1 Page 1of 32 Format No. FP – 036 1) Name of the Unit : VASAVADATTA CEMENT-SEDAM 2) Combined Clinker Capacity of Line- I, II, III & IV: 6.0 MTPA 4) Validity of Consent: 30.06.2021. 5) Month: March- 2017Combined Cement Production Line- I, II, III & IV: 9.0 MTPA 3) Raw Materials / Ton of product (For Line - I, II, III & IV Cement Plant) Sr Source No. 1 2 1. L.S Crusher 2. 3. 4. 5. 6. 7. 8. Raw mill hopper Blending Silo Venting Kiln Feed Equipment Fine Coal Silo. Fine Coal feeding equipment. Clinker Storage hall Cement Mill Hopper. : Lime Stone : 1.184 Total Clinker Production for March- 2017: 409418.00 MT : Fly Ash : 0.125 Total Cement Productions for March- 2017: 450469.00 MT : Additive : 0.072 : Gypsum : 0.027 : Coal (Fuel) : 0.157 Shale : 0.000 Dia. of Chimney ht in (m) APC Equipment Monitoring Time Emission rate Emission level Chimney date m3 / H mg / Nm3 in meters Stipulated Provided Stipulated Provided Stipulated Provided Stipulated Provided 3 4 5 6 7 8 9 10 11 12 13 Pulse Pulse jet 0.75 32.0 32.0 jet bag N.R N.R 42000 N.R 150 N.R bag filter filter 0.70 28.9 28.9 -do- -do- 10.03.2017 08.35 AM 17000 7553 150 35 1.00 84.0 84.0 -do- -do- 11.03.2017 09.55 AM 18300 15147 150 36 0.50 20.5 20.5 -do- -do- 10.03.2017 03.45 PM 5500 4360 150 35 0.50 39.5 39.5 -do- -do- -do- 11.05 AM 6500 4649 150 36 0.50 30.5 30.5 -do- -do- -do- 09.50 AM 6500 3337 150 33 0.62 40.7 40.7 -do- -do- 11.03.2017 02.25 PM 20000 11930 150 39 1.00 31.3 31.3 -do- -do- 17.03.2017 08.20 AM 10800 10399 150 37 LINE - I 2 Page 2 of 32 Format No. FP - 036 Month: March- 2017 Sr. No. Source Dia. of Chimney in (m) 1 2 9. Cement Silo 10. 11. Packing Plant – I Packing Plant – II Chimney height in APC Equipment Monitoring Time (m) date Stipu`- Provided Stipulated Provided lated 3 4 5 6 7 8 9 Pulse Jet Pulse Jet 050x0.45 40.0 40.0 17.03.2017 09.50 AM bag filter bag filter Emission rate m3 / H StipuProvided Lated 10 11 Emission level mg / Nm3 StipuProvided Lated 12 13 15500 10416 150 35 0.80 38.8 38.8 -do- -do- 24.03.2017 03.30 PM 25000 20891 150 38 0.80 38.8 38.8 -do- -do- 27.03.2017 10.00 AM 25000 19120 150 37 12. Clinker Cooler Venting 3.00 48.0 48.0 ESP ESP 11.03.2017 11.05 AM 350000 261137 150 31 13. Coal Mill 1.20 61.9 61.9 Pulse Jet bag filter Pulse Jet bag filter 10.03.2017 2.25 PM 63800 48938 150 30 3.00 80.2 80.2 Bag House Bag House 11.03.2017 08.35 AM 330000 275645 150 27 1.50 49.0 49.0 -do- Bag Filter 17.03.2017 11.00 AM 57000 49991 150 32 14. 15. \ Kiln / Raw Mill Cement Mill LINE – I Page 3 of 32 Format No. FP-036 Month: JANUARY-2017 Sl No Dust Load Kg / H 14 1. N.R 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 0.15 0.45 0.11 0.10 0.07 0.32 0.24 0.21 0.53 0.45 6.13 1.19 6.69 0.97 Failure of Equipments No of Duration of times tripping in a tripped day ( H) in a day ** 15 16 Total No. of times tripped in the month 17 Total duration of tripping in the month ( H) 18 Actual concentration when tripped 19 Format No. FP-037 enclosed. Format No. FP-037 enclosed. Dust load in Kg / Day during failure. 