Wheatstone Project Update July 31, 2015 © 2015 Chevron Corporation. All rights reserved. 1 Overall Project Progress The Wheatstone Project is more than 65 percent complete. Condensate Tanks Product Loading Jetty LNG Trains Materials Offloading Facility LNG Tanks Gas Turbine Generators Slug Catcher © 2015 Chevron Corporation. All rights reserved. 2 Wheatstone Platform Hookup and Commissioning The 440-person accommodation vessel is connected to the platform to support hookup and commissioning activities now underway. Accommodation Vessel Wheatstone Platform © 2015 Chevron Corporation. All rights reserved. 3 Subsea Activities Installation of the subsea manifolds is complete, and subsea equipment and flow lines are now being installed on the Wheatstone and Iago gas fields. © 2015 Chevron Corporation. All rights reserved. 4 LNG Plant Site At the LNG plant site, equipment and modules continue to be delivered and installed. Train 2 Train 1 © 2015 Chevron Corporation. All rights reserved. 5 LNG Plant Site The LNG Train 1 cold boxes have been delivered to the site. They will play a central role in the gas liquefaction process, cooling gas to -320°F (-160°C). © 2015 Chevron Corporation. All rights reserved. 6 LNG Plant Site The slug catcher header and piping systems have been installed, which will separate condensate from gas at the inlet of the plant before further gas processing. © 2015 Chevron Corporation. All rights reserved. 7 Marine Facilities At the Materials Offloading Facility the breakwater is complete, and the loading platform has been installed on the 0.75-mile (1.2-km) product-loading jetty. Loading Platform Product-Loading Jetty Breakwater © 2015 Chevron Corporation. All rights reserved. 8 Onslow Social Infrastructure The new water tanks and booster pump are complete, and the Onslow Airport terminal is operational. © 2015 Chevron Corporation. All rights reserved. 9
© Copyright 2026 Paperzz