a lot more. This is the tip of the benefits iceberg that would accrue the programme proposed. The council is introducing further layers of traffic control technology to achieve a network-wide positive traffic flow effect, but with the resources available this is a slow process. Thus in the ‘do-minimum’ situation it is likely that congestion effects on the principal tourism routes will continue to grow; the council’s other regeneration policies are slowly gaining traction and tourism volumes are growing, most people coming by car. As noted above, SMART technology is now the only option to tackle this and a programme of the scale proposed is needed to get the council ‘on the front foot’. The programme proposed is estimated to cost £260,000. Blackpool Council proposes to provide 10% match, or £26,000. The projected benefits are described above and baseline data is provided at C1. For this investment, it is anticipated that Blackpool’s network can be managed to ameliorate congestion that a growing economy would otherwise generate, particularly during peak tourism times. In terms of the DfT’s scheme appraisal summary table headings and the distributional 7-point scale, the following benefits would achieve ‘large beneficial’: • • • • • • Business users and transport providers Reliability impact on business users Regeneration Commuting and other uses Reliability impact on commuting and other users Journey quality. The following would achieve ‘beneficial’: • • • Wider impacts eg. Promenade decongestion Air quality Greenhouse gases. The following would achieve ‘slight beneficial’: • • • Townscape, largely through reduced voids Physical activity (modal shift to active travel) Accidents (reduce stop/start driving patterns and overall frustration). Air quality might only achieve ‘beneficial’ under this system, but the potentially reduced morbidity associated with this has an extremely high value. Demonstrating causality between schemes and improved air quality in a complex situation like Blackpool is difficult, otherwise air quality might achieve ‘large beneficial’. The latest air quality monitoring data is provided in appendix 7. 7 Without the programme proposed, visitors will continue to navigate sub-optimally around Blackpool’s limited road-space, clashing with local traffic flows. Blackpool was developed before mass car ownership and there is no parking where people tend to think it should be, for example The Tower attraction. The systems proposed would optimise traffic flows and get people into the best parking locations. To achieve regeneration, the resort has little choice but to attract more traffic, particularly during special events including the Illuminations display, air show, fireworks competition and Christmas shopping period. B7. The Commercial Case (maximum 300 words) The scheme will use the same procurement process as that for the current variable message signage/car park guidance scheme mentioned above, using an existing framework agreement. There would be no additional benefit in a separate tender process; a number of suppliers are named in the framework agreement. This decision takes into account a number of factors: • • • A fully compliant OJEU tender process, already undertaken on behalf of all potential public sector contracting authorities. Reduced timescales, even if running a mini-competition from a framework, in comparison to a full tender process. Increased leverage, resulting in more competitive prices compared with current market rates. The council has identified a Crown Commercial Service (CSS) contract that would be suitable for this scheme. This is RM1089, Traffic Management Technology, which has a number of named suppliers. Under this contract, there can be a direct award or a mini-competition can be run. Suppliers within this arrangement can supply or develop all the equipment or technology that these proposals require. Under this contract, the procurement of maintenance services can readily be separated out. The project manager will work closely with the council’s Procurement Team to ensure that the framework agreement delivers a fully cooperative approach aimed at pushing technology forward in a demanding real world situation and the best value for money that is available. B8. Management Case - Delivery (maximum 300 words) A Project Programme is included at Appendix 2. The key programme dates are as follows: • • • • • • • Detailed Design: Quarter 4 2016/17 Procurement: Quarter 1 2017/18 Contractor Selection: June 2018 Site Surveys & Investigations: Quarter 2 2017/18 Manufacturing & Purchasing: April – Quarter 3 2017/18 Installation: Quarter 3 & 4 2017/18 Commissioning: February – March 2018 This timetable will be brought forward if possible; quarter 4 2017/18 includes provision for any programme slippage. The framework agreement-based procurement processes proposed will allow a smooth programme delivery. The Local Growth Deal supported variable message signage scheme that precedes and integrates with this initiative provides an implementation template and provides industry contacts to facilitate the value for money procurement process. No additional statutory processes to the council’s established traffic regulation order process will 8 be required. This technology-led approach will have little disruptive impact during installation and there should be now objections on these grounds. There might be objections to the use of speed cameras, these being considered through the democratic processes in place. Implementation will be achieved with the assistance of the council’s private finance initiative supported Community Lighting Partnership, which has refurbished and now maintains Blackpool’s street lighting and signal-controlled junctions. The project board will be meeting monthly to monitor progress against these milestones, contractors being obliged to meet the milestones and facilitate spend to an agreed profile towards the scheme’s completion. The projects board’s composition is described at B9 below and laid out as an organogram in appendix 3. A highly experienced implementation team with expert contractor support is in place, which will deliver the proposals proposed to the committed profile. The project board will approve extra resources to bring the programme back on target if this becomes necessary. Deliverability is one of the essential criteria for this Competition and as such any bid should set out if any statutory procedure is needed before it can be delivered. a) An outline project plan (typically in Gantt chart form) with milestones should be included as an annex, covering the period from submission of the bid to scheme completion. The definition of the key milestones should be clear and explained. The critical path should be identifiable and any contingency periods, key dependencies (internal or external) should be explained. Has a project plan been appended to your bid? Yes (appendix 2) b) A statement of intent to deliver the scheme within this programme from a senior political representative and/or senior local authority official. A statement from the council’s Deputy Leader, with transport policy oversight, is included as appendix 10. B9. Management Case – Governance (maximum 300 words) Project governance will be in-line with the council’s PRINCE2 project management