20 Total dust in Kg / month during failure 21 Remarks 22 Process Inter lock -do-do-do-do-do-do-do-do-do-do-do-do-do-do- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. LINE - II Page 4 of 32 Format No. FP-036 : VASAVADATTA CEMENT – SEDAM : Ref. Page 1 of 22 : Ref. Page 1 of 22 1. Name of the Unit 2. Production capacity 3. Raw Materials / Ton of product Sl. Source No Dia. of Chimney in (m) Chimney height in (m) APC Equipment Stipul Provi -ated -ded 4 5 36.00 36.00 Stipulated 6 Pulse jet bag filter Provided 7 Pulse jet bag filter 1 2 16. Raw mill hopper & weigh feeders 3 0.80 17. Raw meal silo 0.70 90.05 90.05 -do- -do- 18. Kiln Feed fluidor & weigh bin 19. Cement Mill hopper 0.60 22.47 22.47 -do- -do- 0.50 35.00 35.00 -do- -do- 20. Poly Com & bucket elevator 21. Static separator 1.00 35.00 35.00 -do- -do- 0.50 40.00 40.00 -do- -do- Monitoring Date 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Time Emission Rate m3 / Hr Emission Level mg / Nm3 Stipul- Provided ated 10 11 Stipu- Provlated Ided 12 13 8 9 03.03.2017 08.30 AM 25000 17208 150 35 -do- 02.30 PM 20000 12801 150 40 -do- 09.45 AM 14000 9502 150 38 21.03.2017 08.40 AM 12000 5419 150 34 -do- 09.55 AM 50000 32668 150 38 -do- 11.00 AM 12000 7239 150 39 LINE - II Page 5 of 32 Format No. FP-036 Month: March- 2017 Sr. No Source Dia. of Chimney in (m) Chimney height in (m) Emission Rate m3 / H APC Equipment Stipulated Provi -ded Stipulated Provided Monitoring Date Time Emission Level mg / Nm3 Stipulated Provided Stipulated ProvIded 1 2 3 4 5 6 7 8 9 10 11 12 13 22. Packer M/C-I 0.80 33.00 33.00 Pulse jet bag filter Pulse jet bag filter 23.03.2017 02.30 PM 25000 15750 150 36 0.80 33.00 33.00 ,, ,, 03.40 PM 25000 18504 150 39 0.80 33.00 33.00 ,, ,, -do- 04.50 PM 25000 19908 150 40 0.80 33.00 33.00 ,, ,, 31.03.2017 10.30 AM 25000 17802 150 35 0.40 41.50 41.50 ,, ,, 21.03.2017 04.10 PM 6000 5112 150 38 0.40 41.50 41.50 ,, ,, 04.03.2017 02.15 PM 6000 4734 150 35 23. 24. 25. 26. 27. Packer M/C-II Packer M/C-III Packer M/C-IV Cement Silo-I Cement Silo-II -do- LINE - II Page 6 of 32 Format No. FP-036 Month: March- 2017 Sr. No Source Dia. of chimney in (m) Chimney height in (m) Stipul- Proviated ded APC Equipment Stipulated Provided 6 Pulse jet bag filter Bag House 7 Pulse jet bag filter Bag House ESP 1 2 3 4 5 28. Cement silo-III 0.40 41.50 41.50 3.50 100.00 100.00 3.20 48.00 48.00 ESP 1.40 52.00 52.00 ESP 100.00 Pulse jet bag filter 29. 30. 31. 32. Raw Mill / Kiln Clinker Cooler Cement Mill Coal Mill 1.30 100.00 Bag Filter Pulse jet bag filter Monitoring Date Time Emission Rate m3 / H Stipulated Provided Emission Level mg / Nm3 Stipu- Provlated Ided 8 9 10 11 12 13 04.03.2017 03.55 PM 6000 4441 150 39 03.03.2017 11.00 AM 6,50,000 370293 150 26 04.03.2017 08.40 AM 4,60,000 286434 150 33 21.03.2017 02.35 PM 1,00,000 77387 150 35 04.03.2017 10.00 AM 1,25,000 74986 150 33 LINE-II Sl No Dust load Kg / H 14 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 16 Total No. of times tripped in the month Total duration of tripping in the month ( H) 17 18 Page 7 of 32 Format No. FP – 036 Month: March- 2017 Actual Dust load in concentration Kg / Day when tripped during failure. 19 20 Total dust in Remarks Kg / month during failure 21 22 Process 16. 0.45 Inter lock 17. 