STATE OF TEXAS
COUNTY OF EL PASO
)
)
lWENTY-SIXTH AMENDMENT TO CONTRACT WITH STRUCTURAL ENGINEERING
ASSOCIATES, INC. FOR PROFESSIONAL SERVICES RELATED TO SURVEYING
FOR RIGHT-OF-WAY ACQUISITION AND RAIL ROAD CROSSING USE AND FOR
CONSTRUCTION SUPERVISION
On the 81h day of October, 2001, the County of El Paso, Texas ("County"), and Structural
Engineering Associates, Inc., a Texas corporation ("Consultant"), entered into a
Professional Services Contract to Provide Permitting Services, Surveying, Design,
Preparation of Plans and Specifications, Project Management, Resident Project
Representative (Inspection Services) and Materials Testing for the Fabens International
Bridge, Border Facilities and Access Roadway, ("Agreement"). The Agreement was
subsequently amended on March 25, 2002, April 22, 2002, twice on September 16,
2002, November 18, 2002, June 23, 2003, June 30, 2003, December 15, 2003, April 4,
2005, September 19, 2005, December 19, 2005, December 18, 2006, November 11,
2007 (as corrected on November 26, 2012), May 19, 2008, September 15, 2008, June
1, 2009, September 20, 2010, November 1, 2010, April 16, 2012, June 18, 2012,
November 19, 2012, November 26, 2012, January 28, 2013, June 3, 2013, April 28,
2014 and July 28, 2014. The Parties now desire to amend the Agreement again for
good and valuable consideration specified herein. All sections of the Agreement not
specifically amended shall remain in full force and effect.
CONSTRUCTION PHASE SERVICES
1. As described in the Fourth Amendment to Professional Services Agreement, a
portion of Exhibit A to the Original Contract dated October 8, 2001 was omitted
by mutual error. Along with the portion of Exhibit A attached to the original
contract the additional pages of Exhibit A attached to Amendment 4 describe the
Scope of Work amended herein.
2. Section V. Compensation and Payment of the original agreement dated the 81h
day of October, 2001, shall be amended to increase the maximum total of
reimbursable expenses permitted under the agreement by Forty Two Thousand
Sixty-six and 00/100 Dollars ($42,066.00) for a total maximum reimbursable
expense budget of Five Hundred Forty-eight Thousand Sixty-eight and 10/100
Dollars ($548,068.10).
3. Pursuant to 2G. of Exhibit A to the base contract, Structural Engineering
Associates, Inc. designed the access roadway known as FM 3380, and SEA's
employee Sidney A. Mielke, P.E. signed off on the construction drawings as a
Professional Engineer, in Texas. In this role, SEA must oversee any changes
that are made to the original design specifications of the road and determine that
the changes do not compromise the integrity of the project. SEA will make one
15-0703 SEA Amendment #26 - Fabens Bridge Demolition
site visit per month for a a total of 14 months and one construction site visit per
month for 14 months. In preparation for and during construction, SEA will review
and approve revisions to drawings related to the use of TxGirders (as approved
by TxDOT) in lieu of Type IV beams originally shown in the construction plans.
SEA shall participate in substantial and final completion walks-through. SEA will
not participate in daily construction observation/inspection, materials testing,
construction administration or any other construction phase services excluded
from their proposal, attached hereto. SEA will not prepare or review of repair
details for construction error.
4. Professional Service Fees for professional engineering services and subconsultant services necessary during the construction phase of FM 3380, as
authorized by Exhibit A, Sections 2g and 4a, are amended to add the total
amount of Two Hundred Thousand Eight Hundred Eighty Seven and 36/100
Dollars ($200,887.36) are approved for the work documented below and more
specifically detailed in Attachment A hereto:
$ 131,652.16
18, 147.20
51,088.00
$ 200,887.36
General (Prime Consultant)
Special (Prime Consultant) (Review & Approve Beam Re-designs)
General (Sub-consultant FXSA)
Total for Construction Phase Services
Add Stock-Fencing along Right of Way
5. Pursuant to Exhibit A. Sections 2G. and 4A, of the base contract, Structural
Engineering Associates will prepare/oversee the preparation of an amendment to
the construction drawings to add fence construction to the work to be performed
by the contractor selected to construct FM 3380. Work shall include all
necessary revisions to engineering plans and the preparation of plans for a
change order.
The details of the work are more specifically detailed in
Attachment B hereto.
6. Structural Engineering Associates' total fee to perform this work is Seven
Thousand Nine Hundred Eighty and 72/100 Dollars ($7,980.72).
