Untitled - Birla Shakti

1 Page 1of 32
Format No. FP – 036
1) Name of the Unit
: VASAVADATTA CEMENT-SEDAM
2) Combined Clinker Capacity of Line- I, II, III & IV: 6.0 MTPA
4) Validity of Consent: 30.06.2021.
5) Month: March- 2017Combined Cement
Production Line- I, II, III & IV: 9.0 MTPA
3) Raw Materials / Ton of product
(For Line - I, II, III & IV Cement Plant)
Sr Source
No.
1
2
1.
L.S Crusher
2.
3.
4.
5.
6.
7.
8.
Raw mill hopper
Blending Silo
Venting
Kiln Feed
Equipment
Fine Coal Silo.
Fine Coal feeding
equipment.
Clinker Storage
hall
Cement Mill
Hopper.
: Lime Stone : 1.184
Total Clinker Production for March- 2017: 409418.00 MT
: Fly Ash
: 0.125
Total Cement Productions for March- 2017: 450469.00 MT
: Additive
: 0.072
: Gypsum
: 0.027
: Coal (Fuel) : 0.157
Shale
: 0.000
Dia. of
Chimney ht in (m) APC Equipment
Monitoring Time
Emission rate
Emission level
Chimney
date
m3 / H
mg / Nm3
in meters Stipulated Provided Stipulated Provided
Stipulated Provided Stipulated Provided
3
4
5
6
7
8
9
10
11
12
13
Pulse
Pulse jet
0.75
32.0
32.0
jet bag
N.R
N.R
42000
N.R
150
N.R
bag filter
filter
0.70
28.9
28.9
-do-
-do-
10.03.2017 08.35 AM
17000
7553
150
35
1.00
84.0
84.0
-do-
-do-
11.03.2017 09.55 AM
18300
15147
150
36
0.50
20.5
20.5
-do-
-do-
10.03.2017
03.45 PM
5500
4360
150
35
0.50
39.5
39.5
-do-
-do-
-do-
11.05 AM
6500
4649
150
36
0.50
30.5
30.5
-do-
-do-
-do-
09.50 AM
6500
3337
150
33
0.62
40.7
40.7
-do-
-do-
11.03.2017
02.25 PM
20000
11930
150
39
1.00
31.3
31.3
-do-
-do-
17.03.2017 08.20 AM
10800
10399
150
37
LINE - I
2 Page 2 of 32
Format No. FP - 036
Month: March- 2017
Sr.
No.
Source
Dia. of
Chimney
in (m)
1
2
9.
Cement Silo
10.
11.
Packing Plant – I
Packing Plant – II
Chimney height in APC Equipment
Monitoring Time
(m)
date
Stipu`- Provided Stipulated Provided
lated
3
4
5
6
7
8
9
Pulse Jet Pulse Jet
050x0.45 40.0
40.0
17.03.2017 09.50 AM
bag filter bag filter
Emission rate
m3 / H
StipuProvided
Lated
10
11
Emission level
mg / Nm3
StipuProvided
Lated
12
13
15500
10416
150
35
0.80
38.8
38.8
-do-
-do-
24.03.2017
03.30 PM
25000
20891
150
38
0.80
38.8
38.8
-do-
-do-
27.03.2017
10.00 AM
25000
19120
150
37
12.
Clinker Cooler
Venting
3.00
48.0
48.0
ESP
ESP
11.03.2017
11.05 AM
350000
261137
150
31
13.
Coal Mill
1.20
61.9
61.9
Pulse Jet
bag filter
Pulse Jet
bag filter
10.03.2017
2.25 PM
63800
48938
150
30
3.00
80.2
80.2
Bag
House
Bag
House
11.03.2017
08.35 AM
330000
275645
150
27
1.50
49.0
49.0
-do-
Bag
Filter
17.03.2017
11.00 AM
57000
49991
150
32
14.
15.
\
Kiln / Raw Mill
Cement Mill
LINE – I
Page 3 of 32
Format No. FP-036
Month: JANUARY-2017
Sl
No
Dust Load
Kg / H
14
1.
N.R
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
0.15
0.45
0.11
0.10
0.07
0.32
0.24
0.21
0.53
0.45
6.13
1.19
6.69
0.97
Failure of Equipments
No of
Duration of
times
tripping in a
tripped day ( H)
in a day
**
15
16
Total No. of
times tripped
in the
month
17
Total
duration of
tripping in
the month
( H)
18
Actual
concentration
when tripped
19
Format No. FP-037 enclosed.
Format No. FP-037 enclosed.
Dust load in
Kg / Day
during
failure.