0.35 -do18. 0.31 -do19. 0.14 -do-do20 0.76 21. 0.23 -do22. 0.46 -do23. 0.60 -do24. 0.50 -do25. 0.39 -do26. 0.13 -do27. 0.13 -do28. 0.12 -do29. 6.69 Format No FP – 037 enclosed -do30. 6.02 -do31. 2.03 Format No. FP-037 enclosed. -do32. 1.61 -do** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. THERMAL POWER PLANT Page 8 of 32 Format No. FP - 036 1. Name of the Unit 2. Production Capacity of Power Plant in MW 3. Raw Materials Consumption Sr. No 1 33. 34. 35. 36. Source 2 Boiler 70 TPH Coal Crusher 100 KVA D.G. Set Boiler 42 TPH Dia. of Chimney in (m) Chimney height (in m) Stipu Provi lated -ded : VASAVADATTA CEMENT – SEDAM : TPP # 1, 15.7 (Peak capacity 16.2) : Coal: 0.822 kg/kwh TPP# 2, 9.5 MW, Coal: 0.779 kg/kwh APC Equipment Monitoring date Stipulated Provided Time 4) Validity of Consent : 30.06.2021. 5) Month : March- 2017 Emission Rate m3 / H Stipulat Provided -ed Emission level mg/Nm3 Stipu- Provlated ided 3 4 5 6 7 8 9 10 11 12 13 1.85 75 75 ESP ESP 15.03.2017 08.30 AM 140508 116131 150 35 0.5x 0.4 15.20 15.20 Pulse jet bag filter Pulse jet bag filter 09.03.2017 11.40 AM 20000 9640 150 37 0.127 8.0 8.0 Chimney Chimney 1.90 65 65 ESP ESP Not running 09.03.2017 09.00 AM 378 91919 150 76293 150 40 THERMAL POWER PLANT Page 9 of 32 Format No FP-036 Month: March- 2017 Sl. No Dust load Kg / H 14 33. 3.77 34. 35. 36. 0.25 2.34 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 Format NoFP-037 enclosed 16 Total No. of times tripped in the month Total duration of tripping in the month (H) Actual concentration when tripped Dust load in Kg/ day during failure. Total dust in Kg / month during failure 17 18 19 20 21 Remarks 22 Process Inter lock -do-do- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. LINE - III Page 10 of 32 Format No. FP-036 : VASAVADATTA CEMENT – SEDAM : Ref. Page 1 of 22 : Ref. Page 1 of 22 1. Name of the Unit 2. Production capacity 3. Raw Materials / T of product Sl. Source No 1 37. 38. 39. 40. 41. Dia. of Chimney in m 2 Raw mill / Kiln Clinker Cooler ESP Coal Mill Cement Mill Crusher (Located at Mines) 3 Chimney height in (m) APC Equipment Stipul Provi -ated -ded 4 5 Stipulated 6 Provided 7 Monitoring Date 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Time 8 9 Emission Rate m3 / H Emission Level mg / Nm3 Stipulated 10 11 Stipulated 12 ProvIded 13 Provided 4.25 70.00 70.00 Bag House Bag House 07.03.2017 08.45 AM 9,25,560 631398 50 25 3.35 50.00 50.00 ESP ESP -do- 11.15 AM 5,71,428 376133 50 34 1.80 52.00 52.00 Bag Filter Bag Filter -do- 10.10 AM 1,75,000 119839 50 35 1.40 52.00 52.00 -do- -do- 01.03.2017 08.40 AM 1,00,000 62425 50 34 1.50 32.00 32.00 -do- -do- 01.03.2017 03.15 PM 63000 55596 50 29 LINE-III Page 11of 32 Format No. FP-036 Month: March- 2017 Sl No Dust load Kg / H 14 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H.) 15 16 Total No. of times tripped in the month Total duration of tripping in the month ( Hs) 17 18 Actual Dust load in concentration Kg/ Day when tripped during failure. 