Revisions to Parcel 4 (Lutich) to Transfer a Portion of Land to Adjacent Landowner
7. Pursuant to Exhibit A. Section 2G. of the base contract, Structural Engineering
Associates will prepare I oversee the preparation of revised surveys and
amended construction drawings related to the transfer of a portion of Parcel 4 to
W. D. Pruitt for a widened farm road. These revisions shall include necessary
changes to the pond and the maintenance road currently shown on Parcel 4 in
the construction drawings.
It will also include the preparation of survey
documents and metes and bounds legal descriptions for the both the tract of land
15-0703 SEA Amendment #26 - Fabens Bridge Demolition
to be conveyed by the County to Pruitt and the tract of land to be conveyed to
TxDOT. Work shall include the setting of any monuments, the revision of
engineering plans, and the preparation of plans for a change order. The details
of the work are more specifically detailed in Attachment C hereto.
8. Structural Engineering Associates' total fee to perform this work is Twelve
Thousand One Hundred Forty-two and 00/100 Dollars ($12,142.00).
Revisions to Parcel 8 Part 3 to Revise the ROW Acquisition Drawings for University
Land Office
9. Structural Engineering Associates will prepare I oversee the preparation of
revised surveys and amended construction drawings related to the acquisition of
a reduced portion of Parcel 8, Part 3 from University Land Office for right-of-way.
Survey documents and metes and bound legal descriptions for the tracts of land
to be purchased from University Land Office shall be finalized. Work shall
include the setting of any monuments, the revision of engineering plans, and the
preparation of plans for a change order, as necessary.
10. Structural Engineering Associates' total fee to perform this work is Thirteen
Thousand Six Hundred Nine and 36/100 Dollars ($13,609.36).
Staking of the O.T. Smith western right-of-way line to facilitate relocation of the El Paso
Electric Company overhead power lines. in advance of construction.
11. Structural Engineering Associates will oversee the field surveying to place
survey markers along the western right-of-way of 0.T. Smith Road. This staking
will provide the guidance needed for El Paso Electric Company to relocation
various overhead electric lines as needed to clear the construction for this
project. The details of the work are more specifically detailed in Attachment D
hereto.
12. Structural Engineering Associates total fee to perform this work is Five Thousand
One Hundred Seventy Six and 84/100 Dollars($ 5, 176.84).
The amount for all amendments in this contract total Two Hundred Eighty-one
Thousand Eight Hundred Sixty-two and 28/100 ($281,862.28) made up of: (1) Two
Hundred Thirty Nine Thousand Seven Hundred Ninety-Six and 28/100 Dollars
($239,796.28) for professional services and Forty Two Thousand Sixty-six and 00/100
Dollars and (2) ($42,066.00) for reimbursable expenses. Services of the Consultant's
sub-consultants (Frank X. Spencer and Associates) and will be lump sum. All other
services described in this Amendment will be billed on an hourly basis as work is
actually performed. Amounts stated in this Amendment, which will be billed on an
hourly basis are "not to exceed" amounts.
15-0703 SEA Amendment #26 - Fabens Bridge Demolition
Regardless of the date of execution, this Twenty-sixth Amendment shall be effective on
December 14, 2015 and all services shall be provided by December 31, 2018 or the end
of the construction & demolition projects, whichever is later.
IN WITNESS, the parties execute this Twenty-sixth Amendment to the Agreement on
- - - - - - - ' 2015.
ATTEST:
THE COUNTY OF EL PASO
County Clerk Delia Briones
County Judge Veronica Escobar
APPROVED AS TO CONTENT:
STRUCTURAL ENGINEERING
ASSOCIATES, INC.
County Public Works Director
Pat Adauto
David T. Covarrubias, P.E.
Chief Executive Officer
APPROVED AS TO FORM:
15-0703 SEA Amendment #26 - Fabens Bridge Demolition
~~-------------------·-
Attachment "A"
Fee Proposal- Construction Phase Services
S[i\
STRUCTURAL ENGINEERING
ASSOCIATES, INC.
DAVID T. COVARRUBIAS, P.E.
SALVADOR H. LOPEZ
MARTIN R. COVARRUBIAS, P.E.
ERNEST J. MECHE, P.E •.
ALLEN G. SHIAU, P.E.
WILLIAM "MAC" M, GLEESON, P.E~
SAM 0. PALOMERO, P.E.
.
· MD NURUL AMIN, P.E.
·.. JOHNNY E. MARTINEZ, P.E.
LEONA. BERDUGO, P.E: .
