PDF Report 1 - Province of British Columbia

FOREWARD AND STATEMENT OF COSTS
FOR THE
ASSESSMENT REPORT OK THE NlcMASTER I AND I1 CLAIM GROUPS
New W estminister Mmhg Division
Latitude 49 32', Longtude I2 1 17'
NTS 9 2 W l l W and 92W6W
O
Owners:
S. andE. Angus
Athabaska Gold Resources Ltd
J. Shearer
S. Shearer
O
Operator:
Athabaska Gold Resources Ltd.
1200-1 185 West Georgia Street
Vancouver, B . C. V6E 4E6
,.
..
Prepared By:
R/I.P. Dickson, P. Eng.
1253 Wolfe Avenue
Vancouver. B.C. V6H 4B5
September 10, 1996
TABLE OF CONTENTS
I
I
I
I
1
I
I
I
k
Page Number
Summary
Location and Access
Claim Status
History
Work Program
Statement of Costs
Detailed Cost Breakdown Spreadsheets
Statement of Qualifications
!
1
1
9
10
11
12
26
LIST OF TABLES
Table 1
Master List for McMaster Claim Groups I and I1
LlST OF FIGURES
Figure 1
Figure 2
Figure 3
Figure 4
General Location Map
Topographic Map with Claim Boundary
Ladner Creek Property, Claim Location Map
McMaster I and McMaster I1 Claim Groups
6
LIST OF APPENDICES
I
Geological and Diamond Drilling Assessment Report, Ladner Creek
Project, McMaster Groups I and 11: by J.T.Shearer. M.Sc.. P.Geo.;June 1,
1996.
Geology and Diamond Drilling Report on the McL/laster and Lorraine
Zones: by D.G. Cardinal. B.Sc., P.Geo., FGAC; February 38, 1996.
Metallurgical Report, Ladner Creek Project. Idaho Zones : Tailings
Studies; and various reports by Melis Engineering Ltd. from September 2 1.
1995 to April 23. 1996.
Tailings Dam Inspection, Ladner Creek Project (Carolin Mines): by Golder
Associates Ltd.: October 27, 1995.
APPENDIX V
I
I
I
I
4
I
4
1
8
Tailings Sampling Program, Grade and Tonnage Calculations: by W.M.
Ash and Associates; November 3. 1995 and January 15, 1996.
1
SUMMARY
This forward to the Assessment Reports on the McMaster claim groups I and I1 briefly deals with
the various facets of work carried out on surface and underground at the Ladner Creek Project
between September 25, 1995 and June 15, 1996.
The work was carried out by various contractors and consulting groups, most of which are listed
here.
A statement of costs is included to cover all work, with an equal breakdown between the two
McMaster goups.
LOCATION AND ACCESS
The McMaster claim groups J and I1 are situated approximately 17 kilometres northeast of Hope,
B.C., and lie west of the Ladner Creek (Figure 1). The approximate centre of the claims is at
latitude 49 O 32' and longitude 12 1 17' (Figure 2).
O
Elevation in the area ranges from 500 to 1530 metres. Access is from Hope via the Coquihalla
Highway for 25 kilometres, then up the Ladner Creek Mine Road (old Carolin Mine road) for 6.2
kilometres to the Carolin mill site. Various roads take off from there to cover most of the
property.
The southern part of the property (mainly crown grants) have been logged in the past. A section
of the northern part of the property has been logged recently from the Siwash Creek connector.
I
CLAIR1 STATUS
I
The McMaster claim groups I and I1 consist of McMaster 1 to 123, two post claims, hlchlaster 1
and 2 fractions, Elman Creek 1 (S units) and 9 crown ,orants.
4
1
B
I
Table 1 contains a master claims list and grouping list for McMaster claim groups I and 11.
showing the recording dates and owners. Figures 3 and 4 show in plan view the two groups
i
O
L
U
T-3
WASHINGTON
@
-SI
ATHABASHA
WLD REOURCES LIMITED
LADNER CREEK PROJECT
MC rcWSTER 1 & 2 CLAIM GROUPS
mu
GENERAL LOCATION MAP
Mlz
Dum
13/5/96
I
;
3cale:
i s shown
I
I
J--H.P.D.l=-Ic:
1""
e
I
1
L
c
34 3684
92 H l l W
92H6W
7
I
RECREATION AREA
NO SI'AKINO II.C,II!o.
n
LADNER CREEK
McMASTER l & M c M A S T E R 2
C L A I M GROUPS
I
>
J
1
t
I
i
!
i
!
i
!
I
I
I
>
I
I
I
i
L
i
?
!
i
I
I
>
!
!
i
I
I
I
I
!
I
!
!
!
!
I
!
!
I
I
i.
~
z
m
m
Q
0
s
(D
8e
0
s
E
-I
b
n
E
P
t
9
HISTORY
Past exploration and production are dealt with extensively by J. Shearer and D. Cardinal in the
appended reports. Considerable detail is also included in the above two reports on the program
from September 25, 1995 to June 15, 1996.
Athabaska’s objectives for the above period were:
Collect sufficient, unoxidized and representative material from underground to complete
exhaustive metallurgical test work to arrive at an economically viable ana environmentally
sound milling process.
Drill the existing tailings on a representative basis for metallurgical and economic
evaluation.
Drive approximately 280 metres of drift on the 875 level to permit diamond drilling of the
northern projection of the Idaho Zone(s).
Diamond drill the Idaho Zone projection, hrther test the 3 Zone. and probe for other
targets from the new drift and existing workings.
Further test the McMaster Zone with surface diamond drilling.
Prospect the northern parts of the property and the McMaster, Lorraine and Pipestem
areas.
Enter all data on computer. printing out new sections and plans for study, guidance and
ore reserve calculations.
10
WORK PROGRAM
Athabaska’s objectives resulted in the work programs that are documented in the appended
reports. The program for objectives 1. 3, 4 and 7 is covered by the June I , 1996 report by J.T.
Shearer in Appendix I and the metallurgy for objective 1 by Mellis Engineering (September 2 1,
1995 to April 23. 1996) in Appendix 111.
Ash and Associates in their reports ofNovember 3, 1995 and January 15, 1996 cover the work
prosrams for tailings (objective 2) and for drilling and sampling (Appendix 5) while Mellis
Ensheering reports cover the metallurgy studies on the tailings.
The report by -Mr. D.G. Cardinal dated February 25, 1996 on McMaster and Lorraine Zones
(Appendix 11) covers the work program with regards to objectives 5 and 6.
In addition. the Golder and Associates report on the Tailings Dam Inspection dated October 27,
1995 (Appendix IV) gives an update of the tailings dam conditions.
The reader is referred to all of the above-mentioned reports for details of the various facets of the
September 25. 1995 to June 15, 1996 program for the Ladner Creek Project.
11
STATEMENT OF COSTS
The following is the statement of costs for the Ladner Creek Project, and includes all expenditures
dated from September 25, 1995 to June 15, 1996.
ITEM
CONTRACTOR
COST
Underground drifting and services
related to underground diamond
drilling.
Procon
510.221
Surface diamond drilling
Connors
82,907
Underground diamond drilling
Connors, F.Boisvenu
494,512
Consulting, contractors (geology,
mining and management)
various
2301404
Consulting, contractors
(environmental, geotechnical)
Golder,
44,165
New Pacific Ventures
Tailings drilling
Ace Drilling
3 3 >166
Consultant - tailings drilling and
sampling
Ash & Associates
20,02 1
Metallurgical test work
Lakefield
88,40 1
Metallurgical consulting
Mellis Engineering
94,982
Metallurgical consulting
E. Thornton
7,596
Metallurgical consulting
(environmental)
mco
7.500
Wages and benefits
Athabaska employees
51,801
Roads, trenches. snowplow,
deactivation
various
108. 133
Assaying
Acme. Chemex
36,785
Camp costs. supplies
various
17.625
12
Equipment rentals
various
33,854
Communications
various
712
Fuel
Whitmore
Freight, courier services
various
6,454
Draft@, includes computer work
various
6,964
Safety gear
various
1,887
Field work supplies
various
14,993
Travel, meals. accommodations,
taxi. etc.
various
9,079
Hydro
B.C. Hydro
Workers Compensation Board
employees, contractors
Canada Pension Plan
employees
942
Unemployment ins.. com
employees
1,774
16,380
129
TOTAL
13,232
S1,964,651
Approximately 1.4% (or $27,267) of the above total is applicable to physical work (trenching,
roads, trails. etc.). Approximately 0.9% (or $16,900) of the above total is applicable to
prospecting (general).
The balance (or $1,920,454) is allocated to drifting, diamond drilling, tailinzs drilling,
metallurgical work and related services.
In addition to the above splitting of costs. it may be considered that 50% of the total costs be
allocated to hlciblaster Group I and 50% to McMaster Group 11.
