Major Customer Connections > 5 MW Export Embedded Generation Application to Connect Form For the connection of embedded generating units exporting > 5 MW) Privacy Notice Ergon Energy is collecting information on this form for the purpose of assessing the Connection Enquiry. This may include the collection of your personal information. Your personal information will not be disclosed to any external third parties without your consent, unless authorised or required by law. If you wish to apply for access to this information, or make a privacy complaint, you may contact the Privacy Officer on 13 10 46 Ergon Energy’s privacy policy may be viewed at or [email protected]. ergon.com.au. If you have provided personal information of another individual, please ensure that you advise the person about this privacy statement. When completed, please email this Application to Connect form to [email protected] For information about the embedded generation connection process, please see the Embedded Generation Information Pack, which can be found at www.ergon.com.au Major Customer Connection Enquiry Please complete as many sections as possible. Relevant sections will depend on the nature of your particular project Customer Business Details (this will be the entity that enters into relevant contracts to establish and maintain a connection to Ergon Energy’s distribution network) Company Name (as per ASIC registration) ACN ABN Email Address (we will use email as the preferred method of contact unless otherwise advised) Website Address Postal Address SECTION A Phone Number 1 Phone Number 2 Fax Number Other information about company (e.g. joint venture, manager/agent arrangements/authority) The applicant listed above acknowledges and agrees that Ergon Energy may concurrently process competing enquiries, as described on page 9 of this Embedded Generation Application to Connect Form, which may impact on the physical, technical or financial arrangements required to connect the applicant’s project to the Ergon Energy network. To facilitate transparency and assist applicants, the applicant listed above agrees that Ergon Energy may disclose to third parties the applicant’s: capacity requirements, general project location, and relevant submission dates in the connection process. If the applicant does not consent to this disclosure, please tick this box: The applicant listed above also acknowledges and agrees that information submitted as part of this Embedded Generation Application to Connect Form may be released to contractors, sub-contractors or consultants of Ergon Energy (subject to confidentiality requirements) for the purposes of managing the Application to Connect on Ergon Energy's behalf, and submission of this Embedded Generation Application to Connect Form is deemed to be consent to such release. This Embedded Generation Application to Connect Form is hereby submitted to Ergon Energy by an authorised representative of the applicant listed above. Signed Business Representative Details Position (Note that you can also nominate an authorised agent on page 3) Name SECTION B Date Role/Title Email Address (we will use email as the preferred method of contact unless otherwise advised) Postal Address Phone Number 1 Version 3 March 2017 Phone Number 2 Fax Number 2 Consultant Details Company or Business (Trading) name (as per ASIC or ABN registration, as relevant) Major Customer Connection Enquiry Website SECTION C Consultant’s Name Email Address (we will use email as the preferred method of contact unless otherwise advised) ABN Postal Address Role Title Phone Number 1 Phone Number 2 Fax Number Authorised Agent (if you complete this section and nominate an authorised agent, we will only transact with this agent and not any business representative listed on page 2) As Ergon Energy will only transact with an authorised agent, please arrange for the applicant to sign section A and this section to grant authority for the consultant to act on their behalf. I/we authorise to act on our behalf in relation to this project. Any information or advice provided by my/our authorised agent may be relied upon by Ergon Energy as if it were information or advice provided by the entity listed in section A. Signed Position Date Invoicing Details SECTION D Business Address (as above) Business Representative Address Company Name Other (enter details below) (as above) ABN / ACN Postal Address Phone Number 1 Version 3 March 2017 Phone Number 2 Fax Number 3 Your embedded generation Application to Connect Section E (below) assists us to process your application efficiently and ensure compliance with the relevant National Electricity Rules (NER), applicable to the size and type of the connection. Major Customer Connection Enquiry For embedded generation enquiries less than 30 kVA, please refer to the New Connections & Alterations page on our website, or contact the Solar Support Team, who are available to answer questions on connecting a micro embedded generating unit, on 1300 553 924 or email: [email protected] Proposed Generation Connection Exporting Embedded Generation SECTION E > 30 kW to 5,000 kW Embedded Generators (Export) - New or Alteration to an existing Generator Connection This applies to embedded generator connections that would typically follow the connection process regulated by Chapter 5A of the National Electricity Rules (NER), but the proponent chooses to be processed under Rule 5.3A of the NER. > 5,000 kW Embedded Generators (Export) - New or Alteration to an existing Generator Connection This applies to embedded generator connections that will follow the connection process regulated by Chapter 5.3A of the NER, who either intend to register with AEMO as a Generator, or who are required to required to apply for exemption from this requirement. AEMO Registration Registration Categories (please tick any/all that apply) (for information on registration requirements, refer to www.aemo.com.au) (for information on registration categories, refer to www.aemo.com.au). Market (or intending to register as a Market Generator) Exempt Intending to apply for Exemption Non-Market (or intending to register as a Non- Market Registered Intending to apply for Registration Non Scheduled Semi Scheduled (or intending to register as Semi -Scheduled) Scheduled (or intending to register as Scheduled) PROJECT DETAILS Project/Site Details Project/Site Name Site Address Site Location (GPS) SECTION F Latitude: National Metering Identifier (NMI) Longitude: Google Earth Pin Attachment, files or spatial data may also be