BINAYA SHRESTHA, P.E:.
· CONSULTING ENGINEERS
3838 N.W. LOOP 410
SAN ANTONIO, TX. 78229
E-mail:
, sea@seatx:com
'
-
(210) 735-9202 ·
·.·FAX (210)735-2074', .
JOHNNIE C. CHING, P.E;
CHARLES F. GARZA
SIDNEY "SID" A. MIELKE, P.E.
DAVID A. ROCHA, P.E.
. . ' ERIC H. JAHELKA, P.E.
ADRIAN M. ROMERO, P.E.
MELVIN K. LARA, P.E.
ALVARO J. LOPEZ, P.E.
. DANIEL M. MORALES, P.E.
., DANIEL B. RODRIGUEZ, RE.
'
-
July 22,2015(Reyised12..,os-15).
,,'
"
,
Mr. Sal Alonzfr ·
1'
·
--,
.·
.
.
.
,
.El Paso' County, Public, Works Department:.·.
800 E .. Overland, Rooth 40T. ·..
·..
.El Paso, .Teias ?9901 ·
.;
'
, , ManuelF. Aquilenr HighwayPh~se U:_ C~J# 0?24'-06;.311· .. •· . . .. .· ..· . . .... • ..
Propos~d Amendiuentto Professi()naf Services Con~act...: §oiistructionfhase Services
'.·
~:~'
1
fat
·· · As .requested, \Ve' have prepared a fee Proposal to pt6vid~ co~s;uction phase S°erViCes
th~. abdv~ captioned/·,
project ·ServiCes will be provided. by SEA and ~ur ·~ub-cpnsultant Frank :X. Spenc~r and A:ssociat~s,Jq¢:; .. · ·
: ·'. ,'-;:;~<-
w~ ha~e ,only ftiduded ~ho~
drawing review~·on~\egulai: site~~i~it per morith'cl4; montlts to~},rutd one
'eonstruction site visit per month( 14 months total), and ()ther miscellaneous hours. for questions, RFI::s, as well . ,
. ·•. a8 substantial and final completion :walkAhroughs. •We have inch1ded on.e special section to te:vie~ arid approve
, revil'!ed. drawings should.the contractor decide to submit new TxGiiders ln:Iieu of the.Type fv beam,s currently .
. sh9wri.fii.the·plari$. .' , '·
i '''.r . "
.,; ·
>/, .· /.:. · · ' · · ·· ·· '·. '· , ' · ·.. ·. .
'.
; .\
~~:, ~-
';.
):<
>
-
;,- "'. ;
"'' \:'.w;.¥av~'~10t iti~1tid~d dail~ constru~ti~Il ·~b,serV,~tion1inspedi6n~·. mat~riais't~.~ting~ ~onstrudti.@ ~i~isp-ation
' .• ,or any, other construction phase SCI'Vices no~ iriclud~d 011 ~e ~ttached spreadS.hC1ef: 'W~also :have~n9f inciuded'
'thepreparationorrevie:vofrepairdetailsfotconsttuctionerr9rs.. · <'~
·:)>,;>,. · :.
'
I
,:,
,-
~
,.
'
~
;
,::_ '·
~
' -
- ' ·.
-~,:_;
· .·.· · ·.·,
.·. Out total fe~ pro~osalto perform this work is broken doWn 11.s f~llows:
~·>
.
'•, ''.'
.; ,,.:..11~<:,:::,~ ~--,·: -_.: i
.······We afo prepared t6 bill. for these
on an hourly~ .as· expeod~d;: basis with the total proposed•. f¢~·as a, not
. to exc~~d amoilnt:; withoutprior approvaL '. ·· '. · ; .
" · ·: < ,. .
.· ·.' · , '.,~ •• ·~.: .' . ;; · . ·.
.setvfoes
..., ,. A'i', always,,we. woµld appreciate Your ·prompt atfoi:ttion~to this requesf,
. questions you or others at El Paso ·county may have..
..
.
mid' rem~in available to aris~er any .'
. ..
.
Cc:.· · Mr. D~vidJ. Covarrubias; P.E., SEA.
Pagel oft ·
..
Attachment "B"
Fee Proposal- Fencing
<~'I J~
.
.>
DAVID T. COVARRUBIAS, P.E.
SALVADOR H, LOPEZ
MARTIN R COVARRUBIAS, P.E.
ERNEST J. MECHE, P.E.
ALLEN G. SHIAU, P.E. '
WILLIAM"MAC" M. GLEESON, P.E,
SAM 0. PALOMERO, P.E:.