19 20 Total dust in Remarks Kg / month during failure 21 22 Process Inter lock 37 10.18 38 9.69 -do- 39 2.71 -do- 40 1.45 -do- 41 1.29 -do- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. TPP-III Page 12 of 32 Format No. FP - 036 1. Name of the Unit 2. Production Capacity of Power Plant in MW 3. Raw Materials Consumption Sr. No Source 1 42. 2 Boiler 80 TPH Dia. of Chimney in (m) 3 2.45 Chimney height (in m.) Stip Provi u -ded lated 4 5 80 80 : VASAVADATTA CEMENT – SEDAM : TPP # 3, 18 MW : Coal: 0.824 kg/kwh APC Equipment Monitoring date Stipulated Provided 6 7 8 ESP ESP 15.03.2017 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Emission Rate m3 / hr Time Emission level mg/Nm3 Provided Stipulated Stipulated Provided 9 10 11 12 13 10.00 AM 2,08,152 132595 150 38 TPP-III THERMAL POWER PLANT Page 13of 32 Format No FP-036 Month: March- 2017 Sl. No Dust load Kg / H 14 42 3.45 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 Format NoFP-037 enclosed 16 Total No. of times tripped in the month Total duration of tripping in the month ( H) Actual concentration when tripped Dust load in Kg / day during failure. Total dust in Kg / month during failure 17 18 19 20 21 Remarks 22 Process Inter lock ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, Time of tripping/failure, duration, reason for failure and connected details should be reported. Page 14 of 32 Format No FP-036 Month: March- 2017 DG SETS Sl. Source No Dia. of Chimney in (m) Chimney height in (m) APC Equipment Stipul Provi -ated -ded 4 5 Stipulated 6 Provided 7 1 2 3 43. Kiln-I 125 KVA DG set 0.108 5.00 8.50 Chimney Chimney 44. Kiln-II 125 KVA DG set 0.175 5.00 8.75 Chimney 45. Kiln-III 380 KVA DG set 0.136 6.00 11.90 0.089 5.00 5.00 46. Boiler 42 TPH 250 KVA DG set Monitori Time ng Date 8 9 Emission Rate m3 / H Stipul- Provide ated d Emission Level mg / Nm3 Stipu- Provlated Ided 10 11 12 13 Not run as there was no power failure 3786 --- --- --- Chimney --do-- 3786 --- --- --- Chimney Chimney --do-- 3786 --- --- --- Chimney Chimney --do-- 3786 --- --- --- DG SETS Sl No Dust Load Kg / H 43 44 45 46 14 ------------- Failure of Equipments No of Duration of times tripping in a tripped day ( H) in a day ** 15 16 Total No. of times tripped in the month 17 Page 15 of 32 Format No. FP – 036 Month: March- 2017 Total duration of tripping in the month (H) 18 Actual concentration when tripped 19 Dust load in Kg / Day during failure. 20 Total dust in Kg / month during failure 21 Remarks 22 ------------- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. LINE - IV Page 16 of 32 Format No. FP-036 : VASAVADATTA CEMENT – SEDAM : Ref. Page 1 of 22 : Ref. Page 1 of 22 1. Name of the Unit 2. Production capacity 3. Raw Materials / T of product Sl. No Source Dia. of Chimney in (m) Chimney height in (m) 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Emission Rate m3 / H APC Equipment Monitoring Date Time Emission Level mg / Nm3 8 9 10 11 Stip ulated 12 08.03.2017 08.35 AM 9,25,560 937902 50 26 ESP -do- 11.10 AM 5,71,428 484371 50 32 Bag Filter Bag Filter -do- 09.50 AM 1,75,000 168123 50 33 52.00 -do- -do- 14.03.2017 09.00 AM 1,00,000 65308 50 32 12.8 Chimney Chimn ey 3,786 N.R 50 N.R Stipulated Provided Stipulated Provided 6 Bag House 7 Bag House 1 2 3 4 5 47. Raw mill / Kiln 4.25 70.00 70.00 