Scope of Work Glover Plaza 1346 Little John Circle Wilmington, NC 2 bedroom Overview: 1. The contractor will be responsible for removal of all debris from the apartment. No debris will be left outside the unit overnight. 2. WHA will not be responsible for any equipment, tools or materials lost or damaged during this project. 3. The Contractor will supply all tools, equipment and materials to complete this work. 4. The Contractor may not park on the grass. 5. The Contractor will ensure that safety practices are performed while on the development. 6. The Contractor must check-in with the Development Manager when entering the site and checkout when exiting. 7. The Contractor will not spray any paint in the apartment. The contractor will apply primer to all surfaces to be painted in the apartment. 8. The Contractor will work hours that will be set by the Development Manager. Interior: General Front & Back Porch: Clean exterior light fixture front & back Clean exterior Screen doors inside and out front and back Clean front & back porch including threshold Living Room: Clean ceiling light fixtures Clean all outlet, switches and wall plates Clean all hardware on doors Clean all windows inside and out Clean and paint all walls in living room Clean and paint ceiling Remove floor tile and treat all floors throughout the apartment pet urine Repair baseboard throughout living room Kitchen: Replace countertop in kitchen Replace filter to range hood Clean GFCI in kitchen Clean kitchen sink Remove/replace tile floors in kitchen and treat floor Paint all walls & ceiling in kitchen Paint interior door in kitchen inside and out Clean kitchen window inside and out Pantry: Strip and wax floor Paint walls of pantry Clean off HWH system in pantry Bathroom: Clean sink, faucet and shower area Clean toilet inside and out Clean medicine cabinet Clean and paint bathroom door Clean window inside and out Clean soap dish/toothbrush holder Clean tile baseboard Replace tile floors in bathroom and treat floor Paint bathroom Bedroom # 1: Paint baseboards Paint walls and ceiling Remove carpet from bedroom closet and treat floor Clean and paint bedroom door Clean windows inside and out Paint shelves inside closet Bedroom #2 Paint baseboards Paint walls and ceiling Remove carpet from bedroom closet and treat floor Clean and paint bedroom door Clean windows inside and out Paint shelves inside closet Contractor will: Remove all nails, screws from walls Patch holes and damaged walls throughout apartment before painting Note: Any additional work items must be pre-approved by the WHA Property Manager.
© Copyright 2026 Paperzz