MD NURUL AMIN, P.E.
JOHNNY E: MARTINEZ, P.E.
LEON A. BERDUGO, P.E.
BINAYA SHRESTHA, P.E.•
STRUCTURAL ENGINEERING
ASSOCIATES, INC. .
· .CONSULTING ENGINEERS
•
3838 N:W:LOOP 410
SAN ANTONIO, TX 78229
E-mail:
[email protected]
(210) 735c9202
FAX (210) 735-2074 ..
JOHNNIE C. CHING, P.E.
CHARLES F. GARZA
SIDNEY ~'SID" A. MIELKE, P.E.
.
DAVID A. ROCHA, P.E.
ERICH. JAHELKA, P.E.
ADRIAN M. ROMERO, P.E.
MELVIN K. LARA, P.E.
ALVARO J. LOPEZ, P.E.
DANIEL M: MORALES, P.E.
DANIEL B. RODRIGUEZ, P.E.
. July 22,. 20 ~ 5 (Revised 12-08., 15) · .·
.
..
· Mr, SalAloriio
ElPaso County, Public Works Department
·. 800 R Overland, Roo:ni 407
··
·· El P~o~ Texas 79901
n
REF:.. Ma.Iluelf. AquileraHighvvayJ>hase :..::.cSJffe 0924~06,.3 lJ ,
..'{>ropo~~d Amendment tQ Pt9fessional S~rviceS.Contract· .· ··
Add :Barb-:Wire F~ncitig
akJrig Right
of:r-Way. _, · , , .
'
. 1
Dear
Sal•:
,,
. :·
.'
'.
As}eqtie~t~d, we have prepared a fee proposalto pro~ide barb-wiie fencing along ait of the right-ofovay forthe
'·<n9ted project, a8 is:required by the UniversityLandPffice .. Services 'YillJ~e provided by SEAand.oursub' con~mlfant Frank X. Spencer and Asspciates, me.for coordination and.constrncti~:m. plan ,sheet. changes necessary
provide
and
install the
fence'.·
.
· ·· for the contractorto
'
.
···.
.
·.
,
'
'
,/
'
_.
., our'tofal fee piopdsal io perfcn-'m thi~ Wm]{•is b~oken down as foUow~:.
. . 2,934:12.
. '5,046.00
: '.7,980.72:'
.,
"\
1'h~
~yFr~ ~pence;
~s ~himp sum>~~ ar~ pr~pared.
kd.
p1a.Jl revision work
x.
and'Associates,
win be bfoeJ
·
to bill fodhese coordination services on arihourly,~as expended; basis with the.total proposed fee as a.not to
. exceed.a.woUllt; yvithout pfiorapprovahi .
•'' ·.... , ..· . .
.
.
.
> : As'
ahvays~ ~e. ~oukf ap~r~ciate: f~ur
:attenti~n \hi~•. re~~~st,· ~d r~maln available:'to answ~r any
prompf
to
. questions
you
or
oihers'.
at
El
Paso
CoUµty;
may
have
..
):"
.· . ·. -. .
.
.
'
- "·
'
'
.
..
. . '. '.
. . ..
.
,
.·'
·.. ·. ·.... '
-
. -~
Page 1of1
COUNTY OF EL PASO - MANUEL F. AGUILERA HIGHWAY PHASE II
CSJ# 0924-06-311
~I;:!
ADD R.O.W. FENCING FOR ULO LANDS & STAKEOUT FENCE JN FIELD
STRUCTURAL ENGINEERING ASSOCIATES, INC.
22-Jul-15
(REVISED 12-08·15)
PROPOSED MANHOURS/FEES
Sheet
Description
Project
Manager
SPECIAL COORDINATION WITH
TxDOT, EP COUNTY AND ULO (SEA)
Project
Engineer
Engineer
Engineer
In-Training
CADD
Operator
Clerical
Total
Hours
16
16
STAKE OUT R.O.W. FOR FENCING
INSTALLATION (FRANK X. SPENCER)
(See attached spreadsheet breakdown)
TOTAL FEE PROPOSAL»»»»»>
Hourly Rates
Total
Fee
$2,934.72
$5,046.00
0
16
0
0
0
0
0
0
0
$0.00
$183.42
$183.42
$135.13
$97.12
$0.00
$0.00
$83.48
$69.75
16
$7,980.72
F:>cEiA
SERVICE:
CLIENT:
PROJECT:
DATE:
130 Montana Ave.
El Paso, Texas 79902
Ph: (915) 533.4600 • F: (915) 533.4673
www.fxsa.com
TBPLS# 100490-00 & 100490-01 TBPE# F-3584
Stake out the Manuel F Augilera Hwy.