20
Total dust in
Kg / month
during
failure
21
Remarks
22
Process Inter
lock
-do-do-do-do-do-do-do-do-do-do-do-do-do-do-
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
LINE - II
Page 4 of 32
Format No. FP-036
: VASAVADATTA CEMENT – SEDAM
: Ref. Page 1 of 22
: Ref. Page 1 of 22
1. Name of the Unit
2. Production capacity
3. Raw Materials / Ton of product
Sl. Source
No
Dia. of
Chimney
in (m)
Chimney
height in (m)
APC Equipment
Stipul Provi
-ated -ded
4
5
36.00 36.00
Stipulated
6
Pulse
jet bag
filter
Provided
7
Pulse
jet bag
filter
1
2
16. Raw mill hopper &
weigh feeders
3
0.80
17. Raw meal silo
0.70
90.05
90.05
-do-
-do-
18. Kiln Feed fluidor &
weigh bin
19. Cement Mill hopper
0.60
22.47
22.47
-do-
-do-
0.50
35.00
35.00
-do-
-do-
20. Poly Com & bucket
elevator
21. Static separator
1.00
35.00
35.00
-do-
-do-
0.50
40.00
40.00
-do-
-do-
Monitoring
Date
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Time
Emission Rate
m3 / Hr
Emission Level
mg / Nm3
Stipul- Provided
ated
10
11
Stipu- Provlated Ided
12
13
8
9
03.03.2017
08.30 AM
25000
17208
150
35
-do-
02.30 PM
20000
12801
150
40
-do-
09.45 AM
14000
9502
150
38
21.03.2017
08.40 AM
12000
5419
150
34
-do-
09.55 AM
50000
32668
150
38
-do-
11.00 AM
12000
7239
150
39
LINE - II
Page 5 of 32
Format No. FP-036
Month: March- 2017
Sr.
No
Source
Dia. of
Chimney
in (m)
Chimney
height in (m)
Emission Rate
m3 / H
APC Equipment
Stipulated
Provi
-ded
Stipulated
Provided
Monitoring
Date
Time
Emission Level
mg / Nm3
Stipulated
Provided
Stipulated
ProvIded
1
2
3
4
5
6
7
8
9
10
11
12
13
22.
Packer M/C-I
0.80
33.00
33.00
Pulse
jet bag
filter
Pulse
jet bag
filter
23.03.2017
02.30 PM
25000
15750
150
36
0.80
33.00
33.00
,,
,,
03.40 PM
25000
18504
150
39
0.80
33.00
33.00
,,
,,
-do-
04.50 PM
25000
19908
150
40
0.80
33.00
33.00
,,
,,
31.03.2017
10.30 AM
25000
17802
150
35
0.40
41.50
41.50
,,
,,
21.03.2017
04.10 PM
6000
5112
150
38
0.40
41.50
41.50
,,
,,
04.03.2017
02.15 PM
6000
4734
150
35
23.
24.
25.
26.
27.
Packer M/C-II
Packer M/C-III
Packer M/C-IV
Cement Silo-I
Cement Silo-II
-do-
LINE - II
Page 6 of 32
Format No. FP-036
Month: March- 2017
Sr.
No
Source
Dia. of
chimney
in (m)
Chimney height
in (m)
Stipul- Proviated
ded
APC Equipment
Stipulated
Provided
6
Pulse
jet bag
filter
Bag
House
7
Pulse
jet bag
filter
Bag
House
ESP
1
2
3
4
5
28.
Cement silo-III
0.40
41.50
41.50
3.50
100.00
100.00
3.20
48.00
48.00
ESP
1.40
52.00
52.00
ESP
100.00
Pulse
jet bag
filter
29.
30.
31.
32.
Raw Mill / Kiln
Clinker Cooler
Cement Mill
Coal Mill
1.30
100.00
Bag
Filter
Pulse
jet bag
filter
Monitoring
Date
Time
Emission Rate
m3 / H
Stipulated
Provided
Emission Level
mg / Nm3
Stipu- Provlated Ided
8
9
10
11
12
13
04.03.2017
03.55 PM
6000
4441
150
39
03.03.2017
11.00 AM
6,50,000
370293
150
26
04.03.2017
08.40 AM
4,60,000
286434
150
33
21.03.2017
02.35 PM
1,00,000
77387
150
35
04.03.2017
10.00 AM
1,25,000
74986
150
33
LINE-II
Sl
No
Dust load
Kg / H
14
Failure of Equipments
No of times Duration of
tripped in a tripping in a
day **
day ( H)
15
16
Total No. of
times tripped
in the
month
Total duration
of tripping in
the month
( H)
17
18
Page 7 of 32
Format No. FP – 036
Month: March- 2017
Actual
Dust load in
concentration Kg / Day
when tripped during
failure.
