A76910-2 V4_Sec1_Overview_and_Appendix_List

CA PDF Page 1 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
1.0
Section 1
Overview
OVERVIEW
This volume describes the engineering design considerations and philosophies for the
pipeline portion of the Project, including:

new mainline segments (Alberta, Ontario East, Québec and New Brunswick)

pipeline laterals (Cromer, Montréal and Lévis)

Canaport Energy East marine terminal pipeline connection (Saint John
Connection)

connecting pipelines from the existing conversion segments to pump stations that
are not co-located with existing TransCanada Mainline compressor stations

minor route realignments around existing TransCanada Mainline facilities

related pipeline components such as mainline valves (MLVs), cathodic protection
(CP) and in-line inspection (ILI) facilities such as launchers and receivers
The volume is presented in multiple parts. The first part is divided into three sections,
beginning with this Section 1, Overview. The overview concludes with a detailed list
of appendices (see Table 1-1).
Section 2, General Design, begins by outlining the engineering considerations and
philosophies that will be generally applicable to the new pipelines installed for the
Project, including mainline, laterals, terminal connections, and route re-alignments
along converted segments. Topics include:




safety and environmental protection
pipeline route selection criteria
quality management
engineering design details such as:














class location
depth of cover
pipe wall thickness
line pipe specifications
valves and fittings
corrosion control elements
in-line inspection facilities
watercourse crossings
geohazard assessment
buoyancy control
acid rock management
designated protected areas
valve placement
pipeline integrity
Section 3.0, Pipeline-Specific Information, describes the design considerations and
activities that will be specific to the design of the individual mainline segments,
May 2016
Page 1-1
CA PDF Page 2 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
laterals and terminal connections. Pipeline-specific information is provided from west
to east, by each new pipe category, except for the route re-alignments that are detailed
in Volume 5, Conversion Design. Topics include:






selected pipeline routing and rationale for the new pipelines
class location
pipe design specifications
watercourse crossings
geohazard and hydrotechnical analyses
designated protected areas traversed
The information provided in these sections is preliminary, supported by initial results
from field investigation and engagement programs. Revisions and refinements will be
made as additional data are collected and assessed, and as engineering progresses
through detailed design.
Supporting Documents
Table 1-1 is a list of the supporting documents (e.g., drawings, aerial maps, reports
and studies) that are provided in this Consolidated Application volume.
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design
Consolidated
Appendix No.
Consolidated Appendix Name
Appendix 4-1
Typical Drawings
Appendix 4-2
Design Confirmation Letter
Appendix 4-3
Addendum to Design Confirmation Letter
Appendix 4-4
Golder Associates Inc. Summary of Geohazards
Appendix 4-5
Golder Energy East Pipeline (New-Build Portion), Geologic Hazard Phase II
Assessment
Appendix 4-6
BGC Preliminary Phase 1 Geohazard Assessment
Appendix 4-7
Preliminary Report – Hydrotechnical Conditions
Appendix 4-8
Energy East Pipeline (New-Build Portion), Hydrotechnical Hazards Phase II
Assessment
Appendix 4-9
Acid Rock Drainage Mitigation Plan (Québec and New Brunswick)
Appendix 4-10
Acid Rock Drainage Mitigation Plan (Saint-Onésime/Picard Realignment)
Appendix 4-11
Terrain Mapping
Appendix 4-12
Rock and Acid Rock Geotechnical Investigation
Appendix 4-13
Engineering Assessment for Valve Placement
Appendix 4-14
HSR Data – Stantec Report
Alberta Segment
Appendix 4-15A
CCI HDD Feasibility Report – Red Deer River and South Saskatchewan River
Appendix 4-15B
CCI HDD Geotechnical Evaluation – Red Deer River and South Saskatchewan River
Ontario East Segment
Appendix 4-16
Class Location Changes Relative to Population Density ‒ Ontario East Segment (1 of 3)
Appendix 4-17
Class Location Changes Relative to Population Density – Ontario East Segment (2 of 3)
Page 1-2
May 2016
CA PDF Page 3 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design (cont'd)
Consolidated
Appendix No.
Consolidated Appendix Name
Appendix 4-18
Class Location Changes Related to Population Density – Ontario East Segment
(3 of 3)
Appendix 4-19
Entec HDD Preliminary Feasibility Review – Raisin River
Appendix 4-20
Entec HDD Preliminary Feasibility Review – Delisle River
Appendix 4-21
Entec HDD Preliminary Feasibility Review – Rigaud River
Québec Segment
Appendix 4-22
Class Locations Relative to Population Density ‒ Québec Segment (1 of 23)
Appendix 4-23
Class Locations Relative to Population Density ‒ Québec Segment (2 of 23)
Appendix 4-24
Class Locations Relative to Population Density ‒ Québec Segment (3 of 23)
Appendix 4-25
Class Locations Relative to Population Density ‒ Québec Segment (4 of 23)
Appendix 4-26
Class Locations Relative to Population Density ‒ Québec Segment (5 of 23)
Appendix 4-27
Class Locations Relative to Population Density ‒ Québec Segment (6 of 23)
Appendix 4-28
Class Locations Relative to Population Density ‒ Québec Segment (7 of 23)
Appendix 4-29
Class Locations Relative to Population Density ‒ Québec Segment (8 of 23)
Appendix 4-30
Class Locations Relative to Population Density ‒ Québec Segment (9 of 23)
Appendix 4-31
Class Locations Relative to Population Density ‒ Québec Segment (10 of 23)
Appendix 4-32
Class Locations Relative to Population Density ‒ Québec Segment (11 of 23)
Appendix 4-33
Class Locations Relative to Population Density ‒ Québec Segment (12 of 23)
Appendix 4-34
Class Locations Relative to Population Density ‒ Québec Segment (13 of 23)
Appendix 4-35
Class Locations Relative to Population Density ‒ Québec Segment (14 of 23)
Appendix 4-36
Class Locations Relative to Population Density ‒ Québec Segment (15 of 23)