Costs are detailed in the following section
13
DETAILED COST BREAKDOWN SPREADSHEETS
The following spreadsheets contain a detailed cost breakdown of the expenses incurred on the
Ladner Creek Property from September 25, I995 to June 15, 1996.
14
530 I 1 Assaying
5 3 0 I i Assaying
530 I I Assavine
5 3 0 I 1 Assavine
! 10- 1S-95 j Acme Analytical Laboratorics Ltd.
10-20-95 I Acme Analytical Laboratorics
Ltd. ____
__
530 I 1, Assaying
530 1 I Assaying
~
~
I
-
10-25-93 I Acme Analvtical Laboratories Ltd.
:15-4209
95-4269
:J162 ,
J173 I
,5172 j
15242
! IO-35-95 1 Acme Analvtical Laboratories Ltd.
________--__
~
_
_
.
530 I /Assaying
530 I i Assaying
jjOl/Assaying
530 I I Assaving
5 3 0 1 Assak 1ng
530 1 ;Assaying
-_530 I /Assaying
5 3 0 I IAssavine
530 I 1 Assaying
530 I 1 Assaying
530 I i Assaying
5 3 0 I IAssavinp
~
1
I 1 -0:-95 /Acme Andytical Laboratories Ltd.
/
1
~
~
~
Laboratories Ltd.
Laboratones Ltd
Laboratories Ltd.
Laboratories Ltd.
Laboratories Ltd.
Laboratories Ltd.
Laboratories Ltd.
Laboratories Ltd.
Laboratories Ltd.
1 12-06-95 Acme Analytical Laboratories Ltd.
1 12-06-95 Acme Analytical Laboratories Ltd.
1 12-07-95 Acme Analvtical Laboratories Ltd.
I 12-13-95 I Acme Analvtical Laboratories Lid.
j 12-14-95 /Acme Analytical Laboratories Ltd.
i 12-15-95 (Acme Analytical Laboratories Ltd.
12-18-95 j Acme Analytical Laboratories Ltd.
12-15-95 /Acme Analytical Laboratories Ltd.
' 12-1S-95/Chemes Labs Ltd.
j 12-20-95 !Acme Analytical Laboratories Ltd.
12-20-95 I Acme Analvtical Laboratories Ltd.
! 12-20-95 /Acme Analvtical Laboratories Ltd.
12-2 1-95 I Acme Analytical Laboratories Ltd.
12-22-95 I Acme Analytical Laboratories Ltd.
i 12-21-95 \Acme Analvtical Laboratories Ltd.
\ 12-23-95 i Acme Analytical Laboratories Ltd.
12-77-95 1Cliemes Labs Ltd.
t
i 12-23-95 j Acme Analytical Laboratories Ltd.
0 1-0:-96 I Acme Analvtical Laboratories Ltd.
0 1-03 -96 I Acme Analytical Laboratories Ltd.
! 0 1-04-96 1 Acme Analytical Laboratories Ltd.
! 0 1-04-96 Acme Analytical Laboratories Ltd.
1 0 1-04-96 /Acme Analytical Laboratories Ltd.
1 0 1-04-96 1 Acme Analvtical Laboratories Ltd.
j 0 I J)4-96 j Acme Analytical Laboratories Lid.
I 0 1-05-96 i Acme Analytical Laboratories Lld.
_ _ ~
; 0 1-115-96i Acmc An:iIytic:iI Laboratories Lid.
__--__-__
-_
: 0 1-08-96 I Acme Analytical Lubor:itories Ltd.
:
~
~
~
~
~
~
~
I
_
_.
1 1- 14-95 I Acme Analytical Laboratories Ltd.
! 1 1-1 7-95 I Acme Analvtical
I 1-3 1-95 1 Acme Analvtical
j I 1-2 1-95 I Acme Analytical
11-2 1-95 /Acme Analytical
11-23-95 /Acme Analvtical
11-24-95 ]Acme Analytical
j 1 1-27-95 1 Acme Analytical
i 11-27-95 i Acme Analytical
j 11-2s-95 /Acme Analvtical
1
279.40
744.58
706.72
1.298.89 I
$5-4293______-.___I_
15240j
189.30
"5-4368
521
I
j
466.94
___
___.__
1 1-0
1-95 Acme Analytical Laboratories Ltd.-_
_
_
j 1 1-113-95 Acme Analytical Laboratories Lid.
I 1 I - 10-95 I Acme Analytical Laboratories Ltd.
5 3 0 1 j Assaying
5301 IAssaying
530 1/Assaving
530 11Assaving
530 1 I Assaying
530 I IAssaying
530 1 Assaying
530 1 1 Assaying
5301 :Assaying
-_
530 1 j Assaying
530 1 Assavtne
5301 IAssavine,
530 I / Assaying
530 I /Assaying
530 I I Assaving
530 I i Assaying
530 I ;Assaying
530 I I Assaying
~ _ _ _
5.3) I I Assaving
5.3) I I Assaying
.-530
-, I 1 Assaying
____
530 1 / Assaying
530 I /Assaying
5.301 1.4ss:ivinq
530 I I Assaying
___5:O 1 !Assaying -_-_
_ _ . _
5.70 I :Assaying
.
5 3 0 1 j Assaying
_
~
_.______
~
. -
;;>-lo75
'j5-4120
-.
-1_1____
E-4544
45-4611
354609
95-462 1
'25-4612
45-4717
45-4686
35-4687
35-4817
95-4S38
3551207
95-4968
Dec1495
954994
954994
95-5053
?5_75876
95-5093
95-5081
95-5080
95-5054
?!Dl222
95-5160
35-5094
$536274
\I i<
,-,ll28
?5.-5185
95-5 164
1
cJ329
iJ341
J367
I J369
!J36S 1
:J365 !
iJ366 i
iJ38S 1
-i
265 02 I
694.10
8 1.29
2 0 I .92
820.30
731.96
236.48
757.20
/ J ~ Oj
/J31 1
151.44
391.22
31.46
375.30 I
235.30
883.40
141.70
~
/J2S
I
1527 I
jJ26 I
/ ~ 2 jI
1566
/J67
113.58
iJ342
138.15
iJ73
971.74
iJ75 I
337.90
iJ76 !
441.70 I
iJ74 1
3 16.10
IJ69 1
31.00
/J71 j
378.60
1J72 1
359.70
jJ5l
22 2 . 0 0
25.68
1570
iJ1W j
517.42
iJ1 IO
294.30
i!t;-WOX
/J102 !
391.22
96-0007 I J 104 -____
705.70
$5-5220 IJiO6 1
305.20
'7'5-5197 15107
109.00
?"-il9l
/JlOY
'
265.02
________.. .___
__
"'-5237
iJIO5
744.5X
._
--__
lO.00
k.!oDoloj JjI
I.;
____
..
%5010X
jJ1 I ?
12S.40
~
~
1
~
~
'
--I
1.
I
15
530 I I Assaying____
5301 i Assaying __
-~
530
I Assaying
____
530 I Assavinr!
.
_____
~
-
8
I)
1
I
J
E
1
--530 1 j Assaying
0 1-09-96 Acme Analytical
0 1 - 10-96 Acmc Analytical
1 0 1 - 12-96 j Acme Analytical
i 0 I - 12-96 1 Acme Analvtical
!
~
~
Laboratorics
Laboratories
Laboratories
Laboratories
Ltd.
Ltd.
Ltd.
Ltd.
___155.36
Jan1296
.____C_9 6 4 IO3
J IO2
' J I 19
I JI 20
378.60
254.04
492.18
j 0 I - 15-96 Acme AnaIytical Laboratories Ltd.
96-01 19
96-0159
'Jl37
,1134
466.94
858.16
530 I Assaying
5 3 0 I Assaying
530 I I Assaying
530 1 !Assaying
5301 IAssaying 530 1 j Assaying
530 1 I Assaying
530 11Assaying530 I j Assaying
530 1 Assaying
530 1 !Assaying
5 3 0 11Assaying
5308 j Camp Costs - Supplies
530s j Camp Costs - Supplies
5305 1 Camp Costs - Supplies
5308 Camp Costs - Supplies
5308 1 Camp Costs - Supplies
53OSiCamp Costs - Supplies
5308 i Camp Costs - Supplies
5308 1 Camp Costs - Supplies
5305 !Camp Costs - Supplies
j3OglCarnp Costs - Supplies
5508
Costs - Supplies
5308 i c a m p Costs - Sumlies
53OXlCamp Costs - Supplies
5.308 i Camp Costs - Supplies
5308 I Camp Costs - Sumlies
-.__
5308 I Camp Costs - Supplies
5.308 j Camp Costs - Supplies
53oSjCamp Costs - Supplies
530s C a m Costs - SuDoiies
S.:OX Camp Costs - Supplies
. _ _ _
5 ; L Oi Camp Costs - Other -5.:. IolCarnp Costs - Other
5.; I O I Ciiiiip
~Costs - Other
5.3 I Oi Camp Costs - Other
~
53 IOiCilmp Costs - 0 --___-___t h
._ _ _ _ _ _
5.: I- Oj C:imp
Costs
- _Other
~
_
_
~
57 LO Camo Costs - Othcr
j 0 1-76-96 Acme Analytical Laboratories Ltd.