sufficient. If no, please provide name of registered owner: Is there existing generation on site? (i.e. existing PV / Solar installation, diesel generator (export or non-export). Yes YesNo No Export No Export If YES, please provide details below: Type of Generation Unit(s) (i.e. IES, Rotating Machine) Size of Existing Unit _______ kW Total Authorised Size of Existing Unit _______ kW Total Site Capacity (inc all Embedded Generation) ___________ kW Version 3 March 2017 4 SECTION F cont.. Project/Site Details Cont.. Registered Owner Major Customer Connection Enquiry Is the Applicant the Registered Owner of the property? Yes No Additional Details on Location (i.e. restrictions, cultural heritage etc.) Registered Plan Number and/or Lease No. Project Timing SECTION G Requested Connection Date: If capacity requirements are to change over time, please provide indicative timeframes below: (e.g. 5 MW in YYYY, 10 MVA in YYYY etc.) Generator Plant Details Qualitative description of the objectives / purpose of the Project proposed: Generating Unit Description (i.e. type, make, model): Energy Production (estimated energy production kW per Please attach relevant product data sheets annum) SECTION H ______________kWh per annum Maximum Power Generation / Output: ______________kW Details of Protection System (i.e. model, compliance details of components of protection system - to compliment the SLD provided) Type of Metering Required Metering Mode: Peak Loading Continual Operation Seasonal High Voltage Metering Low Voltage Metering Operating Hours (i.e. 24hrs/7 days per week operation) Version 3 March 2017 5 Generator Plant Details Cont... SECTION I Generator Technology: (synchronous generating unit, induction generator, PV) Major Customer Connection Enquiry Details of Disturbing Loads applicable to Rotating Machines—please specify kW or kVA (Additional information including nature of power electronic plant which may produce harmonic distortion, e.g. harmonics, large motors, welders, thyristor drives, draglines.) Load Type: Component Size: Duty Cycle: Load Type: Component Size: Duty Cycle: Load Type: Component Size: Duty Cycle: Load Type: Component Size: Duty Cycle Additional Information: (including nature of power electronic plant which may produce harmonic distortion) Other Connection Information SECTION J Type of Metering Required Anticipated Power Factor High Voltage Metering Low Voltage Metering Power Factor Correction to be installed? Yes Other Information Version 3 March 2017 6 No The following information is to be submitted with this Application to Connect where the relevant connection involves the connection of a generating system exporting 5,000 kW or above to the Ergon Energy distribution network*. Major Customer Connection Enquiry Attached For additional information on the detail to be provided please see the appendix. NOTE: Your application may not be accepted if the information below is more than 3 months old. * or Proponents with generating systems >30 KW to 5 MW who have elected to be processed under Rule 5.3A Major Customer Connection Detailed Response You must submit a valid Detailed Response. Where the Applicant has obtained a Detailed Response, it must attach the Detailed Response to the Application to Connect Form. Yes No The Detailed Response should contain information specified under clause 5.4B of the NER. The Detailed Response should also include any relevant information pertaining to the Network Assets of which Ergon Energy will have final ownership i.e. : Network Assets which Ergon Energy is to Design, Build and Own; or SECTION K Network Assets which the Customer will Design, Build and Transfer (Gift Ownership to Ergon Energy). AEMO Modelling Requirements For generating installations > 5 MW, information is required for the AEMO assessment of the modelling of the power system plan for load flow and dynamic assessments of the power system. In order for AEMO to commence their technical assessment of a proposed plant’s access standards and performance standards under Chapter 5 of the NER, information on the performance modelling is required to be provided to Ergon Energy for submission to the AEMO as part of your Application to Connect. Yes No The model must represent the physical arrangement of the generating system, its control systems and its connection to the network. The software models should be sufficiently accurate to demonstrate the performance of the proposed pant under all expected operating conditions. AEMO requires a simulation model package, as outlined the Detailed Enquiry Response. Attach any additional information, preliminary system planning data and technical data outlined in the Detailed Response deemed necessary by Ergon Energy to process an Application to Connect - note that Ergon Energy will advise if further information is required to assess the technical performance and costs of the connection to enable Ergon Energy to prepare an offer to connect. Major Customer Connection - Negotiated Access Standards For each such technical requirement where the proposed arrangement will not meet the access standards previously nominated by Ergon Energy in the Detailed Enquiry Response, the Applicant must submit a proposal for a negotiated access standard for such a requirement to be determined in accordance with clause 5.3.4A of the NER. N/A Yes - Attached N/A Yes - Attached SECTION L Other Information Note that if after submitting this form the Applicant becomes aware of any material change to any information contained in or relevant to this application to connect, it must promptly notify Ergon Energy in writing of the change. Within 10 working days of receiving your application, Ergon Energy will send the Applicant a written response confirming receipt of your application and whether any further information is required to finalise the application. An Application Fee will be payable by the Applicant. Ergon Energy will advise the amount and terms and conditions associated with that Fee. Version 3 March 2017 7 Appendix Major Customer Connection Enquiry Detail to be provided in the Detailed Response Introduction Background and other information regarding the proposed connection. Existing System Information Description of existing system and the proposed connection point. Information and a brief description of any existing or emerging issues surrounding the Network, Capacity and Loading, Thermal Ratings, Steady Stage Voltage Regulations Existing and Emerging Issues and Voltage Regulation studies, Step Voltage Change Load rejection studies. Motor