El Paso County, Femie Hernandez
Manuel F Augilera Hwy Perimeter Fence Boundry and Fence Line Staking
05-22-2014
(REVISED)
EXHIBIT?
DESCRIPTION OF SERVICES/EXPENSES
TASK DESCRIPTION
~
u
~
u
~
!
!
u
c
1nsk 1.
Horizontal Control
DIRECT & MMISC. EXPENSES
OFFICE PERSONNEL
FIELn PERSONNEL
I
Ii
.,
~
:5"'
.
4
~
F
J
"
~
.:
!I;
I
0.5
1
6
24
8
i
j
.i
i
i.,
~
I•
1
;
=
;;
~
:Ii
"
"' 12
i.
0
!
~
:!i
f
j
0
IP
a
J
§!
-'!~
~ :>
2S
Tas11 2. r-iela work
1umceWork
Calculations for fence line staking and setting boundary Corners
'
1nvur«> :;u1:1-1u1AL:;
LABOR COST PER HOUR
4
0
0
0.5
25
14
0
0
0
0
0
0
0
0
0
0
$149.00
$180.00
$216.00
$300.00
$88.00
$150.00
$142.00
$71.00
$71.00
$32.50·
$48.00
$43.00
$108.00
$500.00
$108.00
$400.00
~OTAL.LABORANDEXPENSE
$596.00
$0.00
$0.00
$150.00
$2,200.00
$2,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,046.00
C:\My Documents\Fabens\associated files\contracts\Amendments - Add'l-Services\amendment# 268 - MFAll UTLB Fencing\Boundary Corners and Fence line staking REVISED 12-08-15
Attachment "C"
Fee Proposal- Plat Parcels
S[i\
DAVID T. COVARRUBIAS, P.E. ·
SALVADOR H. LOPEZ
MARTIN R. COVARRUBIAS, P.E.
ERNEST J. MECHE, P.E.
ALLEN G. SHIAU, P.E.
WILLIAM "MAC" M; GLEESON, P.E:
SAM 0. PALOMERO, P.E.
MD NURUL AMIN, P.E.
JOHNNY E. MARTINEZ, P.E.
· . LEON A. BERDUGO, P.E. .
BINAYA SHRESTHA, P.E, ·
STRUCTURAL ENGINEERING
ASSOCIATES, INC.
CONSULTING ENGINEERS
(21 O) 735-9202
FAX (210)735•2074
E-mail;
3838 N.W. LOOP. 410
SAN ANTONIO, TX 78229
[email protected]~m
JOHNNIE C; CHING, P.E.
CHARLES F. GARZA
SIDNEY "SID" A. MIELKE, P.E.
.
DAVID A. ROCHA, P.E.
ERIC H. JAHELKA, P.E.
ADRIAN M; ROMERO, P.E.
MELVIN K LARA, P.E.
ALVARO J. LOPEZ, P.E.
DANIEL M. MORALES, P.E.
.DA!"!IEL B. RODRIGUEZ, P.E.
. Decetiiber8;·Wl5 ·•. ·.
Mr. Sal Alonzo
.· · El Paso County, Public Works Department
800 E. Overland, RoomA.01 ·
El Paso,Texas 79901 ·· · ·
RElF: ~ .· Manuel F.. Aq~ifora Highway Phase J1:_,... CSJ# 0924'"06-311
·. ProposedAmendnient toJ>rofessional Sertices.Co.ntract ·
,Access
Roadway Changes ·.. ·
ReyiseLuttichSlU'Vey
,,_.,
..
._
·;.
,_·
,
for
-'
·,,-,
.·As requested, we have prepared a fee proposal to provide revise the plat parcels,· and the con,struction plan sheets· · ·
the ·agreed to modifications to· the·· Luttich ·parcel,. ~d the ·assoc.iated ·changes for the· access
to· accoiint
. roadway. Services wiUbe provided by our sub-consultant Fra1lkX. Spencer. artd Associates,. for this :additional
service, and we are jlot adding any overall project ma.llagement.
.
.
. .. , . . .
for·
.
"
:
"
.
.-
-
..
..
';"
"
.
'
·.'
·· :Our·tofulfee. proposal
fo petlormthi~.work
is broken
. ..
,.. . . .
-
,.
,
~
'
',
''
.'
doWh as.folfows:·
.
