Clad Magnum Double Hung Replacement System with Panning Installation and Finishing Instructions 8/12/97 19970219 BEFORE YOU BEGIN for all performance requirements. Selection of the appropriate fastening method is the sole responsibility of the installer, contractor, structural engineer, architect, building owner and/or consumer. Important! Read these instructions thoroughly before beginning to install your clad Magnum Double Hung Replacement System Failure to install as recommended will void any warranty, written or implied. Regional applications and standards may vary, therefore Marvin Windows & Doors is not responsible for interpretations of local codes and/or ordinances. Installation of Marvin products is the sole responsibility of the installer, contractor, structural engineer, architect, building owner and/or consumer. For additional information, consult your local Marvin dealer. IMPORTANT: Do not allow strong detergents, ammonia, solvents, chemicals or other harsh cleaning substances come in contact with clad surfaces as they can cause damage. If you wish to maintain the finish gloss of the clad exterior, you can wash it with soap and water and then apply a coat of automotive wax. NOTE: When specifying or considering the structural load requirements for windows and doors, it is important to consider the method of fastening the unit(s) into the opening. The methods contained herein may not be appropriate WARNING: Practice safety! Wear safety glasses or goggles when installing or performing adjustments to a Marvin window or door product. STANDARD PARTS SHIPPED WITH UNIT ILLUSTRATIONS (not to scale) DESCRIPTION AND COLOR Aluminum #10 flat jamb panning PART/PROFILE NUMBER A550 Colors: Stone White, Pebble or Bronze Aluminum sill panning 8_ bevel Colors: Stone White, Pebble or Bronze A552 Aluminum #10 flat head panning A551 Colors: Stone White, Pebble or Bronze Jamb mounting bracket NOTE: Numbers listed in parentheses ( ) are metric equivalents in millimeters rounded to the nearest whole number. ATTENTION: Specifications and technical data are subject to change without notice. 1 11860005 ILLUSTRATIONS (not to scale) DESCRIPTION AND COLOR Aluminum head panning trim PART/PROFILE NUMBER V378 Colors: Beige and White ~ ~ 0 ~ Stainless steel head and sill panning clip 11860020 Wood shims pkg. NA' Vinyl sash retainer plate (factory installed) Colors: Bronze and White Sash retainer plate Bronze - 11870464 White - 11870500 Attached to sash with #8 x 1" Phillips flat head screws Colors: Bronze and White (Screws) Bronze - 11800811 White - 10840018 Vinyl sash stop Beige - 11870134 White - 11870135 Colors: Beige and White Wood head part stop with weatherstrip W7170 White weatherstrip 84" 15818400 Vinyl jamb liner hardware V398 Colors: Beige and White SASH • Not applicable Two clad magnum sash 2 NA' ILLUSTRATIONS (not to scale) ~ ~ DESCRIPTION AND COLOR Galvanized steel head bracket PART/PROFILE NUMBER 11S6001S Standard on all units with an inside opening of 40" and wider #8 x 1 1/4" pan head lead point 11S00825 @1l1111ii1.. #7 x 7/S" flat head screws 11S00nS Om> #8 x 1/2" pan head drill screws 11800500 €)UIIUUI) #6 x 3/4" truss head screws 11S00634 Installation template used for sillblocking installation and sill panning measurement SOS02292 O)nllllUIIIllIIl1 I ""- ~ OPTIONAL PARTS AND ACCESSORIES AVAILABLE FROM MARVIN ILLUSTRATIONS (not to scale) DESCRIPTION AND COLOR Aluminum #20 Charles Street jamb panning Colors: White, Pebble and Bronze L. ~ J £ ~ 3 PART/PROFILE NUMBER A556 ILLUSTRATIONS (not to scale) DESCRIPTION AND COLOR PART/PROFILE NUMBER Aluminum #20 Charles Street head panning Colors: White, Pebble and Bronze A555 Aluminum hardware track cover Colors: White, Pebble and Bronze A558 Aluminum panning expander A554 Colors: White, Pebble and Bronze 6" space mull cover consisting of aluminum mull cover, vinyl receiver, wood attachment block, #8 x 2" Phillips head wood screws and #8 x 112" Phillips head screws. Cover- A557 Receiver - V379 Block - W71917-001 Colors: White, Pebble and Bronze Extruded aluminum full or half screen SCREENS Colors: White, Pebble and Bronze See Retail Price Guide for information regarding ordering screens. Touch up paint Colors: White, Bronze and Pebble Gray Sill blocking supplied if required • Not applicable 4 White - 05120100 Bronze - 05120103 Pebble - 05120102 NA· YOU WILL NEED TO SUPPLY REPLACEMENT PARTS 4'-6' Level Hammer Wood Chisel Putty knife Tape measure ReCiprocating saw (optional) 3/B" to 9/16" staples Staple gun Small finishing nails 6d nails for sill blocking if provided Utility knife . Power drill Power screw driver w/Phillips tip Good quality contractor's caulk/adhesive Caulking gun Fiberglass