19
20
Total dust in Remarks
Kg / month
during
failure
21
22
Process
16.
0.45
Inter lock
17.
0.35
-do18.
0.31
-do19.
0.14
-do-do20
0.76
21.
0.23
-do22.
0.46
-do23.
0.60
-do24.
0.50
-do25.
0.39
-do26.
0.13
-do27.
0.13
-do28.
0.12
-do29.
6.69
Format No FP – 037 enclosed
-do30.
6.02
-do31.
2.03
Format No. FP-037 enclosed.
-do32.
1.61
-do** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
THERMAL POWER PLANT
Page 8 of 32
Format No. FP - 036
1. Name of the Unit
2. Production Capacity of Power Plant in MW
3. Raw Materials Consumption
Sr.
No
1
33.
34.
35.
36.
Source
2
Boiler
70 TPH
Coal
Crusher
100 KVA
D.G. Set
Boiler 42
TPH
Dia. of
Chimney
in (m)
Chimney
height
(in m)
Stipu Provi
lated -ded
: VASAVADATTA CEMENT – SEDAM
: TPP # 1, 15.7 (Peak capacity 16.2)
:
Coal: 0.822 kg/kwh
TPP# 2, 9.5 MW, Coal: 0.779 kg/kwh
APC Equipment
Monitoring
date
Stipulated
Provided
Time
4) Validity of Consent : 30.06.2021.
5) Month
: March- 2017
Emission Rate
m3 / H
Stipulat Provided
-ed
Emission level
mg/Nm3
Stipu- Provlated
ided
3
4
5
6
7
8
9
10
11
12
13
1.85
75
75
ESP
ESP
15.03.2017
08.30 AM
140508
116131
150
35
0.5x 0.4
15.20
15.20
Pulse jet
bag filter
Pulse jet
bag filter
09.03.2017
11.40 AM
20000
9640
150
37
0.127
8.0
8.0
Chimney
Chimney
1.90
65
65
ESP
ESP
Not running
09.03.2017
09.00 AM
378
91919
150
76293
150
40
THERMAL POWER PLANT
Page 9 of 32
Format No FP-036
Month: March- 2017
Sl.
No
Dust load
Kg / H
14
33.
3.77
34.
35.
36.
0.25
2.34
Failure of Equipments
No of times
Duration of
tripped in a
tripping in a
day **
day ( H)
15
Format NoFP-037
enclosed
16
Total No. of
times tripped
in the
month
Total
duration of
tripping in
the month
(H)
Actual
concentration
when tripped
Dust load in
Kg/ day
during
failure.
Total dust in
Kg / month
during
failure
17
18
19
20
21
Remarks
22
Process
Inter lock
-do-do-
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
LINE - III
Page 10 of 32
Format No. FP-036
: VASAVADATTA CEMENT – SEDAM
: Ref. Page 1 of 22
: Ref. Page 1 of 22
1. Name of the Unit
2. Production capacity
3. Raw Materials / T of product
Sl. Source
No
1
37.
38.
39.
40.
41.
Dia. of
Chimney
in m
2
Raw mill / Kiln
Clinker Cooler ESP
Coal Mill
Cement Mill
Crusher (Located at
Mines)
3
Chimney
height in (m)
APC Equipment
Stipul Provi
-ated -ded
4
5
Stipulated
6
Provided
7
Monitoring
Date
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Time
8
9
Emission Rate
m3 / H
Emission Level
mg / Nm3
Stipulated
10
11
Stipulated
12
ProvIded
13
Provided
4.25
70.00
70.00
Bag
House
Bag
House
07.03.2017
08.45 AM
9,25,560
631398
50
25
3.35
50.00
50.00
ESP
ESP
-do-
11.15 AM
5,71,428
376133
50
34
1.80
52.00
52.00
Bag
Filter
Bag
Filter
-do-
10.10 AM
1,75,000
119839
50
35
1.40
52.00
52.00
-do-
-do-
01.03.2017
08.40 AM
1,00,000
62425
50
34
1.50
32.00
32.00
-do-
-do-
01.03.2017
03.15 PM
63000
55596
50
29
LINE-III
Page 11of 32
Format No. FP-036
Month: March- 2017
Sl
No
Dust load
Kg / H
14
Failure of Equipments
No of times Duration of
tripped in a tripping in a
day **
day ( H.)
15
16
Total No. of
times tripped
in the
month
Total duration
of tripping in
the month
( Hs)
17
18
Actual
Dust load in
concentration Kg/ Day
when tripped during
failure.