48 Clinker Cooler ESP 3.35 48.00 50.00 ESP 49 Coal Mill 1.80 50.00 52.00 50 Cement Mill 1.40 52.00 51 Kiln –IV 380 KVA DG Set 0.136 12.8 Not run as there was no power failure Stipulated Provided ProvIded Page 17of 32 Format No. FP-036 Month: March- 2017 LINE-IV Sl No Dust load Kg / H 14 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 16 Total No. of times tripped in the month Total duration of tripping in the month (H) 17 18 Actual Dust load in concentration Kg / Day when tripped during failure. 19 20 Total dust in Remarks Kg / month during failure 21 22 Process Inter lock 47 18.75 48 10.92 -do- 49 4.19 -do- 50 1.26 -do- 51 N.R --- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. Page 18 of 32 Format No. FP - 036 TPP-IV 1. Name of the Unit 2. Production Capacity of Power Plant in MW 3. Raw Materials Consumption Sl No Source Dia. of Chimney in (m) 1 2 CPP-18 MW 3 52. Boiler 80 TPH 2.45 Chimney height (in m) Stip Provi u -ded lated 4 5 80 80 : VASAVADATTA CEMENT – SEDAM : TPP # 4, 18 MW : Coal: 0.828 kg/kwh APC Equipment Monitoring date Time 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Emission Rate m3 / hr Stipulat- Provided ed Emission level mg/Nm3 Stipu- Provlated ided Stipulated Provided 6 7 8 9 10 11 12 13 ESP ESP 09.03.2017 10.35 AM 2,81,000 134971 150 35 Page 19 of 32 Format No FP-036 Month: March- 2017 TPP-IV THERMAL POWER PLANT Sl. No Dust load Kg / H 14 52 3.55 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 Format NoFP-037 enclosed 16 Total No. of times tripped in the month Total duration of tripping in the month (H) Actual concentration when tripped Dust load in Kg / day during failure. Total dust in Kg / month during failure 17 18 19 20 21 Remarks 22 Process Inter lock ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. Page 20 of 32 Format No FP-036 Month: March- 2017 DG SETS (TPP-IV) Sr. Source No 1 2 53. Boiler 80 TPH 380 KVA DG set Dia. of Chimney in (m) 3 0.136 Chimney height in (m) APC Equipment Stipul Provi -ated -ded 4 5 5.20 5.20 Stipulated 6 Provided 7 Chimney Chimney Monitori Time ng Date 8 9 Not run as there was no power failure Emission Rate m3 / H Stipul- Provide ated d 10 3786 11 --- Emission Level mg / Nm3 Stipu- Provlated Ided 12 --- 13 --- DG SETS (TPP-IV) Page 21 of 32 Format No. FP – 036 Month: March- 2017 Sr. No Dust Load Kg / H 53 14 ---- Failure of Equipments No of Duration of times tripping in a tripped day ( H) in a day ** 15 16 Total No. of times tripped in the month 17 Total duration of tripping in the month (H) 18 Actual concentration when tripped 19 Dust load in Kg / Day during failure. 20 Total dust in Kg / month during failure 21 Remarks 22 --- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. Page 22 of 32 Format No. FP - 036 TPP-V 1. Name of the Unit 2. Production Capacity of Power Plant in MW 3. Raw Materials Consumption Sr. No Source Dia. of Chimney in (m). 1 2 CPP-18 MW 3 52. Boiler 80 TPH 2.45 Chimney height (in m) Stip Provi u -ded lated 4 5 80 80 : VASAVADATTA CEMENT – SEDAM : TPP # 5, 18 MW : Coal: 0.822 kg/kwh APC Equipment Monitoring date Time 4) Validity of Consent: 30.06.2021. 