Insulation Power shears If replacement parts becomes necessary, please contact your local Marvin dealer. Whenever possible, provide a part number and length of component if applicable. BEFORE YOU BEGIN Before assembly of your Clad Magnum Double Hung Replacement System layout the contents of the panning packages and identify from the parts list. This will allow you to more easily assemble the unit. By exercising proper safety procedures, your Marvin Replacement System with Panning may be installed from inside of the building. REMOVING THE SASH 1. '\ ...... -; Before attempting to remove inside stops, score the paint line with a utility knife to allow for easier removal. Remove inside stops. Be careful not to damage stops if you plan on reusing. On old units with a rope and pulley system. cut or unhook rope and remove bottom sash. See illustration 1. '/yr " Cut rope e- \ Inside stop· " H 1 2. Remove part stop from jambs. See illustration 2. Lower top sash. cut or unhook rope and remove top sash. Remove top part stop and any remaining hardware from jamb (i.e. pulley rollers and metal weatherstrip/track). See illustration 2. Open weight pocket access door and fill weight cavity with insulation. =- - / "" rl Remove port stop- ""J30~ f(\ Top sash 2 5 "\ \ -..- i \ PREPARING THE FRAME 3. Using a reciprocating saw or wood chisel. cut off blindstop flush with jamb and head jamb. See illustration 3. 4. Temporarily retack inside stop removed in step one. (Stop is used to index wood shims and jamb brackets.) See illustration Cut off bL i ndstop flush with 4. 5. jamb & head jamb Fasten wood shims on jambs 2" to 3" from head jamb and sill with 3/8" to 9/16" staples or small nails. Butt up against inside sash stops for correct placement. Space remaining shims evenly 16" to 20" apart. See illustration 4. 3 Wood shim -'l1.!--4i 2' to 3" from head jomb g sill space 16" to 20" 4 6 0 Jns ide stop ---,..-.l_Jll_--:::/i 6. 7. -- If wood sill blocking is required, it will be necessary to install at this time. Lay wood sill blocking on sill. Place installation template against inside stop and sill, then adjust blocking to give sill support. Mark the location on the sill. Repeat at opposite jamb. With blocking positioned on sill, check level and shim if needed. Nail in place using 6d nails. See illustration 5. ~ 0-- p- TempLate should be flush w j th inside stop --.... Place jamb brackets against inside stop. Move as needed to avoid placing over rope and pulley cavity. Place top and bottom bracket 4-6" away from head jamb and sill. Remaining brackets can be spaced about 24" apart See illustration 6. '" ~ Template should rest on sill and on 5 j l L bLocki ng ~ ~ \ """ """ Mark: position of blocking c;...- 5 Bracket _-+Mr- Ins j de stop o lU $1IItC.:::::'';;;;;;;~d-__ 4" From head jamb g si It ~---~-~ o ,, ,, , ,, , 6 # 7 x 7/8' screws ,, , '~-------------------------------------------------~ 7 _ _ _ .. 8 x 1 114' " screws -- - --.: -',".::-".: -'--- -- -- --··-. -------- ----- ------- _.. --- ----- ------ -- -- - --------- --.. · . -"" ~~~ i~~'~ cover/ 1 : 7 -" [ ml ~ ---------------------.!.. ---------- ~ ----------------------------- ----- ------- -------------- ~ ASSEMBLING AND INSTALLING ALUMINUM PANNING 8. Arrange aluminum panning parts on a clean flat work surface, flat side down. Install #8 x 1 1/4" screws; do not tighten completely until all screws are in place. Make sure comers are flat and even then tighten screws. See illustration 7. NOTE: Install optional panning expanders if supplied. See page 17, 9. Install vinyl sill cover into groove on sill. See illustration 7. 8 WARNING: Exercise caution in ensuring that the panning frame is kept away from scrap residue when trimming to avoid scratching. Also make sure the waste pieces you are cutting are pulled away from frame as they have a tendency to curl and scratch the frame. Trim panning (equotL~ 10. Recheck width of masonry opening. Use power shears to trim jamb panning (equally on both sides) so that outside edges of the panning are within l/S" of the masonry opening. on both sides) to Fit loIi thin J/S· of either side of masonry opening_ 8 11. To determine how much needs to be trimmed off panning sill use the installation template supplied and measure from the bottom of the template to the masonry opening sill as shown in illustration 9. Remove the difference between the template measurement and the actual dimension of the sill panning. After sill has been cut, measure the masonry opening to determine the amount to be removed from the head panning. The height should be l/S" less than masonry opening. Template should be fLush with inside stop Template should rest on 5 ill and on si LL bLocking