EMERGENCY RESPONSE AND POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN FOR: REDLAM WASTE SERVICES 10 Industrial Road UNANDERRA GPS Location: Latitude: - 34.274954 Long: 150.512040 AUTHORISED BY: UPDATED: RICK JONES, MANAGING DIRECTOR 11 January 2016 Summary of Dangerous Goods held at the premises Dangerous Goods Class Class 2.1 Flammable Gas Class 3 Flammable Liquid Class 6.2 Infectious substances Class 8 Corrosive Liquid Quantity 2 x 140kg 300L 6T 100L EMERGENCY SERVICES INFORMATION PACKAGE FIRE FIGHTERS SUMMARY Site location: Redlam Waste Services: 10 Industrial Road, Unanderra Brief description of works: Redlam Waste Services provides a waste collection service to hospitals, dentists, doctors, pathologists and overseas shipping for clinical, quarantine and cytotoxic waste. The clinical, quarantine and related wastes are treated by steam sterilisation process to destroy microbial organisms, rendering the waste harmless. Cytotoxic and anatomical waste is collected and temporarily stored before being transported to another waste treatment facility to be incinerated. Areas of the site that are potentially hazardous during a fire emergency have been determined to be the autoclave and associated equipment and the waste storage locations. Fire in the autoclave, shredder and bin can be due to unwanted solvents within the waste. This is difficult to control; ► ► Clinical and related waste and cytotoxic waste is classified as special waste under the NSW EPA Waste Classification Guidelines. The main hazards associated with this waste are sharps and the infectious nature of the waste. The risk of these hazards depends on exposure. A truck wash bay is located in an undercover area at the rear of the site. This area is connected to tradewaste but stormwater drains run adjacent to this area. There is also a wash bay inside the building for cleaning of bins. This area is connected to the Sydney Water Tradewaste System; ► ► There are minor quantities of dangerous goods stored at the site including Class 2.1 flammable gas (LPG), Class 3 flammable liquids and Class 8 corrosive substances. Dangerous goods of other classes are occasionally brought onto site and are dealt with by licensed waste contractors. Cytotoxic wastes and residual wastes that may contain infectious microorganisms are considered to be a Class 6.2. The nearest waterway is Allens Creek which is located 1km north-east of the site. The building is bunded at all doorways to contain all spills and any contaminated fire water. treated by an on-site DAF which drains to sewer. All spills are There is a street fire hydrant located at the front of the site. Two fire hose reels and fire extinguishers are installed at the site. A stormwater isolation valve is installed on the site’s stormwater system. The location of nearest fire services is Unanderra at 80 Central Road, Unanderra NSW 2526. Site Location: 10 Industrial Road, Unanderra Aerial photograph Source: © Google Earth EMERGENCY AND POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN FOR REDLAM WASTE SERVICES PTY LTD Prepared for: Rick Jones, Managing Director, Redlam Waste Services Pty Ltd NSW Fire Brigade CONTENTS PAGE EMERGENCY SERVICES INFORMATION PACKAGE Fire Fighters Summary 1. 1.1 1.2 1.3 1.4 1.5 1.6 INTRODUCTION....................................................................................................................................... 1 Reference Documents .............................................................................................................................. 1 Definition of an emergency ....................................................................................................................... 1 Definition of a Pollution Incident................................................................................................................ 2 Pollution Incident Response Management ............................................................................................... 3 Aims of The Plan....................................................................................................................................... 7 Scope and Objectives ............................................................................................................................... 7 2. 2.1 2.2 2.3 SUMMARY OF OPERATIONS, HAZARDS, AND SAFETY SYSTEMS .................................................. 9 Summary of Operations ............................................................................................................................ 9 Summary of Transport Operations.......................................................................................................... 11 Summary of Hazards .............................................................................................................................. 15 2.3.1 2.3.1.1 2.3.1.2 2.3.2 2.3.3 2.3.4 2.4 Material Related Hazards......................................................................................................................... 15 Dangerous Goods .................................................................................................................................... 16 Special Waste .......................................................................................................................................... 18 Process Related Hazards ........................................................................................................................ 19 Potential Pollutants Stored on Site ........................................................................................................... 19 Risk Assessment...................................................................................................................................... 20 Summary of Safety Systems................................................................................................................... 25 2.4.1 2.4.1.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 On-site Water Retention System.............................................................................................................. 25 Containment of Contaminated Water ....................................................................................................... 25 Disposal of Fire Fighting Water ................................................................................................................ 25 Dangerous Goods and Waste Storage Areas .......................................................................................... 26 Fire Fighting Equipment ........................................................................................................................... 26 Spill Control Equipment............................................................................................................................ 27 Personal Protective Equipment (PPE) ..................................................................................................... 28 Safety Data Sheets (SDS) ....................................................................................................................... 28 3. TYPES OF EMERGENCIES ................................................................................................................... 29 4. 4.1 4.2 4.3 4.4 EMERGENCY CONTROL AND RESPONSE......................................................................................... 30 Principles of Emergency Control and Response .................................................................................... 30 emergency Control Organisation ............................................................................................................ 30 Criteria for Selecting Emergency Response Personnel .......................................................................... 29 Principle Roles and Responsibilities ....................................................................................................... 31 4.4.1 4.4.2 Damage Control ....................................................................................................................................... 31 Rescue and First Aid ................................................................................................................................ 32 4.4.3 4.4.4 4.4.5 4.4.6 4.4.7 4.5 4.6 Fire Detection.......................................................................................................................................... 33 Raising Alarm.......................................................................................................................................... 33 4.6.1 4.6.2 4.6.3 4.6.4 4.7 Evacuation Initiation ................................................................................................................................. 33 Personnel Accounting System ................................................................................................................. 33 Adjacent Premises ................................................................................................................................... 34 Relocation of Evacuees ........................................................................................................................... 36 Notification of a Pollution Incident ........................................................................................................... 36 4.7.1 4.7.1.1 4.7.1.2 4.7.1.3 4.7.1.4 4.7.1.5 4.7.1.6 4.7.2 4.7.2.1 4.7.2.2 4.7.2.3 4.7.2.4 4.7.2.5 4.8 4.9 4.10 4.11 Communications ...................................................................................................................................... 32 Evacuation ............................................................................................................................................... 32 Traffic Control .......................................................................................................................................... 32 Emergency control Point .......................................................................................................................... 32 Movement of Vehicles .............................................................................................................................. 33 Notification of a Pollution Incident at the Facility ...................................................................................... 36 When to Notify? ....................................................................................................................................... 36 How to Notify? .......................................................................................................................................... 37 What to Notify? ........................................................................................................................................ 37 Site Contacts ............................................................................................................................................ 38 Regulatory Authority Contacts ................................................................................................................. 38 Surrounding Area Receptors ................................................................................................................... 39 Notification of a Pollution Incident during Transport of Waste ................................................................. 39 When to Notify? ....................................................................................................................................... 39 How to Notify? .......................................................................................................................................... 40 What to Notify? ........................................................................................................................................ 47 Site Contacts ............................................................................................................................................ 48 Surrounding Area Receptors ................................................................................................................... 48 Terminating an Emergency ..................................................................................................................... 49 Statutory Investigation of Incident ........................................................................................................... 49 Written Report on Emergency and Review of Emergency Plan ............................................................. 50 Emergency Training ................................................................................................................................ 50 4.11.1 4.11.2 General Personnel and Contractors......................................................................................................... 50 Emergency Control Organisation Personnel ............................................................................................ 51 5. 5.1 5.2 5.3 5.4 EMERGENCIES DURING TRANSPORT OF WASTE ........................................................................... 52 Emergency Contacts............................................................................................................................... 52 Communicating with the community ....................................................................................................... 53 Emergency Action Plan........................................................................................................................... 53 Staff Training........................................................................................................................................... 53 6. REVIEW AND TESTING OF THE PLAN ................................................................................................ 54 7. REFERENCES........................................................................................................................................ 55 8. LIMITATIONS ......................................................................................................................................... 56 TABLES PAGE Table 2-1: Dangerous Goods Storage Details ..................................................................................................... 10 Table 2-2: Classes of dangerous goods stored and handled at the Site ............................................................. 16 Table 2-3: Placarding and Manifest Quantities – 2005 Dangerous Goods Regulations ...................................... 17 Table 2-4: Potential Pollutants ............................................................................................................................. 20 Table 2-5: Hazard and Likelihood Risk Assessment and Control Measures ........................................................ 22 Table 3-1: Summary of Emergencies and Response Procedures ....................................................................... 29 Table 4-1: Emergency Control Organisation Member Summary ......................................................................... 29 Table 4-2: Surrounding Area Receptors................................................................................................................ 34 Table 4-3: Site Contacts ........................................................................................................................................ 38 Table 4-4: Site Contacts ........................................................................................................................................ 48 Table 5-1: Site Emergency Contacts .................................................................................................................... 52 FIGURES Figure 2-1: Figure 2-2: Figure 2-3: Figure 4-1: PAGE Site Location ...................................................................................................................................... 12 Site Layout ......................................................................................................................................... 13 Site Layout & Stormwater Plan .......................................................................................................... 13 Surrounding area receptors ............................................................................................................... 35 ATTACHMENTS Attachment 1: Emergency Procedure Flow Chart Attachment 2: Emergency Response Procedures Attachment 3: Incident Reporting Procedure Attachment 4: Notification of a Pollution Incident Procedure at the Facility Attachment 5: Notification of a Pollution Incident during Transport of Waste Attachment 6: Emergency Drill Procedure and Log Attachment 7: Excerpt from HB76: 2010 Dangerous Goods – Initial Emergency Response Guide Redlam Waste Services Emergency and Pollution Incident Response Management Plan DOCUMENT DISTRIBUTION LIST Document Revision 1 2 Issued Date Issued To Issued By 14 January 2014 14 January 2014 11 January 2016 11 January 2016 11 January 2016 Unanderra Fire Brigade Warrawong Fire Brigade Unanderra Fire Brigade Warrawong Fire Brigade Wollongong Fire Brigade R Jones R Jones R Jones R Jones R Jones RWS PIRMP JANUARY 2016.DOC Page: i Redlam Waste Services Emergency and Pollution Incident Response Management Plan DOCUMENT REVISION RECORD Revision 1 2 3 Date 1.1.14 1.1.15 11.1.16 Comments General Revisions & Updates General Revision & Updates General Revision & Updates Prepared by J Scimone J Scimone J Scimone Checked R Jones R Jones R Jones Approved R Jones R Jones R Jones RWS PIRMP JANUARY 2016.DOC Page: ii Redlam Waste Services Emergency and Pollution Incident Response Management Plan ABBREVIATIONS & GLOSSARY OF TERMS ADG Code: Australian Code for the Transport of Dangerous Goods by Road and Rail published by the National Transport Commission, Commonwealth of Australia. Appropriate regulatory authority: Generally, the appropriate regulatory authority is the EPA for licensed premises and local Council for non-licensed premises. There are exceptions to this definition as stated in Clause 6 of the POEO Act. BCA: Building Code of Australia. Chief Warden: Director of operations or Delegate. Consequence: the expected physical result of an incident (e.g. gas or liquid release, fire, explosion, overpressure in vessel, discharge of contaminant into a waterway), including the characteristic of this physical result that causes harm to people, property and the environment (e.g. heat radiation, explosion overpressure, concentration of toxic gas, contamination of habitat). Council: Wollongong City Council. DAFC: Dissolved Air Flotation Cell. Dangerous goods: Substances that are listed in The Australian Dangerous Goods (ADG) Code or that meet the classification criteria specified in that Code. DECCW: Department of Environment, Climate Change and Water (now known as the NSW EPA). DP: NSW Department of Planning (now known as Department of Planning and Infrastructure). Emergency: An incident at a hazardous facility requiring activation of the emergency plan. Emergency Assembly Area: This is a safe location to which all people are required to assemble in the case of an emergency. Environment: As defined in the POEO Act, "environment" means components of the earth, including: (a) land, air and water, and (b) any layer of the atmosphere, and (c) any organic or inorganic matter and any living organism, and (d) human-made or modified structures and areas, and includes interacting natural ecosystems that include components referred to in paragraphs (a)(c). RWS PIRMP JANUARY 2016.DOC Page: iii Redlam Waste Services Emergency and Pollution Incident Response Management Plan EOCC: Emergency Operations Control Centre. FSS: Fire Safety Study. Harm: As defined in the POEO Act, "harm" to the environment includes any direct or indirect alteration of the environment that has the effect of degrading the environment and, without limiting the generality of the above, includes any act or omission that results in pollution. Hazard(s): A situation or an intrinsic property with the potential to cause harm to people, property or the built or natural environment. Hazardous Material(s): Any material which, because of its chemical, biochemical, microbiological or radiological properties, temperature or state of compression, could in sufficient quantity or concentration, cause harm to people, property or the environment. HAZCHEM Code: The emergency action code associated with dangerous goods. Immediately: Promptly and without delay. Impact: The physical damage to people, property or the environment from the consequences of an incident (e.g. property damage, injury, fatality, fish kill). Incident(s): A deviation from the intended operating conditions at a hazardous facility that has the potential to result in an emergency (e.g. hole in pipework or vessel, runaway reaction, overfilling of pressure vessel). Material risk of harm: “Material risk of harm to the environment” is defined under Section 147 of the POEO Act as: (a) harm to the environment is material if: (i) It involves actual or potential harm to the health or safety of human beings or to ecosystems that is not trivial, or (ii) It results in actual or potential loss or property damage of an amount, or amounts in aggregate, exceeding $10,000 (or such other amount as is prescribed by the regulations), and loss includes the