ELECTRONIC FILING for EARTH STATION (Art 9 & 11) Info Two steps to be followed Coordination • Submission of Appendix 4 data to affected ADM’s Notification • Submission of Appendix 4 data to BR 3 Why you need this exercise? •No. 9.29: Requests for coordination under 9.15 to 9.19 shall be sent by the requesting administration to the identified administrations, together with the appropriate information listed in Appendix 4 to the Radio Regulations Which BR program is for this capturing? •AP7 Capture_v7 Exercise only to draw Coordination diagrams - It is not complete data for Coordination Request - •Space Capture V7 (SpaceCap) - SpaceCap creates complete set of database - When coordination is completed, the same file can be converted to a notification notice to be submitted to the Bureau 5 Exercise 1 AP7 Capture_v7 Trinidad_ES_AP7Capture.MDB (id 1,2) in your workshop CD Sample Parameters Trinidad_ES_AP7Capture.MDB (id 1,2) in your workshop CD • Trinidad ES (TRD, 61W.30’50”, 10N.40’13”) • Assoc Satellite : INTELSAT8 304.5E (55.5W) • Beams: HL (Uplink & Downlink) • Frequency & Antenna Gain: • Up-6635-6665MHz, 45 dBi, 17.5dB,-52.5 dB/Hz • Down-3645 -3675MHz, 40 dBi,NoiseT: 100 ⁰ K • Horizon elevation angle (A7a) = 0 degree for all azimuths (ex: azimuth 0/90/180/270) • Antenna radiation pattern (B5c) = REC-580-6 • Class of Station : TC (Fixed Satellite Service) Check Associated Satellite: INTELSAT8 304.5E Check Service area as follows in GIMS Up link beam: HL Down link beam: HL Common Receivability Issues • Associated space station must already be notified • Provide the correct name used in BR databases • Frequencies of S/S should match INTELSAT8 304.5E … 3645.00000 .. 6665.00000 … • Beam names of E/S should match those of the S/S in the opposite direction 9 AP7 Capture Tool – New Input 1 0 AP7 Capture Tool – New Input Earth Station Parameters 11 AP7 Capture Tool – New Input (Grp_id: 1, 0 deg Ele) 12 AP7 Capture Tool – New Input (Grp_id: 2, actual Ele) 13 GIBC/ AP 7- Input Database Database file locationTools/ Options page Use the browse button to select : • the srs.mdb from the latest BR-IFIC ( in the DVD drive) for normal case • a different input database file (for AP7) Select the Tools & Options tab Check the SRS database file location Select the input file (ex: BAH_Nassau_ES.MDB) 14 How to Proceed? • Select the Appendix 7 tab • Enter ES Network ID • Press Calculate Check Progress of Calculation Select type of messages : Warning\Error\Progress Results in MS–Access file Each calculation in a separate file Results Directory: C:\BR_TEX_RESULTS\APP7 Naming convention: NetworkId_Date_Time.mdb Select the Appendix 7 tab Enter the Network Id of the earth station (test case 1 from BAH_Nassau_ES.mdb) Press Calculate SRS SRS Appendix 7 Calculation ESCC 15 ESCC Report Generation After an Appendix 7 calculation… Just Press the Report button Note! Ap7print.rtf Ap7Print.RTF is rewritten each time!!! If the file is locked you will get an error message. Generate report 16 Ap7Print.RTF Document Graphics: Contains diagrams displaying: o Title o Details o Coordination Contours Main Mode I and II Auxiliary Contours o Country codes o Legend Edits the Ap7Print.RTF file in the C:\br_tex_results\ap7 folder 17 o Coordination distances at 72 azimuths o (0-355degrees at 5 deg steps) o Details of the calculation o Intermediate data o List of affected countries Print the Report Document G/ 18 Auxiliary Mode 1 : Reduced required loss expressed in dB Auxiliary Mode 2 : Angular