19
20
Total dust in Remarks
Kg / month
during
failure
21
22
Process
Inter lock
37
10.18
38
9.69
-do-
39
2.71
-do-
40
1.45
-do-
41
1.29
-do-
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
TPP-III
Page 12 of 32
Format No. FP - 036
1. Name of the Unit
2. Production Capacity of Power Plant in MW
3. Raw Materials Consumption
Sr.
No
Source
1
42.
2
Boiler
80 TPH
Dia. of
Chimney
in (m)
3
2.45
Chimney
height
(in m.)
Stip Provi
u
-ded
lated
4
5
80
80
: VASAVADATTA CEMENT – SEDAM
: TPP # 3,
18 MW
: Coal: 0.824 kg/kwh
APC Equipment
Monitoring
date
Stipulated
Provided
6
7
8
ESP
ESP
15.03.2017
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Emission Rate
m3 / hr
Time
Emission level
mg/Nm3
Provided
Stipulated
Stipulated
Provided
9
10
11
12
13
10.00 AM
2,08,152
132595
150
38
TPP-III
THERMAL POWER PLANT
Page 13of 32
Format No FP-036
Month: March- 2017
Sl.
No
Dust load
Kg / H
14
42
3.45
Failure of Equipments
No of times
Duration of
tripped in a
tripping in a
day **
day ( H)
15
Format NoFP-037
enclosed
16
Total No. of
times tripped
in the
month
Total
duration of
tripping in
the month
( H)
Actual
concentration
when tripped
Dust load in
Kg / day
during
failure.
Total dust in
Kg / month
during
failure
17
18
19
20
21
Remarks
22
Process
Inter lock
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
Time of tripping/failure, duration, reason for failure and connected details should be reported.
Page 14 of 32
Format No FP-036
Month: March- 2017
DG SETS
Sl. Source
No
Dia. of
Chimney
in (m)
Chimney
height in (m)
APC Equipment
Stipul Provi
-ated -ded
4
5
Stipulated
6
Provided
7
1
2
3
43.
Kiln-I 125 KVA
DG set
0.108
5.00
8.50
Chimney
Chimney
44.
Kiln-II 125 KVA
DG set
0.175
5.00
8.75
Chimney
45.
Kiln-III 380 KVA
DG set
0.136
6.00
11.90
0.089
5.00
5.00
46.
Boiler 42 TPH 250
KVA DG set
Monitori Time
ng
Date
8
9
Emission Rate
m3 / H
Stipul- Provide
ated
d
Emission Level
mg / Nm3
Stipu- Provlated
Ided
10
11
12
13
Not run as there
was no power
failure
3786
---
---
---
Chimney
--do--
3786
---
---
---
Chimney
Chimney
--do--
3786
---
---
---
Chimney
Chimney
--do--
3786
---
---
---
DG SETS
Sl
No
Dust Load
Kg / H
43
44
45
46
14
-------------
Failure of Equipments
No of
Duration of
times
tripping in a
tripped day ( H)
in a day
**
15
16
Total No. of
times tripped
in the
month
17
Page 15 of 32
Format No. FP – 036
Month: March- 2017
Total
duration of
tripping in
the month
(H)
18
Actual
concentration
when tripped
19
Dust load in
Kg / Day
during
failure.
20
Total dust in
Kg / month
during
failure
21
Remarks
22
-------------
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
LINE - IV
Page 16 of 32
Format No. FP-036
: VASAVADATTA CEMENT – SEDAM
: Ref. Page 1 of 22
: Ref. Page 1 of 22
1. Name of the Unit
2. Production capacity
3. Raw Materials / T of product
Sl.
No
Source
Dia. of
Chimney
in (m)
Chimney height
in (m)
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Emission Rate
m3 / H
APC Equipment
Monitoring
Date
Time
Emission
Level
mg / Nm3
8
9
10
11
Stip
ulated
12
08.03.2017
08.35 AM
9,25,560
937902
50
26
ESP
-do-
11.10 AM
5,71,428
484371
50
32
Bag
Filter
Bag
Filter
-do-
09.50 AM
1,75,000
168123
50
33
52.00
-do-
-do-
14.03.2017
09.00 AM
1,00,000
65308
50
32
12.8
Chimney
Chimn
ey
3,786
N.R
50
N.R
Stipulated
Provided
Stipulated
Provided
6
Bag
House
7
Bag
House
1
2
3
4
5
47.