reasonable costs and expenses that would be incurred in taking all reasonable and practicable measures to prevent, mitigate or make good harm to the environment. Material Safety Data Sheet (MSDS): [see below for Safety Data Sheet]. A Material Safety Data Sheet (MSDS,) now referred as a Safety Data Sheet (SDS), is a document that describes the chemical and physical properties of a material and provides advice on its safe storage, handling and use. (www.safeworkaustralia.gov.au). NFPA: National Fire Protection Association. A US-based organisation promoting fire safety and protection. NFPA Codes of Practice are commonly used in Australia for situations not covered by Australian Standards and Regulations or Codes of Practice. RWS PIRMP JANUARY 2016.DOC Page: iv Redlam Waste Services Emergency and Pollution Incident Response Management Plan Non-scheduled activity: Under the POEO Act, a “non-scheduled activity” means an activity that is not a scheduled activity and is not scheduled development work. NSW EPA: NSW Environment Protection Authority. Occupier: As defined under the POEO Act, "occupier" of premises means the person who has the management or control of the premises. PG: Packing Group used to rank the hazard associated with the transport and handling of a particular dangerous goods (except for Dangerous Goods Class 1, 2 and 7). Pollution: As defined under the POEO Act, "pollution" means: (a) water pollution, or (b) air pollution, or (c) noise pollution, or (d) land pollution. Pollution Incident: The Environmental Guidelines: Preparation of pollution incident response management plans defines a pollution incident as: “…an incident or set of circumstances during or as a consequence of which there is or is likely to be a leak, spill or other escape or deposit of a substance, as a result of which pollution has occurred, is occurring or is likely to occur. It includes an incident or set of circumstances in which a substance has been placed or disposed of on premises, but it does not include an incident or set of circumstances involving only the emission of any noise”. PPE: Personal Protection Equipment. Pre-emptive action: Actions taken as a measure against possible or anticipated harm such as use of spill containment kits, installation of stormwater cut-off valves and installation of fire-containment water tanks. Premises: As defined under the POEO Act, "premises" includes: (a) a building or structure, or (b) land or a place (whether enclosed or built on or not), or (c) a mobile plant, vehicle, vessel or aircraft. Prevention of pollution: Use of processes, practices, materials or products that avoid, reduce or control pollution, which may include recycling, treatment, process changes, control mechanisms, efficient use of resources and material substitution. Note: The potential benefits of prevention of pollution include the reduction of adverse environmental impacts, improved efficiency and reduced costs. Risk: The likelihood of harm occurring from a hazard. RWS PIRMP JANUARY 2016.DOC Page: v Redlam Waste Services Emergency and Pollution Incident Response Management Plan Risk Assessment: The evaluation of the likelihood of undesired events and the likelihood of harm or damage being caused, together with the value judgments made concerning the significance of the results. SCBA: Self-Controlled Breathing Apparatus. Scheduled activity: "Scheduled activity" means an activity listed in Schedule 1 of the POEO Act. SDS (Safety Data Sheet): A document that describes the properties and uses of a substance, that is, the identity, chemical and physical properties, health hazard information, precautions for use, and safe handling information (previously referred to as MSDS). SES: State Emergency Services. Site: 10 Industrial Road, Unanderra. Spill kit: A set of equipment used to isolate or control an accidental overflow or release of a substance or material. UN No.: United Nations Number. In relation to dangerous goods, the UN No. means the number assigned to the goods by the UN Committee of Experts on the Transport of Dangerous Goods and published in the UN Recommendations as in force from time to time and are listed in the Australian Dangerous Goods Code. RWS PIRMP JANUARY 2016.DOC Page: vi Redlam Waste Services Emergency and Pollution Incident Response Management Plan 1. INTRODUCTION This document describes the Emergency and Pollution Incident Response Management Plan (plan) for Redlam Waste Services Pty Ltd (Redlam)’s waste storage and processing facility at 10 Industrial Road, Unanderra. For the purpose of this report, the facility will be known as “the site” from here onwards. All personnel and contractors working at the site should be made aware of the general contents of this document and accompanying procedures. It is a requirement that all those employees responsible for emergency response activities, as defined by this document, have a copy of this plan and receive the appropriate level of training needed to ensure the effective implementation of the respective emergency and pollution incident response procedures identified in this plan. The plan is designed to cover all emergency and pollution incidents conditions that could be reasonably anticipated at the site. 1.1 REFERENCE DOCUMENTS This plan has been developed in accordance with the following guidance documents and relevant Australian/New Zealand Standards: 1.2 Hazardous Industry Planning Advisory Paper (HIPAP) No.1 – Industry Emergency Planning Guidelines (NSW Department of Urban Affairs and Planning 1993); Occupational Health and Safety Act 2000 and relevant Regulations (NSW Legislation); SAA/SNZ HB76:2004 Dangerous Goods - Initial Emergency Response Guide (Standards Australia 2004); AS 3745-2010 Planning for Emergencies in facilities (Standards Australia); HB 76-2004: Dangerous Goods-Initial Emergency Response Guide (Standards Australia); NSW Fire & Rescue Guidelines; Cytotoxic Drugs and Related Waste Risk Management Guide 2008 (WorkCover NSW); Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 (NSW Legislation); Part 5.7A of the Protection of the Environment Operations Act,1997 (NSW Legislation); and Environmental Guidelines: Preparation of Pollution Incident Response Plans (NSW EPA). DEFINITION OF AN EMERGENCY An emergency situation can be defined as any abnormal or dangerous event that may adversely affect the safety or well-being of nearby persons, communities or the environment. Under these circumstances, the occupants of the said premises are called to immediately respond to the emergency situation in an effort to control, correct and return the dangerous situation to a safe condition. RWS PIRMP JANUARY 2016.DOC Page: 1 Redlam Waste Services Emergency and Pollution Incident Response Management Plan If there is any doubt, an event should be treated as an emergency and the procedures stipulated by this plan should be followed. Note that all fires are to be treated as emergencies. The three levels of emergency are defined as: LOCAL ALERT: Any emergency situation that threatens human lives, property or the environment at one location of the Site, but is not likely to spread to other areas of the Site or the property; SITE ALERT: Any emergency situation where its effects may spread to other areas on the Site; and EXTERNAL ALERT: Any emergency situation where its effects may spread and impact on people, property or the environment outside the site boundaries, such as a grass fire. Each of these three levels of emergency may be further classified as follows: MINOR EMERGENCY: An emergency situation that can be handled entirely by the Site’s emergency response personnel without the assistance of the respective public emergency services; and MAJOR EMERGENCY: An emergency situation that requires the assistance of the public emergency services i.e. ambulance, fire brigade or police services. An EXTERNAL ALERT is automatically a MAJOR EMERGENCY, as action cannot be taken outside the site boundary independently of the public emergency services. 1.3 DEFINITION OF A POLLUTION INCIDENT The Environmental Guidelines: Preparation of pollution incident response management plans (NSW EPA) defines a pollution incident as: “…an incident or set of circumstances during or as a consequence of which there is or is likely to be a leak, spill or other escape or deposit of a substance, as a result of which pollution has occurred, is occurring or is likely to occur. It includes an incident or set of circumstances in which a substance has been placed or disposed of on premises, but it does not include an incident or set of circumstances involving only the emission of any noise.” Under the Section 148 of the POEO Act, pollution incidents causing or threatening material harm to the environment must be notified immediately to the relevant authorities. “Material risk of harm to the environment” is defined under Section 147 of the POEO Act as: (a) harm to the environment is material if: (iii) It involves actual or potential harm to the health or safety of human beings or to ecosystems that is not trivial, or (iv) It results in actual or potential loss or property damage of an amount, or amounts in aggregate, exceeding $10,000 (or such other amount as is prescribed by the regulations), and (b) loss includes the reasonable costs and expenses that would be incurred in taking all reasonable and practicable measures to prevent, mitigate or make good harm to the environment. RWS PIRMP JANUARY 2016.DOC Page: 2 Redlam Waste Services Emergency and Pollution Incident Response Management Plan The following section provides an explanation of Redlam’s obligations under the new legislation relating to the management of pollution incidents. 1.4 POLLUTION INCIDENT RESPONSE MANAGEMENT Changes to the Protection of the Environment Operations Act, 1997 (the POEO Act) came into force on 29 February, 2012. A new requirement under Part 5.7A of the POEO Act imposes an obligation on holders of environmental protection licences to prepare and implement a pollution incident response management plan (PIRMP) for each licensed activity. Redlam hold two (2) environmental protection licences under the POEO Act: EPL No. 12171 for Waste storage and Non-thermal treatment of hazardous and other waste at their site located at 10 Industrial Road, Unanderra; and, EPL No. 12194 for transport of Category 2 trackable waste and transport of Category 1 trackable waste. Requirements for pollution incident response management plans are stipulated in the Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 and Part 5.7A of the POEO Act. Part 5.7A of the POEO Act specifies: Information to be included in the plan (Clause 153C) including the procedures to be followed in notifying a pollution incident to the relevant people and authorities, a detailed description of action to be taken immediately after a pollution incident to reduce or control any pollution and procedures to be followed; The plan must be kept at the premises to which the relevant environmental protection licence (EPL) relates (Clause 153D); Licensees must test the plan in accordance with Clause 98E of the Regulation (Clause 153E); and Licensees must immediately implement the plan if a pollution incident occurs in the course of an activity so that material harm to the environment is caused (Clause 153F). Section 98C (1) of the regulation specifies general matters to be included in pollution incident response management plans. These requirements are detailed in the following table. RWS PIRMP JANUARY 2016.DOC Page: 3 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 – Clause 98C (1) No. Requirement Section (a) a description of the hazards to human health or the environment associated with the activity to which the licence relates (the relevant activity) 2.3 (b) the likelihood of any such hazards occurring, including details of any conditions or events that could, or would, increase that likelihood. 2.3.4 (c) details of the pre-emptive action to be taken to minimise or prevent any risk of harm to human health or the environment arising out of the relevant activity 2.3.4 (d) an inventory of potential pollutants on the premises or used in carrying out the relevant activity 2.3.3 (e) the maximum quantity of any pollutant that is likely to be stored or held at particular locations (including underground tanks) at or on the premises to which the licence relates 2.3.3 (f) a description of the safety equipment or other devices that are used to minimise the risks to human health or the environment and to contain or control a pollution incident 2.4 (g) the names, positions and 24-hour contact details of those key individuals who: (i) are responsible for activating the plan, and (ii) are authorised to notify relevant authorities under section 148 of the Act, and (iii) are responsible for managing the response to a pollution incident 4.2 and Table 4-1 (h) the contact details of each relevant authority referred to in section 148 of the Act 4.7.1.5 (i) details of the mechanisms for providing early warnings and regular updates to the owners and occupiers of premises in the vicinity of the premises to which the licence relates or where the scheduled activity is carried on 4.6 and Table 4-2 (j) the arrangements for minimising the risk of harm to any persons who are on the premises or who are present where the scheduled activity is being carried on 2.4 (k) a detailed map (or set of maps) showing the location of the premises to which the licence relates, the surrounding area that is likely to be affected by a pollution incident, the location of potential pollutants on the premises and the location of any stormwater drains on the premises 1. Figure 4-1, Figure 2-1, 2. 3. 2 RWS PIRMP JANUARY 2016.DOC Page: 4 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 – Clause 98C (1) (l) a detailed description of how any identified risk of harm to human health will be reduced, including (as a minimum) by means of early warnings, updates and the action to be taken during or immediately after a pollution incident to reduce that risk 4.7 and 5 (m) the nature and objectives of any staff training program in relation to the plan 6 and Attachment 5 (n) the dates on which the plan has been tested and the name of the person who carried out the test 6 and Attachment 5 (o) the dates on which the plan is updated 6 and Attachment 5 (p) the manner in which the plan is to be tested and maintained 6 and Attachment 5 RWS PIRMP JANUARY 2016.DOC Page: 5 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Section 98C (2) of the regulation specifies matters to be included in pollution incident response management plans relating to trackable waste transporters. These requirements are detailed in the following table. Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 – Clause 98C (2) No. Requirement Section (a) the names, positions and 24-hour contact details of those key individuals who: (i) are responsible for activating the plan, and (ii) are authorised to notify relevant authorities under section 148 of the Act, and (iii) are responsible for managing the response to a pollution incident 4.2 and Table 4-1 (b) the contact details of each relevant authority referred to in section 148 of the Act 4.7.1.5 (c) A community engagement protocol that includes procedures for notifying people living or working in the vicinity of a pollution incident and keeping them informed of relevant matters 4.7.2.5 4.7.1.6, Attachments 4 & 5 (d) Details of the pre-emptive action to be taken to minimise or prevent any risk of harm to human health or the environment arising out of that activity (including, as a minimum, action that complies with the requirements set out in clause 49 of the Protection of the Environment Operations (Waste) Regulation 2005), 2.3.4 (e) the nature and objectives of any staff training program in relation to the plan 6 and Attachment 5 (f) the dates on which the plan has been tested and the name of the person who carried out the test 6 and Attachment 5 (g) the manner in which the plan is to be tested and maintained 6 and Attachment 5 The NSW EPA have prepared Environmental Guidelines: Preparation of Pollution Incident Response Plans. This Pollution Incident Response Management Plan has been prepared in accordance with the POEO Act, Regulation and the guidelines. Requirements included are: A description and likelihood of hazards to human health and the environment associated with the licensed activity; Pre-emptive actions to be taken to minimise risk of harm; An inventory of potential pollutants; A description of safety equipment and devices used to minimise risks and/or contain a pollution incident; 24-hour details of key site contacts and relevant authorities; Mechanisms used to provide early warnings to neighbours and the local community; Actions to minimise risk of harm should an incident occur; Actions to be taken during or immediately following a pollution incident; A detailed set of plans; and Staff training programs relating to implementing the plan. RWS PIRMP JANUARY 2016.DOC Page: 6 Redlam Waste Services Emergency and Pollution Incident Response Management Plan 1.5 AIMS OF THE PLAN The aims of this plan are the following: Provide a clear understanding of how to handle and react to any emergency and pollution incident situation that may occur at the site or during the transport of waste in the form of effective control structures, procedures and directives; Prevent or minimise the impact of an emergency on human life, the community and surrounding environment; and Facilitate a return to normal or safe operations as soon as possible. The procedures contained in this plan have been designed to protect life and where possible prevent or minimise damage to the equipment, site and installations at the site. The procedures also aim to facilitate a return to normal operations by providing effective utilisation of the safety features, systems and equipment installed at the site to protect people from fire, pollution incidents and other emergencies. 1.6 SCOPE AND OBJECTIVES This plan applies to all equipment, personnel and visitors under the control or management of Redlam whilst working or visiting the site. The plan contains information and instructions that provide a basis for handling various types of emergency situations, such as a fire, explosion, medical emergency, spills, gas-leaks and bomb threats. These instructions should not be regarded as rigid procedures to be followed, but rather as continually improving guidelines to be adapted to cope with unanticipated situations. The objectives of this plan are the following: To protect human life and facilitate the rescue or evacuation of personnel affected by the emergency situation. To control or limit any effect that an emergency situation may have on the site, neighbouring areas or on the community in the vicinity of the location of the emergency. To facilitate emergency response and to provide such assistance as is appropriate to the occasion. To ensure the quick and effective communication of all vital information to respective authorities. To facilitate the organisation and reconstruction activities so that normal operations can be resumed as soon as possible. To provide for emergency response training so that a high level of preparedness can be maintained at the facility. RWS PIRMP JANUARY 2016.DOC Page: 7 Redlam Waste Services Emergency and Pollution Incident Response Management Plan To provide the structure under which emergency procedures are revised and updated. To ensure timely and comprehensive communication of a pollution incident to staff, relevant authorities and all other stakeholders affected by the impacts of the pollution incident. To identify risks and develop actions to minimise and manage these risks. RWS PIRMP JANUARY 2016.DOC Page: 8 Redlam Waste Services Emergency and Pollution Incident Response Management Plan 2. SUMMARY OF OPERATIONS, HAZARDS, AND SAFETY SYSTEMS 2.1 SUMMARY OF OPERATIONS The Site is located within an industrial area and surrounded by industrial premises as seen in the aerial photograph. The land area is 2,952 m2 and has excellent access to major transport infrastructure. Refer to Figure 2-1 for a location map. The site has one entrance and exit driveway from Industrial Road. The site consists of an industrial warehouse, hardstand driveways and open areas (refer to ). The adjoining land consists of industrial warehouses or is vacant. The site provides treatment for clinical, quarantine and related waste using an autoclave process. Wastes are transported to the site from waste generators including hospitals, dentists, doctors and pathologists, by Redlam vehicles across the Sydney and Wollongong areas. Cytotoxic and other non-compatible wastes delivered to the site are stored and then removed from the site unprocessed and incinerated off-site. Autoclaving involves the heating of infectious waste by steam under pressure. The autoclave process destroys microbial fauna and flora through the saturation of heat and moisture that renders the proteins in the microbes non-viable. The clinical, quarantine and related waste is delivered to the site in reusable yellow clinical waste bins by trucks. The waste includes sharps, infected material, human tissue and quarantine. Cytotoxic, anatomical pharmaceutical waste, which is collected in purple bins, is also delivered to the site, however this waste is incinerated off-site at another waste treatment facility. RWS PIRMP JANUARY 2016.DOC Page: 9 Redlam Waste Services Emergency and Pollution Incident Response Management Plan The autoclaving process involves the following steps: The clinical and related waste is weighed and emptied into an autoclave cart; The yellow bins are empties and then hand-cleaned using disinfectant; after cleaning the bins are returned for reuse; The carts are temporally stored in a designated area; The carts are placed in the autoclave and a thermocouple is placed to measure the temperature of the core and the edge of the cart, the temperatures are recorded; The autoclave is closed and sealed, a vacuum is applied in the autoclave chamber, the air is filtered using a HEPA filter; Steam is then injected into the chamber, the working pressure of the steam in the chamber is typically 75 psi, however the chamber can operate at pressures up to 250 psi; The steam pressure is maintained at a temperature of 143oC for at least 30 minutes, the condensate from the steam would be collected, treated and disposed to the sewer in line with the site’s trade waste agreement; After the completion of the steam sterilisation, the autoclave chamber is opened, steam is released from the chamber, this steam is collected in vents located above the chamber door and goes to a scrubber; The cart is removed from the autoclave chamber and placed in a treated waste storage area, where the waste is cooled for approximately 30 minutes, the treated waste storage area is ventilated with a scrubber; After cooling the treated waste is fed to a shredder using a fork-lift and then loaded directly into a bulk container, compacted, and then the container is loaded onto a hook-lift truck; and The treated waste is then transported to a licenced landfill. After the waste has been sterilized it has in effect been rendered harmless, the volume of waste has been reduced in volume by 40-60 % after shredding. The treated waste is removed to landfill. A maximum quantity of 800 litres of waste solvents, such as photographic developer and fixer may be stored on site. The solvents are transported to an approved treatment facility. There are minor quantities of dangerous goods located at the site. The location of dangerous goods storage areas on site are provided in the following table. Table 2-1: Dangerous Goods Storage Details Area Chemical Name UN No DG Class Quantity 1 3 4 5 LPG Various flammable goods Sodium hypochlorite Infectious substances 1075 Various 1791 3291 2.1 3 8 6.2 280 kg 300 litres 100 litres 6 tonnes There is a DAF unit on site collects and treats washwater from the bin wash area prior to discharge to the Sydney Water Tradewaste System. All areas within the building drain to the DAF. The wastewater from the truck wash area drains to an oil-water separator which is also discharged to Sydney Water Tradewaste RWS PIRMP JANUARY 2016.DOC Page: 10 Redlam Waste Services Emergency and Pollution Incident Response Management Plan System. Wastewater discharge to sewer is tested regularly in accordance with the Sydney Water Tradewaste Agreement. All stormwater on site is directed to a 16m3 detention basin via gross pollutant traps. There is a stormwater shut off valve located within the detention basin for use in emergencies. 