Alterna ative Source e of Water S Supply Provi ider

ADDE
ENDUM NO. 1
Requ
uest for Prop
posals – RFP
P No. 2011-055
Alternaative Sourcee of Water S
Supply Proviider
Due: Auugust 31, 2011 at 2:00 p.m
m. Mountain Tiime
The fo
ollowing item
ms provide additional information and cclarification fo
or the Request for Proposal (RFP No. 2011‐05
5) for Alternaative Source of Water Suupply Provideer, and made part of th
his Reque
est for Propo
osal, by issuaance of this Addendum. A
All other req
quirements, cconditions an
nd stipulations in the Request for P
Proposal remain in force.
In the
e RFP 2011‐05
5, Section 3.1 the pre‐prop
posal meetinggs were to bee held on August 11 and 12
2, 2011. However, due to scheduling conflicts,, the pre‐propposal meetinggs will be held
d August 16‐
19, 20
011. Furthermore the fiinal date to submit Requessts for Clarificcation will bee August 24, 2
2011 with thee Final A
Addenda to b
be issued by A
August 26, 20
011. Each Respondent is required to t acknowled
dge receipt oof this Adden
ndum by his//her signaturre affixed hereto and to file with aand attached to their Requuest for Propo
osal submittaal. H
Heather Beassley W
Water Resources Engineerr ********************************************* ***************
The u
undersigned aacknowledgess receipt of th
his Addendum
m and the RFFP submitted herewith is in accordance with th
he informatio
on, instruction
n and stipulattions set forth
h herein. _____
___________
________ ___________________________________________ Date Responddent Name ___________________________________________ Signatur e of Respond
dent Represen
ntative ___________________________________________ Print Nam
me of Respon
ndent Repressentative ___________________________________________ Title ADDE
ENDUM NO. 2
Requ
uest for Prop
posals – RFP
P No. 2011-055
Alternaative Sourcee of Water S
Supply Proviider
Due: Auugust 31, 2011 at 2:00 p.m
m. Mountain Tiime
ollowing item
ms provide additional information and cclarification fo
or the Request for Proposal The fo
(RFP No. 2011‐05
5) for Alternaative Source of Water Suupply Provideer, and made part of th
his Reque
est for Propo
osal, by issuaance of this Addendum. A
All other req
quirements, cconditions an
nd stipulations in the Request for P
Proposal remain in force.
1. Castle Rock owns 1.4 M
MGD of capaciity in ECCV’s nnorthern pipeeline. 2. Currently, the type of w
water allowed
d to be storedd in Rueter‐Heess Reservoirr (RHR) is limited to Non‐Tributarry Groundwatter and reusaable effluent. There is an eeffort underway to lift that re
estriction. For the purposees of this RFP,, please assum
me that any type of waater may be sttored at any ttime during t he year in RH
HR. Castle Ro
ock owns 8,00
00 acre‐feet o
of storage in R
RHR. 3. The anticip
pated minimu
um pressure iin the Westerrn Line at thee E‐470 and Chambers connection
n is 80‐130 pssi and the antticipated maxximum pressu
ure is 210 psi.. The elevation o
of the Westerrn Pipeline att the E‐470 annd Chambers connection is approximaately 5,800 ft.. 4. Copies of aall project pro
oposals will be distributed to the Town Council mem
mbers and members o
of the Utilitie
es Commission prior to thee presentation
ns scheduled for September 14th. However, the Coun
ncil and Comm
mission will n
not be furnish
hed a detailed
d staff analyysis of the pro
oposals. 5. Below are changes to th
he schedule listed in Sectioon 3.1 of the RFP: ed Milestone RFP Schedulle Anticipate
Proposal SSubmittal Date Septem
mber 7, 2011
First Prese
entation to To
own Council // Utilities Com
mmission Second Pre
esentation to
o Town Counccil / Utilities CCommission Septem
mber 14, 2011 Mid‐Octtober (TBD) Each Respondent is required to t acknowled
dge receipt oof this Adden
ndum by his//her signaturre affixed hereto and to file with aand attached to their Requuest for Propo
osal submittaal. H
Heather Beassley W
Water Resources Engineerr ***************
********************************************* The u
undersigned aacknowledgess receipt of th
his Addendum
m and the RFFP submitted herewith is in accordance with th
he informatio
on, instruction
n and stipulattions set forth
h herein. _____
___________
________ ___________________________________________ Date Responddent Name ___________________________________________ Signatur e of Respond
dent Represen
ntative ___________________________________________ Print Nam
me of Respon
ndent Repressentative ___________________________________________ Title