I
I 0 1-26-96 1 Acme Analytical Laboratories Ltd.
.-
! 0 1-26-96 j Acme Analytical
Laboratories Ltd.
I 01-26-96 /Acme Analytical Laboratories Ltd.
I 0 1-29-96 [Acme Analytical Laboratories Ltd.
; 0 1-3 1-96 Acme Analytical Laboratories Ltd.
1
: 02-0 1-96 1 Acme Analytical Laboratories Ltd.
i
I 02-05-96 Acme Analytical Laboratories Ltd.
02-07-96 i Acme Analytical Laboratories Ltd.
; 02-07-96 I Acme Analytical Laboratories Ltd.
\ 02-07-96 1 Acme Anali-tical Laboratories Ltd.
I
02-05-96 Acme Analytical Laboratories Ltd.
i 10-06-95 /Canyon Cable (1988) Ltd.
i 10-10-95 I Canyon Cable (1988) Ltd.
10-23-95 /Homegold Resources Ltd.
10-27-95 1 Sun Group Resource Management
i 10-3 1-95 losirus Enterprises Ltd.
i 11-15-95 /Homegold Resources Ltd.
i I 1-15-95/Plen Dickson
11-22-95 /Canyon Cable (1985) Ltd.
I 1 1-29-95 I Esso (Phil Whitmore Ltd.)
\ 11-30-95/Plen Dickson
j 1 1-30-95 /Homegold Resources Ltd.
1 12-0 1-95 I Arlene Webster
! 12-79-95 /Canyon Cable (1988) Ltd.
j 0 1-0 1-96 1 Arlene Webster
; 0 1-05-96 Canvon Cable 1988) Ltd.
0 1-06-96 Canyon Cable (1988) Ltd.
1 0 1-08-96 I Canyon Cable (1985) Ltd.
[ 0 2 - 0 1-96 Arlene Webster
y 02-02-96 1 Canvon Cable 1988) Ltd.
i 02-05-96 j Neville Crosby Inc.
~ _ _ _ _ _ ~
08-75-95 Wendelin Thalhofer
.___
03-3 1-95 i Dwayne Cromarty
! 09-29-95 I Arlene Wcbstcr
_
_10-06-95
_ Dwayne
_ Cromany
i IO- 12-95 I S&S Electric
____10-15-95 losinis Enterprises Ltd.
I O - 17-95 ! C;invon Cable ( 1988) Ltd.
~
~
~
~
~
camp
~
8
1
~
_
~
~
*
-_-______-_I_-
i 0 1- 17-06 Acme Analytical Laboratories Ltd.
___
530 I !Assaying
__-
~
'__
JI 1I
96SO I09
96-OIJ66
iJl54
618.38
11186
277.64
15187
265.02
/JlSS
214.54
iJ136
405.29
jJ190
735.53
iJ150
1350.34
39 1.22
/J145
I ~3 16
618.38
29U.26
/J317
1 J3 IS
277.64
J 176
580.52
lJ223
273.37
/J220
40.02
15176
473.40
jOct2795 (Jt66
1.359.33
jOct319j IJ167
1,120.00
iNov1595 15296
1,442.36
~ N o ~ ~ S IJ313
EX
1.105.91
:69532
IJ409
6.37
iNov2995 15355
1.923.58
iNov3OEs /J3?9
1,411.25
INov3OEs /I404
639.3 1
i DecRent 1 Jl00
725.00
4.07
174619
jJ77
JanRerit
JIO 1
725.00
;74892
iJl58
547.84
174875
jJ166
24.37
i74967
/J159
103.45
725.00
1 FebRsnt
15147
-__
'79696
IJ4I4
26.95
149194
jJl5Z ___._
585.02
:280798
jJ55
2.500.00
__________--1020262
j J56
1.000.00
-_
,Sep2995 !J90
9s7.00
,20264
1557
250.00
__________-IJlO5
1.774.06
:-Is8
~ .
'___
J I74 .- __420.00
-iOct 1505
67496
,3232.
69.S2
96-013 I
96-0292
96-0294
96-0308
96-0322.
96-0330
;Feb0196
96-0371
96-0400
96-0407
196-O-IX
j 96-0444
167063
j67090
lOct2395
~
I
~
c
_
~ .
16
1
53 I o I Camp Costs - Othcr
____
t-53 I O 1 Camp Costs - Other
j IO-I S - 9 5 Hopc Security Patrol
! 10-3--95I Edson's Resources Ltd.
_-
._- -.
-__
-__,
53 I O 1 Camp Costs - Othcr
53I()jmp Costs - Othcr
53 10 I Cam0 Costs - Other
53 10!Camp Costs - Other
__~___
53 IOlCarnp Costs - Other
53 1 0 I Camp Costs - Othcr __
-
---
--__c
53 10/Camp Costs - Other
53 I O 1 Camp Costs - Other
53 I O I Camp Costs - Other
53 IO!Camp Costs - Other
53IOiCamo Costs - Other
53 IO !Camp Costs - Other
__.
53 IO I Camp Costs - Other
__.
5 3 IO /Camp Costs - Other
53 10 1 Camp Costs - Other
53 IOICamp Costs - Other
53 l0lCamp Costs - Other
53 10 Camp Costs - Other
53 12 lcommunication
5 3 12j~ommunication
53 12 1Communication
53 12 i Communication
i 11-31-93 Osirus Entemrises Ltd.
12-01-95 Canyon Cable (1988) Ltd.
12-15-93 Osirus Enterprises Ltd.
12-22-95 Canyon Glass
~
~
~
/J104
__.__
1/J200
J200
No\ I595 .__
!IJ333
J333
Xo\.l595
Xov3095 IJ375
69866
1535
___
Decl595 --1523
45%
j J50
~~
103-03-96 Cantel Cellular
1 03-14-96 B.C. Telephone Company
09-30-95 Wendell Zerb
I blarO396
I
iSGJE
~
I
~
~
1
1
11-30-95 Reclassify P.Dickson As In House
12-3 1-95 T.J. Adamson
0 1-3 1-96 T.J. Adamson
Nov 1495
DecZYes
19121
72(1. O-( )
__.-
J 165
So\O195
So\.O I95
Jan3 196
Feb1596
Feb2996
Feb2996
hIarO 196
Marl596
Marl596
Mar3 l e s
Mar3 196
Mar3 196
79327
69364
IOct 1495
I
.'
OctlS95
Oct2795
01-3 1-96 Osirus Enterprises Ltd.
02-l5-96/0sirus Enternrises Ltd.
02-29-96 ID Heino
j 02-29-96/0sirus Enterpnses Ltd
03-0 1-96 1 Arlene Webster
' 03-15-961D. Heino
' 03-15-96/Osirus Enterprises Ltd.
I 03-3 1-96 Homegold Resources Ltd.
03-3 1-961D. Heino
1 03-3 1-96 Osirus Enterprises Ltd.
I 03-3 l-961Canyon Cable (1985) Ltd:
I 03-3 1-961Gardner Chevrolet Oldsmobile Ltd.
1 10- 14-95 I B.C. Telephone Company
j 11-14-95iB.C. Telephone Company
I 12-13-951 Wendelin Thalhofer
02-02-96 1 Pacific Cellular
~
5 3 I 2 I Communication
53 I4 !Consulting - In House
53 14 j Consulting - In House
53 I4 1 Consulting - In House
___-___
~
1
53 12 1 Communication
53 14jConsulting - In House
1 1-0 1-95 Arlene Webster
Ltd.
iI 11-15-95
I 1- 15-95 Osirus Enterpriscs Ltd
~
-.
I .680.00
.-_.____
725.00
725 00
Il.050.00
.050.00
9 I O 00
~~
22.15
9 10.00
160.50
IJl4-I
490.00
15360
2.100 00
jJi88
1.500 00
IJ392
1.960 00
'J419
725 00
iJ436
1.6jO.Ov
IJ444
2.100.00
15452
1.049.54
-1 J455
I .s(k.OO
/J456
2240.00
IJ54l
22.47
88.52
IJ55Y -~
j 577
88.6 I
I J3 19 - 79.13
iJ61
38.50
IJ149
394.83
15439
jblar1496 15477
195N008 1575
15445
ITJ.49535 J334
:TJ*A9538 IJ333
1
38.95
3 1.23
2.040.00
17.524.00
I. 125.00
1.Y75.00
17
- Drilling (Surface)
53 16 1 Contractor - Drilling (Surface)
53 I6 icontractor - Drilling (Surface)
53 I7 /Contractor - Drilling (Underground)
53 I7 contractor - Drilling (Underground)
( ' 753
.---____-.
l
53 I7 Contractor - Drilling (Underground)
..53
.. .