2.2 SUMMARY OF TRANSPORT OPERATIONS In addition to the licensed activities undertaken at the site, Redlam is licensed to transport waste of Category 1 and Category 2. Transport includes the following: Collection of wastes from hospitals and surgeries around the Wollongong and Sydney areas and transport of these wastes back to the site; Transport of cytotoxic waste from the site to facilities for incineration; and Transport of processed waste (rendered harmless) from the site to a licenced landfill. RWS PIRMP JANUARY 2016.DOC Page: 11 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Figure 2-1: Site Location RWS PIRMP JANUARY 2016.DOC Page: 12 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Site Layout Figure 2.2 incorporated into Figure 2.3 RWS PIRMP JANUARY 2016.DOC Page: 13 Redlam Waste Services Emergency and Pollution Incident Response Management Plan Figure 2.3 Site Layout and Stormwater Plan RWS PIRMP JANUARY 2016.DOC Page: 14 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 2.3 SUMMARY OF HAZARDS This section describes the potential occupational and environmental hazards associated with the Site’s operations. A discussion on the safety features that have been incorporated into the Site’s operations to control or minimise these hazards has been included in the following section. The hazards can be sub-divided into the following two categories: (i) Material related hazards associated with the storage and handling of quantities of substances that are classified as Dangerous Goods in accordance with the Australian Dangerous Goods Code 6th Edition, relevant Australian Standards and Occupational Health and Safety Amendment (Dangerous Goods) Regulation 2005 or are classified as special wastes under the NSW EPA Waste Classification Guidelines. The inherent chemical and physical properties of these materials require the implementation of particular storage and handling operating procedures to minimise the possibility of a serious or dangerous incident from happening. (ii) Process related hazards that have the potential to cause severe injury to human life and the surrounding environment if not controlled or managed in an appropriate and effective manner. Some of these hazards may be associated with: 2.3.1 The transfer of substances that are hazardous to human health and the environment, if an accidental emission was to occur; or The use of high pressures and/or temperatures with the potential of initiating an explosion or fire due to abnormal process conditions. Material Related Hazards The site shall be storing and handling quantities of special waste as part of its day-to-day operations. The main hazards are spillage and fire. Causes of a spillage would be during unloading and handling. A fire may occur with the potential principal causes being: The potential for unknown substances within the collected waste to go through the autoclave process and cause an explosion or fire; Failure to follow hot work permit requirements; Smoking or use of non-approved electrical devices in an explosive atmosphere hazardous area; and Release of solvent vapour in an area not zoned as hazardous. RWS PIRMP JANUARY 2016.DOC Page: 15 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Safeguards are in place to reduce the risk of a fire. 2.3.1.1 Dangerous Goods The site stores minor quantities of dangerous goods. An inventory of the dangerous goods depots is provided in Table 2-1. The different classes of dangerous goods stored and handled at the Site are listed in Table 2-2. Table 2-2: Classes of dangerous goods stored and handled at the Site Class Class Description 2.1 Flammable Gas 3 Flammable Liquid C1 Combustible Liquid (flash point >35oC and < 150oC) 6.2 Infectious Substances 8 Corrosive Substances Major Hazards Jet fire Flash fire Aerosols becoming projectiles in a fire Unconfined vapour cloud explosion Toxicity (under extreme concentrations) Flash fire Pool fire Unconfined vapour cloud explosion Potential toxic fumes (in the event of fire) Potential water contamination Able to support combustion or further fuel a fire, although it is far less likely to ignite than flammable liquids Can cause infectious disease in humans or animals Capable of spreading disease when exposure to them occurs. Destroy living tissues Corrode metal and other materials May ignite flammable/combustibles substances React dangerously with other corrosive or incompatible substances Table 2-3 provides the placarding and manifest quantities in the 2005 Dangerous Goods Regulations. There are no dangerous goods stored at the site that exceed the thresholds listed on this table. Any changes in dangerous goods quantities would need to be checked for exceedance of these quantities and relevant action taken to ensure the site complies with requirements under the regulations. RWS PIRMP JANUARY 2016.DOC Page: 16 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Table 2-3: Placarding and Manifest Quantities – 2005 Dangerous Goods Regulations DG Description Class 2 Class 2.1 Class 2.2 (5.1) Class 2.2 Class 2.3 Aerosols Cryogenic Fluid Class 3 4.1 4.2 4.3 5.1 5.2 6.1 8 Class 9 Mixed classes of DG where none of the classes, types or PG present exceed the quintets specified for the relevant quantity in above categories. C1 combustible liquids stored and handled with fire risk dangerous goods where none of the Classes, types or PG’s (if any) present exceeds the relevant quantities listed above. Goods too dangerous to be transported that are not kept in a laboratory. C1 combustible liquids in bulk stored and handled separately from other dangerous goods. C1 combustible liquids stored and handled in packages separately from the other DG’s. C1 Combustible liquids in bulk and in packages stored and handled separately from other DG’s provided the quantity in bulk is 10,000L or less. PG Placarding Quality Manifest Quantity N/A N/A N/A N/A N/A N/A 500L 2,000L 5,000L 50L 5,000L 1,000L 5,000L 10,000L 10,000L 500L 10,000L 10,000L I 50 kg or L 500 kg or L II 250 kg or L 2,500 kg or L III 1,000 kg or L 10,000 kg or L Mixed PG in a single class with the quantity of each PG below the specified quantity for PG 1,000 kg or L 10,000 kg or L 1,000 kg or L 5,000 kg or L 10,000 kg or L 10,000 kg or L 5,000 kg or L 10,000 kg or L II III Mixed PG in Class 9 with the quantity of each PG below the specified quantity for the PG N/A 5,000 kg or L The quantity applies only if the placarding quantity for an individual Class that is present is 5,000 kg or L 2,000kg or L The quantity applies only if the placarding quantity for all of the Classes present is 2,000 kg or L N/A 1,000 kg or L 10,000 kg or L N/A Any quantity Any quantity N/A 10,000 kg or L 100,000L N/A 50,000L 100,000L 10,000 kg or L Note: C1 definition: Combustible liquids: flashpoint above 62oC but not exceeding 150oC (e.g. diesel). RWS PIRMP JANUARY 2016.DOC Page: 17 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 2.3.1.2 Special Waste The following section contains a brief description of the wastes processed and stored at the site: (i) Clinical, quarantine and related waste includes sharps, infected material, human tissue and quarantine waste. Clinical waste can result from many sources such as nursing, medical, pharmaceutical, skin penetration, dental or other related clinical activity. Clinical waste has the potential to cause injury, infection or offence. Quarantine waste is collected from arriving international aircraft and ships into Australian ports. Some examples of clinical waste include: Body fluids or Blood; Materials or equipment that have been exposed to body fluids and or blood; Human tissue (excluding hair, nails, and teeth); Laboratory specimens/cultures; and Animal tissue/carcases resulting from medical research. This waste is put through a steam sterilisation process at the site which renders the waste harmless. (ii) Cytotoxic and other non-compatible waste Cytotoxic waste relates to any substance that may be contaminated with any residue or preparations that contains materials that are toxic to cells especially because of theire ability to alter cell production. Some examples of cytotoxic waste may include: Drugs that are used to treat cancer, rheumatoid arthritis, multiple sclerosis; Equipment utilised in administering or preparation of cytotoxic materials; or Body fluids/Blood that may still have cytotoxic properties. Exposure can occur through skin absorption, skin contact, ingestion and sharp injuries, inhalation of aerosols and drug particles. Pharmaceutical waste is stored at the site then incinerated off-site at another waste treatment facility. (iii) Anatomical wastes are human/animal tissues, organs, body parts and pathological specimens that may be recognisable This waste is often produced from: Cadavers; RWS PIRMP JANUARY 2016.DOC Page: 18 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Significant quantities of blood from living or deceased donors; and Recognisable body parts from living or deceased donors. Safety Data Sheets (SDS) for each hazardous substance stored at the Site are kept at locations that are accessible to where each chemical is stored. A full set of SDSs is kept on the outside wall of the Operations Manager’s office. 2.3.2 Process Related Hazards Operations include the loading, unloading and storage of infectious and toxic wastes as well as the processing of infectious waste. The major operational related hazards associated with the site activities are summarised as follows: Damage to a waste bin during unloading from transport vehicle causing a spill of a waste product. A pallet/bin collapses as a result of an unstable storage arrangement causing possible injury to an employee and/or damage to bins. Injury to employees as a result of contact with a waste product. Spill of waste bin during processing, during transfer or from equipment leak or the like. Release of vapours (toxic or flammable) during processing or as a result of a spill. A waste spill travels down a stormwater drain potentially causing significant environmental harm. This is particularly relevant at the truck wash area. There is also the possibility for human injury (off-site) due to direct or indirect contact with the substance. Fire caused by ignition of an unwanted substance such as flammable liquid or flammable vapour/gas within the autoclave or waste bin following shredding. Fire or explosion due to the storage of incompatible wastes or dangerous goods that are inadvertently brought onto site. 2.3.3 Potential Pollutants Stored on Site As part of the pollution incident response management plan, the plan must include potential pollutants that are kept on site. This section details the potential pollutants at the site that are not dangerous goods or hazardous materials. RWS PIRMP JANUARY 2016.DOC Page: 19 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Table 2-4: Potential Pollutants Pollutant Name Storage location details Maximum Quantity Washwater from bin wash bay and all areas within the buildings. Treated in on –site bunded DAF then released to tradewaste under Sydney Water TWA 3000L Washwater from truck wash bay Drains to DAF then discharged to Sydney Water tradewaste 400 L Cytotoxic waste Stored within purple bins in the warehouse 3T Stored within purple bins within the warehouse 3T Stored within burgundy bins within the warehouse 1T Stored within the processing building in a bunded area Unknown Temporarily stored within bin and removed off site daily 8T Clinical & quarantine waste Anatomical waste Other waste - Waste inadvertently brought onto site. Treated autoclave waste 2.3.4 Risk Assessment For the purposes of this plan, risk can be evaluated using the following tables: HOW LIKELY IS AN EVENT TO OCCUR? Level A B C D E Descriptor Almost Certain Likely Moderate Unlikely Rare LIKELIHOOD Description The event is expected to occur in most circumstances. The event will probably occur in most circumstances. The event should occur at some time. The event could occur at some time. The event may occur only in exceptional circumstances. IF IT DOES, WHAT ARE THE WORST CASE SCENARIO CONSEQUENCES? CONSEQUENCES OR IMPACT Level Descriptor Description 1 Insignificant No injuries. 2 Minor First Aid treatment. 3 Moderate Medical treatment required. 4 Major Extensive injuries, loss of product capability. 5 Catastrophic Death. RWS PIRMP JANUARY 2016.DOC Page: 20 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Use the information above to find risk level (i.e. Likelihood 'C', Consequence '3', would equal 'S' or Significant Risk. LEVEL OF RISK Consequence Likelihood A (almost certain) B (likely) C (moderate) D (unlikely) E (rare) Insignificant 1 S M L L L Minor 2 S S M L L Moderate 3 H S S M M Major 4 H H H S S Catastrophic 5 H H H H S LEGEND H = High Risk S = Significant Risk M = Moderate Risk L = Low Risk Table 2-5 provides a risk assessment of the main potential hazards that could occur at the site using the above matrix. RWS PIRMP JANUARY 2016.DOC Page: 21 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Table 2-5: Hazard and Likelihood Risk Assessment and Control Measures Site Name: Redlam Waste Services, Unanderra site Description of Hazard / Incident leading to hazard Functional Area 1. Truck delivery Responsible person: Chief Warden 1. 2. Damaged bin delivered to site. Bin dropped or damaged during unloading from truck. Possible Consequences 1. 2. 3. 4. Clinical and related waste products spill in delivery area. Pathogens from the clinical and related waste released into the air. Employees come into contact with clinical and related waste and are exposed to pathogens. Clinical and related waste products enter the stormwater system and flow off-site. Level of Consequence Likelihood Risk Level Moderate Unlikely Moderate Control Measures / Corrective Action 1. 2. 3. 4. 5. 2. Bin-emptying area 1. 2. 3. Bin dropped or damaged during emptying into cart. Cart overfilled during bin emptying. Cytotoxic waste bin emptied into cart. 1. 2. 3. 4. 5. 3. Pre-treatment storage area 1. 2. Cart full of clinical and related waste is damaged or tipped over during transport from bin unloading area. Cart full of clinical and related waste is left outside pre-treatment storage area. 1. 2. 3. 4. Clinical and related waste products spill in bin empty area. Pathogens from the clinical and related waste released into the air. Employees come into contact with clinical and related waste and are exposed to pathogens. Clinical and related waste products enter the stormwater system and flow off-site. Cytotoxic waste mixed with clinical and related waste. Clinical and related waste products spill in pre-treatment storage area. Pathogens from the clinical and related waste released into the air. Employees come into contact with clinical and related waste and are exposed to pathogens. Clinical and related waste products enter the stormwater system and flow off-site. Moderate Moderate Significant 1. 2. 3. 4. Moderate Moderate Date: November 2012 All bins delivered to site are inspected, locked and secured at the waste generators premises before delivery to the site. The contents of any damaged bins would be repacked in a new bin and the damaged bin returned to the site, cleaned and disposed of. The waste contained within the bins is typically sealed in plastic bags by the waste generator prior to placement in the bin. In the event of a bin being damaged the waste would be contained within the plastic bag. All employees are trained in the handling of clinical and related waste and are provided with appropriate personal protective equipment (PPE). Employees are in attendance during all unloading operations and will implement spill control procedures and/or emergency response procedures in the event of a large spill. All unloading operations are conducted within the building, which is bunded to contain all spills. Any spills within the building drain to the site’s drainage system, treated and ultimately released to the sewer with no potential release to the stormwater system. All employees are trained in the handling of clinical and related waste and are provided with appropriate PPE. Employees are in attendance during all unloading operations and will implement spill control procedures and/or emergency response procedures in the event of a large spill. Cytotoxic waste bins are a distinctive purple colour as opposed to the yellow clinical waste bins, the purple bins are identified, inspected and removed to a designated storage area before being removed for waste treatment off-site. All unloading operations are conducted within the building, which is bunded to contain all spills. Any spills within the building drain to the site’s drainage system, treated and ultimately released to the sewer with no potential release to the stormwater system. Significant 1. 2. 3. All employees are trained in the handling of clinical and related waste and are provided with appropriate PPE. Employees are in attendance during all transport operations and will implement spill control procedures and/or emergency response procedures in the event of a large spill. All transport operations are conducted within the building, which is bunded to contain all spills. Any spills within the building drain to the site’s drainage system, treated and ultimately released to the sewer with no potential release to the stormwater system. RWS PIRMP JANUARY 2016.DOC Page: 22 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Table 2-5: Hazard and Likelihood Risk Assessment and Control Measures Site Name: Redlam Waste Services, Unanderra site Description of Hazard / Incident leading to hazard Functional Area 4. Autoclave Responsible person: Chief Warden 1. 2. 3. 4. 5. Autoclave chamber door not closed during sterilization. Autoclave chamber door opened before sterilization process finished. Autoclave chamber fails during sterilization. Steam boiler fails during sterilization. Steam control valve fails open or closed. Possible Consequences 1. 2. 3. 4. 5. 6. 5. Treated waste storage area and Shredder 1. 2. Cart full of treated waste is damaged or tipped over during transport from bin unloading area. Fire in shredder 1. 2. 