1. 1.1 PROJECT PARTICULARS PROJECT LOCATION The project initiated by the promoter Splendour Investment (Rodrigues) Ltd consists of the construction of a 76-bedroom capacity luxurious villas complex situated along the south-eastern coastal fringe of Mourouk, over a land portion of extent of 29, 810m2 situated within the region of Pâté Reynieux, in the island of Rodrigues, as shown on the Location Plan enclosed at Annex 1A, at the end of Section 1. 1.2 PROJECT PHASING The project initiated by the promoter consists of the construction of a luxurious 76bedroom capacity touristic villas complex to be developed under the Invest Hotel Scheme (IHS). 1.3 PROJECT DESCRIPTION The villas resort project will encompass: (i) Construction of 76No rooms broken down into 24No superior bedrooms, 13No deluxe rooms, 18No suite bedrooms and 21No villas rooms Note: The breakdown and detailing for the number of rooms is given in sub-section 4.9.7 to which the reader is referred. (ii) A main building of GF + 2 configuration, encompassing restaurants, bar, lounge, dining terrace, reception desk, offices, kitchen and back-up amenities (iii) Leisure areas including swimming pool, complete with pool deck for relaxation, kiosks (iv) Back-of-house services encompassing desalination plant, technical building, wastewater treatment plant, composting area, garbage area, M&E area, water storage tank, etc. The villas complex will comprise of all the standard and leisure amenities usually incorporated in such resort development projects. These amenities are more fully described in Section 4 entitled “Architectural and Functional Planning”. 1.4 PROJECT JUSTIFICATION The aim of the project is to satisfy the accommodation needs of an increasing number of tourists visiting Rodrigues in line with the vision of the Rodrigues Regional Administration (RRA) to make the tourism sector a pillar of the economy with the objective of attracting 100, 000 tourists and visitors yearly on the island. The project site possesses all the natural attributes to attract potential visitors looking for tranquillity and serenity for which Rodrigues is so renowned. 1-1 Rep -06-04-15-EIA-IHS Mourouk - [cs].docx 1.5 SITE STATUS The site, earmarked for the villas project under IHS, is sandwiched between the existing Mourouk Ebony Hotel and Bakwa Lodge. There is an untarred track road leading to the site. Owing to its naturally sloping topography and elevation up to 20 to 30metres above mean sea level, the site offers an unobstructed, panaromic view onto the lagoon and also possesses a white sandy beach frontage of length 260metres with scattered rocky promontories. These patches of rock promontories have also been observed in the interior of the site. The site being in a bare state, there are no designated sites of interest within the site. The whole site is more fully shown on the Site/Contour/Topographical Plan enclosed at Annex 1B at the end of Section 1. 1.6 PROJECT TEAM The project team comprises of the following professional partners: 1.7 Promoter: Splendour Investment (Rodrigues) Ltd Project Manager Jeetah Consulting Ltd Architect: Jean Michel D’Unienville Architects Ltd Civil/Structural Engineers Property Design and Management Consultants Ltd M&E Engineer SEE Engineering Consultants Wastewater Engineer Solution Eau et Environnement Ltée (SEE) Landscape Consultant Mr Olivier Bereaux EIA Consultant: Scene-Ries Consult Ltd. HOTEL MANAGEMENT The management of the proposed villas project will fall under the existing Mourouk Ebony Hotel which has been operating for the last twenty years, i.e. since 1993. The hotel manager, Mr Willy Auguste, through the years, has built up a solid experience in hotel management. 1.8 ALTERNATIVE The site located within the coastal fringe of Mourouk, within the area of Pâté Reynieux, is contiguous to the operating hotel site, lodge and houses so that no industrial development will normally be permitted on it. Accordingly, there is no other permitted development alternative as regards the utilization of that site. However, there is always the theoretical alternative to the project known as the “Do Nothing” or “Zero Option” i.e. adopting the ‘status quo’ for the site, leaving it in its present form. 1-2 Rep -06-04-15-EIA-IHS Mourouk - [cs].docx Leaving the site in its present state would imply: (a) Foregoing this proposed development of a touristic project on the site, with the accompanying positive economic return to the country, and potential for more jobs creation (b) Missing an opportunity to strive towards the goal of providing additional touristic accommodation set-up in the region of Mourouk and its adjoining peripherals which have less developed to date. (c) Foregoing an opportunity for development and its associated creation of economic activities both during its construction and operational phase. (d) Encouraging the undesirable habits of indiscriminate dumping which has prevailed over the site Hence, in the circumstances described above, the option to utilize the site for a touristic project is definitely the best possible alternative. 1.9 IMPLEMENTATION SCHEDULE A tentative implementation schedule for the project is detailed hereunder: Submission of EIA ……………………………………….March 2016 Approval of EIA and issue of EIA Licence…….June 2016 Finalization of design ………………………………….June 2016 Construction Period………….…………………………July 2016 –October 2017 Official commissioning of the project …………November 2017 An appeal is therefore made to the Department of Environment to consider the granting of the EIA Licence within the lead time indicated above so as to enable the promoter to achieve this objective. 1-3 Rep -06-04-15-EIA-IHS Mourouk - [cs].docx
© Copyright 2026 Paperzz