Appendix 4-37
Class Locations Relative to Population Density ‒ Québec Segment (16 of 23)
Appendix 4-38
Class Locations Relative to Population Density ‒ Québec Segment (17 of 23)
Appendix 4-39
Class Locations Relative to Population Density ‒ Québec Segment (18 of 23)
Appendix 4-40
Class Locations Relative to Population Density ‒ Québec Segment (19 of 23)
Appendix 4-41
Class Locations Relative to Population Density ‒ Québec Segment (20 of 23)
Appendix 4-42
Class Locations Relative to Population Density ‒ Québec Segment (21 of 23)
Appendix 4-43
Class Locations Relative to Population Density ‒ Québec Segment (22 of 23)
Appendix 4-44
Class Locations Relative to Population Density ‒ Québec Segment (23 of 23)
Appendix 4-45
PLACEHOLDER ‒ HMM Trenchless Crossing Feasibility Report –
Rivière des Outaouais
Appendix 4-46
Entec HDD Preliminary Feasibility ‒ Rivière du Nord
Appendix 4-47A
Entec HDD Preliminary Feasibility Review-Rivière l’Assomption
Appendix 4-47B
Entec HDD Preliminary Feasibility Review-Rivière l’Assomption (Follow up)
Appendix 4-48A
Entec HDD Preliminary Feasibility Review-Rivière Bayonne
Appendix 4-48B
Entec HDD Preliminary Feasibility Review-Rivière Bayonne (Follow up)
Appendix 4-49A
Entec HDD Preliminary Feasibility Review-Rivière Chicot
Appendix 4-49B
Entec HDD Preliminary Feasibility Review-Rivière Chicot (Follow up)
Appendix 4-50
Entec HDD Preliminary Feasibility Review – Rivière Maskinongé
Appendix 4-51
Entec HDD Preliminary Feasibility Review – Rivière du Loup
May 2016
Page 1-3
CA PDF Page 4 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design (cont'd)
Consolidated
Appendix No.
Appendix 4-52
Consolidated Appendix Name
Entec HDD Preliminary Feasibility Review – Rivière Saint-Maurice
Appendix 4-53A
Entec HDD Preliminary Feasibility Review – Rivière Batiscan
Appendix 4-53B
Entec HDD Preliminary Feasibility Review – Rivière Batiscan
Appendix 4-54A
Entec HDD Preliminary Feasibility Review – Sainte-Anne
Appendix 4-54B
Entec HDD Preliminary Feasibility Review – Sainte-Anne (Follow up)
Appendix 4-55
Entec HDD Preliminary Feasibility Review – Rivière Jacques Cartier
Appendix 4-56A
Entec HDD Preliminary Feasibility Review – Rivière Beaurivage
Appendix 4-56B
Entec HDD Preliminary Feasibility Review – Rivière Beaurivage (Follow up)
Appendix 4-57A
Entec HDD Preliminary Feasibility Review – Rivière Chaudière
Appendix 4-57B
Entec HDD Preliminary Feasibility Review – Rivière Chaudière (Follow up)
Appendix 4-58A
Entec HDD Preliminary Feasibility Review – Rivière Etchemin
Appendix 4-58B
Entec HDD Preliminary Feasibility Review – Rivière Etchemin (Follow up)
Appendix 4-59A
Entec HDD Preliminary Feasibility Review – Rivière du Sud
Appendix 4-59B
Entec HDD Preliminary Feasibility Review – Rivière du Sud (Follow up)
Appendix 4-60A
Entec HDD Preliminary Feasibility Review – Rivière Bras-Saint-Nicolas
Appendix 4-60B
Entec HDD Preliminary Feasibility Review – Rivière Bras-Saint-Nicolas (Follow up)
Appendix 4-61A
Entec HDD Preliminary Feasibility Review – Rivière Trois-Saumons
Appendix 4-61B
Entec HDD Preliminary Feasibility Review – Rivière Trois-Saumons (Follow up)
Appendix 4-62A
Entec HDD Preliminary Feasibility Review – Rivière Ouelle
Appendix 4-62B
Entec HDD Preliminary Feasibility Review – Rivière Ouelle (Follow up)
Appendix 4-63A
Entec HDD Preliminary Feasibility Review – Grande Rivière
Appendix 4-63B
Entec HDD Preliminary Feasibility Review – Grande Rivière (Follow up)
Appendix 4-64A
Entec HDD Preliminary Feasibility Review – Rivière du Loup
Appendix 4-64B
Entec HDD Preliminary Feasibility Review – Rivière du Loup (Follow up)
Appendix 4-65A
Entec HDD Preliminary Feasibility Review – Rivière Madawaska
Appendix 4-65B
Entec HDD Preliminary Feasibility Review – Rivière Madawaska (Follow up)
Appendix 4-66
St. Lawrence River Tunnel Feasibility/DBM Report
Appendix 4-67