3. Autoclave unable to hold chamber pressure causing an explosion. Explosion overpressure causes damage to the building and surrounding premises. Release of vapours that contain pathogens from unsterilized clinical and related waste. Release of condensate into stormwater system. Sterilization process does not meet the requirements of NMHRC and NSW Health guidelines for treatment of clinical and related waste. Unsterilized clinical and related waste removed from the autoclave chamber and moved to the treated waste storage and shredder and sent to landfill. Treated waste products spill in pre-treatment storage area. Treated waste products enter the stormwater system and flow off-site. Release of vapours that contain pathogens from treated waste. Level of Consequence Likelihood Risk Level Major Rare Significant Control Measures / Corrective Action 1. 2. 3. 4. 5. 6. 7. Moderate Moderate Significant Date: November 2012 1. 2. 3. 4. 5. Doors of the autoclave are fitted with an interlock system, the interlock system must be engaged before the sterilization process commences. Waste treatment guidelines require the temperature of the waste in the autoclave to the monitored and recorded. In the event that the temperature, pressure or time required fail to satisfy the requirement of the guidelines, the waste will remain sealed in the autoclave chamber until the sterilization cycle can be completed to satisfy the guidelines. Employees are trained in the autoclave operating procedures and are in regular attendance during all sterilization processes. In the event of a failure of the steam boiler or steam control valve before the completion of the sterilization cycle, the waste will remain sealed in the autoclave chamber until the sterilization cycle can be completed to satisfy the guidelines. Condensate from autoclave is treated and released to sewer. Autoclave chamber can withstand pressures up to 250 psi, operating pressures are typically 75 psi. The autoclave is fitted with pressure relief valves, which are regularly inspected. The autoclave process destroys microbial fauna and flora through the saturation of heat and moisture that renders the proteins in the microbes non-viable. The sterilization process destroys all pathogens and the treated waste is considered harmless. The treated waste storage area is negatively ventilated, with the air directed to a scrubber to remove any air borne microorganisms and prevent the release of pathogens outside of the building. All employees are trained in the handling of clinical and related waste and are provided with appropriate PPE1. Employees are in attendance during all transport operations and will implement spill control procedures and/or emergency response procedures in the event of a large spill. All transport operations are conducted within the building, which is bunded to contain all spills. Any spills within the building drain to the site’s sewerage system, treated and ultimately released to the sewer with no potential release to the stormwater system. RWS PIRMP JANUARY 2016.DOC Page: 23 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Table 2-5: Hazard and Likelihood Risk Assessment and Control Measures Site Name: Redlam Waste Services, Unanderra site Description of Hazard / Incident leading to hazard Functional Area 6. Bin wash area Responsible person: Chief Warden 1. Clinical and related waste left in bin moved to bin wash area. 1. 2. 3. 4. 7. External Areas 1. 2. Damaged bin delivered to site. Bin dropped or damaged during unloading from truck. 1. 2. 3. 4. 8. Transport of Medical Waste 1. 2. 3. Transport container fractures due to traffic accident. Transport container falls from truck spilling contents on driveway. Transport truck unloads at wrong location spilling contents outside designated area. Level of Consequence Likelihood Risk Level Clinical and related waste products spill in wash area. Pathogens from the clinical and related waste released into the air. Employees come into contact with clinical and related waste and are exposed to pathogens. Clinical and related waste and/or cleaning solution products enter the stormwater system and flow off-site. Minor Unlikely Low Clinical and related waste products spill in the external areas. Pathogens from the clinical and related waste are released into the air. Employees come into contact with the clinical and related waste and are exposed to pathogens. Clinical and related waste products enter the stormwater system and flow off-site. Minor Spill is contained by truck operator or site personnel without any effect. Spill is not contained and finds its way into the stormwater system. Potential contamination of stormwater system with quarantine waste. Major Possible Consequences 1. 2. 3. Control Measures / Corrective Action 1. 2. 3. 4. Unlikely Low 1. 2. 3. 4. 5. 6. Rare Significant Date: November 2012 1. 2. 3. 4. 5. 6. 7. 8. The waste contained within the bins is typically sealed in plastic bags by the waste generator prior to placement in the bin. All clinical and related waste products are removed from the bins in the bin empty area. All employees are trained in the handling of clinical and related waste and are provided with appropriate PPE. Employees are in attendance during all washing operations and will implement spill control procedures and/or emergency response procedures in the event of a large spill. All bin washing operations are conducted within the building, which is bunded to contain all spills. Any spills within the building drain to the site’s drainage system, treated and ultimately released to the sewer with no potential release to the stormwater system. All clinical and related waste transport operations are conducted in accordance with the NSW Health guidelines. All truck unloading operations are conducted within the building, no bins are unloaded external to the building. The waste contained within the bins is typically sealed in plastic bags by the waste generator prior to placement in the bin. The internal areas of the building are bunded and drain to the sewer. All employees are trained in the handling of clinical and related waste and are provided with appropriate PPE. The site stormwater system will be fitted with a stormwater isolation valve, in the event of a large spill the isolation valve will be closed. Transport containers are of sturdy construction able to withstand significant impacts without fracturing. Transport containers are fully sealed so potential for spillage is negligible. There are no stormwater drains within the vicinity of the unloading area. Truck unloading procedure is always supervised by Site personnel who can provide guidance and assistance if required to do so. Procedures and facilities for spillage control are maintained at the Site for effective response. All medical waste transport operations undertaken within the requirements of the ADG Code and NSW Health guidelines. All medical waste transport operations are undertaken by Redlam trucks. Truck driver and Site personnel have been trained in the correct spill clean-up procedure. RWS PIRMP JANUARY 2016.DOC Page: 24 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 2.4 SUMMARY OF SAFETY SYSTEMS A number of important safety features have been incorporated into the design and operation of the Site to reduce the potential for hazardous events as outlined above to occur, or to minimise their impacts in terms of potential effects on human life and the surrounding environment. 2.4.1 On-site Water Retention System The facility is equipped with bunding and stormwater isolation protection which limits pollutant release in the event of a spill in which spill kits may not be sufficient to limit the extent of the spill. 2.4.1.1 Containment of Contaminated Water The building has been constructed with 120 mm high bunding at all doorways to contain all spill and contaminated fire water within the building. All spills within the building drain to the site’s sewerage system, treated and ultimately be released to the sewer with no potential release to the stormwater system. The fire services available at the site are: 2 fire hydrants Required amount of firewater containment; Hydrant: 10 Litres per second for 60sec for 90minutes = 54,000 litres/hydrant Total containment required 54,000 L Amount of firewater containment provided; Bunding of the building: 120 mm 540 m2 x 120 mm = 64,800 L Total containment provided = 64,800 L 2.4.2 Disposal of Fire Fighting Water In the event that contaminated fire-fighting water is generated, it would require analysis prior to being discharged from the site. Pending the results, the water will be either disposed off-site by a licensed contractor or discharged to sewer. The Site Manager would take a sample of the water and get it analysed. RWS PIRMP JANUARY 2016.DOC Page: 25 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Analysis would be undertaken by analysis by a NATA accredited laboratory. The fire-fighting water would be analysed for specific analytes based on the location of fire and the types of contaminants that would have contaminated the fire-fighting water. The results of the analysis would be compared against the Australian Water Quality Guidelines for Fresh and Marine Waters (1992). The firewater would be held on site for the time taken for analysis to be completed. The maximum time expected for this would be 24 hours. This would require the provision of retention capacity of the contaminated water on site until the results of the water are received. The site has the necessary bunding capacity to hold enough firewater for 90 minutes. If at any stage rain threatened the contaminated firewater storage to overflow then the contained waters would be immediately assumed contaminated and a licensed contractor would be commissioned to remove the contaminated water from the site. If the water is slightly contaminated it can be discharged to Sydney Water Sewer by applying for a temporary trade waste agreement from the Sydney Water. If the water is highly contaminated then it would need to be collected and treated by an appropriate liquid waste treatment facility. 2.4.3 Dangerous Goods and Waste Storage Areas The buildings have been designed to comply with the relevant Australian/New Zealand Standards in terms of ensuring bunding arrangements contain a spill of waste or minor dangerous goods that are stored within this area. 2.4.4 Fire Fighting Equipment External fire hydrants, and portable fire extinguishers have been provided for fire-fighting purposes in accordance with the requirements of the Building Code of Australia (BCA) and relevant Australian Standards. External fire hydrants; Portable fire extinguishers; and Hose Reels. The Emergency Control Organisation (ECO) would make up the fire-fighting team. The ECO is outlined in Section 4.2. A First Aid kit is available in the site lunch room. 4 personnel have first aid training. RWS PIRMP JANUARY 2016.DOC Page: 26 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Emergency Response Personnel can be quickly contacted via the following communication methods: Air horn (Warning Mechanism); Using internal telephone system; and Mobile phones (if the person to be contacted is known to be outside the site). 2.4.5 Spill Control Equipment In addition to the building bunding and fire-water containment, it is recommended that the following types of spill kits are provided on site: Clinical waste spill kit A clinical waste spill kit should contain at least: broom, a pan and scraper, mop and mop bucket a large (10 litre) reusable plastic container or bucket with fitted lid; 2 clinical waste bags for the disposal of clinical waste; disinfectant containing (1%) 10,000 ppm available chlorine or equivalent; rubber gloves suitable for cleaning detergent, sponges / disposable cloths personal protective equipment including eye protection, an apron or long sleeve impervious gown, a face mask, heavy duty gloves. incident report form waste spill sign. Cytotoxic spill kit A cytotoxic spill kit should contain at least: mop and mop bucket, a pan and scraper. a large (10 litre) reusable plastic container or bucket with fitted lid; 2 cytotoxic waste bags for the disposal of cytotoxic waste 2 hooded overalls, shoe covers, long heavy duty gloves, latex gloves, a face mask and eye protection absorbent towelling / absorbent spill mat incident report form waste spill sign These spill kits are located: In the building; and In the transport vehicles. RWS PIRMP JANUARY 2016.DOC Page: 27 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 2.4.6 Personal Protective Equipment (PPE) Personal protective equipment available to employees includes: Safety footwear, Eye Protection, and Various Gloves. Additional PPE is provided in spill-kits in case employees need to clean up waste spillages. 2.4.7 Safety Data Sheets (SDS) SDS registers are located on the outside wall of the Operations Manager’s office. RWS PIRMP JANUARY 2016.DOC Page: 28 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 3. TYPES OF EMERGENCIES The following types of emergencies covered by this plan as summarised in Table 3-1. Table 3-1: Summary of Emergencies and Response Procedures Emergency Event Fire Explosion Spills Personal Injury Natural Events Miscellaneous Emergency Type Fire within property Fire within shredder / waste bin Fire within property Fire within shredder / waste bin Spills during material handling operations or transport Collision of road vehicles Bin damaged by forklift tyne Overflow/failure of DAF causing release of contaminated wastewater Bin containing infectious waste overturns during unloading, spilling contents Work accident, such as heart attack, serious fall, severe injury or contact with chemical Earthquake Wind and Electrical Storms Localised Flooding Bomb Threat Vandalism and Civil Disturbance Site Evacuation Emergency Response Procedure Fire/Explosion; Gas Release Fire/Explosion; Gas Release Dangerous Goods Emergency; Spill Control and Containment Medical Emergency Earthquake Severe Storms Severe Storms Bomb Threat/Suspect Package Evacuation. The emergency procedures have been included in Attachment 2. RWS PIRMP JANUARY 2016.DOC Page: 29 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4. EMERGENCY CONTROL AND RESPONSE The normal hours of operation of the site are between 4am and 4pm, Monday to Friday. 4.1 PRINCIPLES OF EMERGENCY CONTROL AND RESPONSE The principles of emergency response will be based on Prevention, Containment, Rescue and First aid. These have been summarised below: Prevention: Inspection of all Site and dangerous goods storage facilities. Regular emergency response drills to ensure site readiness. Containment: Minimise any secondary damage. Immediate isolation of all electrical power to the affected area. Strict co-operation with any instructions provided by the Chief Warden. Emergency Equipment: Only trained emergency personnel are to use emergency equipment where an emergency situation requires particular precautions (i.e., Spill Kits, Fire Fighting Equipment) or the use of specialised Personal Protection Equipment (PPE). Approved safety clothing to be worn. All emergency equipment would be located in relative areas of concern. Emergency equipment operations must never endanger the safety of personnel. First-aid officer to provide assistance. First Aid: A copy of the Emergency Flowchart is included as Attachment 1. 4.2 EMERGENCY CONTROL ORGANISATION The Emergency Control Organisation (ECO) consists of a group of Site personnel who have the responsibility of providing first response actions in an emergency. The Emergency Control Organisation tasks involve organising the necessary resources, communications, evacuation of personnel and implementing corrective actions that may be necessary to return the emergency situation back to normal. All personnel who are part of the Emergency Control Organisation (ECO) shall be trained in accordance with the procedures contained in this plan and Australian Standard AS 3745—2010 Planning for Emergencies in facilities. They shall be recognised as members of the ECO by all other personnel throughout the Site. RWS PIRMP JANUARY 2016.DOC Page: 30 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan The Emergency Control Organisation (ECO) consists of the following members. Table 4-1: Emergency Control Organisation Member Summary Emergency Control Organisation Team Member Personnel Internal Contact No Chief Warden Rick Jones 0412 998121 Facility Coordinator Kym Doyle 0410 471739 4272 4866 Supervisor Elton Johns 0422 587271 4272 4866 Compliance Joseph Scimone 0419 277 188 4272 4866 All Emergency Control Organisation members clearly understand that they provide the first line of attack in an emergency situation, such as a fire. However on the instruction to EVACUATE they are to implement their responsibilities as a member of the Emergency Control Organisation. The general responsibilities of the Emergency Control Organisation are discussed in the next section. 4.3 CRITERIA FOR SELECTING EMERGENCY RESPONSE PERSONNEL Any persons appointed to deal with emergencies need to possess the following qualities: Be physically capable and willing to carry out their respective duties and tasks; Have certain leadership qualities and command authority; Have clear diction and be able to communicate with all personnel under their care or supervision; Have maturity of judgement, good decision making skills; and Are capable of remaining calm under pressure. 4.4 PRINCIPLE ROLES AND RESPONSIBILITIES The Chief Warden is in charge of overseeing and controlling all emergency response actions at the Site. In the case that the Chief Warden is unavailable at the time of the emergency, control will be delegated to the responsibility of the Deputy Chief Warden. 4.4.1 Damage Control The Emergency Control Organisation at the Site shall be a fully functional emergency response unit. All Emergency Control Organisation personnel shall be trained in the use of advanced fire-fighting techniques and equipment; including the use of fire hydrants, water cannons, fire extinguishers and hose reels. The aim of training is to be capable of adequately handling most, if not all, local and Site alerts involving fires without the need to involve the local NSW Fire Brigade Service. In the event of a Major Emergency, the role of the RWS PIRMP JANUARY 2016.DOC Page: 31 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Emergency Control Organisation is to ensure that the damage or danger caused by the emergency situation is controlled or minimised until external aid arrives at the Site. 4.4.2 Rescue and First Aid Selected Emergency Control Organisation members will be nominated as First Aid Officer/s. It will be their task to render assistance in removing any injured personnel from the emergency area and to provide effective management of injuries until the State Ambulance Service arrives on-site. 4.4.3 Communications A member of the Emergency Control Organisation will be nominated as the Communications Officer. It will be his/her task to monitor communication and facilitate the effective exchange of information between the Site and the relevant State Emergency Services. The Emergency Control Organisation (ECO) can be quickly contacted via the following communication methods: Air Horn (Warning Mechanism); Using internal telephone system; and Mobile phones (if the person to be contacted is known to be outside the Site). The Chief Warden will be responsible for relaying information to the media and other public bodies. All staff will be instructed to not discuss such issues with any external bodies. 4.4.4 Evacuation The Chief Warden will determine and control the evacuation of the Site. The Chief Warden will direct staff to evacuate the Site should the emergency grow beyond manageable proportions. To aid in the evacuation an employee checklist will be used by Chief Warden to mark names and ensure all employees working in the affected area have been safely evacuated. 4.4.5 Traffic Control A Traffic Control Officer, nominated by the Chief Warden will be responsible for ensuring the free flow of traffic around the Site. The task may also involve the removal of any vehicle that may obstruct the free flow of emergency vehicles in and out of the Site. 4.4.6 Emergency control Point In the event of an emergency, the Chief Warden will co-ordinate the emergency response activities from the Emergency Control Point which is located on the grassed area at the front of the site (if appropriate to emergency). RWS PIRMP JANUARY 2016.DOC Page: 32 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.4.7 Movement of Vehicles Vehicles shall not be removed from the carpark area during an emergency requiring evacuation of the premises unless authorised by the State Emergency Services Controller. This is to avoid a local traffic jam and to protect employees in vehicles against possible injury. 4.5 FIRE DETECTION Site personnel are the primary mechanism by which fires are detected. Site personnel would be able to quickly detect any leaks of flammable materials which may lead to an increased fire risk, via visual or odour recognition. Once such situations are detected appropriate first response action would be taken. Smoke detectors are fitted throughout the facility. Smoke detectors are connected ‘back to base’ as part of an early warning system. Personnel would raise a Site alarm and appropriate steps would be taken. 4.6 RAISING ALARM The Managing Director shall immediately be informed of an emergency situation being identified. If necessary, emergency services shall be contacted by calling 000. A checklist of information the emergency services might require is presented in the Emergency Response Procedure – Attachment 5. 4.6.1 Evacuation Initiation 1. The Chief Warden shall assess the extent and severity of the emergency situation and issue a complete site evacuation order if considered necessary. 