17:Conlractor - Drilling (Underground)
-~
53 17'Contractor
__
- Drilling (Underground)
5 3 17;Contractor - Drilling (Underground)
53 17jContractor - Drilling (Undereround)
(Underground)
17'Contractor
(Underground)
.
53
17j
Contractor
Drilling
.
53 I7 I Contractor - Drilling (Underground)
53 I 7 I Contractor - Drilling (Underground)
5 3 171Contractor - Drilling (Underground)
5 3 I7 ; Contractor - Drilling (Underground)
53 I7 icontractor Drilling (Underground)
17'Contractor
.53 17
'Contractor - Drilling (Underground)
53 17 I Contractor - Drilling (Underground)
53 17 j Contractor - Drilling (Underground)
53 I7 I Contractor - Drilling (Underground)
5.317 Contractor - Drilling (Underground)
53 IhlCoiitractor
--___
~
1
1 I - 11-95 1 Ramida Enterpriscs Ltd. ___
Nov1295
Novl395
1 11-22-95iConnors Drilling Ltd. ____ 18002
IO/ljCr
1 10-15-95 IConnors Drilling Ltd. ___I 10-20-95 I Connors Drilling Ltd. _-__-______ 17965 .
179134
1
SO0 I
i I I - 15-95 /Connors Drilling Ltd._______
j I I - 15-95 I Procon Mining & Tunnelling
NovI595
j 11-30-95 IConnors Drilling Ltd.
I so22
12-15-95 losirus Enterprises Ltd.
Decl595
1205
I1 12-3 1-95 IF. Boisvenu Drilline
Drilling Ltd. - ~ - _ _95
951205
_
_ ~
/Connors Drilling Ltd.
1 0 1-09-96 IConnors
IS032
I 0 I -- 10-96 j Hope Mechanical Sewices
I393
Jan 1595
I 0 1- 15-96 I1 Osirus Enternrises
Enterprises Ltd.
Jan1595
960 102
- 15-96 1 F. Boisvenu Drilling Ltd.
I 0 II-15-96jF.
960102
18042
i! 0 1- 16-96 1 Connors Drilling- Ltd.
__..
~~
! 1 l-13-95ID; Heino
~
J300
2.393.75
J304
l.6l5.00
J389 28.682.77
(45.75
'5276 j
' J l 4 l 32.379.40
:J372 1 63.090.11
__
J371 i 29.352.15
J384 , 116.968.39
5432 j 47.670.10
,523 j
910.00
J2SO
9
.840
.oo
0.840.00
- ,;J379
J379 59.102.S2
59.102.S~
125.00
Jl53
125.00
.050,00
,193 , II.050.00
1.996.86
J3l3 1 441.996.86
'
3
0.5
74.SO
J37Y 30.574.SO
101.6__I
J154 ______
33
J377 74.51 I1.33
5315 . 2.385.38
'.J143 ' 4.050.00
'J3Y5 25.955.00
J327 49.280.4;
~
'
~
0
1400
1
i4uii
~
~
1
j 0 1-25-96
1-15-96 / Connors Drilling Ltd.
i 0 1-29-96 Connors Drilling Ltd.
I 0 1-3 1-96 Homegold Resources Ltd.
0 1-3 1-96 Procon Mining & Tunnelling
1 0 1-3 1-96 IF. Boisvenu Drilling Ltd.
__
53 17 contractor - Drilling (Underground)
5-3 I7 'Contractor - Drilling (Underground)
1 02-14-96
53 IS 1 Contractor - Environmental
53 1 8 j Contractor - Environmental
1
Connors Drilling Ltd.
1 02-20-96 Connors Drilling Ltd.
11-08-95 Colder Associates
I 11-23-95 Colder Associates
118050
SO50
1SO53
Jan3196
Jan3196
96CJ106
'
l8OOlB
15070
.I382 '
iJ3i5
836.39
4.231.00
i2172S9
:217590
lJ210
jJ431
/
6.747.06
6.3 .z1
~
18
53 1 Contractor - Geological
53 I9 /Contractor - Geologml
53 19 /Contractor - Geological
53 I9 I Contractor - Geological
53 19 I Contractor - Geological
5 3 19 /Contractor
___. - Geological
53 I 9 [Contractor - Geological
53 191Contractor - Geological
53 I9 1 Contractor - Geological
53 19 I Contractor - Geological
.
53
- I 9 I Contractor - Geo~ogica~
53 19 I ____
Contractor - Geological
53 19 I Contractor - Geological
5 3 I9 I Contractor - Geological
53 19 contractor - Geological
- I9
i
1
I
I
i
:
i
1
1
1
I
iJ165 I 2.520 00
Oct2795 -_--____
10-27-95 Edson's Resources Ltd
Oct2795 15166 10.800 00
10-27-95 Sun Group Resource Management
~10-3 1-95 Homegold Resources Lid
Oct3 I95 E' 3.600 o i
___
iJl7f) : 4,496.71
10-3 1-95 /Cardinal Geoconsulting ~ _ _ _ LClOO2
_
3.716.18
LC/OO3--.- jJ306
I 1 - 15-05 1 Cardinal Geoconsulting
4.200.00
I5Nov95 iJ33-I
I I - 15-05 Homegold Resources Ltd. -- .
_ _ _ ~ . ~ _____.._
_
Nov3095 ____._____
iJ376 : 3.OOO.00
I 1-30-05 I Homegold Resources Lid. ___-__._
DeclSes 1111 i 2.079.78
12-15-95 IHoniegoId Resources Lid.
___.
Decl595 jJl8 ; 4.050.00
12- 15-95 I Homegold Resources Ltd.
12- 15-95 1 Cardinal Geoconsulting
LC/004
jJ19 I 3.607%
Decl595
/ J 2 0 -____
4.687.50
12- 15-95 1 Plen Dickson
_ _ _ _ _ ~ Decljes
/J24
882.50
__________
12-15-95/Plen Dickson
.3.300.00
Dec3 I95 J57
12-3 1-95 I Homegold Resources Ltd.
3.937.50
Dec3 I95 1560
12-3 1-95 Plen Dickson
1.O72.1 I
Dec3 l e s 1564
12-3 1-95 !Pien Dickson
i
-
,
_
1
~
~~
- ~ ~ _ _ _ _
,
j
~~
j
~
I
i
I
53 I9 1 Contractor - Geological
53 19 I Contractor - Geological
5 3 I 9 i Contractor - Geological
1 0 I - 1 1-96 Vancouver Petrographics Lid.
I 0 1- 15-96 Homegold Resources Ltd.
I 01-15-96 Plen Dickson
960021
Jan1595
Janljes
jJ277
jJ92
jJ96
53 l9/Contractor - Geological
53 I9 j Contractor - Geological
53 19 I Contractor - Geological
53 19 Contractor - Geological
53 19 j Contractor - Geological
53 I9 1 Contractor - Geological
53 19 I Contractor - Geological
53 19 I Contractor - Geological
53 I9 1 Contractor - Geological
5 3 I 9 I Contractor - Geological
! 0 1-15-96
- Geological
.
I
~
53 19 1 Contractor
53 I9 i Contractor
53 19 contractor
53 I 9 Contractor
5.3 19 1 Contractor
I
- Geological
- Geological
- Geologicai
- Geological
5.3 I9 Icontractor - Geological
__
-_____
Si I9 Contractor - Geological
53 I9 j Contractor - GeoIogicaI
__
5320 i Contructor - illetal1urgic:ll
5 3 2 0 !Contractor - ilietallurgic:ll
5320 icontractor - illeta~urgicn~
:
385.00
3.300.00
:
1.027.68
/J123 j
jJl33
IJ142 i
IJ144
IJ145 1
J146 !
5177 /
lJ191 I
5371 1
5372
6.514.00
I 0 1-3 1-96 Wendell Zerb
LC/OO5
Jan3196
Jan3le.u
Jan3196
Jan3196
3 1Jan96
Jan3196
LC/006
96L001
Jan3 lex
j 02-15-96
02- 15-96
02-29-96
02-29-96
1 02-29-96
FeblSex
Febl596
Feb2996
Feb2996
Feb2996
lJ325 i
/J359
iJ359
15391 1
I J393
391.75
3.900.00
3.125.00
3.450.00
5.880.00
Marl596
Mar1596
Mar3 l e s
114-15 ;
/J450 i
j J452
2.4(10.00
00-18-95 Melis Engineering -___-
9549
jJ102
10-1445 Melis Engineering
10-28-95 Melis Engineering
9557
9560
Cardinal Geoconsulting
j 01-3 1-96 D. Heino
1 0 1-3 1-96 Homegold Resources Lid.
I 0 1-3 1-96 Osirus Enterprises Ltd.
i 0 1-3 1-96 Plen Dickson
! 0 1-3 1-96 ! Plen Dickson
I 0 1-3 1-96 Sun Group Resource Management
1 0 1-3 1-96 Cardinal Geoconsulting
1 0 1-3 1-96 Wendell Zerb
Plen Dickson
Homegold Resources Ltd.