5) Month : March- 2017 Emission Rate m3 / H Stipulat- Provided ed Emission level mg/Nm3 Stipu- Provlated ided Stipulated Provided 6 7 8 9 10 11 12 13 ESP ESP 15.03.2017 11.15 AM 2,81,000 158910 50 36 Page 23 of 32 Format No FP-036 Month: March- 2017 TPP-V THERMAL POWER PLANT Sr. No Dust load Kg / H 14 52 3.51 Failure of Equipments No of times Duration of tripped in a tripping in a day ** day ( H) 15 Format NoFP-037 enclosed 16 Total No. of times tripped in the month Total duration of tripping in the month (H) Actual concentration when tripped Dust load in Kg / day during failure. Total dust in Kg / month during failure 17 18 19 20 21 Remarks 22 Process Inter lock ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. Page 24 of 32 Format No FP-036 Month: March- 2017 DG SETS (TPP-V) Sr. Source No 1 53. 2 Boiler 80 TPH 380 KVA DG set Dia. of Chimney in (m) 3 0.136 Chimney height in (m) APC Equipment Stipul Provi -ated -ded 4 5 Stipulated 6 5.20 5.20 Chimney Provided 7 Chimney Monitori Time ng Date 8 9 Not run as there was no power failure Emission Rate m3 / H Stipul- Provide ated d Emission Level mg / Nm3 Stipu- Provlated Ided 10 11 12 13 3786 --- --- --- Page 25 of 32 Format No. FP – 036 Month: March- 2017 DG SETS (TPP-V) Sl No Dust Load Kg / H 53 14 ---- Failure of Equipments No of Duration of times tripping in a tripped day ( H) in a day ** 15 16 Total No. of times tripped in the month 17 Total duration of tripping in the month ( H) 18 Actual concentration when tripped 19 Dust load in Kg / Day during failure. 20 Total dust in Kg / month during failure 21 Remarks 22 --- ** Separate annexure should be enclosed giving complete details of tripping / break downs of all the other pollution control equipments date, time of tripping/failure, duration, reason for failure and connected details should be reported. NAME OF UNIT LOCATION OF A.A.Q.M. STATION. MONTH WEEK NO. VASAVADATTA CEMENT, SEDAM GUEST HOUSE March- 2017 TIME S.NO MONITORING DATE DAY NO 1 2 3 1 06.03.2017 to 07-03-2017 2&3 09.50 AM 2 09.03.2017 to 10-03-2017 5&6 3 13.03.2017 to 14.03.2017 4 CONCENTRATION IN Micro-gm/m TO 3 WIND PM10 PM2.5 SO2 NOX DIRECTION 5 6 7 8 9 09.45 AM 59 21 5.10 18.60 NE 10.00 AM 09.55 AM 57 20 5.99 19.85 N 2&3 09.50 AM 09.45 AM 58 16 7.49 19.10 S 16.03.2017 to 17.03.2017 5&6 10.05 AM 10.00 AM 57 17 6.24 17.85 5 20.03.2017 to 21.03.2017 2&3 10.20 AM 10.15 AM 56 19 7.69 19.60 6 23.03.2017 to 24.03.2017 5&6 10.10 AM 10.05 AM 57 16 9.14 21.10 7 27.03.2017 to 28.03.2017 2&3 10.00 AM 09.55 AM 55 17 10.14 21.95 8 30.03.2017 to 31.03.2017 5&6 10.30 AM 10.25 AM 54 19 9.29 20.90 57 18 7.64 19.87 24 Hourly Average. FROM PAGE NO 26 OF 32 FORMAT NO FP-036 ANNEXURE - V WEEKLY REPORT. 4 N N N N N REMARK S 10 NAME OF THE UNIT LOCATION OF A.A.Q.M. STATION. MONTH WEEK NO. VASAVADATTA CEMENT SEDAM SEDAM TOWN March-2017 TIME SL.NO MONITORING DATE DAY NO 1 2 3 1 06.03.2017 to 07-03-2017 2&3 ˉ 2 09.03.2017 to 10-03-2017 5&6 3 13.03.2017 to 14.03.2017 4 CONCENTRATION IN Micro-gm/m TO 3 WIND PM10 PM2.5 SO2 NOX 5 6 7 8 ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ ˉ 2&3 ˉ ˉ ˉ ˉ ˉ ˉ 16.03.2017 to 17.03.2017 5&6 ˉ ˉ ˉ ˉ ˉ ˉ 5 20.03.2017 to 21.03.2017 2&3 11.45 AM 11.40 AM 56 17 ˉ ˉ N 6 23.03.2017 to 24.03.2017 5&6 ˉ ˉ ˉ ˉ ˉ ˉ ˉ 7 27.03.2017 to 28.03.2017 2&3 ˉ ˉ ˉ ˉ ˉ ˉ ˉ 8 30.03.2017 to 31.03.2017 5&6 ˉ ˉ ˉ ˉ ˉ ˉ ˉ 56 17 ˉ ˉ 24 Hourly Average. FROM PAGE NO. 27 OF 32 FORMAT NO FP-036 ANNEXURE - V WEEKLY REPORT. 