2. If it is considered safe to do so, pre-selected personnel shall remain behind to ensure that the Site is brought to a safe or stable condition before proceeding to the Emergency Assembly Area. 3. All other personnel shall be evacuated immediately. Where a clear danger exists, Site personnel may evacuate on their own initiative to safe areas or the emergency assembly area. 4.6.2 Personnel Accounting System After evacuating, personnel shall assemble at their designated Emergency Assembly Area. The Chief Warden shall then conduct an attendance roll call to ensure that all persons are accounted for including any visitors and contractors working on-site. The Chief Warden will assess whether or not the on-site emergency response team has the capability or necessary equipment to safely undertake the search and rescue activity of the missing person or wait until the State Emergency Service personnel arrive on-site. Upon arrival, the State Emergency Service will be advised immediately of any missing personnel. RWS PIRMP JANUARY 2016.DOC Page: 33 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.6.3 Adjacent Premises The occupants of adjacent premises should be advised if endangered by the emergency. However, evacuation of those areas is the responsibility of the individual companies and the State Emergency Service. A list of surrounding area receptors is provided in the following table and are shown in Figure 4-1. Table 4-2: Surrounding Area Receptors Receptor Nature of Occupancy / Sensitivity Approximate Distance Contact Details Address Southern Plumbing Speacialists Neighbouring Industrial facility 20m W 42712220 6-8 Industrial Rd, Unanderra, NSW 2526 Star Track Express Neighbouring Industrial facility 20m N 4222 1333 4 Industrial Rd, Unanderra, NSW 2526 Sydney Water Neighbouring Industrial facility 90m E Creations in glass Neighbouring commercial site 30m S 4272 4244 7/1 Industrial Rd, Unanderra, NSW 2526 Nan Tien Temple Sensitive receptor 160m S 4272 7560 1 Industrial Rd, Unanderra, NSW 2526 RSPCA Unanderra Sensitive receptor 400m E 4271 3410 54 Industrial Rd, Unanderra, NSW 2526 Residential area Sensitive receptor 1000m SSW Various 230 Nolan Street, Berkeley, NSW 2506 Residential area Sensitive receptor 1200m SE Various 51 Jarvie Rd, Cringila, NSW 2502 Residential area Sensitive receptor 800m SW Various 111 Berkeley Rd, Berkeley, NSW 2506 Lathe Pl, Unanderra, NSW 2526 RWS PIRMP JANUARY 2016.DOC Page: 34 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Figure 4-1: Surrounding area receptors Legend: Industrial Neighbours Sensitive Receptor Residential Areas Schools/ Colleges Others (Shopping Centre) RWS PIRMP JANUARY 2016.DOC Page: 35 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.6.4 Relocation of Evacuees If the designated Emergency Assembly Area becomes unsafe, or if evacuees are to remain outside the premises for some time, they should be relocated to a suitable, safe alternative location nominated by the Chief Warden. 4.7 NOTIFICATION OF A POLLUTION INCIDENT A pollution incident that occurs in the course of an activity (within the facility or during the transportation of waste) so that material harm to the environment is caused or threatened must be notified. This section details how, when and who needs to be notified. Procedures attached to this plan provide step by step instructions on how to notify a pollution incident and can be read as stand-alone documents. Section 4.7.2 provides notification requirements for a pollution incident that occurs at the facility. A procedure is provided as Attachment 4. Section 4.7.2 provides notification requirements for a pollution incident that occurs during transportation of waste. A procedure is provided separately as Attachment 5. 4.7.1 Notification of a Pollution Incident at the Facility 4.7.1.1 When to Notify? Under Section 148 of the POEO Act, holders of environmental protection licences and anyone carrying on an activity or occupying a licensed premises who becomes aware of a pollution incident are required to report it immediately. Note that pollution incidents that warrant notification are defined under Section 1.3. RWS PIRMP JANUARY 2016.DOC Page: 36 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.7.1.2 How to Notify? If the incident presents an immediate threat to human health or property: CALL 000 Fire and Rescue NSW, the NSW Police and the NSW Ambulance Service If the incident does not present an immediate threat, or once the initial 000 call has been made: Notify the relevant authorities in the following order: NSW EPA – Environment Line 131 555 Wollongong City Council – (02) 4227 7111 Ministry of Health (Wollongong) – 02 4221 6700 (After hours: 02 4222 5000 - ask for Public Health Officer on call) WorkCover on 13 10 50 (WorkCover will ask for the ABN) Fire and Rescue NSW – 000 Notify other persons as required by the EPA. 4.7.1.3 What to Notify? Section 150 of the POEO Act specifies relevant information about a pollution incident to be given as follows: (a) the time, date, nature, duration and location of the incident, (b) the location of the place where pollution is occurring or is likely to occur, (c) the nature, the estimated quantity or volume and the concentration of any pollutants involved, if known, (d) the circumstances in which the incident occurred (including the cause of the incident, if known), (e) the action taken or proposed to be taken to deal with the incident and any resulting pollution or threatened pollution, if known, (f) other information prescribed by the regulations. The above information is that known to the informant notifying the incident at the time it is notified. If further information becomes known after notification, this information needs to be notified immediately. RWS PIRMP JANUARY 2016.DOC Page: 37 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.7.1.4 Site Contacts Site personnel with specific responsibilities for incident response and management need to be contacted in the event of an incident. This section contains the names, positions and 24-hour contact details of those key individuals who: (i) (ii) (iii) are responsible for activating the plan, and are authorised to notify relevant authorities under section 148 of the Act, and are responsible for managing the response to a pollution incident. The following table lists the key individuals and their responsibilities. These key individuals are listed in order of who to contact in the event of a pollution incident at the site. Table 4-3: Site Contacts Contact Name Telephone No. Responsibilities Rick Jones 0412 998 121 Chief Warden Kym Doyle 0410 471 739 Facility Coordinator Elton Johns 0422 587 271 Supervisor Joseph Scimone 0419 277 188 Compliance 4.7.1.5 Regulatory Authority Contacts The contact details of each authority referred to in section 148 of the Act that are relevant to this site include: NSW EPA – Environment Line 131 555. Wollongong City Council – (02) 4227 7111. Ministry of Health (Wollongong) – 02 4221 6700 (After hours: 02 4222 5000 - ask for Public Health Officer on call). WorkCover on 13 10 50 (WorkCover will ask for the ABN: 42102 934 743). Fire and Rescue NSW – 000. RWS PIRMP JANUARY 2016.DOC Page: 38 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.7.1.6 Surrounding Area Receptors The nearest sensitive receptors and neighbouring facilities have been identified in the Section 4.6.3. Figure 4-1 shows the location of these sensitive receptors. Communication mechanisms that would be used to notify these sensitive receptors would be dependent on the nature and extent of the pollution incident. Communication methods would be decided upon by the Emergency Control Organisation in liaison with emergency services and would be the following or a combination of the following: Telephone calls; Incident notifications on the company website; Letterbox drops; or Door-knocking. 4.7.2 Notification of a Pollution Incident during Transport of Waste This section details how to notify a pollution incident that occurs during the transportation of waste undertaken by Redlam Waste Services. 4.7.2.1 When to Notify? Under Section 148 of the POEO Act, holders of environmental protection licences and anyone carrying on an activity who becomes aware of a pollution incident are required to report it immediately. Note that pollution incidents that warrant notification are defined under Section 1.3. RWS PIRMP JANUARY 2016.DOC Page: 39 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.7.2.2 How to Notify? If the incident presents an immediate threat to human health or property, the driver of the vehicle which was involved in the pollution incident must: CALL 000 Fire and Rescue NSW, the NSW Police and the NSW Ambulance Service If the incident does not present an immediate threat, or once the initial 000 call has been made, then notify the site contact listed in Table 4-3. The site contact will then need to determine the contact details of the authorities relevant to the location of the incident and notify them in the following order. NSW EPA – Environment Line 131 555 Local Council Ministry of Health WorkCover on 13 10 50 Fire and Rescue NSW – 000 Notify other persons as required by the EPA. Note: If none of the site contacts can be contacted, it is the responsibility of the driver to contact the relevant authorities. The site contact / driver can use the following maps to determine the relevant Council and Ministry of Health Service to contact. Local Councils The following details have been sourced from the Division of Local Government website: http://www.dlg.nsw.gov.au/dlg/dlghome/dlg_regions.asp RWS PIRMP JANUARY 2016.DOC Page: 40 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan State Map: RWS PIRMP JANUARY 2016.DOC Page: 41 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Illawarra Region: ILLAWARRA Council Contact The Council of the Municipality of Kiama Shoalhaven City Council Shellharbour City Council Wingecarribee Shire Council Wollongong City Council 02 4232 0444 02 4429 3111 02 4221 6111 02 4868 0888 02 4227 7111 RWS PIRMP JANUARY 2016.DOC Page: 42 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Sydney Surrounds Region: SYDNEY SURROUNDS Council Contact Blue Mountains City Council 02 4780 5000 Gosford City Council 02 4325 8222 Hawkesbury City Council 02 4560 4444 Wollondilly Shire Council 02 4677 1100 Wyong Shire Council 02 4350 5555 RWS PIRMP JANUARY 2016.DOC Page: 43 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Outer Sydney RWS PIRMP JANUARY 2016.DOC Page: 44 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Region: OUTER SYDNEY Council Contact Auburn City Council 02 9735 1222 Bankstown City Council 02 9707 9999 Blacktown City Council 02 9839 6000 Camden Council 02 4654 7777 Campbelltown City Council 02 4645 4000 Fairfield City Council 02 9725 0222 Holroyd City Council 02 9840 9840 Ku-ring-gai Council 02 9424 0888 Liverpool City Council 02 9821 9222 Parramatta City Council 02 9806 5050 Penrith City Council 02 4732 7777 Pittwater Council 02 9970 1111 Ryde City Council 02 9952 8222 Sutherland Shire Council 02 9710 0333 The Council of the Shire of Hornsby 02 9847 6666 The Hills Shire Council 02 9843 0555 Warringah Council 02 9942 2111 RWS PIRMP JANUARY 2016.DOC Page: 45 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Inner Sydney Region: INNER SYDNEY Council Contact Ashfield Council 02 9716 1800 Burwood Council 02 9911 9911 Canterbury City Council 02 9789 9300 City of Canada Bay Council 02 9911 6555 Council of the City of Sydney 02 9265 9333 Hurstville City Council 02 9330 6222 Kogarah City Council 02 9330 9400 Lane Cove Municipal Council 02 9911 3555 Leichhardt Municipal Council 02 9367 9222 Manly Council 02 9976 1500 Marrickville Council 02 9335 2222 Mosman Municipal Council 02 9978 4000 North Sydney Council 02 9936 8100 Randwick City Council 02 9399 0999 Rockdale City Council 02 9562 1666 Strathfield Municipal Council 02 9748 9999 The Council of the City of Botany Bay 02 9366 3666 The Council of the Municipality of Hunters Hill 02 9879 9400 Ashfield Council 02 9716 1800 Burwood Council 02 9911 9911 Canterbury City Council 02 9789 9300 RWS PIRMP JANUARY 2016.DOC Page: 46 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan Ministry of Heath - Public Health Units (PHU) Public Health Unit Hornsby Office (North Sydney) Randwick Office (Inner Sydney) Wollongong Office (Illawarra) Contact After Hours Contact 02 9477 9400 Ph: 02 9477 9123 (Hornsby Hospital) - ask for Public Health Officer on call 02 9382 8333 Ph: 02 9382 2222 (Prince of Wales Hospital) - ask for Public Health Nurse on call 02 4221 6700 Ph: 02 4222 5000 (Wollongong Hospital) - ask for Public Health Officer on call 02 9515 9420 Ph: 02 9515 6111 (Royal Prince Alfred Hospital) - ask Public Health Officer on call 02 4734 2022 Ph: 02 9845 5555 (Westmead Hospital) - ask for Public Health Officer on call 02 9840 3603 Ph: 02 9845 5555 (Westmead Hospital) - ask for Public Health Officer on call Eastern (Sydney) Zone(Camperdown Office) For Liverpool Area, please dial the Camperdown office. Penrith Office (Western Sydney) Parramatta Office (Outer Sydney) Source: www.health.nsw.gov.au/publichealth/infectious/phus.asp 4.7.2.3 What to Notify? Section 150 of the POEO Act specifies relevant information about a pollution incident to be given as follows: (a) the time, date, nature, duration and location of the incident, (b) the location of the place where pollution is occurring or is likely to occur, (c) the nature, the estimated quantity or volume and the concentration of any pollutants involved, if known, (d) the circumstances in which the incident occurred (including the cause of the incident, if known), (e) the action taken or proposed to be taken to deal with the incident and any resulting pollution or threatened pollution, if known, (f) other information prescribed by the regulations. RWS PIRMP JANUARY 2016.DOC Page: 47 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan The above information is that known to the informant notifying the incident at the time it is notified. If further information becomes known after notification, this information needs to be notified immediately after it becomes known. 4.7.2.4 Site Contacts This section contains the names, positions and 24-hour contact details of those key individuals who are responsible for activating this plan in the event of a pollution incident during transportation of waste by Redlam vehicles. The driver of the vehicle must phone the site contacts and inform them of the incident. If the driver is unable to contact anyone in the list, it is the driver’s responsibility to contact the regulatory authorities. Table 4-4: Site Contacts Contact Name Telephone No. Responsibilities Rick Jones 0412 998 121 Chief Warden Kym Doyle 0410 471 739 Facility Coordinator Elton Johns 0422 587 271 Supervisor Joseph Scimone 0419 277 188 Compliance 4.7.2.5 Surrounding Area Receptors The community that would potentially be affected by a pollution incident from a vehicle is dependent on the location where the incident occurs. The site contact that has been notified of the incident needs to determine the exact location of the incident and use online maps and aerial photographs such as Google Earth to locate the nearest receptors. This can be undertaken in consultation with Emergency Services or Fire and Rescue NSW. It should be noted whether these receptors are residential, industrial, rural etc. It is also necessary to note sensitive receptors such as schools, child care centres and public recreation areas. Methods for communication would need to be determined based on the nature and extent of the incident and the number of receptors that need to be informed. Methods can include: Telephone calls; Letterbox drops; or Door-knocking. Other methods may include: Announcements on local radio stations; and Announcements in local television news. RWS PIRMP JANUARY 2016.DOC Page: 48 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan The site contact, in consultation with Emergency Services, will decide the content of the notification. This should be recorded for future reference and filed. A contact number should be provided to the receptors to enable them to call for updates on the situation. An example of what might be included: Date and time of the incident; Brief description of the incident including nature and extent of the spill; Information regarding the waste being transported / spilled; What is being done about the incident; Potential effects of the pollutant/s released during the incident and potential effected area; What they can do to protect themselves; and Who to contact for more information. A site representative may need to be made responsible for undertaking the notification to the community. All notification needs to be undertaken in consultation with the Emergency Services. 4.8 TERMINATING AN EMERGENCY Once clearance is given by the emergency services that the emergency incident has been controlled, the Chief Warden will assume control of the site. In this event the following tasks shall be undertaken: 1. The Chief and Deputy Chief Warden must undertake a full investigation and assessment of the area prior to allowing workers to return; 2. The Chief and Deputy Chief Warden must ensure any clean up required is done so to ensure a safe work environment for all staff. In addition, ensure the safe handling, transport and storage of any waste materials; 3. All clean up material and contaminated items must be disposed of appropriately, according to the waste management procedure; and 4. When the area is considered safe, workers can return to work. 4.9 STATUTORY INVESTIGATION OF INCIDENT Government authorities such as the NSW Coroner, NSW Police Service, WorkCover Authority, Wollongong Council or the NSW EPA may request a formal investigation or Coronial Inquiry to be carried out on certain types of emergencies, particularly in the case of fatalities. Full co-operation will be given to such request. During emergency operations the Chief Warden should attempt to ensure that the area is disturbed as little as is necessary to control the incident, until investigations are completed. Actions taken during the emergency and any noteworthy features of the incident should be advised to the investigator. There must be no interference with the scene of the accident or evidence. RWS PIRMP JANUARY 2016.DOC Page: 49 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.10 WRITTEN REPORT ON EMERGENCY AND REVIEW OF EMERGENCY PLAN After any emergency, the Operations Manager shall prepare a detailed incident report within 28 days of the incident occurring outlining the following information: Reason and cause of incident; Review of the emergency response performance; Recommendations on preventative strategies or additional safety systems that may be considered essential to avoid a recurrence of the incident; and Recommendations on methods or ways to improve the emergency response performance so that any future incidents can be dealt with in a more effective manner. In the case of a pollution incident that was required to be notified under Section 148 of the POEO Act, written notification must be provided to all regulatory authorities that were notified within 7 days of the incident. Information required in the written notification is included in the site’s Environment Protection Licence. The Incident Reporting Procedure and relevant documentation to be submitted in conjunction with the report are included in Attachment 3. 4.11 EMERGENCY TRAINING A general overview of the respective training requirements for particular personnel is discussed in the following sections. 