Plen Dickson
Homegold Resources Ltd.
Wendell Zerb
i 03-15-96
Homegold Resources Ltd.
i 03-15-96 Plen Dickson
I 0 3 - 3 1-96 Homegold Resources Lid.
~
1
~
~
~
1215.00
i.003.82
490.00
1.150.32
5.625.00
984.94
4.259.00
6.300.00
1.777.17
3.600.00
S58.7I
126.61
~-
__--___
~
~
!JIG1 j
/J24S .
___--___
610.19
1.042.96
19
5320 1 Contractor
- Metallurgical
11-30-95 !Edward W Thornton. P.Ene
No\ 3095
I J427
;
_____
427
12-07-95 Lakefield Research Limited _ - ~ _ _ _ _ _ _
_ _ - _ iJ321 j
j J48
12-23-95 Melis Engineering
9580
~.
i 0 1-06-96 Melis Engineering
9532
-j J i w
-___ 0 1-20-96 Melis Engineering
~_9585
iJ178 ,
62U
IJ322 1
0 1-20-96 Lakefield Research Limited
02-03-96 Melis Engineering
9588
-/J31<!
j 02-10-96 Lnkefield Research Limitcd
776
iJ329
02- 17-96 Melis Engineering
9590
jJ328
j
______
j 02-29-96 Melis Engineering
9595
iJ410
FebZY96 ___
iJ125
02-29-96 ,Edward W. Thornton. P.Eng
5320lContractor - Metallurgical
5320 1 Contractor - Metallurgical
-.5320 [Contractor - Mctallurgical
5320 /Contractor - Mctallurgical
5320 Contractor - Metallurgical
5320 I Contractor - Metallurgical
53201Contractor - Metallurgical
-5320
.
/Contractor - Metallurgical
~.
5320 Contractor - Metallurgical
5320 1 Contractor - R/Ietallurgical
~
~
I
1
~
~
I
~
~
~
5320 i Contractor - Metallurgical
532 1 /Contractor - Mining
532 1 1 Contractor - Mining
I
'
03-30-96 Melis Engineering
10- 15-95 Procon Mining & Tunnelling
10-3 1-95 Procon Mining & Tunnelling
70211
/J9S I
iJlOY ;
/J111
I 02-29-96'Rescan Engineering Ltd.
5322 !Contractor - Roads
5322!Contractor - Roads
5322 1 Contractor - Roads
5322 Contractor - Roads
5322
- Roads
j 09-29-95 Canyon Cable (1988) Ltd.
10-05-95 Doug Lasser
74334
~
5322 1 Contractor - Roads
~
1.767.38
;J~;T
96020
96039
i 10-15-95 ClSTeather
! 10-17-95 Cliff Teather
Y.174.12
9.785.72
iJ540
:J177 152.098.30
:J297 (2.156.75
: 02- 13-96 Rescan Engineering Ltd.
1
r contractor
16.199.50
9.654.04
5.850.51
11.192.56
25.910.00
11.376.71
22.335.50
6.758.52
9602
Oct1595
Oct3195
5321 !Contractor - Mining
532 I /Contractor - Mining
~
3.950 00
14
10-15-95 Doug Lasser
15
74335
11-12-95 IRamida Enternrises Ltd.
NO
,
____-
iJ-117
932. I 1
~
jJ243
3.w7.35
~
1.702.82
5.137.50
5.720.00
3.215.W
IJ109
:
jJ390
lJ391
! 6.SZ5.01)
2.100.00
~~~
5322 1 Contractor - Roads
5322IContractor - Roads
5322 !Contractor - Roads
5322 Contractor - Roads
I
5322 Contractor - Roads
5322 contractor - Roads
_5322
_
1 Contractor - Roads
5322/Contractor - Roads
5 3 2 2 Icontrrictor - Roads
5322 Icontractor - Roads
5322 !Contractor - Roads
-._.___
5377 1 Contractor - Roads
5322 ,Contractor - Roads
~
11-14-! ,
~
~
~~~~~~
~
~ ~ ~ . -. . ~ - - .
__
1 11-14-95 1 International Forest Products Ltd.
I
11-30-95 Ramida Enterprises Ltd.
j 11-30-95 Emil Anderson Construction Co. Ltd.
12- 15-95 1 Ramida Enternrises Ltd.
12- 15-93
Enterpriscs Ltd.
i 12-15-95iD. Heino
12-3 1-95 ITolsons Eritcrprises Ltd.
0
I - 15-96 ~TO~SOIIS
Enternrises Ltd.
_____.__
~
/Telsons
!
~
~
' 0 1-3
j D. Heino
_1-96
_ .__01
-:
1-96 i Ramida Enterprises Ltd.
N O
Nov3095
1739
I
1.4023)
20
5.322 I Contractor - Roads
! 0 1-3 1-96 i Tolsons Entcmrises Ltd.
i 1 I - 15-95 j Sun Group Resource Management
5323 IContractor - Miscellaneous
5323
/Contractor
Miscellaneous
/
11-15-95iAsh & Associates Consulting Ltd.
_
_
~
_
_
_
~
5323 !Contractor - Miscellaneous
1 11-15-95/0sirus Entemrises Ltd.
5323 I Contractor - Misccllancous
! I 1- 17-93 i Ace Drilling Services Ltd.
1 11-24-95/Ash & Associates Consulting Ltd.
5323 !Contractor - Misccllancous
__-__
i 11-30-95/Sun Group Resource Management
5323 j Contractor - Miscellaneous
5323 IContractor - Miscellaneous
1 12-15-95;Sun Grouu Resource Manarcment
S i 2 3 icontractor - Miscellaneous
1 12- 15-95 1 Ash St Associates Consultine Ltd.
5.323 /Contractor - Miscellaneous
j 12-15-95iAce Drilling Services Ltd.
5323 iContractor - Miscellaneous
j 12-15-951D. Heino
5323 /Contractor - Miscellaneous _____/ 12-3 1-95 Sun Group Resource Management
? ? 3 !Contractor - Miscellaneous
! 12-3 1-95 i Ash & Associates Consultine Ltd.
j 12-3 1-95 !Ace Drilling Services Ltd.
_
5323
~~______
-_
Miscellaneous
_
5323 I Contractor - Mscellaneous
i 12-3 1-95 /Osirus Enterprises Ltd.
E23 j Contractor - ~ i s c e ~ a n e o u s
1 0 1- 13-96 1 Vancouver Petrographics Ltd.
5323 ]Contractor - Miscellaneous
! 02-15-96 1 Ash & Associates Consultine Ltd.
5336iDrafting
j 09-0 1-95 IProComp Geodraft Ltd.
5336iDrafting
09-30-95 /Homegold Resources Ltd.
5336 j Drafting
1 10-12-951Canyon Cable (1988) Ltd.
5336lDraliine
i 1 1-14-93I SuDerior ReDro Centre
__
1 12- 14-95 1 Superior Repro Centre
5336iDr'afting
~-__
5336 Dr,afting ____
12- 14-95 I Superior Repro Centre
i 12-20-95 i Suuerior Rem0 Centre
5336 I Drafting
5336
_
_ I Drafting
1 12-20-95 I Superior Repro Centre
5336
!Drafting
1 12-27-95 1 Vancal Reproductions Group Ltd.
5336jDrafting
i 12-3 1-95 /Royanna Wild
5336 Draftine
5336iDrafting
i 02-0 1-96 1 Geoff Lillos
5336iDrafting
j 02-15-96 1 Vancal Reproductions Group Ltd.
5336 \Drafting
1 02-22-96Superior Repro Centre
5336 ;Drafting
! 02-39-96 Ibex Drafting Services
5336iDrahing
j 03-08-96 i Dominion Blue Reprographics
5336 I Drafting
i 03-08-96 I Superior Repro Centre
5336 !Drafting
1 03-05-96 ISuDerior ReDro Centre
5 3 36 / Drafting
03- 1 1-96 Geoff Lillos
5 3 36 Drafting
I 03-20-96 Speedy Printing Centres
53361Dr'afting
/ 03-22-96 Superior Repro Centre
5336 !Dr,afting
03-73-96 'Graphic Resource Group Ltd.