'
, .~ Ov(lraiiP~ojectManageinent ~.SEA;
···.'·~~~e0ut1\1anueLF. A.gµileii{ffiiJiwayfofFehcing.:FxsA.:
·
·
·
, :.;\
.:
·· .c·
. ,-,,_''
Th~
··
. FeePropdsaLTotal·
$·
:,$.:.·
·~ 0.00 ·
1'.2.142,00> ··
$'.. · '17~244;00
"• ·,-:,-!,
artd'pl~re~isio~\vor,k
Sp~11cer and.Assoc~ates,ihc.wiU bebill~d a1mnp
sl1fVeying
by FrankX
a$
shm:·
·AS always, 'Ye woul<f appreciate your prompt attentio~to,thisrequest, and.remain' avaifa)Jleio lillswet any
.
..
. .
questions y01io( others at El Paso Ccmnfy may have: ·
·-' )
~
'.' »
'
.:-
.
'
', ·),_. '·,·'
'
' •"
::~~-~'
Senior P;~;:~t}l~ager
c6;
,
Mr. b~~id f
'.
'
Covfuubias,
.· '
.---. ··,·
,.,
·,
P.E;, SEA..
...
-
,.
Pagel ofl
.. \ ·
Date:
Service:
Client:
Frank X. Spencer & Associates, Inc.
~-
--~-~~~~i~~-~·-~~i-~~-~~-~.~~-~~~---····
· 1130 Montana Ave.
El Paso, Texas 79902
Ph: (915) 533.4600 • F: (915) 533.4673
www.fxsa.com • [email protected]
12/4/2015
Surveying Services.
SEA
Luttich Survey
Project:
Additional Servtces.
2015-Dec
DESCRIPTION OF SERVICES/EXPENSES
TASK DESCRIPTION
FIELD PERSONNEL
OFFlCE PERSONNEL
~
(J
c
:t
.I.
~
(J
~
(J
•c
•
!
:ii
.:.
c
.c
~
:!:!
c
:>
f
~
~
I!
cc
w
'Z
~
~
;;:
•
-!
.i:
·a.c
:t
Iii
E
.c
j
~
gi
c
I
~
.i
DIRECT & MMISC. EXPENSES
;;:
Task 1. Revise Parcel 21 and Create New Parcel.
::I
.I
..
~
"
:i:
= !""
Q
Q
Q
~
~
•i
~
~
!
a) Records Searoh - To be Provided by EP County.
4
4
4
b) Recover Boundary Survey Control.
c) Conduct Recon Survey.
d) Tie Existing Roadway and Water Source.
d) Prepare Wooong Sketch.
e) Perform Boundary Calculations.
f) Prepare (2) Plats of Survey.
g) Prepare (2) Metes and Bounds Descriptions.
h) Set Type II Monuments.
0.5
0.5
0.5
1
1
1
2
4
2
4
1
1
1
1
2
12
1
8
2
4
Task 2. Revise Englnerlng Plans.
a)
b)
c)
d)
1
1
Modify Fence Sheets.
Modify Drinage Sheets.
Moodify Summary Sheets.
Prepare Plans for Change Order.
4
4
2
4
1
;.;:u
,HUUK::; ::;u1:1-1v1ALS
LAl:IUK 1,;u::;, t't:K HOUR
:S149.00
TOTAL LABOR AND EXPENSE
#######
0
0
ljj180.00 1;p.:16.w
$0.00
$0.00
.:.o
;p.ow.00
$750.00
19
,,..,.,.uo
1')
..
15150.00 l:S160.uu
0
ljj90.00
il>"U.W
$1,672.00 $2.400.0<J $480.00 $1,260.00
$0.00
..
;p;oo.00
~i
li
$
$
$
$
$
$
$
$
$
$
ljj
7 1 1'4;C.UU
~
4.:.:uu.uu
$
$
$
$
$
$
$
$
$
8
8
4
10
14
~
.
.!!
~
ljj
"°
IS82.00
$140.00 $2,460.00
u
u
IJ
u
u
'l'tl'l.00
$0.50
:iou.oo
ljjl/U.W
:i;oO.w
$0.00
$0.00
$0.00
$0.00
$0.00
C:\Users\Sid\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\LEHOIKHS\12-04-15-Revised-T-G-Alameda-AguUera-Surveys-Changes-Proposal
-
984.00
984.00
984.00
476.00
600.00
1,356.00
740.00
1,818.00
-
-
1,176.00
1,176.00
508.00
1,340.00
-
$12,142.00
$12,142.00
Attachment "D"
Fee Proposal- UT Land Board Parcel
•
DAVID T. COVARRUBIAS, P.E.