Measure from bottom ~ of template to masonry openIng sill 9 9 NOTE: If optional 6" mull cover is being used it will be necessary to install attachment block and vinyl receiver before installing frames in openings. See page 17. --------- ------ ------------ ------• • 12. Slip assembled panning frame(s) through opening and pull tight against jamb brackets. See illustration 10. If no further trimming is required, remove panning frame and attach stainless steel head and sill clips. Back caulk the unit at panning head and sill joints. See illustration 11. Loosely lay thin strips of insulation along existing sill as shown in illustration 10. Jamb brackets InsuLate on si LL ----- 10 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Caulk 11 , - ------ - --------------- 10 , --------, ---- --- --- - - - - -- 13. Remove stops. Reinstall panning frame on exterior. Pull it tight against brackets. Check sill panning to be sure it is level. Center frame in opening and install a #8 x 1/2" pan head self tapping screw through each bottom jamb bracket into jamb panning. See illustration 12. 14. Plumb jambs at panning head and install #8 x 112" pan head self-tap screw through each top jamb bracket into jamb panning. Fasten remaining brackets to panning jambs. . .. --_ ....................................... 12 15. Measure between jamb panning at sill and center brackets. Make sure distance is the same. Adjust panning for plumb by loosening screw slightly and moving left or right. See Hiustration 13. Move ponn i ng left or right to pLumb i necessary r 13 11 .-- .~ ~ ... 16. Install insulation at top of panning. (Caution: Do not use aerosol expandable foam insulation.) Caulk from the sill to the jamb. See illustration 14. . __ . --_w_. _______, NOTE: Optional 6" mull cover, if supplied, should be installed at this time. See Step 5 on page 18. "------'.,,-'. ". -··l ____________________________________________________ 1 .----------------------------------------------------- • -·-·1 _________________________________________________ --14 17. Units with a 40" or wider inside opening width will have a head bracket included. Existing frome Center bracket at top of head panning; slide it against panning flange. If bracket is too high, trim to fit with power shears. Install with two #7 x 7/8" screws into wood header. Install into head panning flange with self tapping screws. See illustration 15. Panning #7 x 7/8' screw Brocket Area to Ponn j n9 Flange ,8 x 1/2" screw 15 12 INSTALLING VINYL TRIM AND RECEPTACLE --. 18. Install vinyl head trim into head panning by inserting into kerf. Be sure flexible portion of the vinyl head trim curves towards the interior of the dwelling. See illustration 16. 19. Insert vinyl jamb receptacle into jamb area, making sure that bottom of the receptacle rests snugly.on the sill panning. See illustration 17A and 17B. Starting at the bottom, insert outside edge of vinyl into kerf in jamb panning and tap into place until it engages. Repeat procedure along the entire length of the jamb panning. See illustration 17A. - _ ~~c- Frame 16 Hake sure bottom of receptacle rests snu9l~ on the sill panning. 17A 17B 20. Check sash opening width to see that it is same at top, center and bottom. Shim between wood filler and vinyl jamb receptacle if needed. r·--·--------·-----·.·------······----··.··---·--····--- 21. Using a 7/64" bit, drill through vinyl jamb receptacle and shim on the drill line located 3/4" from interior edge of jamb. Repeat procedure at each previously placed shim. See illustration 18. 22. Fasten jamb receptacle to jamb using #6 x 3/4" truss head screws. Replace inside stops. See illustration 18. 23. Place a small bead 01 caulking along interior of jamb receptacle at sill. See illustration 18. 18 13 c...................................................... ,..- 24. Caulk exterior of panning to masonry. See illustration 19. 1 ._----------...,··,L: __________________________________________________ --_.Caulk panning to 19 25. Install top sash stops. See illustration 20. Install vinyl jamb liner by placing exterior flange of the jamb liner into the groove in the receptacle. Using stiff putty knife, start at the bottom on the interior of the flange and push it into place working your way to the top. Push hardware slightly to make sure it slides in and out of the receptacle. See illustration 20. -------.------------------------------- Sash stop --------------------------------------~- .--------------------------------------, , , ,, Push Liner into groove ': '. -------------------------------------~ 20 14 mosonr~ SASH INSTALLATION Note: If unit was ordered with optional full screen it is recommended that the screen be installed prior to sash installation. Grasp screen with both hands, keeping pull tabs to the left (as viewed from interior) and bow springs to the right Slide bow springs into screen channel on the right and release. 