Raw mill / Kiln
4.25
70.00
70.00
48
Clinker Cooler ESP
3.35
48.00
50.00
ESP
49
Coal Mill
1.80
50.00
52.00
50
Cement Mill
1.40
52.00
51
Kiln –IV 380 KVA
DG Set
0.136
12.8
Not run as there was no
power failure
Stipulated
Provided
ProvIded
Page 17of 32
Format No. FP-036
Month: March- 2017
LINE-IV
Sl
No
Dust load
Kg / H
14
Failure of Equipments
No of times Duration of
tripped in a tripping in a
day **
day ( H)
15
16
Total No. of
times tripped
in the
month
Total duration
of tripping in
the month
(H)
17
18
Actual
Dust load in
concentration Kg / Day
when tripped during
failure.
19
20
Total dust in Remarks
Kg / month
during
failure
21
22
Process
Inter lock
47
18.75
48
10.92
-do-
49
4.19
-do-
50
1.26
-do-
51
N.R
---
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
Page 18 of 32
Format No. FP - 036
TPP-IV
1. Name of the Unit
2. Production Capacity of Power Plant in MW
3. Raw Materials Consumption
Sl
No
Source
Dia. of
Chimney
in (m)
1
2
CPP-18
MW
3
52.
Boiler
80 TPH
2.45
Chimney
height
(in m)
Stip Provi
u
-ded
lated
4
5
80
80
: VASAVADATTA CEMENT – SEDAM
: TPP # 4,
18 MW
: Coal: 0.828 kg/kwh
APC Equipment
Monitoring
date
Time
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Emission Rate
m3 / hr
Stipulat- Provided
ed
Emission level
mg/Nm3
Stipu- Provlated
ided
Stipulated
Provided
6
7
8
9
10
11
12
13
ESP
ESP
09.03.2017
10.35 AM
2,81,000
134971
150
35
Page 19 of 32
Format No FP-036
Month: March- 2017
TPP-IV
THERMAL POWER PLANT
Sl.
No
Dust load
Kg / H
14
52
3.55
Failure of Equipments
No of times
Duration of
tripped in a
tripping in a
day **
day ( H)
15
Format NoFP-037
enclosed
16
Total No. of
times tripped
in the
month
Total
duration of
tripping in
the month
(H)
Actual
concentration
when tripped
Dust load in
Kg / day
during
failure.
Total dust in
Kg / month
during
failure
17
18
19
20
21
Remarks
22
Process
Inter lock
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
Page 20 of 32
Format No FP-036
Month: March- 2017
DG SETS (TPP-IV)
Sr. Source
No
1
2
53. Boiler 80 TPH 380
KVA DG set
Dia. of
Chimney
in (m)
3
0.136
Chimney
height in (m)
APC Equipment
Stipul Provi
-ated -ded
4
5
5.20
5.20
Stipulated
6
Provided
7
Chimney
Chimney
Monitori Time
ng
Date
8
9
Not run as there
was no power
failure
Emission Rate
m3 / H
Stipul- Provide
ated
d
10
3786
11
---
Emission Level
mg / Nm3
Stipu- Provlated
Ided
12
---
13
---
DG SETS (TPP-IV)
Page 21 of 32
Format No. FP – 036
Month: March- 2017
Sr.
No
Dust Load
Kg / H
53
14
----
Failure of Equipments
No of
Duration of
times
tripping in a
tripped day ( H)
in a day
**
15
16
Total No. of
times tripped
in the
month
17
Total
duration of
tripping in
the month
(H)
18
Actual
concentration
when tripped
19
Dust load in
Kg / Day
during
failure.
20
Total dust in
Kg / month
during
failure
21
Remarks
22
---
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
Page 22 of 32
Format No. FP - 036
TPP-V
1. Name of the Unit
2. Production Capacity of Power Plant in MW
3. Raw Materials Consumption
Sr.
No
Source
Dia. of
Chimney
in (m).
1
2
CPP-18
MW
3
52.
Boiler
80 TPH
2.45
Chimney
height
(in m)
Stip Provi
u
-ded
lated
4
5
80
80
: VASAVADATTA CEMENT – SEDAM
: TPP # 5,
18 MW
: Coal: 0.822 kg/kwh
APC Equipment
Monitoring
date
Time
4) Validity of Consent: 30.06.2021.
5) Month
: March- 2017
Emission Rate
m3 / H
Stipulat- Provided
ed
Emission level
mg/Nm3
Stipu- Provlated
ided
Stipulated
Provided
6
7
8
9
10
11
12
13
ESP
ESP
15.03.2017
11.15 AM
2,81,000
158910
50
36
Page 23 of 32
Format No FP-036
Month: March- 2017
TPP-V
THERMAL POWER PLANT
Sr.
No
Dust load
Kg / H
14
52
3.51
Failure of Equipments
No of times
Duration of
tripped in a
tripping in a
day **
day ( H)
15
Format NoFP-037
enclosed
16
Total No. of
times tripped
in the
month
Total
duration of
tripping in
the month
(H)
Actual
concentration
when tripped
Dust load in
Kg / day
during
failure.