St. Lawrence River Crossing Geotechnical Investigation and Geotechnical Data Report
Appendix 4-68A
Entec Letter Affirming Trenchless Crossing Assessments – Rivière Bayonne
Appendix 4-68B
Entec Letter Affirming Trenchless Crossing Assessments – Rivière Chicot
Appendix 4-68C
Entec Letter Affirming Trenchless Crossing Assessments – Rivière Ouelle
Appendix 4-68D
Entec Letter Affirming Trenchless Crossing Assessments – Rivière du Loup
Appendix 4-68E
Entec Letter Affirming Trenchless Crossing Assessments – Rivière Madawaska
New Brunswick Segment
Appendix 4-69
Class Locations Relative to Population Density – New Brunswick Segment (1 of 8)
Appendix 4-70
Class Locations Relative to Population Density – New Brunswick Segment (2 of 8)
Appendix 4-71
Class Locations Relative to Population Density – New Brunswick Segment (3 of 8)
Appendix 4-72
Class Locations Relative to Population Density – New Brunswick Segment (4 of 8)
Appendix 4-73
Class Locations Relative to Population Density – New Brunswick Segment (5 of 8)
Page 1-4
May 2016
CA PDF Page 5 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design (cont'd)
Consolidated
Appendix No.
Consolidated Appendix Name
Appendix 4-74
Class Locations Relative to Population Density – New Brunswick Segment (6 of 8)
Appendix 4-75
Class Locations Relative to Population Density – New Brunswick Segment (7 of 8)
Appendix 4-76
Class Locations Relative to Population Density – New Brunswick Segment (8 of 8)
Appendix 4-77A
Entec HDD Preliminary Feasibility Review – Rivière Iroquois
Appendix 4-77B
CCI HDD Feasibility Report – Rivière Iroquois
Appendix 4-77C
Stantec/CH2M Geotechnical Report for HDD Crossings – Rivière Iroquois
Appendix 4-78A
Entec HDD Preliminary Feasibility Review – Petite Rivière Iroquois
Appendix 4-78B
CCI HDD Feasibility Report – Petite Rivière Iroquois
Appendix 4-78C
Stantec/CH2M Geotechnical Report for HDD Crossings – Petite Rivière Iroquois
Appendix 4-79A
Entec HDD Preliminary Feasibility Review – Rivière Verte
Appendix 4-79B
CCI HDD Feasibility Report – Rivière Verte
Appendix 4-79C
Contingency Crossing Drawing – Rivière Verte
Appendix 4-79D
Stantec/CH2M Geotechnical Report for HDD Crossings – Rivière Verte
Appendix 4-80A
Entec HDD Preliminary Feasibility Review – Salmon River (North)
Appendix 4-80B
CCI HDD Feasibility Report – Salmon River (North)
Appendix 4-80C
Contingency Crossing Drawing – Salmon River (North)
Appendix 4-80D
Trenchless Crossing Assessment – Salmon River (North) – HDD Drawings
Appendix 4-80E
Stantec/CH2M Geotechnical Report for HDD Crossings – Salmon River (North)
Appendix 4-81A
Entec HDD Preliminary Feasibility Review – Tobique River
Appendix 4-81B
CCI HDD Feasibility Report – Tobique River
Appendix 4-81C
Contingency Crossing Drawing – Tobique River
Appendix 4-81D
Trenchless Crossing Assessment – Tobique River – HDD Drawings
Appendix 4-81E
Stantec/CH2M Geotechnical Report for HDD Crossings – Tobique River
Appendix 4-82A
Entec HDD Preliminary Feasibility Review – Coal Creek
Appendix 4-82B
CCI HDD Feasibility Report – Coal Creek
Appendix 4-82C
Contingency Crossing Drawing – Coal Creek
Appendix 4-82D
Trenchless Crossing Assessment – Coal Creek – HDD Drawings
Appendix 4-82E
Stantec/CH2M Geotechnical Report for HDD Crossings – Coal Creek
Appendix 4-83A
Entec HDD Preliminary Feasibility Review – Canaan River
Appendix 4-83B
CCI HDD Feasibility Report – Canaan River
Appendix 4-83C
Contingency Crossing Drawing – Canaan River
Appendix 4-83D
Trenchless Crossing Assessment – Canaan River – HDD Drawings
Appendix 4-83E
Stantec/CH2M Geotechnical Report for HDD Crossings – Canaan River
Appendix 4-84A
Entec HDD Preliminary Feasibility Review – Long Creek
Appendix 4-84B
CCI HDD Feasibility Report – Long Creek
Appendix 4-84C
Contingency Crossing Drawing – Long Creek
Appendix 4-84D
Trenchless Crossing Assessment – Long Creek – HDD Drawings