1
s contractor
~
~
~
I5383
8.7 1 I .OO
/Novl595 jJ302
5394.51
iNovl595 /.I307
6,557.z
/Nov1595 15333
1.050.00
j 1094
53 16 13.778.80
j I53
15332 ' 2,252.20
!Nov3095 lJ373 , 1,458.06
/Decl595 1514 : I65248
iDecl595 1515 \ 3.908.66
1Decl595 !J21 ' 9,990.00
I Dec 1595
15306
2.985.00
iDec3l95 /J53
2:104.90
'Dec3 I95 'J58
4.935.93
,1101
i J59
9.397.40
Dec3 195 j 563
896.00
385 .OO
,960030
J276
3 60 .OO
iFeb1596 IJ34l
!942SY
!J89
YO5.00
Sep3OEs j J78
32.62
167361
/J299_____
305.22
y V3 728 1
J32 1
19.30
:V39345 . J 1
35.33
103.39
I V39: 1 1
,J2
;V39336 iJ55
3 1.96
jV39192
IJ56
105.69
j31141S
/J54
15.87
10024
I J27Y
262.50
19612-01 15278
1.475.25
iG1614l4 /Jl55
360.00
/3ii9x 15387 :
18.07
1V46320 15336
37.54
j 96-008
5424
1.12 1.00
i37404
15437
337.59
1 V470 17 J442
23.24
1 V46978 1 J443
20.27
4YO.00
io360132 /J441
115237
jJ451
32.10
! V4766 1 I J47 1
19. IO
$298
15473
16.05
i Jan3 196
~
______
~
~
'
E
1
1
1
I
1
S3.X I Equipment Rental
~
10-20-95 1 Gardner Chevrolcr Oldsmobile Ltd.
~
~
i66941
!J215
I(,3.5()
21
~
~~~~~
i 10-23-95 i Gardner Chevrolet Oldsmobile Ltd.
5337 I Eouioment Rental
5337 I EauiDment Rental
5337IEquipment
Rental
_____
i 11-02-95 IGardner Chevrolet Oldsmobile Ltd.
: 11-03-95\B.C. Rentals
__._
5317 1 Equipment Rental
5337iEaui~mentRental
5337 i EauiDment Rental
5337 1 Equipment Rental ______
-_
5337 I Equipment Rental ~ _ _ _ . _ _ _ _ _ .
5337 1 Eouioment Rental
5.337lEoui~mentRental
53T7l Equipment Rental_____
-__
5337
- - _ _IEquipment
_ _ - ~ ~ - Rental
- - - _
5337IEaulDmcnt Renval
5337 1 Equipment Rental
5.337 I Equipment Rental
5337 I Equipment Rental
5337 I EauiDment Rental
5337 1 Equipment Rental
5337 /Equipment Rental
5337jEquipment Rental
5337 EauiDment Rental
5.337 iEquipment Rental
5337 [Equipment Rental
5337jEquipment Rental
5337 1 Eouiument Rental
5343 iFreight
5343 /Freight
~
1
11-06-95lB.C. Rentals
1 1-07-95 i Canvon Cable f 1988) Ltd.
I I-14-95iB.C. Rentals
j I 1 - 15-95 j Edson's Resources Ltd.
1
1
i
11-16-95iB.C. Rentals
11-30-95 /Edson's Resources Ltd.
I I 1-30-95 1 Gardner Chevrolet Oldsmobile Ltd.
I 12-0 1-95 I Canyon Cable ( 1988) Ltd
I 12-05-95 I Gardner Chevrolet Oldsmobile Ltd
I 12-06-95 1 Gardner Chevrolet Oldsmobile Ltd.
j 12- 1 1-95 I Canyon Cable (1988) Ltd.
1 12-15-95 IEdson's Resources Ltd.
12-3 1-95 IEdson's Resources Ltd.
i 0 1-05-96 1 Gardner Chevrolet Oldsmobile Ltd.
101-12-96/B.C. Rentals
I Ol-l5-96/Ramida Enterprises Ltd.
101-16-96jB.C. Rentals
i 0 1-3 1-96 1 Sun Grour, Resource Management
i 02-0 1-96 / Gardner Chevrolet Oldsmobile Ltd.
1 02-09-96lB.C. Rentals
I 02-15-96jB.C. Rentals
I 03-0 1-96 1 Gardner Chevrolet Oldsmobile Ltd.
09-28-95 !Canadian Airlines Int'l
09-30-95 IKemas Freight & Courier
1
1
5343 !Freight
5343 [Freight
5343 IFreight
5343 iFreight
5343 Freight
5343 IFreight
5313 Freight
5343 !Freight
5343 !Freight
5343 i FreiSht
5343 IFreight
1 10-14-95 \Canyon Cable (198s) Ltd.
5343 1 Freight
5343 IFreight
5343 I Freight
--53-13 [Freight
5343 iFreight
5343 1 Freight 5343 IFrciglit
5343 freight
___
5343 Freight
1
10-17-95 1 Canyon Cable (1988) Ltd.
10- 18-95 I Fastfrate
I 10-20-95 Canyon Cable (1 988) Ltd.
10-24-95 Canyon Cable (1988) Ltd.
1 10-26-95 I Canadian Airlines Int'l
I 10-31-95 /Loomis Courier Service
1 I 1-07-95 1 Canyon Cable (1988) Ltd.
1 I 1-07-95 (Canyon Cable (1988) Ltd.
1 l-l4-95/Canyon Cable (1985) Ltd.
j 11-17-95iCanvon Cable (1988) Ltd.
j
1
1
1
~
1
~
--__
_________
~
i
i
_____
1
1 1-26-95 Canyon Cable (1985) Ltd.
I 1-28-95 1 Canyon Cable ( 1988) Ltd.
I
___ I 1-31-95 -1j Canvon Cable ( 1988) Ltd.
i 12-01-95/Canyon Cable (1988) Ltd.
i
~
i
12-1 l-95/Canyon Cable (1988) Ltd.
12-1 1-95 !Canyon Cable (1988) Ltd.
12-l3-95iCanyon Cable (1988) Ltd.
12- 17-95 C:inyon Cable ( 1988) Ltd.
12- 18-95iCanvon Cable ( 198s) Ltd.
~
66961
Novo295
Nov0395
:J216
5209
j 53 I7
32.05
1.070.00
466.57
69127
Novl405
Novl595
Novl69j
Nov3095
Nov3095
74009
DecO595
67738
74179
Dec1595
Dec3195
Jan0596
Jan1296
Jan1596
Jan1696
Jan3196
FebOl96
Feb0996
Feblj96
Mar0196
174920
40 17 1
/J410
iJ429
/J303
IJ370
15374
! J430
J4I
J33
375.8 I
642.00
67314
67352
Va95766
67467
67561
465207
3 1s
69209
69144
69326
69417
11227 \
iJ219
lJ244
lJ230
j J231
/J236 !
/ 5250
15-121 I
iJ422
/J408
iJ418
I
I
_-
I
1.865.00
I
542
jJ40
lJ5
iJ52
iJ175
jJ332
iJ117
jJ127
iJ177
15335
IJ33l '
15330 t
lJ43S
(J93 I
IJ99 I
~
1.275.00
1.070.00 I
3.445 40
1.070 00
~32882 I
493.27
800.00
560.00
1.070.00
1.572.50
2.750.00
342.30
200.00
1.349.71 I
1.572.50
209.54
1.070.00 I
14.80
330.00
250.00
200.00
1.476.15
60.00
20.00
15.50
22.53
20.00
35.00
22.00
I25 .OO
69464
/J419
20.00
69699
jJ415
20.00
69812
i5407
40.00
69566
lJ35
40.00
74234
lJ.34
120.00
74190
;J39
IO,00
______-______
74262
iJ36
3
0 .oo
-_________
74294
J82
12.00
74388
,JS5
22
5313 Frcight
5343 Frcight
-5343
. Freight
12-20-95 [Canyon Cable (1988) Ltd.
12-27-95 1 Canyon Cable (1988) Ltd.
12-25-95 Canyon Cable (1988) Ltd.
.....
~
~
~~
,
74447
_____________~
~~
5343 IFrcieht
I 0 1-05-96 Canyon Cable (1988) Ltd.
5343 IFrcight
__
1 01-OY-96!Canyon Cable (1988) Ltd.
5343 IFrcight
i 01-08-96jCanyon Cable (1988) Ltd.
5343 /Freight
0 I - 1 1-96 Canyon Cable (1 988) Ltd.
______
5343 1 Freight
01-12-961Fastfrate
5343 IFrcight
0
1- 13-96 Canyon Cable (1988) Ltd.
__.__________
5343 /Freight --._______
1 Ol-15-96ICanyon Cable (1988) Ltd.
5343 Freight
I 0 1- 15-96 ! Canyon Cable ( 1988) Ltd.
--5343 j Freight
i01-19-96/Canyon Cable (1988) Ltd.
-_
5343 j Freight
j 01-21-96 ICanyon Cable (1988) Ltd.
5343 I Freight -___________
1 0 1-24-96 1 Canyon Cable (1988) Ltd.
5343
__-.
IFreight
_
/ 01-25-96/Canyon Cable (1988) Ltd.
5343 /Freieht
i 0 1-26-96 1 Canvon Cable (1988) Ltd.
~
~
~
1
1
__i___--
-.__
~
1
I
~
5343 1 Freighi
5343 /Freight
5343 /Freight
1 02-02-96
5346 1 Fuel
5346 /Fuel
j 09-30-95 jHomegold Resources Ltd.