offset between beams expressed in degrees How to produce auxiliary contours? Press Auxiliary Contours button Enter the values in the list Mode 1 (dB) (negative values) Mode 2 (deg) Perform the Calculation To add Mode 1 aux contours press the Auxiliary Contours button. Add Mode 1 Contours (-5, -10, -20dB) Add Mode 2 Contours (1.5, 3, 5 Deg) Perform Calculation Perform Report Generation 19 Ap7Print.RTF Document Edits the Ap7Print.RTF file in the C:\br_tex_results\ap7 folder 20 Compare Results Horizon Ele. Angles (Tx) – Exercise E/S Zero-degree horizon elevation angles PROBABLY AFFECTED COUNTRIES: GRD VEN Non-zero-degree (Actual angle from 0⁰ to 12 ⁰) PROBABLY AFFECTED COUNTRIES: VEN 21 Compare Results Horizon Ele. Angles (Rx) – Exercise E/S Zero-degree horizon elevation angles PROBABLY AFFECTED COUNTRIES: ATG HOL/BES BRB HOL/CUW DMA F/GLP GRD GUY KNA LCA F/MRT G/MSR SUR VCT VEN Non-zero-degree (Actual angle from 0⁰ to 12 ⁰) PROBABLY AFFECTED COUNTRIES: BRB GRD GUY LCA VCT VEN 22 Exercise 2 to send to ADM (for coordination) & BR (for notification) SpaceCap Trinidad_ES_SpaceCap.MDB (id 3,4) in your workshop CD Request for Notification of an Earth station– Radio Regulations • Section I of Article 11 : Notification • 11.2 : • Any frequency assignment to a transmitting station and to its associated receiving stations shall be notified to the Bureau • After the completion of the coordination procedure with the concerned Administrations under 9.17 24 Guidance for Notification Earth station • Use SpaceCap to update the status of coordination with neighboring Administations • Please Validate the E/S.MDB file before sending to Bureau for the notification • Correct or Modify data if you have any fatal error in the report of Space Validation software Validation of AP4/III database SAM / SpaceVal SpaceVal 1. Open Input Database (MS Access) 2. Select Network (ID) 3. Start Validate 4. Check Validation Report Fatal Errors in Sample ES (by AP7 Capture) Common Errors (in Notification data) • Space station name/beam name/ frequency band not covered • Missing horizon elevation angle • Missing minimum angle of elevation • Missing coordination area diagram • Missing antenna diameters when required • Missing antenna radiation patterns • Missing coordination agreements • Notification (No. 11.2) • Antenna Operation • Minimum elevation angle (A7b1) = 30⁰ • Altitude (A7d) = 20m, GSO Az Angle(A7c)=150-160 ⁰ • Beamwidth (B5b) = 1.0⁰(uplink), 1.6 ⁰(downlink) • General/Common Characteristics for all groups • Data brining into use (A2a) = 01.09.2015 • Operating ADM/Agency (A3a, A3b), Polarization • Beamwidth (C3a) =10MHz, Special Sections (A13) • Carrier Characteristics:10M0G7W, Up link PWR: 17.5 dBw • Operating Agency, Publication Info for Satellite network • Coordination obtained (A5/A6 ) = 9.17│O│neighbor ADMs Correction or New file (SpaceCap) SAM / SpaceCap Edit 2 New 33 34 35 36 37 Group level 38 Group level 39 Group level 40 Re-Validation Report (No fatal errors) Submission to Bureau • Create a zip file ADM_ESName.zip containing • ESName.mdb (change to .itu) • Coordination contour diagrams generated using AP7 software • Any other attachments or notes in Word or PDF format • Rename the zip file to ADM_ESName.itu • Send email with attachment ADM_ESName.zip to [email protected] • Send confirmation telefax to BR at +41 22 730 5785 within seven days from the email submission 42 Questions? Software: [email protected] Submission: [email protected] 43
© Copyright 2026 Paperzz