4.11.1 General Personnel and Contractors All personnel working at the Site who are not directly involved in the ECO shall be trained in the basic emergency response procedures. All personnel must undertake Induction Training at the commencement of their employment at the Site and would continue to attend every 2 years thereafter. Any contractors that work at the Site would be subjected to similar induction training. Competency would be recorded following the completion of the training program to ensure that the employee has acquired a satisfactory level of knowledge. RWS PIRMP JANUARY 2016.DOC Page: 50 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 4.11.2 Emergency Control Organisation Personnel All Emergency Control Organisation (ECO) personnel shall be trained in the use of fire-fighting techniques and equipment, including the use of fire extinguishers and hose reels. The aim of this training is to ensure capability to adequately handle most, if not all, local and Site alerts involving fires without need the external assistance of the local NSW Fire Brigade Service. Further training involving the correct emergency procedures to be used when dealing with emergency incidents that include major quantities of dangerous goods, such as those found on the Site, should be included in the training program. All emergency training is designed to ensure that the ECO is ready for an emergency. Personnel designated as First-Aid Officers shall be trained to the standard required in the Work Health and Safety Act 2011, the Work Health and Safety Regulation 2011 and associated standards. Retraining shall be conducted at recommended intervals. Key personnel with responsibilities relating to the notification of pollution incidents need to undertake training in the following: What constitutes a pollution incident that requires notification and that it needs to be notified "immediately"; Definitions of "pollution incident", "material risk of harm", and "immediately"; New responsibilities in relation to notification of a pollution incident; and Notification of a pollution incident procedure at the facility and during the transport of waste (Attachments 5 and 6) i.e.: when to notify, who to notify, what to notify. RWS PIRMP JANUARY 2016.DOC Page: 51 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 5. EMERGENCIES DURING TRANSPORT OF WASTE This section has been prepared to specifically address emergency situation during the transport of waste. It should be read in conjunction with this entire plan. Incidents during the transport of waste need to be dealt with in a similar way to incidents on site. 5.1 EMERGENCY CONTACTS In the event of an emergency situation or incident during the transportation of waste, the driver must assess whether emergency services need to be contacted. The driver must then use the following list of emergency contacts to inform the site of the incident (in order of preference). Table 5-1: Site Emergency Contacts Contact Name Telephone No. Responsibilities Rick Jones 0412 998 121 Chief Warden Kym Doyle 0410 471 739 Facility Coordinator Elton Johns 0422 587 271 Supervisor Joseph Scimone 0419 277 188 Compliance The driver must inform the contact of the following (as per Section 150 of the POEO Act): (a) the time, date, nature, duration and location of the incident, (b) the location of the place where pollution is occurring or is likely to occur, (c) the nature, the estimated quantity or volume and the concentration of any pollutants involved, if known, (d) the circumstances in which the incident occurred (including the cause of the incident, if known), (e) the action taken or proposed to be taken to deal with the incident and any resulting pollution or threatened pollution, if known, (f) other information prescribed by the regulations. It is then the site contact’s responsibility to decide whether the incident poses a significant threat to human health or the environment. If this is the case, the site contact must initiate the Notification of a Pollution Incident during Transport of Waste Procedure (Attachment 5). RWS PIRMP JANUARY 2016.DOC Page: 52 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 5.2 COMMUNICATING WITH THE COMMUNITY Details for communicating with the community in relation to pollution incidents during the transportation of waste are provided in Section 4.7.2.5 and in Attachment 5. 5.3 EMERGENCY ACTION PLAN Pre-emptive actions that need to be taken to prevent any risk of harm to human health or the environment include: Ensure all containers and each load is secure and correctly labelled; Carry a clinical waste and cytotoxic waste spill kit in all transport vehicles; Ensure all loads are covered; Ensure incompatible wastes are never transported in the same load. If unsure, contact the site emergency contact for assistance. Actions to be taken immediately after an emergency or pollution incident to reduce or control the situation include: Call 000 if the situation warrants the need to do so; Contact the site emergency contacts and inform them of the situation as detailed in Section 5.1; Driver ensure personal safety and assist others if safe to do so; Driver to access the appropriate spill kit and clean up spill if safe to do so; Driver to await additional instructions from emergency services; Site emergency contact to follow relevant emergency and notification procedures; and A written report may need to be submitted to relevant authorities as described in the environmental protection licence. Follow up meetings to discuss the incident and any actions to be taken would be undertaken within one week of the incident. Records shall be filed. 5.4 STAFF TRAINING Staff training is detailed in Section 4.11. RWS PIRMP JANUARY 2016.DOC Page: 53 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 6. REVIEW AND TESTING OF THE PLAN This plan needs to be reviewed once per year, or otherwise: Within one month of any emergency, pollution incident that requires notification or training exercise that exposes shortcomings; and Following any significant changes to the layout or operations on site. Review and testing of the plan needs to ensure: Information in the plan is accurate and up to date; and The plan is capable of being implemented in a workable and effective manner. Testing must cover all components of the plan including the effectiveness of staff training. This is undertaken as follows: Annual review of PIRMP and emergency plan standard procedures to ensure all information is accurate and up to date; and Regular drills - if a drill is undertaken, the details of what was tested, how effective the drill was and any changes required to the plan / procedures. A sample drill procedure and drill log is provided as Attachment 6. Whenever the plan is amended, the details of the person(s) making the amendment and date of the amendment need to be included in the Document Revision Record. The date on which the plan is tested is also recorded. RWS PIRMP JANUARY 2016.DOC Page: 54 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 7. REFERENCES NSW Department of Urban Affairs and Planning 1993, Hazardous Industry Planning Advisory Paper (HIPAP) No.1 – Industry Emergency Planning Guidelines NSW Environment Protection Authority 2012, Environmental Guidelines: Preparation of Pollution Incident Response Plans NSW Fire Brigades Fire Safety Division 2006, Policy No.1: Guidelines for Emergency Plans at Facilities having Notifiable Quantities of Dangerous Goods, State Government of NSW (NSWFB) August 2006 Standards Australia 2004, SAA/SNZ HB76:2004 Dangerous Goods - Initial Emergency Response Guide Standards Australia 2002, AS 3745—2010 Planning for Emergencies in facilities Universal Press 2002, UBD CityLink On disc, Copyright Universal Press PTY LTD WorkCover NSW 2008, Cytotoxic Drugs and Related Waste Risk Management Guide 2008 Legislation Occupational Health and Safety Act 2000 (NSW) Occupational Health and Safety Regulation 2001 (NSW) Protection of the Environment Operations Act,1997 (NSW) Protection of the Environment Operations (General) Amendment (Pollution Incident Response Management Plans) Regulation 2012 (NSW) RWS PIRMP JANUARY 2016.DOC Page: 55 Redlam Waste Services Pty Ltd Emergency Response and Pollution Incident Response Management Plan 8. LIMITATIONS The services provided by Benbow Environmental (BE) for this project are carried out in accordance with its current professional standards for site assessment investigations. No guarantees are either expressed or implied. This report has been prepared solely for the use of Redlam Waste Services Pty Ltd, as per an agreement for providing environmental services. Only Redlam Waste Services Pty Ltd is entitled to rely upon the findings in the report within the scope of work described in this report. Otherwise, no responsibility is accepted for the use of any part of the report by another in any other context or for any other purpose. Although all due care has been taken in the preparation of this study, no warranty is given, nor liability accepted (except that otherwise required by law) in relation to any of the information contained within this document. BE accepts no responsibility for the accuracy of any data or information provided to us by Redlam Waste Services Pty Ltd for the purposes of preparing this report. Any opinions and judgements expressed herein, which are based on our understanding and interpretation of current regulatory standards, should not be construed as legal advice. RWS PIRMP JANUARY 2016.DOC Page: 56 ATTACHMENTS Attachment 1: Emergency Procedure Flow Chart EMERGENCY PROCEDURE FLOW CHART ` IN AN EMERGENCY DIAL 000 Inform the Manager RICK JONES: 0412 998121 Structural Collapse Fire Clear and Secure Area. Implement traffic control as required. DIAL 000 (Fire Brigade, Police and Emergency Services) Provide information on Type of Emergency, Location & Contact Name If the event is a pollution incident that poses a significant risk of harm to the environment, the Manager or delegate must initiate the Notification of a Pollution Incident Procedure Assist as required by providing: Lifting Equipment; Traffic Controllers; First Aid Provisions, PPE, etc. Advise other Emergency Officers etc. as required. Incident Attachment 2: Emergency Response Procedures PROCEDURE NO: 1 NO OF PAGES: 24 PREPARED BY: SUBJECT: DATE: ISSUE NO.: 11/01/16 A EMERGENCY RESPONSE PROCEDURES 1. PURPOSE The purpose of these procedures is to provide directions in the event of an emergency. The procedures aim to protect human life and minimise damage to equipment, buildings, installations and the environment. 2. SCOPE These emergency procedures apply to equipment, buildings, installations, the environment, personnel, contractors and visitors under the control of, or managed by, Redlam Waste Services and neighbouring people/premises in the following emergencies: Fire/Explosion; Gas Release; Dangerous Goods Emergency; Spill Control and Containment Plan; Bomb Threat/Suspect Package; Medical Emergency; Earthquake; Severe Storms; and Evacuation. 3. REFERENCES 1. Australian Standard AS3745-2010 Planning for emergencies in facilities (Standards Australia 2010); 2. Hazardous Industry Planning Advisory Paper (HIPAP) No.1 – Industry Emergency Planning Guidelines (NSW Department of Urban Affairs and Planning 1993); and 3. Protection of the Environment Operations (Waste) Regulation 2005. 4. DEFINITIONS Prior to outlining each specific emergency plan, the following are standard for all emergencies: Evacuation Signal Communication Assembly Point Emergency Contacts Checklists Emergency Assembly Area Is a continuous signal which means move to the nearest Emergency Assembly Area Without communication there cannot be any interaction between the person discovering a potential emergency and the people designated to handle the situation. The communication systems available at Redlam Waste Services include air horn, telephones system and mobile telephones. The Assembly Point ensure Wardens can take an initial count of personnel Police, Ambulance or Fire Brigade on 000 Wardens checklist of site This is a safe location to which all people are required to assemble in the case of an emergency. 5. RESPONSIBILITIES The Emergency Control Organisation (ECO) consists of a group of site personnel that has the responsibility of providing first response action to an emergency in terms of organising the necessary resources, communications, evacuation of personnel and implementing any corrective actions that may be necessary to return the emergency situation back to normal. The Chief Warden is in charge of overseeing and controlling all emergency response actions at the site. In the case that the Chief Warden is unavailable at the time of the emergency, control will be the responsibility of the Deputy Chief Warden. The Emergency Control Organisation (ECO) consists of the following members Table 8-1: Emergency Control Organisation Member Summary Emergency Control Organisation Team Member Chief Warden Facility Coordinator Supervisor Compliance Personnel Internal Contact No Rick Jones 0412 998 121 Kym Doyle 0410 471 739 Elton Johns 0422 587 271 Joseph Scimone 0419 277 188 All Emergency Control Organisation members clearly understand that they provide the first line of attack in an emergency situation, such as a fire. However on the instruction to EVACUATE they are to implement their responsibilities, as members of the Emergency Control Organisation, discussed in the Emergency Response Plan. 6. PROCEDURE Emergency Control Centre In the event of an emergency, the Chief Warden will coordinate the emergency response activities from the Emergency Control Centre located in the Administration Office. Media Enquires Under no circumstances are employees to make any unauthorised verbal or written statements to the media concerning an emergency situation at Redlam. All enquiries should be directed to the Managing Director. FIRE/EXPLOSION A fire or explosion at the site can have severe repercussions in terms of loss of life and property damage. The site has been furbished with an array of manual fire-fighting systems in the form of fire hydrants, hose reels and fire extinguishers. As part of the Employee Safety Induction Program, it is recommended all employees go through a minimum level of emergency response training that includes basic fire-fighting skills using fire extinguishers and hose reels. FIRST-RESPONSE ACTION ON DISCOVERY OF FIRE OR SMOKE (GENERAL) 1. 2. 3. 4. 5. 6. 7. Assist and remove any person from the danger area, only if safe to do so; Sound the alarm over the on-site communication system; Activate the nearest emergency stops or shutdown systems relevant to the affected area; If safe to do so, isolate all electrical equipment in affected area; Immediately notify the Chief Warden; If safe to do so, use the nearest fire extinguisher to smother the fire; If instructed to do so by the Chief Warden responsible for the affected area then move to the designated Emergency Assembly Area. CHIEF WARDEN/DEPUTY CHIEF WARDEN When informed of the emergency: 1. Proceed to the emergency and determine the nature and location of the emergency. 2. Mobilise and co-ordinate Emergency Control Organisation personnel to take emergency response actions. 3. Ensure that the correct Personal Protection Equipment is available to fire-fighting personnel. 4. Determine and implement the most appropriate fire-fighting response action in conjunction with the services of the on-site Emergency Control Organisation. 5. If required, telephone the Fire Brigade and/or Police or Ambulance Services confirming the state of the emergency at the site and requesting for additional assistance. 6. Ensure that personnel are safe. 7. Ensure First Aiders are notified. 8. Notify the Managing Director of status of emergency. In the event that the emergency poses a material risk of harm to the environment, the Managing Director shall initiate the notification of a pollution incident procedure. 9. Brief the State Emergency Services upon their arrival. 10. Ensure that no vehicles other than emergency services vehicles enter the site. EMERGENCY CONTROL ORGANISATION When informed of emergency: 1. Proceed to the Emergency Assembly Point for immediate preparation and activation of the fire-fighting equipment 2. Proceed to the location of the emergency; 3. Report to the Chief Warden or personnel on location for further instructions. 4. Under the instruction of the Chief Warden, carry out the most appropriate fire-fighting response action. 5. Ensure that personnel are safe. 6. If instructed to do so by the Chief Warden, leave emergency location and proceed to Emergency Assembly Area. GAS RELEASE This section applies to a major release of gaseous substances into the ambient environment. The gases that can potentially be released at the site are the following: LPG which is a flammable gas. As part of the Employee Safety Induction Program, it is recommended that all employees go through a minimum level of emergency response training that includes items such as risk identification and the use of personal protection equipment such as breathing masks and self-contained breathing units. FIRST-RESPONSE ACTION ON DISCOVERY OF MAJOR GAS RELEASE (GENERAL) 1. 2. 3. 4. Assist and remove any person from the danger area, only if safe to do so; Sound the alarm over the on-site communications system only if safe to do so; If safe to do so, isolate all electrical equipment in affected area; Immediately notify the Chief Warden and specify details of gas leak such as odour, location of leak and size of leak; 5. If instructed to do so by the Chief Warden responsible for the affected area, move to the designated Emergency Assembly Area. CHIEF WARDEN/DEPUTY CHIEF WARDEN When informed of the emergency: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Proceed to the emergency and establish/confirm its nature and location. Determine appropriate action to take. Take into account the Material Safety Data Sheet information. Ensure that all personnel are safe. Mobilise and co-ordinate Emergency Control Organisation personnel to take emergency response action. In the case that the gas release is toxic and personnel are believed to be trapped, organise a search and rescue party fitted with the correct breathing protection equipment. Initiate a partial or full evacuation, depending upon the location and severity of the gas leak. If required, telephone the Fire Brigade and/or Police or Ambulance Services confirming the state of the emergency at the site and requesting for additional assistance. Notify the Managing Director of status of emergency. In the event that the emergency poses a material risk of harm to the environment, the Managing Director shall initiate the notification of a pollution incident procedure. Brief the State Emergency Services upon their arrival. Ensure that no vehicles other than emergency services vehicles enter the site. Consideration must be given to the notification of neighbouring buildings, particularly those down-wind of the incident. EMERGENCY CONTROL ORGANISATION When informed of emergency 1. Proceed to the Emergency Control Point for immediate preparation and activation of emergency response equipment. 2. Proceed to the location of the emergency. 3. Report to the Chief Warden or personnel on location for further instructions. 4. Ensure that personnel are safe. 5. If instructed to do so by the Chief Warden leave emergency location and proceed to Emergency Assembly Area. DANGEROUS GOODS EMERGENCY This section applies to a major release or spill of a dangerous good substance in an uncontrolled or unconfined space i.e. outside the confines of a tank compound or bund area. The types of dangerous goods that can potentially be released or spilt at the site are the following: Class 2.1 Class 3 Class 8 Flammable Gas; Flammable Liquid; and Corrosive substances. ACTION ON DANGEROUS GOODS EMERGENCY (GENERAL) 1. 2. 3. 4. 5. 6. Assist and remove any person from the danger area, only if safe to do so; Sound the alarm over the on-site communications system; If safe to do so, isolate all electrical equipment in affected area; Immediately notify the Chief Warden; If safe to do so, use the nearest spill control equipment to protect stormwater drains; and Move to the designated Emergency Assembly Area, if instructed to do so by the Chief Warden. CHIEF WARDEN/DEPUTY CHIEF WARDEN When informed of the emergency: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. Proceed to the emergency and establish its nature and location. Secure the area and barricade the area in the most suitable way. Determine the appropriate action to take. Take into account the Safety Data Sheets. Ensure that personnel are safe and clear of vapours, gases and fumes. Maintain contact with the Chief Warden and First Aid personnel. Mobilise and co-ordinate Emergency Control Organisation personnel to take emergency response action. If required, telephone the Fire Brigade and/or Police or Ambulance Services confirming the state of the emergency at the site and requesting for additional assistance. Notify the Managing Director of status of emergency. In the event that the emergency poses a material risk of harm to the environment, the Managing Director shall initiate the notification of a pollution incident procedure. Brief the State Emergency Services upon their arrival. If necessary, activate a Partial or Total Evacuation procedure in consultation with the Chief Warden. 