Total dust in
Kg / month
during
failure
17
18
19
20
21
Remarks
22
Process
Inter lock
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
Page 24 of 32
Format No FP-036
Month: March- 2017
DG SETS (TPP-V)
Sr. Source
No
1
53.
2
Boiler 80 TPH 380
KVA DG set
Dia. of
Chimney
in (m)
3
0.136
Chimney
height in (m)
APC Equipment
Stipul Provi
-ated -ded
4
5
Stipulated
6
5.20
5.20
Chimney
Provided
7
Chimney
Monitori Time
ng
Date
8
9
Not run as there
was no power
failure
Emission Rate
m3 / H
Stipul- Provide
ated
d
Emission Level
mg / Nm3
Stipu- Provlated
Ided
10
11
12
13
3786
---
---
---
Page 25 of 32
Format No. FP – 036
Month: March- 2017
DG SETS (TPP-V)
Sl
No
Dust Load
Kg / H
53
14
----
Failure of Equipments
No of
Duration of
times
tripping in a
tripped day ( H)
in a day
**
15
16
Total No. of
times tripped
in the
month
17
Total
duration of
tripping in
the month
( H)
18
Actual
concentration
when tripped
19
Dust load in
Kg / Day
during
failure.
20
Total dust in
Kg / month
during
failure
21
Remarks
22
---
** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date,
time of tripping/failure, duration, reason for failure and connected details should be reported.
NAME OF UNIT
LOCATION OF A.A.Q.M. STATION.
MONTH
WEEK NO.
VASAVADATTA CEMENT, SEDAM
GUEST HOUSE
March- 2017
TIME
S.NO
MONITORING DATE
DAY NO
1
2
3
1
06.03.2017 to 07-03-2017
2&3
09.50 AM
2
09.03.2017 to 10-03-2017
5&6
3
13.03.2017 to 14.03.2017
4
CONCENTRATION IN Micro-gm/m
TO
3
WIND
PM10
PM2.5
SO2
NOX
DIRECTION
5
6
7
8
9
09.45 AM
59
21
5.10
18.60
NE
10.00 AM
09.55 AM
57
20
5.99
19.85
N
2&3
09.50 AM
09.45 AM
58
16
7.49
19.10
S
16.03.2017 to 17.03.2017
5&6
10.05 AM
10.00 AM
57
17
6.24
17.85
5
20.03.2017 to 21.03.2017
2&3
10.20 AM
10.15 AM
56
19
7.69
19.60
6
23.03.2017 to 24.03.2017
5&6
10.10 AM
10.05 AM
57
16
9.14
21.10
7
27.03.2017 to 28.03.2017
2&3
10.00 AM
09.55 AM
55
17
10.14
21.95
8
30.03.2017 to 31.03.2017
5&6
10.30 AM
10.25 AM
54
19
9.29
20.90
57
18
7.64
19.87
24 Hourly Average.
FROM
PAGE NO 26 OF 32
FORMAT NO FP-036
ANNEXURE - V
WEEKLY REPORT.
4
N
N
N
N
N
REMARK
S
10
NAME OF THE UNIT
LOCATION OF A.A.Q.M. STATION.
MONTH
WEEK NO.
VASAVADATTA CEMENT SEDAM
SEDAM TOWN
March-2017
TIME
SL.NO
MONITORING DATE
DAY NO
1
2
3
1
06.03.2017 to 07-03-2017
2&3
ˉ
2
09.03.2017 to 10-03-2017
5&6
3
13.03.2017 to 14.03.2017
4
CONCENTRATION IN Micro-gm/m
TO
3
WIND
PM10
PM2.5
SO2
NOX
5
6
7
8
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
2&3
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
16.03.2017 to 17.03.2017
5&6
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
5
20.03.2017 to 21.03.2017
2&3
11.45 AM
11.40 AM
56
17
ˉ
ˉ
N
6
23.03.2017 to 24.03.2017
5&6
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
7
27.03.2017 to 28.03.2017
2&3
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
8
30.03.2017 to 31.03.2017
5&6
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
ˉ
56
17
ˉ
ˉ
24 Hourly Average.
FROM
PAGE NO. 27 OF 32
FORMAT NO FP-036
ANNEXURE - V
WEEKLY REPORT.
4
-
REMARKS
DIRECTION
10
NAME OF UNIT
LOCATION OF A.A.Q.M STATION.
MONTH
WEEK NO.