Impacts of new customer motor starts on the Network Coupling Point and the identification of any existing or potential rating issues. Information regarding proposed/required Property Acquisition, Environmental, Cultural Land or Easement Heritage, Native Title, Community Consultation, Vegetation Offsets, Easement Clearing Requirements Issues. Information regarding the works likely to be undertaken to complete the Substation Assets of the Customer’s connection. Where relevant, this should include information Substation Works relating to Civil and Earth Works, Primary Electrical, Secondary Systems, Protection, Communications, Control/SCADA, Metering, Operational Technology. Subtransmission Feeder Works Information outlining the works likely to be undertaken to complete the Subtransmission Assets of the Customer's connection. Distribution Feeder Works Information outlining the works likely to be undertaken to complete the Distribution Feeder Assets of the Customer's connection. Network Switching Associated Projects Information outlining the proposed Network configurations (temporary and permanent) to construct, commission and connect the Network Assets associated with the Customer's connection. Information regarding any known associated or related projects and any known interdependencies. Project Staging and Milestones Information outlining the high level project staging and timeframes. Identified Project Risks Listing of any known risks or issues which will required to be addressed in the process of establishing the Customer's connection. Safety Considerations Details of any known safety considerations that are required to be addressed/ undertaken in the process of establishing the Customer's connection. Reliability Considerations During Construction Information outlining what reliability considerations need to be factored in for the construction phase. Ergon Energy Standards Where known - Information regarding the Ergon Energy Standards that the project is to be designed, constructed, tested and commissioned that are applicable at the time of project approval. Assumptions Statement of any Assumptions that were used during the preparation of the Project Scope. Estimates Estimated costs of labour, material and resources to complete the work as described in the Detailed Response Scope Exclusions Any known activities or works that will NOT be undertaken by the project. Any Supporting Information Where relevant, this may include satellite imagery of the Substation Boundary, Existing and Proposed Substation General Arrangements, Existing and Proposed Operating Diagrams, Major Plant Ratings, Fault Levels and any further information that would be considered beneficial. Version 3 March 2017 8 OTHER INFORMATION YOU MAY REQUIRE FROM ERGON ENERGY Major Customer Connection Enquiry Ergon Energy notes that you will require information from Ergon Energy in order to progress your Application to Connect. Ergon Energy expects that this information will be contained in its response(s) to your connection application (refer clause 5.3.3 and/or S5.4A and S5.4B of the NER). To the extent that you are aware of any further information that you will require from Ergon Energy to lodge your Application to Connect, please list this information here, together with supporting reasons for your requests. Typically, this information may include: Technical information including schematics, fault ratings and configuration of Ergon Energy assets pertinent to your prospective project Network primary plant and access specifications, protection and control requirements and power transfer capabilities Network electrical characteristics Information about network operational performance Information on Ergon Energy’s future planned capital works where these may be relevant to your prospective project _____________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ ______________________________________________________________________________________________________ NOTES Within 5 working days of receiving your Application to Connect, Ergon Energy will send you a written response confirming receipt of your Application and whether any further information is required to finalise the application. Please note that failure to provide any additional information requested will result in your application being placed “on hold”, such that it will not be progressed until sufficient information has been received to form a complete Application to Connect. Your application will be processed under Rule 5.3A of the NER, you should take some time to understand your responsibilities under this process. The NER, which is regularly updated, can be found at the Australian Energy Market Commission website http:// www.aemc.gov.au/Energy-Rules/National-electricity-rules/Current-Rules. MANAGEMENT OF NETWORK CAPACITY Consistent with the national electricity objective, Ergon Energy has a network management policy in place to manage the connection of generating systems to its distribution network. This policy aims, in general, to maximise the network capacity available to proponents and minimise the costs to proponents associated with network augmentation. Ergon Energy processes enquiries and/or applications to connect in line with the negotiated connection process prescribed in the NER. Each enquiry and/or application is assessed as a standalone project, having regard to the circumstances existing at the relevant date (including committed projects but not earlier enquiries and applications). However, you should note that where Ergon Energy is concurrently processing two or more connection enquiries or connection applications relevant to the same portion of distribution network, the commitment by one proponent to proceed with its project (typically demonstrated through execution of the relevant connection contracts and consistent progress with the connection establishment works under those contracts) may result in a material physical, technical or financial impact on the works required for subsequent proponents to proceed with their projects. Relevant impacts could include, for example: · the progression of one project impacting upon the relevant performance standards or other technical requirements with which a subsequent project may have to comply; and · in certain circumstances, imposing a requirement for the subsequent proponent to fund an augmentation of the network, which will be likely to involve increased costs and also delay the expected timeframe for the works. Version 3 March 2017 9
© Copyright 2025 Paperzz