1 10-25-95/Esso (Phil Whtmore Ltd.)
5346 I Fuel
5346jFuel
53461Fuel
5346 IFuel
5372 I Safety Gear
53 72 Safety Gear
5372 Safet\. Gear
5372 1 Safety Gear
5376 1 Supplies - Field Work
5376 1 Supplies - Field Work
5376 1 Supplies - Field Work
5376 1 Supplies - Field Work
5376 1 Supplies - Field Work
5376 I Supplies - Field Work
Sj76 Supplics - Field Work
5376 !Supplies - Field Work
.-._.
53761 Supplies - Field Work
5376 i Supplics - Field Work
5376 1 Supplies - Field Work
___._.__
5376 Supplies - Field Work
I
I
J170
30 00
15171 c-37.00
-iJ172 1
15.00
Jan1296
-13072
75105
75203
-13241
504.06
iJ173
100.00
jJ174 1
25.00
30.00
.1J169
_ _ - ~
10.00
'J164 j
,1167 \
20.00
10.00
15412 I ,
20.00
'5162 1
118.24
-1-3-0 -2 9
13234
75384
75427
Canyon Cable (198s) Ltd.
Canyon Cable (1988) Ltd.
02-08-96 Canyon Cable (1988) Ltd.
12-25-95 /Esso (Phil Whitmore Ltd.)
1 0 1- 17-96 I Esso (Phil Whitmore Ltd.)
1
~
I
j
25.00
10.00
75608
75696
75749
75859
IJ161
I
250.00
22.00
Sep30Es
Oct2595
jJ78
/J245 ,
948.80
4,002.95
1
!J413 1
,5414
iJ411
IJ49 1
IJ179 1
15180 1
iJ472 I
IJ131 1
/Jl32 1
jJ275 i
iJ151 I
jJ98 i
15226
70943
;J229 I
9 5 ~ 1 0 1 0 1197 1
67105
iJ22Y !
-23381
-'J95
67266
,3225 I
Octl5Es ,JOG 1
67375
J218 !
67332
5217
67345
,5222
I
____~
67520
J233
Dec2895
F744
Jan3096
Mar1696
37704
1678
960059
37773
70224
70547
7.032.95
1218.56
1.911.63
710.95
299.95
( I 19.70.
1.524.40
63.13
89.62
989.05
66.88
102.72
98.49
342.65
96.75
3
i 03-16-961Esso (Phil Whitmore Ltd.)
1 01-23-96 i Deakin Equipment Ltd.
1 0 1-23-96 1 Dealun Equipment Ltd.
1 0 1-26-96 i Vancouver Petrographcs Ltd.
I 0 1-29-96 1 Deakin Equipment Ltd.
~
~
71941
74981
74966
----
/ 02-06-96
i
12.00
252.00
iJ84
583 1
40.00
__-_
75295
1 01-3 1-96 Canyon Cable (1988) Ltd.
5343 !Freight
rJ81
7.1520
74626
1 09-79-95 i Canyon Cable (198%)Ltd.
1 10-02-95 !Canyon Cable (1985) Ltd.
1 10-04-95 ICanyon Cable (1988) Ltd.
1
IO- 10-95 /Acme Analytical Laboratories Ltd.
I IO- 10-95 /Canyon Cable ( I 988) Ltd.
-_
\
-__
~
~
1
I
i
i
10- I 1-95 j Deakin Equipment Ltd.
10-1-1-95 ;Canyon Cablc (1988) LLd.
IO- 15-95 [Plen Dickson
10-13-95 /Canyon Cable (1988) Ltd.
1~)-17-95jCanyonCable (1988) Ltd.
IO- 15-35 1 Canyon Cable (1988) Ltd.
1 0 - 3 - 9 5 iCanyon Cable (1988) Ltd.
I
154.14
295.33
31.98
281.52
502.51
~c~
-
-
23
5.376 Supplies - Field Work .~
j 10-15-.95'Canyon Cable (1988) Ltd.
5376ISupplics
Analytical Laboratories Ltd.
Ficld
Work
____
_ i 10-25-95
_ -Acme~
5376jSupplics - Ficld
Work
1 10-30-95 Canyon Cablc (1988) Ltd.
_ _ _ _
--__
.--____
Canyon
Cable
(1988)
Ltd.
5376 1 Supplies - Field _
Work
i
I
1-02-95
_
5376
1 Supplies --_____
Field Work
11-02-95 Canyon Cable (1988) Ltd.
. . ._.
~
-~
5376 Supplies
___- Field Work
j 11-05-95 Canyon Cable (1988) Ltd.
5376 1 Supplies - Field Work .___11-05-95 Canyon Cable (1988) Ltd.
~
_ _
~
5376 1 Supplies - Field Work
5376;Supplies - Field Work
1
5376 I Supplies - Field Work
5376 I Supplies - Field Work
5.376 j Supplies - Field Work
53?6 i Supplies - Field Work
5376 j Supplies - Field Work
5376 supplies - Field Work
5376iSupplies - Field Work
5384lTravel - Meals / Accom / Tasi
5384/Travel - Meals / Accom / Taxi
5384!Travel - Meals / Accom / Tasi
5384ITravel - Me:ils / Accom / Tasi
5384iTravel - Meals / Accom / Tasi
1 0 1-02-96
5584(Travel - Meals I Accom / Taxi
S3W/Travel- Meals / Accom / Tasi
5384/Travel- Meals / Accom / Tasi
S3S4!Travel- Meals / Accom / Tnsi
539O/Utilities Expense
i
I
10-27-95
10-3 1-95
10-3 1-95
101-19-96
j 11-09-95
_5392 !Wages & Benefits - Casual
j 11-30-95 Dennis J. Miller
I I I -3(i-95 Wendelin (Jack) Thnlhofer
5392 Wages & Benefits - Casual
~~.____I__
~
5-30?..._
Wages & Benefits
~
-~5392 i Wages & Benefits
- Casual
- Casual
~
01-05-96
1 01-05-96
~
01-16-96
I 01-25-96
I 02-02-96
i 09-30-95
~
09-30-95
1 10- 15-95
I
~
~
j
1
10-23-95
10-23-95
7
74224
74388
IJ78
jJ85
Canyon Cable (1988) Ltd.
Canyon Cable (1988) Ltd.
Deakin Equipment Ltd.
Canyon Cable (1988) Ltd.
Canyon Cable (1988) Ltd.
Canyon Cable (1988) Ltd.
Canyon Cable (1988) Ltd.
Wendell Zerb
Homegold Resources Ltd.
Plen Dickson
Homegold Resources Ltd.
Wendelin Thalhofer
74751
,74785
37345
74966
75011
75384
75696
SepjUEs
,SepNEs
:OctljEx
Oct2395
,Oct2395
iJ168 !
1J156 1
jJ95
15172 1
/Jl57
1JJ12 !
jJ41-t j
157-1 I
1578 j
!J96
15176 I
1J237
149.75
111.19
319.70
129.20
614.50
359.36
89.88
1.283.67
Sun Group Resource Management
Wendell Zerb
Plen Dickson
K. Cheryl Kermeen
B.C. Hydro
)Oct2795
IOct31Es
iOct31Es
'Janl9ex
:Nov0995
lJ166 i
/J73 I
/J19S
IJl30 I
153 10
249.74
744.46
947.64
S6.88
-54.48
12-17-95 Canyon Cable (1988) Ltd.
I 12-15-95 Canyon Cable (1988) Ltd.
/ 01-03-96
70886
jJ224 -___
975.73
0.0 I
Adj 1025 -/ J2j7
-____
67765
I 309.02
_
_ ~ _ /J234
_
__
67942
/JJI6
281.06
67966
!J424
_ . _ ~ ~149.90
___
67856
lJ413
654.S9
-__
67835
/J426 -__-290.57
'
~
11-30-95 Frederic P x c
11-30-95 Dennis J. Millcr
~
a
'
47.24
598.88
1.132.64
850.95
914.64
-.jJ1 13
[JI 14
1.950,OO
142 -__ IJlUO
;J196
147
3.174.12
2.S70.54
I12
1 IO
-
343.26
~
9S2.03
24
5392 I Wages & Benefits - Casual
5392 I Wagcs % Bcncfits - Casual _---___
_
5392 j_
Wagcs
_& Bcncfits
~
- Casual
5392
I
Wages
&
Bcncfits
- Casual
.-.