system, based on SMART principles, and will deliver the programme to budget. An organogram is included with this application as appendix 3. The project board structure includes the following roles: • • • • Senior Responsible Owner: Holds ultimate project responsibility, ensuring focus on objectives and delivery. This officer will report to the Cabinet Member accordingly – Jeremy Walker: Transport Policy Manager Senior User: Responsible for specifying project users’ needs, including supervising necessary procurement procedures and monitoring contract performance, also identifying and seeking approval for any project variances, in-line with achieving the programme’s overall aims – Will Britain: Principal Engineer, Highway Asset Management. Senior Supplier: Represents those designing, developing, facilitating, procuring and implementing the project – Latif Patel: Group Engineer, Traffic Management. Project Manager: Dealing with the works’ day-to-day implementation – Bob Sutcliffe: Senior Highways Engineer. A project board will be established and will meet monthly. The project board will include the 9 elected portfolio holder with responsibility for traffic management. The project team will report to the project manager who will report to the project board, handling procurement compliant with European and domestic regulations. The project board will be the project’s principal decision-taking body and will monitor the project’s progress throughout. It will deliver the stated post-scheme appraisal and ongoing monitoring regime. Invoiced expenditure will be monitored so that delivery targets are met, a member of the accountancy team taking a place on the board, together with a member of the Communications Team. The day to day project management will rest with the project manager. As each programme phase is completed and energised, a press release informing the Blackpool public of this fact will be made. In this way and information om the council’s website, the new technology systems will be promoted. B10. Management Case - Risk Management Has a risk register been appended to your bid? 10 Yes (appendix 1) SECTION C – Monitoring, Evaluation and Benefits Realisation C1. Benefits Realisation (maximum 250 words) The benefits anticipated are based on the outcomes identified in B1, all achieved by controlling traffic flows, managing parking and encouraging sustainable modes. The quantifiable benefits are: • • • • Reduced congestion – Traffic Master Data sets a baseline congestion figure. Promenade journey times between Starr Gate and Bispham are high during the Illuminations, rising to around 2 to 3 hours for an uncongested journey of around 10 minutes, an average speed of 2.7-4.1kph. The systems proposed should have an immediate de-congestion effect. Automatic traffic counters and multi-modal counts will provide back-up data. The scheme’s benefits will accrue over a five year period Pollution will be ameliorated – These benefits will accrue over a five year period. Currently a detector tube sited in the town centre recorded breaches of the European Union’s 40µg/m³ nitrogen dioxide concentration limit in eleven months of the year 2014 Increased return visits – Work by Bournemouth University in 2013 estimated that 36% of all Blackpool visitors visit more than once a year. Tourism generally presents long-term trends and it can be expected that this benefit will accrue over a five year period Increased spend due to reduced parking search time – The extra spend that will be achieved is difficult to enumerate. However, every extra pound of visitor spend equates to £18m per annum extra. The project board will own these benefits and collect data on an ongoing basis. The scheme’s benefits will start to accrue during the year 2018/19 when the technology proposed has been adopted more widely. C2. Monitoring and Evaluation (maximum 250 words) The National Traffic Master Data is updated annually, allowing time for a congestion change trend to establish. The council’s network of monitoring tubes monitors air quality providing data for the Annual Air Quality Progress Report. Visitor Economy Performance Indicators (VEPI) is available on a monthly basis. The system includes a footfall counter camera installed on the Promenade. VEPI also measures business perceptions of the local economy: 39.29% of Business Improvement District retailers reported improved performance against the July 2015 position. Visitor survey data is collected regularly and that system is under review, enabling return visits to be monitored. Other data sources allow contextual monitoring: • Existing traffic data from automatic counters and quarterly multi-modal counts. The following baseline average daily traffic figures during the busy October period have been recorded: • • Yeadon Way (2014) St Walburga’s Road (2015) 14,744 20,341 11 • • • Preston New Road (2014) Progress Way (2015) North Promenade (2015) 30,663 18,579 14,749 • Car park usage data: in July 2016 149,120 pay and display tickets were sold a 5% increase against the 142,027 sold in July 2015. • Over 2015 Blackpool suffered a total of 508 road related casualties, including 1 fatality and 58 serious injuries. The project board will manage the evaluation and monitoring programme receiving data on a monthly basis and bring more resources to it if necessary. As the new equipment is installed, more data will be available and this will be a further programme benefit. SECTION D: Declarations D1. Senior Responsible Owner Declaration As Senior Responsible Owner for ‘Blackpool tourism traffic flow and enhanced car parking guidance programme’ I hereby submit this request for approval to DfT on behalf of Blackpool Council and confirm that I have the necessary authority to do so. I confirm that Blackpool Council will have all the necessary powers in place to ensure the planned timescales in the application can be realised. Name: Jeremy Walker Signed: Position: Transport Policy Manager D2. Section 151 Officer Declaration As Section 151 Officer for Blackpool Council I declare that the scheme cost estimates quoted in this bid are accurate to the best of my knowledge and that Blackpool Council: - has allocated sufficient budget to deliver this scheme on the basis of its proposed funding contribution will allocate sufficient staff and other necessary resources to deliver this scheme on time and on budget accepts responsibility for meeting any costs over and above the DfT contribution requested, including potential cost overruns and the underwriting of any funding contributions expected from third parties accepts responsibility for meeting any ongoing revenue requirements in relation to the scheme accepts that no further increase in DfT funding will be considered beyond the maximum contribution requested has the necessary governance / assurance arrangements in place has identified a procurement strategy that is legally compliant and is likely to achieve the best value for money outcome will ensure that a robust and effective stakeholder and communications plan is put in place. 12 Name: Signed: Steve Thompson Submission of bids: The deadline for bid submission is 5pm, 30 September 2016. An electronic copy only of the bid including any supporting material should be submitted to: [email protected] 13
© Copyright 2026 Paperzz