VASAVADATTA CEMENT SEDAM
DAIRY FARM
March- 2017
TIME
PAGE NO 28 of 32
FORMAT NO FP-036
ANNEXURE - V
WEEKLY REPORT.
CONCENTRATION IN Micro-gm/m
3
PM10
PM2.5
SO2
NOX
WIND
DIRECTION
REMARKS
5
6
7
8
9
10
10.10 AM
64
22
4.26
16.45
NE
10.45 AM
10.40 AM
62
20
5.51
18.20
N
2&3
10.35 AM
10.30 AM
63
21
6.74
19.15
S
16.03.2017 to 17.03.2017
5&6
10.20 AM
10.15 AM
60
19
4.89
17.90
N
5
20.03.2017 to 21.03.2017
2&3
10.50 AM
10.45 AM
59
18
3.64
16.85
N
6
23.03.2017 to 24.03.2017
5&6
10.40 AM
10.35AM
60
19
4.53
17.60
N
7
27.03.2017 to 28.03.2017
2&3
10.25 AM
10.20 AM
58
18
6.68
18.85
N
8
30.03.2017 to 31.03.2017
5&6
10.20 AM
10.15 AM
60
19
5.43
17.60
N
61
20
5.21
17.83
S.NO
MONITORING DATE
1
2
3
1
06.03.2017 to 07-03-2017
2&3
10.15 AM
2
09.03.2017 to 10-03-2017
5&6
3
13.03.2017 to 14.03.2017
4
24 Hourly Average.
DAY NO
FROM
TO
4
NAME OF UNIT
LOCATION OF A.A.Q.M STATION.
VASAVADATTA CEMENT, SEDAM
MINES SUBSTATION
PAGE NO 29 of 32
FORMAT NO FP-036
MONTH
March-2017
ANNEXURE - V
WEEK NO.
WEEKLY REPORT.
TIME
S.NO
MONITORING DATE
DAY NO
TO
1
2
3
1
06.03.2017 to 07-03-2017
2&3
08.35 AM
08.30 AM
2
09.03.2017 to 10-03-2017
5&6
08.45 AM
08.40 AM
3
13.03.2017 to 14.03.2017
2&3
08.40 AM
4
16.03.2017 to 17.03.2017
5&6
5
20.03.2017 to 21.03.2017
6
WIND
PM10
PM2.5
SO2
NOX
DIRECTION
5
6
7
8
9
24
6.25
16.85
NE
63
23
7.00
08.35 AM
62
22
8.25
17.45
08.45 AM
08.40 AM
61
21
7.50
16.20
2&3
08.50 AM
08.45 AM
62
22
8.95
16.95
23.03.2017 to 24.03.2017
5&6
08.45 AM
08.40 AM
60
19
7.70
15.70
7
27.03.2017 to 28.03.2017
2&3
08.40 AM
08.35 AM
59
20
8.75
17.55
8
30.03.2017 to 31.03.2017
5&6
08.55 AM
08.50 AM
61
22
9.50
18.05
62
22
7.99
16.79
24 Hourly Average.
FROM
CONCENTRATION IN Micro-gm/m
3
4
15.60
N
S
N
N
N
N
N
REMARKS
10
NAME OF UNIT
LOCATION OF A.A.Q.M. STATION.
MONTH
WEEK NO.
VASAVADATTA CEMENT, SEDAM
Power Plant
March 2017
TIME
PAGE NO 30 of 32
FORMAT NO FP-036
ANNEXURE -V
WEEKLY REPORT.
3
PM2.5
SO2
NOX
WIND
DIRECTION
REMARKS
PM10
5
6
7
8
9
10
09.10 AM
67
26
7.11
20.75
NE
09.25 AM
09.20 AM
66
25
8.11
20.00
N
2&3
09.20 AM
09.15 AM
65
23
7.36
21.85
S
16.03.2017 to 17.03.2017
5&6
09.30 AM
09.25 AM
64
22
6.11
20.60
5
20.03.2017 to 21.03.2017
2&3
09.35 AM
09.30 AM
63
20
7.36
22.35
6
23.03.2017 to 24.03.2017
5&6
09.30 AM
09.25 AM
62
21
6.61
21.10
7
27.03.2017 to 28.03.2017
2&3
09.25 AM
09.20 AM
62
22
7.86
22.65
8
30.03.2017 to 31.03.2017
5&6
09.50 AM
09.45 AM
63
20
6.61
21.40
64
22
7.14
21.34
S.NO
MONITORING DATE
DAY NO
1
2
3
1
06.03.2017 to 07-03-2017
2&3
09.15 AM
2
09.03.2017 to 10-03-2017
5&6
3
13.03.2017 to 14.03.2017
4
24 Hourly Average.
FROM
CONCENTRATION IN Micro-gm/m
TO
4
N
N
N
N
N
NAME OF UNIT
LOCATION OF A.A.Q.M. STATION.