Appendix 4-84E
Stantec/CH2M Geotechnical Report for HDD Crossings – Long Creek
Appendix 4-85A
Entec HDD Preliminary Feasibility Review – Kennebecasis River
May 2016
Page 1-5
CA PDF Page 6 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design (cont'd)
Consolidated
Appendix No.
Consolidated Appendix Name
Appendix 4-85B
CCI HDD Feasibility Report – Kennebecasis River
Appendix 4-85C
Contingency Crossing Drawing – Kennebecasis River
Appendix 4-85D
Trenchless Crossing Assessment – Kennebecasis River – HDD Drawings
Appendix 4-85E
Stantec/CH2M Geotechnical Report for HDD Crossings – Kennebecasis
Appendix 4-86A
Entec HDD Preliminary Feasibility Review – Black River
Appendix 4-86B
CCI HDD Feasibility Report – Black River
Appendix 4-86C
Contingency Crossing Drawing – Black River
Appendix 4-86D
Trenchless Crossing Assessment – Black River – HDD Drawings
Appendix 4-86E
Stantec/CH2M Geotechnical Report for HDD Crossings – Black River
Appendix 4-87A
Entec HDD Preliminary Feasibility Review – Mispec River
Appendix 4-87B
CCI HDD Feasibility Report – Mispec River
Appendix 4-87C
Contingency Crossing Drawing – Mispec River
Appendix 4-87D
Trenchless Crossing Assessment – Mispec River – HDD Drawings
Appendix 4-87E
Stantec/CH2M Geotechnical Report for HDD Crossings – Mispec River
Appendix 4-88A
CCI HDD Feasibility Report – Grand Rivière
Appendix 4-88B
Stantec/CH2M Geotechnical Report for HDD Crossings – Grand Rivière
Appendix 4-89A
CCI HDD Feasibility Report – Miramichi River (South Branch Southwest)
Appendix 4-89B
Stantec/CH2M Geotechnical Report for HDD Crossings – Miramichi River
(South Branch Southwest)
Appendix 4-90A
CCI HDD Feasibility Report – Cains River
Appendix 4-90B
Stantec/CH2M Geotechnical Report for HDD Crossings – Cains River
Appendix 4-91A
CCI HDD Feasibility Report – Salmon River South
Appendix 4-91B
Stantec/CH2M Geotechnical Report for HDD Crossings – Salmon South River
Appendix 4-92A
CCI HDD Feasibility Report – Hammond River
Appendix 4-92B
Stantec/CH2M Geotechnical Report for HDD Crossings – Hammond River
Appendix 4-93
Class Locations Relative to Population Density – Montréal Lateral Alternative Route 1
Appendix 4-94
Class Locations Relative to Population Density ‒ Montréal Lateral Alternative Route 1
Appendix 4-95
Class Locations Relative to Population Density ‒ Montréal Lateral Alternative Route 1
Appendix 4-96
Class Locations Relative to Population Density ‒ Montréal Lateral Alternative Route 1
Appendix 4-97
Class Locations Relative to Population Density – Montréal Lateral Alternative Route 1
and 2 (2 on 1 map)
Appendix 4-98
Class Locations Relative to Population Density – Montréal Lateral Alternative Route 2
(1 of 2)
Appendix 4-99
Class Locations Relative to Population Density ‒ Montréal Lateral Alternative Route 2
(2 of 2)
Appendix 4-100
Entec HDD Preliminary Feasibility Review – Rivière des Mille Îles (Alternative
Route 1 and 2)
Appendix 4-101A
Entec HDD Preliminary Feasibility Review – Rivière des Prairies (Alternative Route 1)
Appendix 4-101B
Entec HDD Preliminary Feasibility Review – Rivière des Prairies (Alternative Route 2)
Appendix 4-102
Page 1-6
Class Locations Relative to Population Density – Lévis Lateral
May 2016
CA PDF Page 7 of 7
Energy East Pipeline Ltd.
Consolidated Application
Volume 4: Pipeline Design
Section 1
Overview
Table 1-1: List of Appendices to Volume 4 ‒ Pipeline Design (cont'd)
Consolidated
Appendix No.
Consolidated Appendix Name
Appendix 4-103A
Entec HDD Preliminary Feasibility Review – Rivière Etchemin Lévis
Appendix 4-103B
Entec HDD Preliminary Feasibility Review – Rivière Etchemin Lévis (Follow up)
Additional Placeholder Appendices
Appendix 4-104
Placeholder
Appendix 4-105
Placeholder
Appendix 4-106
Placeholder
Appendix 4-107
Placeholder
Appendix 4-108
Placeholder
Appendix 4-109
Placeholder
Appendix 4-110
Placeholder
May 2016
Page 1-7