4 - REMARKS DIRECTION 10 NAME OF UNIT LOCATION OF A.A.Q.M STATION. MONTH WEEK NO. VASAVADATTA CEMENT SEDAM DAIRY FARM March- 2017 TIME PAGE NO 28 of 32 FORMAT NO FP-036 ANNEXURE - V WEEKLY REPORT. CONCENTRATION IN Micro-gm/m 3 PM10 PM2.5 SO2 NOX WIND DIRECTION REMARKS 5 6 7 8 9 10 10.10 AM 64 22 4.26 16.45 NE 10.45 AM 10.40 AM 62 20 5.51 18.20 N 2&3 10.35 AM 10.30 AM 63 21 6.74 19.15 S 16.03.2017 to 17.03.2017 5&6 10.20 AM 10.15 AM 60 19 4.89 17.90 N 5 20.03.2017 to 21.03.2017 2&3 10.50 AM 10.45 AM 59 18 3.64 16.85 N 6 23.03.2017 to 24.03.2017 5&6 10.40 AM 10.35AM 60 19 4.53 17.60 N 7 27.03.2017 to 28.03.2017 2&3 10.25 AM 10.20 AM 58 18 6.68 18.85 N 8 30.03.2017 to 31.03.2017 5&6 10.20 AM 10.15 AM 60 19 5.43 17.60 N 61 20 5.21 17.83 S.NO MONITORING DATE 1 2 3 1 06.03.2017 to 07-03-2017 2&3 10.15 AM 2 09.03.2017 to 10-03-2017 5&6 3 13.03.2017 to 14.03.2017 4 24 Hourly Average. DAY NO FROM TO 4 NAME OF UNIT LOCATION OF A.A.Q.M STATION. VASAVADATTA CEMENT, SEDAM MINES SUBSTATION PAGE NO 29 of 32 FORMAT NO FP-036 MONTH March-2017 ANNEXURE - V WEEK NO. WEEKLY REPORT. TIME S.NO MONITORING DATE DAY NO TO 1 2 3 1 06.03.2017 to 07-03-2017 2&3 08.35 AM 08.30 AM 2 09.03.2017 to 10-03-2017 5&6 08.45 AM 08.40 AM 3 13.03.2017 to 14.03.2017 2&3 08.40 AM 4 16.03.2017 to 17.03.2017 5&6 5 20.03.2017 to 21.03.2017 6 WIND PM10 PM2.5 SO2 NOX DIRECTION 5 6 7 8 9 24 6.25 16.85 NE 63 23 7.00 08.35 AM 62 22 8.25 17.45 08.45 AM 08.40 AM 61 21 7.50 16.20 2&3 08.50 AM 08.45 AM 62 22 8.95 16.95 23.03.2017 to 24.03.2017 5&6 08.45 AM 08.40 AM 60 19 7.70 15.70 7 27.03.2017 to 28.03.2017 2&3 08.40 AM 08.35 AM 59 20 8.75 17.55 8 30.03.2017 to 31.03.2017 5&6 08.55 AM 08.50 AM 61 22 9.50 18.05 62 22 7.99 16.79 24 Hourly Average. FROM CONCENTRATION IN Micro-gm/m 3 4 15.60 N S N N N N N REMARKS 10 NAME OF UNIT LOCATION OF A.A.Q.M. STATION. MONTH WEEK NO. VASAVADATTA CEMENT, SEDAM Power Plant March 2017 TIME PAGE NO 30 of 32 FORMAT NO FP-036 ANNEXURE -V WEEKLY REPORT. 3 PM2.5 SO2 NOX WIND DIRECTION REMARKS PM10 5 6 7 8 9 10 09.10 AM 67 26 7.11 20.75 NE 09.25 AM 09.20 AM 66 25 8.11 20.00 N 2&3 09.20 AM 09.15 AM 65 23 7.36 21.85 S 16.03.2017 to 17.03.2017 5&6 09.30 AM 09.25 AM 64 22 6.11 20.60 5 20.03.2017 to 21.03.2017 2&3 09.35 AM 09.30 AM 63 20 7.36 22.35 6 23.03.2017 to 24.03.2017 5&6 09.30 AM 09.25 AM 62 21 6.61 21.10 7 27.03.2017 to 28.03.2017 2&3 09.25 AM 09.20 AM 62 22 7.86 22.65 8 30.03.2017 to 31.03.2017 5&6 09.50 AM 09.45 AM 63 20 6.61 21.40 64 22 7.14 21.34 S.NO MONITORING DATE DAY NO 1 2 3 1 06.03.2017 to 07-03-2017 2&3 09.15 AM 2 09.03.2017 to 10-03-2017 5&6 3 13.03.2017 to 14.03.2017 4 24 Hourly Average. FROM CONCENTRATION IN Micro-gm/m TO 4 N N N N N NAME OF UNIT LOCATION OF A.A.Q.M. STATION. MONTH WEEK NO. VASAVADATTA CEMENT SEDAM LIONS BHAVAN March- 2017 TIME PAGE NO 31 OF 32 FORMAT NO FP-036 ANNEXURE - V WEEKLY REPORT. CONCENTRATION IN Micro-gm/m 3 PM10 