MONTH
WEEK NO.
VASAVADATTA CEMENT SEDAM
LIONS BHAVAN
March- 2017
TIME
PAGE NO 31 OF 32
FORMAT NO FP-036
ANNEXURE - V
WEEKLY REPORT.
CONCENTRATION IN Micro-gm/m
3
PM10
PM2.5
SO2
NOX
WIND
DIRECTION
5
6
7
8
9
10.45 AM
63
25
6.80
21.50
NE
11.20 AM
11.15 AM
62
24
5.55
20.25
N
2&3
11.10 AM
11.05 AM
60
20
7.30
22.10
S
16.03.2017 to 17.03.2017
5&6
11.05 AM
11.00 AM
61
22
8.35
22.85
5
20.03.2017 to 21.03.2017
2&3
11.00AM
10.55AM
56
16
6.85
21.60
6
23.03.2017 to 24.03.2017
5&6
11.05 AM
11.00 AM
57
18
7.70
22.35
7
27.03.2017 to 28.03.2017
2&3
10.45 AM
10.40 AM
59
22
6.45
21.30
8
30.03.2017 to 31.03.2017
5&6
11.05 AM
11.00 AM
56
17
8.40
22.25
59
21
7.18
21.78
S.NO
MONITORING DATE
DAY NO
1
2
3
1
06.03.2017 to 07-03-2017
2&3
10.50 AM
2
09.03.2017 to 10-03-2017
5&6
3
13.03.2017 to 14.03.2017
4
24 Hourly Average.
FROM
TO
4
N
N
N
N
N
REMARKS
10
FLY ASH UTILIZATION PROFORMA
Page No: 32 of 32
Format No: FP-036
March- 2017
Utilization ( MT / Year )
Quantity of fly ash
generated / Year
MT / Year
1
Capacity
RTPS/Parli/
Kesoram/Ada
M/s VC
ni/BTPS/JSW/
NTPC
Average
15.7 MW,
9.5 MW, 111119.0
+
18 MW,
15151.0
M/s
18 MW
Vasavadatta
&
Cement
18 MW 126270.0
Sedam
coal
based
Thermal
power
plant
M/s VC
RTPS/Parli/
Kesoram/
Adani/BTPS/
JSW/NTPC
Others
Name &
Address of
The unit
Cement Industries
Bricks
S.No
Total
Utilized
MT / Year
M/s VC
RTPS/Parli/
Kesoram/
Adani/BTPS/
JSW/NTPC
378924.54
+
38658.47
111119
+
15151.00
374725.3
+
40989.860
111119
+
15151.00
374725.3
+
40989.860
417583.01
126270.0
415715.16
126270.0
415715.16
Unutilized
quantity
MT /Year
RTPS/Parli Percentage
/Kesoram/
M/s
Adani /
VC
BTPS/
JSW/NTP
C
0.0
1867.850
100 % for
VC Ash
includes
Bed ash
also.
Remarks
Values
for the
month of
March 2017
Page 1 of 7.
Format No. FP-037.
LINE-1
a.) KILN ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF
DATE
STOP
START
TOTAL NO.
OF MINUTES
MARCH- 2017.
REMARKS
--- NIL---
b.) CEMENT MILL ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
--- NIL---
REMARKS
Page 2 of 7.
Format No. FP-037.
LINE-II
a) KILN ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
REMARKS
---NIL---
b) CEMENT MILL ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
---NIL---
REMARKS
Page 3 of 7.
Format No. FP-037.
POWER PLANT (TPP # 1)
BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
REMARKS
---NIL---
POWER PLANT (TPP # 2)
BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
---NIL---
REMARKS
Page 4 of 7.
Format No. FP-037.
LINE-III
a.) KILN BAG HOUSE STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
REMARKS
--- NIL---
b.) CEMENT MILL BAG FILTER STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
--- NIL---
REMARKS
Page 5 of 7.
Format No. FP-037.
POWER PLANT (TPP # 3 )
BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
--- NIL---
REMARKS
Page 6 of 7.
Format No. FP-037.
LINE-IV
a) KILN BAG HOUSE STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
REMARKS
--- NIL---
b) CEMENT MILL BAG FILTER STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
--- NIL---
REMARKS
Page 7 of 7.
Format No. FP-037.
POWER PLANT (TPP # 4 )
BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
REMARKS
--- NIL---
POWER PLANT (TPP # 5)
BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017.
DATE
STOP
START
TOTAL NO.
OF MINUTES
--- NIL---
REMARKS