12. When assessing the situation the following must be considered: Is there a fire? Is there a spill or leak, how large is it? Is containment of the Dangerous Good necessary? What are the weather conditions? What is the area like? What is the risk to: people, property or environment? How significant is the risk, based on the situation? The hazards of the product, Class and Sub Risk? The degree of danger, based on the Packing Group? Is public protection necessary: stay in place or evacuate? What resources: human and equipment are required and how readily available are they? 13. Ensure that no vehicles other than emergency services vehicles enter the site. 14. Consideration must be given to the notification of neighbouring buildings, particularly those down-wind of the incident. EMERGENCY CONTROL ORGANISATION When informed of emergency: 1. Proceed to the Emergency Control Centre for immediate preparation and activation of emergency response equipment and fire truck; 2. Proceed to the location of the emergency; 3. Report to the Chief Warden or personnel on location and implement emergency response strategy as instructed by the Chief Warden or provide assistance to State Emergency Service personnel as required; 4. Ensure that personnel are safe; 5. If instructed to do so by the Chief Warden, leave emergency location and proceed to Emergency Assembly Area; and 6. Ensure any spillage is cleaned up and disposal of resulting waste is in accordance with regulations. SPILL CONTROL AND CONTAINMENT PLAN The purpose of this procedure is to ensure the containment of all spills on the site and to prevent the entry of spilled materials/debris into stormwater systems and public waterways, reducing the risk of environmental pollution and exposure to breaches and penalties under environmental pollution legislation. DEFINITIONS The Environment For the purpose of this procedure, the environment is defined to include air, soil, groundwater, surface water (stormwater) and trade waste effluent. Environmental Incident/Release An environmental incident /release is defined as any spillage, release, upset, out of limits operation or procedural violation, which potentially: Harms human health; Would cause environmental harm; and Would result in non-compliance with regulations, permits and/or intervention of environmental authorities or results in penalties or fines. Internal Release Any spillage inside buildings that would find its way to the trade waste plant through the existing floor drain system. External Release Any spillage that has the potential to enter the stormwater system (outside buildings) which would ultimately end up in nearby waterways. Minor Spillage A minor spillage is one that can be contained quickly and efficiently utilising the spill kits located at various points around the site. Material risk of harm: “Material risk of harm to the environment” is defined under Section 147 of the POEO Act as: (b) harm to the environment is material if: (v) It involves actual or potential harm to the health or safety of human beings or to ecosystems that is not trivial, or (vi) It results in actual or potential loss or property damage of an amount, or amounts in aggregate, exceeding $10,000 (or such other amount as is prescribed by the regulations), and loss includes the reasonable costs and expenses that would be incurred in taking all reasonable and practicable measures to prevent, mitigate or make good harm to the environment. Major Spillage A major spillage has the potential to leave the site and is characterised by the spillage of a quantity greater than 205 litres (44 gal). A spill of this size requires the operation of the site stormwater isolation valve which serves to isolate the site from surrounding waterways. SPILL CONTROL INFORMATION There is potential for a spillage of waste from the storage bins to occur and to a lesser extent, a dangerous goods spill. As there is only minor storage of dangerous goods, it is more likely a spill of waste would occur. When a spillage occurs, it is important to know what has been spilt and access to the following information will be critical if control is to be effective: Name of material – shipping and/or common name; Type of material (solid, liquid, granulated); Dangerous Goods Class of material (if applicable). This information can usually be obtained from the packaging label e.g. Class 3 (Flammable), Class 8 (Corrosive); Type of waste (if applicable). This can be identified by the colour of the storage bin. ie: purple for cytotoxic waste, yellow for clinical and related waste and burgundy for anatomical waste; and Safety Data Sheets (SDS) kept on site and available from the Safety and Environmental Managers or in the Fire Manifest. The SDS provides information on: Ingredients of the spilt substance; Harmful properties of the substance and its ingredients e.g. evolution of toxic fumes, miscibility with water, effects on the skin and internal bodily systems etc; Requirements of personal protective equipment for safe handling of the spill e.g. impervious gloves, respiratory protection etc; Recommended method for containing the spill and preventing environmental damage. NB Emphasis is required on the necessity of containment of the spill rather than dispersal of it; The safest means of disposing of the spilled materials, e.g. use of approved/authorised waste disposal authorities; Locations of the spill hardware (shovels, brooms, Hazspill Containers etc) and absorbent materials around the site; and In the case of a major spillage, access to the stormwater isolation valve is essential. Spills in excess of 205 litres (equivalent to a 44-gallon drum) are considered a major spill. SPILL CONTAINMENT The facility is protected by building bunding and drainage within the building and truck wash area to a DAF unit prior to release to the Sydney Water Tradewaste System. Spill kits for are located within all transport vehicles. These provide means of controlling minor spills and are located at appropriate locations at the facility. Contents of spill kits may include: Waste Spill Kit Broom/brush, dust pan, mop and mop bucket; a large (10 litre) reusable plastic container or bucket with fitted lid; 2 clinical waste bags for the disposal of clinical waste; 2 cytotoxic waste bags for the disposal of cytotoxic waste; a large (10 litre) reusable plastic container or bucket with fitted lid; disinfectant containing (1%) 10,000 ppm available chlorine or equivalent; rubber gloves suitable for cleaning; absorbent toweling / absorbent spill mat; detergent, sponges / disposable cloths; personal protective equipment including eye protection, an apron or long sleeve impervious gown, a face mask, heavy duty gloves, latex gloves, 2 hooded overalls, shoe covers; incident report form; and spill sign. There is a stormwater retention pit and isolation to prevent release of any unwanted spillage that were to occur outside the building to enter stormwater system. Any spill incidents are considered incidents warranting completion of the incident response procedure. SPILL CONTROL PROCEDURE MINOR SPILL: Bin//Container Rupture Bin/Container Overflow Take action to stop or reduce the source of the spill, or divert the flow to safe containment, to the extent that personal safety will permit; Contain the spillage to minimise spread of material using the contents of the spill kits available on site; Notify the shift supervisor; Report the spill incident, location, time of occurrence, type of spill, chemical involved and quantity to the Managing Director; Consult SDS (if available) for recommended clean-up procedure; and Dispose of material and all contaminated absorbents etc. as per Disposal Procedure outlined in SDS or in accordance with regulations. MAJOR SPILL: Tank Overflow Tank Rupture Multiple Drum/Container Spill Take any necessary emergency measures to protect against immediate danger to human life and health; Take action to stop or reduce the source of the spill, or divert the flow to safe containment, to the extent that personal safety will permit; Attempt to contain the spillage to minimise spread of material using the contents of the spill kits available on site; Notify the shift supervisor; Report the spill incident, location, time of occurrence, type of spill, chemical involved and quantity to the Managing Director. The managing director shall decide whether the spill presents a material risk of harm to the environment and begin the notification procedure; Consults SDS (if available) for recommended clean-up procedure; and Dispose of material and all contaminated absorbents etc. as per Disposal Procedure in SDS. SPILL CONTROL EQUIPMENT MAINTENANCE If emergency equipment is used or borrowed for any purpose it must be replenished or replaced immediately; and Spill kits are to be checked and maintained on a routine basis. All staff on site would be aware of the importance of these kits and know the proper application methods – Bins provided for holding clean and contaminated material are to be used for this purpose alone and not as general rubbish bins. BOMB THREAT/SUSPECT PACKAGE Action on receiving a Bomb Threat or discovery of a Suspect Package, such as an unidentifiable box, bag, tin or container. When a threat has been received: 1. Use the Bomb Threat Checklist and record all details. 2. Notify the Chief Warden by telephone, who will initiate a Total Evacuation to the relevant Emergency Assembly Area or the safest Assembly Area depending where the bomb or package may be located. 3. Contact the Police on 000 if not already done by the Chief Warden. 4. Open as many doors and windows as possible. 5. Evacuate to the Emergency Assembly Area as directed by the Chief Warden. When a Bomb Threat/Suspect Package has been found: DO NOT TOUCH IT! Clear the area and do not re-enter until instructed. 1. 2. 3. 4. Notify the Chief Warden by telephone. Contact the Police on 000 if not already done by the Chief Warden. Open as many doors and windows as possible Evacuate to the designated Emergency Assembly Area or the safest Assembly Area as directed by the Chief Warden. CHIEF WARDEN/DEPUTY CHIEF WARDEN When informed of a Bomb Threat/Suspect Package: 1. Initiate Total Evacuation Procedure to the Emergency Assembly Area, or allocating new safe Assembly Area, if needed, after taking into consideration the location of the bomb. 2. Telephone the Police on 000. 3. Brief the Police upon their arrival. 4. Ensure that no vehicles other than emergency services vehicles enter the site. BOMB THREAT CHECKLIST DATE : ___________________________ TIME: ___________________________ QUESTIONS TO BE ASKED BOMB THREAT Where did you put the bomb? QUESTIONS TO BE ASKED GENERAL THREAT What are you threatening to do? When did you put it there? Why are you making this threat? What does the bomb look like? When do you intend to carry it out? What kind of bomb is it? Do you intend to telephone again? Did you place the bomb? What is your name? Why did you place the bomb? Where are you? Where are you? What is your address? What is your address? Did you recognise the caller’s voice? EXACT WORDING OF THREAT EXACT WORDING OF THREAT IDENTIFYING THE CALLER CALLERS VOICE (please tick where applicable) MALE FEMALE OLD YOUNG CALM EXCITED NORMAL ANGRY SLOW RAPID LOUD SOFT DEEP STUTTER LISP ACCENT TYPE OF ACCENT (please describe) CRYING LAUGHING SLURRING RAGGED DISTINCT RASP IRRATIONAL WELL SPOKEN INCOHERENT FOUL FAMILIAR NASAL DEEP BREATHING CLEARING THROAT DISGUISED CRACKING VOICE OTHER BACKGROUND NOISES (please tick where applicable) STREET NOISES HOUSE NOISES OFFICE MACHINERY FACTORY MACHINERY MUSIC BACKGROUND VOICES MOTORS STATIC CLEAR LOCAL LONG DISTANCE OTHER: MEDICAL EMERGENCY Medical emergencies are events such as when a person suffers a heart attack, respiratory failure or broken limbs due to a fall or accident. There will be a number of First-Aid Officers working at the site at any one time. These personnel have the training to be able to provide first-aid response and care to such emergencies until the Ambulance Service arrives at the location to take over the care of the patient. ACTION ON DISCOVERY OF A MEDICAL EMERGENCY (GENERAL) 1. 2. 3. 4. 5. 6. Check for any threatening situation and control it if safe to do so. Remain with the casualty (unless there is no other option) and provide appropriate support. Do not remove or move any casualties unless in a life threatening situation. Notify the Shift First-Aid Officer via the communication system on-site. Provide support to the First-Aid Officer or Ambulance if required. Should the medical emergency consist of a car accident you are involved in whilst driving a company vehicle either on or off-site then notify your immediate Supervisor. CHIEF WARDEN When informed of the Medical Emergency: 1. 2. 3. 4. 5. Proceed to the emergency and establish the nature and location of the emergency. Determine the appropriate action to take. Ensure that personnel are safe. Maintain contact with the site First Aiders. Determine if the Ambulance Service should be notified and if necessary designate someone to meet them. 6. Brief the Ambulance Service personnel upon their arrival. 7. If necessary, activate a Partial or Total Evacuation Procedure. 8. Provide support to First-Aid Officer or Ambulance if required. SAFETY REPRESENTATIVE In some cases, the appropriate statutory authorities will need to be informed in accordance with the Work Health and Safety Act 2011. EARTHQUAKE CHIEF WARDEN/DEPUTY CHIEF WARDEN 1. 2. 3. 4. 5. 6. 7. 8. 9. Proceed to the emergency and establish the nature and location of the emergency. Determine the appropriate action to take. Telephone the Fire Brigade and/or Ambulance if required, confirming the emergency at the site. Notify the Managing Director. Ensure that personnel are safe. Ensure that the State Emergency Service has been notified. If necessary, activate a Partial or Total Evacuation Procedure. Brief the State Emergency Service personnel upon their arrival. Ensure that no vehicles other than emergency services vehicles enter the site. SEVERE STORMS Severe storms produce extreme wind speeds, rainfall and atmospheric pressures. Although torrential rains produce flooding of river systems, the most severe threats of storms arise from destructive winds. During violent winds, loose sheets of galvanised iron, masonry and other debris may become lethal flying objects. ACTION ON WARNING OF SEVERE STORMS 1. Restrain loose material that could cause injury and damage during extreme winds. 2. Move chemicals stored in drums to a safe, flood free place inside the building. 3. Avoid using the telephone during a storm. 4. Listen to local radio for further information. 5. Await instructions from Chief Warden. 6. If driving during a storm after an evacuation from site, stay clear of trees, power lines or streams. EVACUATION GENERAL The most likely reasons for a total or partial evacuation of staff are: a) b) c) d) e) Fire, explosion; or Major spill of waste; or Discovery of a bomb or similar device; or Failure of an internal service or other internal emergency e.g. gas leak etc; or External emergency. Total evacuation is not the appropriate response for all of the emergencies likely to be encountered. Such an action should only be undertaken in extreme emergencies. STAGES OF EVACUATION There are three stages of evacuation for the site: Stage 1 - The affected area. Stage 2 - Certain other areas. Stage 3 - Total evacuation of the site. Stage 1: Partial Evacuation The most likely response to an emergency is the partial evacuation of an area in response to a fire. The evacuation may be: Short term, until the emergency has been rectified, Medium term, overnight, or Long-term if damage has been extensive, and reconstruction is required. Stage 2: Certain other areas In addition to the affected building, adjacent buildings may need to be evacuated. Stage 3: Total site Evacuation In the event of the whole site being untenable, even temporarily, total evacuation must be considered. EMERGENCY ASSEMBLY AREA The Emergency Assembly Area is located at the front of the site. These Emergency Assembly Areas will change if: 1. During a bomb threat/suspect package if the danger area is located close to the Emergency Assembly Area or at the discretion of the Chief Warden, or 2. During a severe storm if the current Emergency Assembly Area endangers the lives of personnel. ACTION BY STAFF Evacuation 1. When the signal to evacuate is given, collect personal belongings from the immediate area, make plant and machinery safe and store valuables, if safe to do so. 2. The Chief Warden shall direct their staff to evacuate by one of the designated routes. 3. The Chief Warden shall supervise evacuation to the nearest safe exit route and then to the Emergency Assembly Area and account for personnel with the Chief Warden’s Personnel Checklist. 4. Authority to sound the alarm may only be given by the Chief Warden or the Deputy Chief Warden. Accounting for Personnel The Chief Warden shall complete a role call using the employee role when evacuated to the Emergency Assembly Area and be advised if any employees/contractors are on site who have not been accounted for. The Chief Warden shall hold a list of contractors/subcontractors/truck drivers working at the facility on any particular day. CHIEF WARDEN The Chief Warden is responsible for authorising the immediate evacuation of employees/contractors to each Emergency Assembly Area. The decision to evacuate can only be made by the Chief Warden. The Chief Warden shall liaise with the Police, Ambulance and Fire Brigade officers present on the scene. EXIT ROUTES AND EMERGENCY EQUIPMENT A plan showing the Exit/Evacuation pathways and the location of emergency equipment shall be shown on a site plan which is posted on the site. EMPLOYEE ROLE NAME List all employees by name and position. POSITION CONTACT NO. CHIEF WARDEN PERSONNEL CHECKLIST TIME: ________________________ DATE: ________________________________ HEAD COUNT – EMPLOYEES & CONTRACTORS Employees (please tick each name) Tick Contractors / Visitors Tick (please tick each name) MISSING PERSONS List Names of missing persons: If anybody is missing check: A. B. C. D. What job were they doing and where: When they were last seen and where: Is it safe to enter the building? 1) Check area where last seen 2) Check area where job was 3) Check all toilets, wash and locker rooms Check if other employees have information about missing person. If the person is not found and the evacuation crisis is over, then an investigation would be conducted to find out where the person was and why they were not accounted for. EVACUATION CHECKLIST This is to be complete as a last check, to ensure that all documentation has been completed. (Please circle) YES NO N/A have police / fire / ambulance been notified? (Please circle the appropriate department) YES NO N/A has the bomb threat checklist been completed by the person who took the call? (if applicable) YES NO N/A has the visitor book been checked and person/s been accounted for? YES NO N/A has the contractor list supplied by the operations engineer been checked and person/s been accounted for? YES NO N/A has the Chief Warden – employee checklist been completed and all person/s accounted for? YES NO N/A If person/s were found missing, has the search warden been notified and the Chief Warden checklist been completed? YES NO N/A once the emergency is over pass this document and all relating documents to the management systems co-ordinator. CHECKLIST COMPLETED BY: ____________________________________ (Print and signature) DATE: _________________ RAISING ALARM CHECKLIST INFORMATION PROVIDED TO THE EMERGENCY SERVICE Location of the Site 10 Industrial Road, Unanderra Type of Emergency Details of casualties and Injuries What assistance is required? What are the hazards that may be encountered? Your name and telephone number. (tick) Attachment 3: Incident Reporting Procedure PROCEDURE NO: 2 NO. OF PAGES: 6 PREPARED BY: SUBJECT: DATE: 11/01/16 ISSUE NO.: A INCIDENT REPORTING 1. PURPOSE The purpose of this procedure is to describe the method for reporting, recording and investigating environmental and safety incidents. 2. SCOPE This procedure applies to all personnel responsible for the reporting and investigation of environmental and safety incidents. 