PM2.5 SO2 NOX WIND DIRECTION 5 6 7 8 9 10.45 AM 63 25 6.80 21.50 NE 11.20 AM 11.15 AM 62 24 5.55 20.25 N 2&3 11.10 AM 11.05 AM 60 20 7.30 22.10 S 16.03.2017 to 17.03.2017 5&6 11.05 AM 11.00 AM 61 22 8.35 22.85 5 20.03.2017 to 21.03.2017 2&3 11.00AM 10.55AM 56 16 6.85 21.60 6 23.03.2017 to 24.03.2017 5&6 11.05 AM 11.00 AM 57 18 7.70 22.35 7 27.03.2017 to 28.03.2017 2&3 10.45 AM 10.40 AM 59 22 6.45 21.30 8 30.03.2017 to 31.03.2017 5&6 11.05 AM 11.00 AM 56 17 8.40 22.25 59 21 7.18 21.78 S.NO MONITORING DATE DAY NO 1 2 3 1 06.03.2017 to 07-03-2017 2&3 10.50 AM 2 09.03.2017 to 10-03-2017 5&6 3 13.03.2017 to 14.03.2017 4 24 Hourly Average. FROM TO 4 N N N N N REMARKS 10 FLY ASH UTILIZATION PROFORMA Page No: 32 of 32 Format No: FP-036 March- 2017 Utilization ( MT / Year ) Quantity of fly ash generated / Year MT / Year 1 Capacity RTPS/Parli/ Kesoram/Ada M/s VC ni/BTPS/JSW/ NTPC Average 15.7 MW, 9.5 MW, 111119.0 + 18 MW, 15151.0 M/s 18 MW Vasavadatta & Cement 18 MW 126270.0 Sedam coal based Thermal power plant M/s VC RTPS/Parli/ Kesoram/ Adani/BTPS/ JSW/NTPC Others Name & Address of The unit Cement Industries Bricks S.No Total Utilized MT / Year M/s VC RTPS/Parli/ Kesoram/ Adani/BTPS/ JSW/NTPC 378924.54 + 38658.47 111119 + 15151.00 374725.3 + 40989.860 111119 + 15151.00 374725.3 + 40989.860 417583.01 126270.0 415715.16 126270.0 415715.16 Unutilized quantity MT /Year RTPS/Parli Percentage /Kesoram/ M/s Adani / VC BTPS/ JSW/NTP C 0.0 1867.850 100 % for VC Ash includes Bed ash also. Remarks Values for the month of March 2017 Page 1 of 7. Format No. FP-037. LINE-1 a.) KILN ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF DATE STOP START TOTAL NO. OF MINUTES MARCH- 2017. REMARKS --- NIL--- b.) CEMENT MILL ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES --- NIL--- REMARKS Page 2 of 7. Format No. FP-037. LINE-II a) KILN ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES REMARKS ---NIL--- b) CEMENT MILL ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES ---NIL--- REMARKS Page 3 of 7. Format No. FP-037. POWER PLANT (TPP # 1) BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES REMARKS ---NIL--- POWER PLANT (TPP # 2) BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES ---NIL--- REMARKS Page 4 of 7. Format No. FP-037. LINE-III a.) KILN BAG HOUSE STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES REMARKS --- NIL--- b.) CEMENT MILL BAG FILTER STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES --- NIL--- REMARKS Page 5 of 7. Format No. FP-037. POWER PLANT (TPP # 3 ) BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES --- NIL--- REMARKS Page 6 of 7. Format No. FP-037. LINE-IV a) KILN BAG HOUSE STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES REMARKS --- NIL--- b) CEMENT MILL BAG FILTER STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES --- NIL--- REMARKS Page 7 of 7. Format No. FP-037. POWER PLANT (TPP # 4 ) BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES REMARKS --- NIL--- POWER PLANT (TPP # 5) BOILER ESP STOPPAGES / TRIPPINGS FOR THE MONTH OF MARCH- 2017. DATE STOP START TOTAL NO. OF MINUTES --- NIL--- REMARKS
© Copyright 2026 Paperzz