SALVADOR H. LOPEZ
MARTIN R. COVARRUBIAS, P.E.
ERNEST J. MECHE, P.E.
.
ALLEN G. SHIAU, P.E.
. WILLIAM "MAC" M. GLEESON, P.E;
. SAM O. PALOMERO, P.E.
.
MD NURUL AMIN, P.E.
JOHNNY E. MARTINEZ, P.E. •.
, LEON A. BERDUGO; P.E.
. BINAYA SHRESTHA, P.E.
STRUCTURAL ENGINEERING
ASSOCIATES, INC.
.· . CONSULTING ENGINEERS .
, 3838N.W. LOOP410
SAN ANTONIO, TX 78229
E-mail:
. [email protected]
(210) 735~9202
FAX(210)735-2074
JOHNNIE C. CHING, P.E.
CHARLES F. GARZA
SIDNEY "SID" A. MIELKE, P.E.
.
DAVID A. ROCHA, P.E.
. ERIC H; JAHELKA, P.E •
.. ADRIAN M: ROMERO, P.E•
MELVIN K. LARA, P.E.'
ALVARO J. LOPEZ, P.E.
• DANIEL M. MORALES, .P.E.
DANIEL B. RODRIGUEZ, P.E.
December 8; 2015,
I
'.,
•
Mr. Slll Alonio .
. .
El Paso County, Public Works Department:
800 E. Overland, Room 407. ·
.
·
El :Pas9; Texas 79901
.
··-
:•"
'
'
REF: '. Manue~ E Aquilera Highw:ayPhaselI.-;c' CSJ# on4-06) i-i
·
1
.J
Proposed Amendment to Professional Services Contract... . .. •• .. ·,
.•. ~·.Modify. :U'ILB Parcel 8 Plats.: ~tc. and, Revise Cqnstructlon Plan Sheet~
·.i
'1
-~
Dear Sal,
,Y
•
.
·- ,Asr~qliested, we have prepared. a fee- pfoposal to provide revisioQs fothe UT Land B.oafd Parcel 8, i~~ise ili~ .
. · · parcel 'plats, revise the metes anci ,bOunds documents, and revise a~l affected consiru~tioti plan sheets.: Servi¢es
" will be.ptovidedj)y SEA ·and our'oSub;.consultant,FrankX. Spencer and·.Associates, Inc:forthi~ amen.Clment
· request: -- , .
·
·' ·
·
-· '
·
· ·
'
·.
· -,
·· - ·
_. __ . ,,·
:•':ciur total fee.proposal fo perfo~·- this work is broken do)V!l a~·t'oiI<lws:
,;,,
'
.~ .'
.,_:-,'
,·
_;'·
,
.-.,.·
_,.;Spe~i~l Coord.iiiaiioJL+SEA~ ,.
.· ·. ·.
._ . _.
·;.=s~~Out Manilel F:Aguilera High,wayfor Fe11cing_'7 FXSA
>i~.;;-::'(:'.
··-"
:<~.
--··,;~.
>
'
..,
:1 467·.36;·:
~
'.12J42.Qo.··;· ·
-'·'".-
·' ,.
<
•
•
•
'
;:'13,(),0?~~6.····-
c •••
·,<'
. The pl~t a~d plan reyisfoµ;w01{by Frank X: Spenc~r. and Associates, Inc'. will be billed as. a)ump ~tun. We are
. ' ·_ prepared to bill for tJ:iese coordination services on ail hourly, as expended,. bas.is with the toml pr,opose<f f~e a
; rioHo exceed anioun(without prior approval.'
as
·-
"·"
·
-
·
·
· ·
s·,
·
< • :. · ·_ .. ·· ' . · - ·. .,.. . -.. · -, ,· - ·
·, -
'
'
·"
',-._l
1'•·'
·····"
,.,,1,.
·1,' ·
'
'
·
-
_·. As· ~lways,we~puld ~ppreciat~ yqur.prompt attention to tw~r~que§t~ and re~am availabfot~·fil!sWer-any; _·
!.,
-;-
questions you.9:rqther~ at ElPaso <::;ounfy may have; · . :
',._.
_'
·' '·
: _.· ·•. .
.i
,;· '
Ct ~:i
.; ~ ..• , i ')
.
· ·.· ." Sin~erely, _ ·
:
"'
,
--
~
- Sidney A i\i:ielke, fE.~ ,
' Senior Proje9t Manager
Mr:DavidT. Covarrubias, P.K, SEA _
Page 1 ofl ·
. '
:
COUNTY OF EL PASO - MANUEL F. AGUILERA HIGHWAY PHASE II
~1111~tru;
CSJ# 0924-06-311
REVISIONS TO UTLB PARCELS. ETC & REVISE CONSTRUCTION PLAN SHEET
STRUCTURAL ENGINEERING ASSOCIATES, INC.
