N G o dfrey P arkw ay MPRB 46th S t E C oun ty

46th Ave S
(Godfrey Parkway - 46th St E) - 30% Layout - March 16th, 2016
46th St E County
2
6
6
2
6
5
8
6
9
6
existing parking to remain (9 spots)
NB travel
10
BLVD
10
BLVD
added bike lane
Preserve Existing Mature Trees
7
11
parking
bike lane
SB travel
10
10
7
11
sidewalk
boulevard
BLVD
MPRB
widened boulevard with street trees
existing bus stop to remain
BLVD
Godfrey Parkway
coordinate potential
pedestrian ramp upgrade
with MPRB
bike lane
parking removed on eastern curb line
to accomodate new bike lane
coordinate removal of slip
turn with future signal or
46th St E project
coordinate matching
of existing curb line
with MPRB
North
Summary:
•
•
•
•
•
Complete reconstruction of a 1 block segment of 46th Ave S (anticipated 2017 construction)
Existing street is in disrepair; portions of the curbs and street surface have significantly deteriorated
46th Ave S and 46th St E are in the City’s Bike Master Plan as future bikeways; this one block segment
of 46th Ave S is a major gap in the network. Bike lanes in this segment would connect directly to a
regional trail (Godfrey Parkway Trail - part of Grand Rounds)
Parking removed on one side to accomodate bike lanes
Existing mature oak trees will be preserved
Left: Condition of existing
curbs and street surface
Contact: Forrest Hardy
[email protected]
(612) 673-5951
46th Ave S
46th Ave S
(Godfrey Pkwy - 46th St E)
30% Sample Section
N
46th St E (County)
March 16th, 2016
project limit
lvd
aB
sample
section
G
y
fre
d
o
w
Pk
y(
h
ada
aw
N
kw
)
PRB
M
(
y
Go
df
yP
re
to Wabun Picnic Area
& Veterans Home
Above: Project Context
Sidewalk
2
6
6
Park
8
Bike
6
Drive
Drive
10
10
66’ r.o.w. (not to scale)
Bike
7
B)
R
MP
Existing bike/pedestrian path
Open Space
11
41’ street width
Contact: Forrest Hardy
[email protected]
(612) 673-5951