26. Using a flat screwdriver, pull down on locking terminal assemblies in vinyl jamb liner approximately 8 to 10 inches from sill. Engage in locked position by rolling screwdriver counterclockwise. BE SURE THEY ARE IN THE LOCKED POSITION BEFORE LETTING GO. Immediate damage could occur if locking terminal assemblies are not locked. See illustration OPEN LOCKING TERMINAL ASSEMBLY LOCKED 21 21. 27. Install top sash. Insert cam pivot on left side of sash above locking terminal assembly in jamb liner. See illustration 22. 28. Lower right side of sash. Place right metal cam pivot above locking terminal assembly on opposite side of frame. See illustration 22 -=-=============;;;:...J L ._ _ _ 23. 29. Level front edge of sash. See illustration 23. I 23 30. Tilt sash up and depress vinyl jamb liner on both sides. This will ease sash into position in jamb liner. See illustration 24. 24 15 II 31. Once sash is in position, slide it down until cam pivots contact locking terminal assemblies in both jamb liners. This. will release locking terminal assemblies and allow top sash to travel up and down. Note: Before installing bottom sash it will be necessary to remove the single screw and loosen the two screws in the oversized holes on the sash retainer clip. Slide sash retainer plate back. This step will also be necessary in order for the tilt feature to be utilized. See illustration 26. 32. Install bottom sash by repeating steps 27 through 31, this time using tracks in the vinyl jamb liner closest to interior of building. Port stop weatherstrip HalF screen nosing INSTALLING OPTIONAL HALF SCREEN 33. Install optional half screen if supplied. Raise bottom sash. Slide screen through opening keeping pull tabs to interior on left side and bow springs to the right. Slide bow springs into channel on the right and, using pull tabs, pull into place in the left channel and release. See illustration 25. Note: Once screen is installed it will have to be removed to operate top sash or utilize the top sash tilt feature. 34. Install head part stop with leaf weatherstripped edge toward top sash. Nail it in place using small finishing nails. See illustration 25. 35. Slide both sash retainer plates tight against vinyl jamb liner. Secure each plate by installing screw provided into predrilled hole. Tighten two existing screws in sash retainer plate. See illustration 26. Si II cover Si II 25 '---------------------' I +HI-H-r TOP SASH JAMB LINER SASH '-++-+- PLATE RETAINER BOTTOM SASH Note: After securing sash retainer plate the bottom sash cannot be tilted. In order to tilt bottom sash remove single screw and loosen the other two. Slide retainer plate away from vinyl jamb liner track. Return plate to locked position, then replace and tighten screws. 26 36. Finish primed or bare wood surfaces as soon as possible after installation. 16 ,J, INSTALLING OPTIONAL PANNING EXPANDERS 1. Slip panning expanders onto existing jamb panning as shown in illustration 1. 2. Attach clip to panning expander joint as shown in illustration 1 and 2. 3. Return to step 10 found on page 9 1 INSTALLING OPTIONAL 6" MULL COVER 1. Attochment block Before installing attachment block, it will be necessary to verify dimension A to ensure the block will fit as provided from the factory. Dimension A must be 6 9/16" to utilize the attachment block provided. If dimension A is greater than 6 9/16" you will have to reduce the thickness of the attachment block. If Dimension A is less than 6 9/16" you will have to shim between the attachment block and existing mull oover to match the 6 9/16" measurement. See illustration 1. Dimension A 1 17 2. Install attachment block to existing space mull cover using #7 x 2" wood screws. Make sure it is centered equally on existing space mull cover. See illustration #8 X 1/2# #7 X Attach vinyl receiver in groove of attachment block using #8 x 1/2" Phillips head screws as shown in illustration 2. 4. Return to step 13 found on page 11. 5. Run a 1/4" bead of caulk vertically along the entire length of the exterior of the jamb panning ensuring the caulk is no more than a 1/2" from the edge of the jamb palming as shown in illustration 2. 6. 7. Secure mull cover to the vinyl receiver using a rubber mallet. Start at the sill area and work towards the header. See illustrations 2, 3 and 4. 2# screws Coull:: 2. 3. self topping screw 2 3 Return to step 18 found on page 13. . .--,- 4 18 '" ",I, ",:, 4 iri / ~ ~" u II Vin~L receiver cover Attochnlent block
© Copyright 2026 Paperzz