PROPOSED MANHOURSJFEES
Sheet
Description
Project
Manager
OVERALL PROJECT MANAGEMENT
8
Project
Engineer
8-Dec-15
Engineer
CADD
Operator
Engineer
In-Training
Clerical
Total
Hours
8
REVISE PARCEL PLATS, METES AND
BOUNDS & PLAN SHEETS
(See FXSA Breakdown - Attachment}
TOTAL FEE PROPOSAL»»>»»»
Hourly Rates
Total
Fee
$1,467.36
$12,142.00
0
8
0
0
0
0
0
0
0
$0.00
$183.42
$183.42
$135.13
$97.12
$0.00
$0.00
$83.48
$69.75
8
$13,609.36
F:>CSf..\. . :.
---~!-~~~~~-~~·-~!i!j~~-~~~-~~~~---·
Service:
12/8/2015
Surveying & Plan Revision Services.
: 1130 Montana Ave.
El Paso, Texas 79902
Ph: (915) 533.4600 • F: (915) 533.4673
www.fxsa.com • [email protected]
Client:
Project:
UTLand Board - Parcel 8 Part 3, etc - Plat & Construction Plan Revisions
Date:
Frank X. Spencer & Associates, Inc.
SEA
Addltlonal Services.
12/8/2015 0:00
DESCRIPTION OF SERVICES/EXPENSES
TASK DESCRIPTION
....."'
:
~
I
CJ
I
CJ
.
..
c
c
:ii
:ii
.I.
..I.
I
CJ
c
~
.c
..r!!
~
,..
'E
:::>
=
I
:c
al
<
.
tl
I
¥
2'
"l
;;
ft
~
f
4
4
4
0.5
0.5
0.5
1
1
1
2
12
8
2
1
::>
I!
w
:ii
ui...I
a.:rV
~
~
ic
c
u
i.c
Task 1. Revise Parcel 21 and Create New Parcel.
a) Records Search - To be Provided by EP County.
b) Recover Boundary Survey Control.
c) Conduct Recon Survey.
d) Tie Existing Roadway and Water Source.
d) Prepare Working Sketch.
e) Perfortn Boundary Calculations.
f) Prepare (2) Plats of Survey.
g) Prepare (2) Metes and Bounds Descriptions.
h) Set Type II Monuments.
DIRECT & MMaSC• .EXPENSES
OFFICE PERSONNEL
FIELD PERSONNEL
I
Q
Q
Ci
~
0
..."'
~
~
i"'
i
-il
~
:io
$
$
$
$
$
$
$
$
$
$
1
1
1
2
4
2
4
1
:l
JI!
4
~~
7,~<t,<;.UU
-
984.00
984.00
984.00
476.00
600.00
1,356.00
740.00
1,818.00
-
'Ii
Task 2. Revise Englnering Plans.
a) Modify Fence Sheets.
b) Modify Orinage Sheets.
c) Moodify Summary Sheets.
d) Prepare Plans for Change Order.
1
1
4
4
2
4
1
:Ii
$
$
$
$
$
$
$
$
$
8
8
4
10
4 1 .<:uu.UU
1,176.00
1,176.00
508.00
1,340.00
-.
.
.
$
HUUt<~
:S:lJHM
.ABOR .-u:s
I U I AL:.:>
t"'t:K
HOUR
TOTAL LABOR ANO EXPENSE
;l\J
'li1411.00
#######
u
u
;ii11SU.UU i'1i216.uu
$0.00
$0.00
2.:>
:i;30u.uu
$750.00
19
il)00.00
1ti
3
:i;1ou.OO ':ii1tiU.0U
14
:i;90.uu
$1,672.00 $2,400.00 $480.00 $1,260.00
u
3U
:i;8:l.UU
.....,.uu
4
.......w
$0.00
$140.00 $2,460.00
.......oo
u
u
u
u
u
:i;u.ou
$0.60
:i;HO.w
:i;ou.00
$0.00
$0.00
$0.00
$0.00
$0.00
$12,142.00
C:\My Documents\Fabens\associated files\contracts\Amendments -Add'l-Services\amendment#26D - UTLB Parcel 8 Modifications\12-08-15-UTLB PARCEL 8-Surveys-Changes-Rev Plans
$12,142.00