46th Ave S (Godfrey Parkway - 46th St E) - 30% Layout - March 16th, 2016 46th St E County 2 6 6 2 6 5 8 6 9 6 existing parking to remain (9 spots) NB travel 10 BLVD 10 BLVD added bike lane Preserve Existing Mature Trees 7 11 parking bike lane SB travel 10 10 7 11 sidewalk boulevard BLVD MPRB widened boulevard with street trees existing bus stop to remain BLVD Godfrey Parkway coordinate potential pedestrian ramp upgrade with MPRB bike lane parking removed on eastern curb line to accomodate new bike lane coordinate removal of slip turn with future signal or 46th St E project coordinate matching of existing curb line with MPRB North Summary: • • • • • Complete reconstruction of a 1 block segment of 46th Ave S (anticipated 2017 construction) Existing street is in disrepair; portions of the curbs and street surface have significantly deteriorated 46th Ave S and 46th St E are in the City’s Bike Master Plan as future bikeways; this one block segment of 46th Ave S is a major gap in the network. Bike lanes in this segment would connect directly to a regional trail (Godfrey Parkway Trail - part of Grand Rounds) Parking removed on one side to accomodate bike lanes Existing mature oak trees will be preserved Left: Condition of existing curbs and street surface Contact: Forrest Hardy [email protected] (612) 673-5951 46th Ave S 46th Ave S (Godfrey Pkwy - 46th St E) 30% Sample Section N 46th St E (County) March 16th, 2016 project limit lvd aB sample section G y fre d o w Pk y( h ada aw N kw ) PRB M ( y Go df yP re to Wabun Picnic Area & Veterans Home Above: Project Context Sidewalk 2 6 6 Park 8 Bike 6 Drive Drive 10 10 66’ r.o.w. (not to scale) Bike 7 B) R MP Existing bike/pedestrian path Open Space 11 41’ street width Contact: Forrest Hardy [email protected] (612) 673-5951
© Copyright 2026 Paperzz