3. OTHER RELEVANT DOCUMENTS Work Health and Safety Act 2011 Protection of the Environment Operations Act 1997 4. PROCEDURE The following procedures must be followed in the event of an environmental or safety incident. RESPONSIBILITY Managing Director / Chief Warden Informing the relevant authorities of the incident. Completing and submitting the relevant reports. Maintaining records of incidents. Ensuring that corrective/preventative actions are taken. All staff Reporting all incidents to the Managing Director. Page 1 of 5 REQUIREMENTS ENVIRONMENTAL INCIDENT PROCEDURE WHAT IS AN INCIDENT Environmental incidents include emissions and spillages (gas, liquid or solid) where ANY of the following apply: There is a possibility of soil and groundwater contamination There is any off-site environmental impact such as discharge to stormwater, dust, noise, air emissions The involvement of authorities, media or the community is likely The incident must be reported to the authorities There is actual or potential losses of more than $10,000 including fines, clean up and prevention ($10,000 is defined as Material Harm to the Environment according to the POEO Act 1997) Any breach of the environmental operating conditions, including licences, permits and other environmental regulation Any complaints about environmental issues by an external party Any fines and warning notices for permit or licence non-compliance or regulatory breaches Near misses with the potential to cause any of the above INTERNAL REPORTING The Managing Director must be informed of any Environmental Incident as defined above. The Managing Director must complete the Incident Reporting Form. The Managing Director must maintain all records of the incident provided to regulatory authorities. EXTERNAL REPORTING The Managing Director must inform the relevant authorities immediately of any of the above incidents following the Notification of a Pollution Incident Procedure. The Managing Director must inform surrounding neighbouring premises in accordance with the Notification of a Pollution Incident Procedure. Within 24 hours, the Managing Director must supply a report to NSW EPA and Local Council for any incident with an actual or potential OFF-SITE impact on people or the biophysical environment, that is, if the incident was found to pose a material risk of harm to the environment. Within 7 days of the incident, the Managing Director must provide written details of the incident to the NSW EPA and all other relevant regulatory authorities in accordance with conditions with the EPL. Page 2 of 5 REQUIREMENTS SAFETY INCIDENT PROCEDURE WHAT IS AN INCIDENT Safety incidents include an accident/incident which results in: A lost time injury, or An accident with the potential to cause serious injury/illness/death (and near miss accident) Any incident involving major damage/expenditure to property or equipment A medical treatment injury A first aid injury where practical preventative action can be taken to avoid the incident from occurring again Near misses of any of the above INTERNAL REPORTING The Managing Director must be informed of all Safety Incidents The Managing Director or Safety Representative must complete an Incident Report Form whenever a reportable incident/injury occurs. All major incidents/injuries must be verbally reported to the Managing Director immediately. A Safety Alert must be completed and submitted to the Safety Manager for all incidents that: Causes death or permanent disability to a person Causes a fire Causes significant property damage Is likely to give rise to adverse public comment Is likely to result in legal proceedings against Redlam Is reported to the Statutory Authorities Is a Lost-Time Injury or Medical Injury; or Is a significant ‘Near Miss’ or ‘First Aid Treatment Injury’ with the potential to cause any of the above An Accident Investigation Report must be completed for every full investigation conducted. A copy of the completed Report must be forwarded to the Environment, Health and Safety Officer within three days of the incident occurring. EXTERNAL REPORTING Notification to WorkCover is required where an accident or incident results in death or a specified serious injury. That is if an injured person requires: Medical Treatment within 48 hours of being exposed to a substance Immediate hospital/medical treatment for amputation, serious head injury, separation of skin from underlying tissue such as de-gloving or scalping, electric shock, spinal injury, loss of bodily function, serious laceration. Notification is also required of dangerous occurrences (near misses) which seriously endanger the health and safety of people in the immediate vicinity. Such dangerous occurrences include: Collapse, overturning, failure or malfunction of, or damage to certain items of plant, collapse or failure of an excavation or the shoring support of an excavation, collapse of a building or structure, implosion, explosion or fire, escape, spillage, leakage of substance. Page 3 of 5 SAFETY ALERT Site: Redlam Waste Services Nature/Extent of Injury: Probable period of incapacity: Date: Injured Person: N/A :______ Safety Incidents Death: Medical Treatment Injury: Adverse Publicity: Legal: Property Damage: Employee :______ Contractor:______ Visitor:_______ Permanent Disability: Lost Time Injury: Report to Authorities: Fire: Near Miss: SUMMARY OF WORKPLACE INCIDENT CONTRIBUTING FACTORS CORRECTIVE ACTION To be signed at each level Director of Operations Date Operations Manager Date EH&S Officer Date Page 4 of 5 INCIDENT REPORTING FORM URGENT MEMO TO: DIVISION: FAX: CC: FROM: COMPANY: DATE: Employee Injured Person Redlam Waste Services Contractor Workplace Lost Time Injury Medical Treatment Injury First Aid Treatment Injury Near Miss Fire Pollution Incident Property Damage Visitor 10 Industrial Road, Unanderra Name of Workplace Address of Workplace Incident Details Date of Incident How Did the Incident Happen Name of Person in Charge Name of Witness Details of Injury / Damage / Incident Extent of Injury or Damage Probable Period of Incapacity or interruption to production Has this incident been reported to the Statutory Authority? If so, who and when? Is there any likelihood of Adverse Publicity? Has there been any involvement with the news media? If yes, provide details. Proposed Remedial Action Managing Director Date Safety Representative Date Page 5 of 5 Attachment 4: Notification of a Pollution Incident Procedure at the Facility PROCEDURE NO: 3 NO OF PAGES: 5 PREPARED BY: SUBJECT: DATE: 11/01/16 ISSUE NO.: A NOTIFICATION OF A POLLUTION INCIDENT AT THE FACILITY 1. PURPOSE The purpose of this procedure is to give clear instructions regarding who to notify during a pollution incident at the facility that is assessed to present a risk of material harm to the environment. 2. METHOD First Point of Contact: 1. An event occurs which presents an immediate threat to human health or property. Stop work and push local emergency stops (if safely accessible) to shut down operations and close any valves, etc., as necessary. The alarm will then alert the Chief Warden. 2. If there is no immediate threat to human health or property, follow the relevant internal procedure. Notification of Regulatory Authorities (Chief Warden or Deputy Chief Warden): 1. If the event is causing or threatening material harm to the environment, the Chief Warden or Deputy Chief Warden shall contact the regulatory authorities in the following order: NSW EPA – 131 555 Wollongong City Council – (02) 4227 7111 The Ministry of Health (Wollongong) – 02 4221 6700 (After hours: 02 4222 5000 - ask for Public Health Officer on call) WorkCover Authority – 13 10 50 Fire and Rescue NSW – 000 Page 1 of 5 Note: “material risk of harm to the environment” needs to be notified if: It involves potential harm to the health or safety of human beings or ecosystems that is not trivial; or It results in loss of property damage exceeding $10,000; Loss includes costs incurred in taking all reasonable measures to prevent or mitigate harm to the environment. 2. Notify any persons as requested by the NSW EPA. 3. What to Notify your full name, address and telephone contact details date, time and duration of the incident the type of pollutant or a description of the incident discharge or emission location of the incident the extent or size of the area where the pollution is occurring anything else that is relevant to the incident Notifying Neighbouring Properties: If the incident has a risk on human health or the environment external to the site, early warnings and regular updates are to be provided to any premises likely to be affected. The ECO needs to assess the situation and liaise with emergency services to determine: 1. Who to contact - the nearest sensitive receptors and neighbouring facilities have been identified in the following table and Figure 4-1 of the plan. Page 2 of 5 Surrounding Area Receptors Receptor Nature of Occupancy / Sensitivity Approximate Distance Contact Details Address Southern Plumbing Speacialists Neighbouring Industrial facility 20m W 42712220 6-8 Industrial Rd, Unanderra NSW 2526 Star Track Express Neighbouring Industrial facility 20m N 4222 1333 4 Industrial Rd Unanderra NSW 2526 Sydney Water Neighbouring Industrial facility 90m E Creations in glass Neighbouring commercial site 30m S 4272 4244 7/1 Industrial Rd Unanderra NSW 2526 Nan Tien Temple Sensitive receptor 160m S 4272 7560 1 industrial Rd Unanderra NSW 2526 RSPCA Unanderra Sensitive receptor 400m E 4271 3410 54 industrial Rd Unanderra NSW 2526 Residential area Sensitive receptor 1000m SSW Various 230 Nolan Street, Berkeley, NSW 2506 Residential area Sensitive receptor 1200m SE Various 51 Jarvie Rd Cringila, NSW 2502 Residential area Sensitive receptor 800m SW Various 111 Berkeley Rd Berkeley NSW 2506 Lathe Pl Unanderra NSW 2526 2. Decide on the method of communication that will be used, one or a combination of the following: o Telephone calls; o Incident notifications on the company website; o Letterbox drops; or o Door-knocking 3. Assign a responsible person to be a community contact who can provide updates on the situation and other relevant information about the incident. 4. Determine what information is to be provided. An example includes: Date and time of the incident; Brief description of the incident including nature and extent; Information regarding the waste / material involved in the incident; What actions are being taken to mitigate the incident; Potential effects of the pollutant/s released during the incident and potential effected area; What they can do to protect themselves; and A contact number to enable receptors to call for updates on the situation. 5. Determine those who will be responsible for communicating with the neighbouring properties and undertake the notification in consultation with Emergency Services. 6. Record the details of all of the above and file. Page 3 of 5 3. WRITTEN REPORT An incident report will be prepared and provided to all of the above regulatory authorities. Refer to the Site Environment Protection Licence (EPL) for information required to be included in the report. Develop and implement a follow up action plan in consultation with relevant regulatory authorities. Page 4 of 5 FLOWCHART: NOTIFICATION OF A POLLUTION INCIDENT AT THE FACILITY Pollution incident occurs YES Does the incident pose an immediate threat to human health or property? 0412 998121 Chief Warden to call relevant regulatory authorities immediately in the following order: Follow relevant internal procedure. Call Site Contact: Chief Warden RICK JONES Call 000 NO YES NSW EPA – 131 555 Wollongong City Council – 4227 7111 The Ministry of Health – 4221 6700 (After hours: 02 4222 5000 - ask for Public Health Officer on call) WorkCover Authority – 13 10 50 Fire and Rescue NSW – 000 Is incident causing or threatening material harm? NO Notification to authorities is not required. Notify all information known about incident. Contact and notify any persons as requested by the NSW EPA. Does incident pose threat to neighbouring properties? YES Chief or Area Wardens liaises with emergency services and communicates details of the incident to neighbouring properties that may be affected NO Provide written notification to all of the above regulatory authorities within 7 days of the incident (information to be included is provided in the EPL). Develop and implement a follow up action plan in consultation with relevant regulatory authorities. Page 5 of 5 Attachment 5: Notification of a Pollution Incident during Transport of Waste PROCEDURE NO: 4 NO OF PAGES: 10 PREPARED BY: SUBJECT: DATE: ISSUE NO.: 11/01/16 A NOTIFICATION OF A POLLUTION INCIDENT DURING TRANSPORT OF WASTE 1. PURPOSE The purpose of this procedure is to give clear instructions regarding who to notify during a pollution incident that occurs during the transport of waste and is assessed as presenting a material risk of harm to the environment. 2. METHOD A flowchart is provided on the following this procedure. First Point of Contact (Driver): 3. An event occurs during the transport of waste which you believe presents an immediate threat to human health or property. Call 000; Call the site contact/s Provide the following details: ► Location of incident – Name of road / suburb; ► Time incident occurred; ► Vehicle Registration details; ► Type of waste being transported; and ► Brief description of incident including whether any other vehicles were involved, extent of spill. Rick Jones Kym Doyle Elton Johns 0412 998 121 0410 471 739 0422 587 271 Note: “material risk of harm to the environment” needs to be notified if: It involves potential harm to the health or safety of human-beings or ecosystems that is not trivial; or It results in loss of property damage exceeding $10,000; Loss includes costs incurred in taking all reasonable measures to prevent or mitigate harm to the environment. 4. If there is no immediate threat to human health or property, follow the relevant internal emergency procedure. Page 1 of 11 Chief Warden or Deputy Chief Warden: 4. Upon receipt of call from driver, note down the information provided by the driver including the date. 5. If the event is causing or threatening material harm to the environment, the Chief Warden or Deputy Chief Warden shall contact the regulatory authorities in the following order: NSW EPA – 131 555 Local Council The Ministry of Health WorkCover Authority – 13 10 50 Fire and Rescue NSW – 000 Page 2 of 11 State Map: Page 3 of 11 Illawarra Region: ILLAWARRA Council Contact The Council of the Municipality of Kiama Shoalhaven City Council Shellharbour City Council Wingecarribee Shire Council Wollongong City Council 02 4232 0444 02 4429 3111 02 4221 6111 02 4868 0888 02 4227 7111 Page 4 of 11 Sydney Surrounds Region: SYDNEY SURROUNDS Council Contact Blue Mountains City Council 02 4780 5000 Gosford City Council 02 4325 8222 Hawkesbury City Council 02 4560 4444 Wollondilly Shire Council 02 4677 1100 Wyong Shire Council 02 4350 5555 Page 5 of 11 Outer Sydney Region: OUTER SYDNEY Council Contact Auburn City Council 02 9735 1222 Bankstown City Council 02 9707 9999 Blacktown City Council 02 9839 6000 Camden Council 02 4654 7777 Campbelltown City Council 02 4645 4000 Fairfield City Council 02 9725 0222 Holroyd City Council 02 9840 9840 Ku-ring-gai Council 02 9424 0888 Liverpool City Council 02 9821 9222 Parramatta City Council 02 9806 5050 Penrith City Council 02 4732 7777 Pittwater Council 02 9970 1111 Ryde City Council 02 9952 8222 Sutherland Shire Council 02 9710 0333 The Council of the Shire of Hornsby 02 9847 6666 The Hills Shire Council 02 9843 0555 Warringah Council 02 9942 2111 Page 6 of 11 Inner Sydney Region: INNER SYDNEY Council Contact Ashfield Council 02 9716 1800 Burwood Council 02 9911 9911 Canterbury City Council 02 9789 9300 City of Canada Bay Council 02 9911 6555 Council of the City of Sydney 02 9265 9333 Hurstville City Council 02 9330 6222 Kogarah City Council 02 9330 9400 Lane Cove Municipal Council 02 9911 3555 Leichhardt Municipal Council 02 9367 9222 Manly Council 02 9976 1500 Marrickville Council 02 9335 2222 Mosman Municipal Council 02 9978 4000 North Sydney Council 02 9936 8100 Randwick City Council 02 9399 0999 Rockdale City Council 02 9562 1666 Strathfield Municipal Council 02 9748 9999 The Council of the City of Botany Bay 02 9366 3666 The Council of the Municipality of Hunters Hill 02 9879 9400 Ashfield Council 02 9716 1800 Burwood Council 02 9911 9911 Canterbury City Council 02 9789 9300 Page 7 of 11 To determine the relevant Public Area Health Unit: Ministry of Heath - Public Health Units (PHU) Public Health Unit Hornsby Office (North Sydney) Randwick Office (Inner Sydney) Wollongong Office (Illawarra) Contact After Hours Contact 02 9477 9400 Ph: 02 9477 9123 (Hornsby Hospital) - ask for Public Health Officer on call 02 9382 8333 Ph: 02 9382 2222 (Prince of Wales Hospital) - ask for Public Health Nurse on call 02 4221 6700 Ph: 02 4222 5000 (Wollongong Hospital) - ask for Public Health Officer on call 02 9515 9420 Ph: 02 9515 6111 (Royal Prince Alfred Hospital) - ask Public Health Officer on call 02 4734 2022 Ph: 02 9845 5555 (Westmead Hospital) - ask for Public Health Officer on call 02 9840 3603 Ph: 02 9845 5555 (Westmead Hospital) - ask for Public Health Officer on call Eastern (Sydney) Zone(Camperdown Office) For Liverpool Area, please dial the Camperdown office. Penrith Office (Western Sydney) Parramatta Office (Outer Sydney) Source: www.health.nsw.gov.au/publichealth/infectious/phus.asp 6. Notify any persons as requested by the NSW EPA. 7. What to Notify your full name, address and telephone contact details; date, time and duration of the incident; the type of pollutant or a description of the incident; discharge or emission location of the incident; the extent or size of the area where the pollution is occurring; and anything else that is relevant to the incident. Page 8 of 11 Notifying Neighbouring Properties: The Chief Warden in consultation with the Site’s ECO and Emergency Services shall be responsible for notifying neighbouring properties that are potentially affected by the incident. This group needs to assess the situation and undertake the following course of action as soon as practicable: 1. Verify the exact location the incident occurred; 2. Determine the location of any neighbouring premises likely to be affected. Online maps and aerial photographs such as google earth can be used to locate the nearest receptors. It should be noted whether these receptors are residential, industrial, rural etc. and need to include sensitive receptors such as schools, child care centres and public recreation areas; 3. Decide on how these premises will be contacted –the nature and extent of the incident and the number of receptors that need to be informed needs to be considered. For industrial or commercial premises, contact details should be easily obtained. Door knocking or letter box drops may be used for residential premises. Announcements in the media (local radio or television station) is another method of communication. 4. Assign a responsible person to be a community contact who can provide updates on the situation and other relevant information about the incident. 5. Determine what information is to be provided. An example includes: Date and time of the incident; Brief description of the incident including nature and extent of the spill; Information regarding the waste being transported / spilled; What is being done about the incident; Potential effects of the pollutant/s released during the incident and potential effected area; What they can do to protect themselves; and A contact number to enable receptors to call for updates on the situation. 6. Determine those who will be responsible for communicating with the neighbouring properties and undertake the notification in consultation with Emergency Services. 7. Record the details of all of the above and file. Page 9 of 11 3. WRITTEN REPORT A written incident report will be prepared and provided to all of the above regulatory authorities within 7 days of the incident. Refer to the Site Environment Protection Licence (EPL) for information required to be included in the report. Develop and implement a follow up action plan in consultation with relevant regulatory authorities. Page 10 of 11 FLOWCHART: NOTIFICATION OF A POLLUTION INCIDENT Pollution incident occurs YES Does the incident pose an immediate threat to human health or property? Follow relevant internal procedure. Call Site Contact: Chief Warden RICK JONES Call 000 0412 998121 Chief Warden to determine location of incident and relevant local council / ministry of health using procedure above. Call relevant regulatory authorities immediately in the following order: NO YES NSW EPA – 131 555 Local Council The Ministry of Health WorkCover Authority – 13 10 50 Fire and Rescue NSW – 000 Is incident causing or threatening material harm? NO Notification to authorities is not required. Notify all information known about incident. Contact and notify any persons as requested by the NSW EPA. Does incident pose threat to neighbouring properties? YES Chief or Area Wardens liaises with emergency services and communicates details of the incident to neighbouring properties that may be affected NO Provide written notification to all of the above regulatory authorities within 7 days of the incident (information to be included is provided in the EPL). Develop and implement a follow up action plan in consultation with relevant regulatory authorities. Page 11 of 11 Attachment 6: Emergency Drill Procedure and Log PROCEDURE NO: 5 NO OF PAGES: 4 PREPARED BY: SUBJECT: DATE: ISSUE NO.: 11/01/16 A EMERGENCY AND POLLUTION RESPONSE DRILLS 1. PURPOSE The purpose of this procedure is to give clear instructions regarding how to undertake emergency and pollution response drills 2. METHOD A drill should include/assess the following: 1. Regular checks to ensure alarms - such as smoke alarms - are working. 2. Identifying where employees/contractors should gather after evacuation. 3. Regular checks to ensure escape routes are clear of obstruction. 4. Appointing a safety warden to take a role call or register to ensure all employees/contractors are safe. 5. Ensuring safety equipment is in a sensible and easily accessible location, must be in working order. 6. Making sure you have the correct containment equipment and clearly labelled for chemical spills. Drill coordinator: Rick Jones Safety Wardens: Kym Doyle, Elton Johns Scenario (Examples): Fire in the Compaction Bin Spillage in delivery area Spillage in building Page 1 of 4 3. PROCEDURE 1. (Drill Coordinator) Sound warning alarm (air horn) 2. (Safety Wardens/Drill Coordinator) Assess situation, judgement call on whether evacuation is necessary as well as whether or not to contact emergency services 3. (Safety Wardens/Drill Coordinator) Sound evacuation alarm 4. (Safety Wardens) Instruct all employees/contractors to evacuate via emergency exits and assemble at the assembly point (See Site Map) 5. (Safety Wardens) Final sweep and isolate premises only if safe to do so 6. (Safety Wardens) Role call at assembly point to make sure all employees/contractors are accounted for (See Role in Emergency Response Procedures – Attachment 2) 7. (Safety Wardens/Drill Coordinator) Judgement call on whether or not it is safe to recommence normal site operations 8. (Safety Wardens/Drill Coordinator) facilitate a “Toolbox Meeting” to discuss the positive and negative aspects of the drill as well as possible improvements 9. (Safety Wardens/Drill Coordinator) Record all drill information in the “Drill Log” 4. DOCUMENTATION It is important to document everything regarding your safety drills as it will aid WHS program training, help identify areas that might need further practice and to help identify maintenance issues, particularly with safety equipment. (See drill log & drill debrief overleaf). Page 2 of 4 Redlam Waste Services Drill Debrief Questions Notes Discuss what went well during the drill and why? Discuss what could have been done better and why? Look at records of previous drills to see if you’re doing things better, are there any repeat mistakes? Discuss? Page 3 of 4 Questions Notes Employee Comments or Concerns? (Make sure everyone gets chance to speak and that their opinion is valued and respected) No. Amendment Procedure of Amendment Amendment completion date Amended by Signature 1 2 3 4 “Make sure everyone understands that it’s better to make a mistake in a drill than in a real emergency” “Make sure the records are kept and made while things are still fresh in your mind” Page 4 of 4 Attachment 7: Excerpt from HB76: 2010 Dangerous Goods – Initial Emergency Response Guide
© Copyright 2026 Paperzz