Charter Township of Orion Building Department 2525 Joslyn Rd., Lake Orion, MI 48360 Phone (248) 391-0304, ext. 6000 [email protected] Permit Application for Part 91 Sedimentation Control RESIDENTIAL 1. APPLICANT Name Landowner Designated Agent Address City State Zip Code Telephone Number Email 2. LOCATION Address City Subdivision Lot No. 3. PROPOSED EARTH CHANGE County Project Type: Residential Multi-Family Size of Earth Change (acres/square feet) Describe Project Name of and Distance to Nearest Lake, Stream, or Drain Tax ID Number Date Project to Start Date Project to be Completed 4. SOIL EROSION AND SEDIMENTATION CONTROL PLAN (Refer to Rule 323.1703) NOTE: Include two (2) plot plans with application Estimated Cost of Erosion and Sediment Control $____________ 5. PARTIES RESPONSIBLE FOR EARTH CHANGE Name of Landowner (if not provided in Box No. 1 above) City State Address Zip Code Telephone Number I (we) affirm that the above information is accurate and that I (we) will conduct the above described earth change in accordance with Part 91, Soil Erosion and Sedimentation Control, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended, applicable local ordinances, and the documents accompanying this application. Landowner's Signature Print Name Date Designated Agent's Signature* Print Name Date *Designated agent must have a written statement from landowner authorizing him/her to secure a permit in the landowner's name. OFFICE USE ONLY Permit Number_________________ Date Issued______________ Expiration Date________________ Inspector_______________________________Approved_________ Denied________ Date_________ Permit Application Sedimentation Control Residential 4.20.2017 The following is required to be submitted with the completed application: Site plan showing the following: 1) Map with scale: 1" = 200' or less, or indication of exact distances between noted features on site plan 2) Legal description of property (town, range, section, quarter-quarter section) 3) Proximity of any proposed earth change to lakes and/or streams 4) Predominant land features 5) Slope description or contour intervals 6) Soils survey or written description of the soil types of the proposed exposed land area 7) Description and location of the physical limits of each proposed earth change 8) Description and location of all existing and proposed on-site drainage and dewatering facilities 9) Timing and sequence of each proposed earth change 10) Location and description for installing and removing all temporary SESC measures 11) Description and location of all proposed permanent SESC measures 12) Maintenance program for all permanent SESC measures and designation of person responsible for maintenance Answer "Yes" or "No" to the following questions Will a septic field be installed? Will a basement be excavated? Will excavation be limited to 42" deep footings? Will any material be removed from the site? Will any "fill" material be brought onto the site? Will excavated material be used for backfilling around house only? Will the entire lot be graded? Annual on-site review and inspections escrow fee If the total development lot, parcel, or site acreage is: Less than 1 Acre and at least 100 feet from wetlands as defined in Ord. 139 Less than 1 Acre and within 100 feet of a wetlands as defined in Ord. 139 More than 1 Acre and at least 100 feet from wetlands defined in Ord. 139 Plus $50.00 for each added acre or portion there of. More than 1 Acre and within 100 fee of a wetlands as defined in Ord. 139 Plus $50.00 for each added acre or portion there of. $200.00 $400.00 $200.00+ $400.00 TOTAL Acreage:__________________ Total Escrow Fee: $___________________ Return balance on inspection escrow to: Property Owner Designated Agent* * Letter of Authorization from Property Owner must be submitted to return escrow balance to Designated Agent Permit Fee: $100.00 Inspection Schedule Fees Initial Inspection - No Charge Regular Scheduled Inspections - $40.00 (every 30-60 days until site is stabilized with permanent vegetation. Permit Expiration Permit will expire one (1) year from date of issue. Projects not completed or substantially underway within that year may be renewed for additional year, for an additional annual on-site review and inspection fee, as calculated above, and permit fee. Soil erosion and sedimentation control measures must be implemented and inspected prior to beginning any project. Contact Tim London at 248-391-0304 ext. 6007 to schedule your initial inspection. Soil Erosion and Sedimentation Control Application 3.9.2017 Charter Township of Orion Building Department 2525 Joslyn Rd., Lake Orion, MI 48360 Phone (248) 391-0304 ext. 6000 [email protected] Letter of Authorization Effective immediately, Part 91 requires each designated agent applying for a Soil Erosion Permit on behalf of another person to include a statement authorizing him/her to secure the permit. Please have the landowner complete this Letter of Authorization to be submitted with the application. ___________________________is authorized to secure a Soil Erosion Permit in my name for a (Name of Designated Agent) project requiring said permit at: ________________________________________________________ (Address of Project Location) _______________________________ (Print Name of Landowner) _______________________________ (Signature of Landowner) _______________________________ (Date) Soil Erosion Letter of Authorization 3.2.2017
© Copyright 2026 Paperzz