--__
5392 j Wages & Benefits - Casual
5392 j Wagcs & Bcncfits - Casual
5392 1 Wagcs & Benefits - Casual
-____
5302 1 Wages & Bcncfits - Casual
__
53921 Wagcs & Bcncfits - Casual
5392 I Wages & Benefits - Casual
5392 Wages & Bcncfits - Casual
5392 i Wagcs & Benefits - Casual
._-5392 I Wages & Benefits - Casual
5392;Wages & Bcnefits - Casual
5392 Wages & Benefits - Casual
5392 I Wages & Benefits - Casual
5392 I Wages & Benefits - Casual
5392 I Wages & Benefits - Casual
5392 j Wages & Benefits - Casual
5392 I Wages & Benefits - Casual
5395 I WCB Expense
5.395 1 WCB Expense
5395 WCB Expense
5395:WCB Expense
5 3 9 5 WCB Expense
5395 WCB Expense
5395 1 WCB Expense
5395 j WCB Expense
5394 I WCB Expense
5395 WCB Expense
5395 ! WCB Expense
5395 1 WCB Expense
5395 1 WCB Expense +
5395 / WCB Espense
5395 j WCB Expense
5395 i WCB Expense
5395 \ WCB Expense
5395 1 WCB Expense
5395!WCB Expense
5395 j WCB Expense
5 3 9 5 WCB Expense
.
5395
i WCB Expense
~.
5395 WCB Expensc
__
5395 i WCB Expensc
5.?95! WCB Expense
--__
5305 WCB Expense
5395j WCB Expense
5305 i WCB Expensc
5-3951 WCB Expense
5395 i WCB Expense _ _ _ _ . ~ _ _ _ _
5395 i WCB Expense
-.___
-_____
5?06 CPP Expense
.-
I
~
~
__I
~
i 11-30-95 IFrederic Pare
206
~__.__.I_._._______.___J3S3 j 1.115.36
1 1 1-30-95 Wendelin (Jack) Thalhofcr
230
~J402
_ j . 1.950.00
.
12-15-95lFrederic Pare
.______
23 1
-pi--pJ4J ! 1.997.W
23 5
587
744.85
12-3 1-95 i Wendelin (Jack) Thalhofer
_.__
' 12-3 1-95!Frederic Parc
237
JSS ;
998.92
12-3 1-95 1 Clint A. Martindale
238
JS9 i 1.530.76
0 1- 15-06 1 Wendelin (Jack) Thalhofcr
275
J124
I.950.00
.~
_____---~-.__
2
76
J125
YSl.40
0 1- 15-96 I Frederic Parc
___
-___0 1- 15-06 i Clint A. Martindale
1126 *1 3.753.76
___-______ 277
_
_
~
0 1-3 1-96 i Wendelin (Jack) Thalhofer
3 17
5139 1 1.376.17
-_______
3Z(J
2.732.58
0 1-3 1-961 Frederic Pare
_- J140 j
0 1-3 1-96 1 Clint A. Martindale
3
IS
J
l
4
l
3.519.76
-____-~__1323 _
j 1.939.08
02- 15-96 1 Frederic Parc
343
_ _ ~
02-39-96 i Reclass As E&D Wages
SGJE
J370 j
170.97
02-29-96 !Albert D. Siega
365
J38J
1.794.00
02-29-96 [Frederic Pare
371
5423
470.08
03 - 15-96 I Frederic Pare
37 1
J435 1
470.05
J447 -___
1.794.00
372
03-15-961Albert D. Siega
03-3 1-96 Albert D. Siega
40 1
J457
1.560.00
' 03 -3 1-96 i Frederic Pare
402
J458 1 1.931.28
10-20-95 1 Workers' Compensation Board
Octzo95
JS2 j 1.662.19
11-30-95 /Dennis J. Miller
112
Jll3 1
58.04
, 11-30-93 Wendelin (Jack) Thalhofer
1I O
. ,Jll4
110.51
1 1-30-95 j Wendelin (Jack) Thalhofer
140
J17S
110.81
142
J180 j
128.49
11-30-95 iFrederic Pare
147
J196 1
169.65
11-30-95 !Dennis J. Miller
173
:J291 1
151.79
11-3)-95 /Dennis J. Miller
174
iJ292
125.02
11-30-95 /Frederic Pare
1 1-30-95 1 Wendelin (Jack) Thalhofer
176
iJ295
110.51
, 11-30-951Wendelin (Jack) Thalhofer
,205
iJ352
110.51
11-30-95IFrederic Pare
206
:J353 I
125.02
11-30-95 1 Wendelin (Jack) Thalhofer
230
iJ-102 1
110.51
23 1
:J44
118.07
12-15-95 iFrederic Pare
12-3 1-95 I Wendelin (Jack) Thalhofer
,235
/JS7
42.90
237
J58 1
59.04
12-3 1-95 jFrederic Pare
i 12-3 1-95 iClint A. Martindale
:23Y
iJS9
90.47
01-15-961 Wendelin (Jack) Thalhofer
274
iJ12-l 1
137.41
j 276
jJ125 1
52.09
01-15-96lFrederic Pare
j 277
15126 I
221.35
0 1- 15-96 i Clint A. Martindale
: 317
/Jl39 j
99.08
j 0 1-3 1-96 1 Wendelin (Jack) Thalhofer
, 32u
iJ140 I
131.96
' 0 1-3 1-96 1 Frederic Pare
208.07
; 3 1s
'Jl4l 1
01-3 1-96jClint A. Martindalc
0 2 - 15-96 Frederic Pare
343
IJ323 i
114.611
02- 15-96 1 Minister Of Finance
'WCB1995 iJ326 1 4 . 3 3 . 4 1
02-29-96 j Albert D. Siega
jJ3Y-I_ 1
101.95
~
~
_ j 365 _
_
_
02-29-96 I Frederic Pare
37
I
'J423
__ 37.78
__-____
03- 15-96 1 Frederic Pare
,371
;J435 I
17.78
~
_
'--?
,J4-!7 j
1111.95
03-15-96iAlbet-t D. Siegai
3 i-___.
03-3 1-9c~i~4lbex-t
D. Siega
41) 1
!J457 I
SY.65
iJ-158
,402 _.--_____
, 0 3 - 3 1-96 IFrederic Pare
'01-1)396 !J560
7.:-!7.07
03-3 1-96 I Workers' Compensation Board
.________--__-1 1-30-95 i Dennis J. Millcr
111
Jll3 :
22.69
1
~
~
~
~
~
~
1
1
1
~
~
~
~
~
~
~
~
cTK
~
25
P
~.___.
5396lCPP Expense
__
5.396 ICPP Expense 5306 CPP Expcnse
__.
-_
- ~ _ _ _ _
-2
t
,
~
~
.~
12-15-95 Frederic Pare
12-3 1-95 Frederic Pare
12-3 1-95 /Clint A. Martindale
-
I
_
_
_
23 I
lJ44 1 ~ 50.12
__
237
IJ88 1
23.15
---______
238
iJ89 j .37.5 I
__.~_ _ _____
_
~
~
_
_
_
_
_
~
_
_
_
_._c_-
E
E
F
I
1.
E
5397 1 UIC Expense
5397 1 UTC Expense
53971UIC Expense
5397 / UIC Expense
5397 I UIC Expense
5397jUIC Expense
5397lUIC Expense
5397 i UIC Expense
5397 I UIC Expense
53 97 ] UIC Expense
1 11-30-95 /Dennis J. Miller
1 11-30-95 /Frederic Pare
I 11-30-95 1 Wendelin (Jack) Thalhofer
1 11-30-95 1 Wendelin (Jack) Thalhofer
I
12-3 1-95 Wendelin (Jack) Thalhofer
12-3 1-95 (Frederic Pare
12-3 1-95 I Clint A. Martindale
01-15-96 I Wendelin (Jack) Thalhofer
0 1- 15-96 Frederic Pare
0 1-15-96 1 Clint A. Martindale
1
173
174
; 176
I205
1 J29 1
,235
,237
1238
,275
276
277
IJ87 I
J88
589
,5124 i
IJ125 1
/J126 1
74.16
74.16
74.16
74.16
1 J292
15295
15382
1
1
30.48
41.96
64.29
74.16
37.02
74.16
.
~
26
STATEMENT 0F QUA LlFICATTONS
I, Melvin Plenny Dickson, of 1283 Wolfe Avenue, in the City of Vancouver. in the Province of
British Columbia, Canada hereby certifir as follows:
1.
I am a graduate of Mount Allison University, Sackville. New Brunswick and hold a
Bachelor of Science Degree in Geology.
2.
I am a Registered Professional Engineer of the Province of British Columbia, Registration
No. 1 1456, and of the Province of Ontario, Registration No. 1 1 56 1305.
3.
I have actively practiced my profession on a full-time basis in mineral exploration, mine
development, production. management and consulting since graduation in 1965.
4.
That the information contained in this report is based on published and unpublished
reports on the property, work conducted on the property from September 25, 1995 to
June 15, 1996, various site visits. and the author's personal knowledge of the area in
general.
u
5.
I have been employed on a contract consulting basis as general manager of the Ladner
Creek Project since September. 1995.
6.
I have no interest, direct or indirect, in the property or securities of Athabaska Gold
Resources Ltd.: but do have an option agreement to purchase Athabaska stock.
Date( at Vancouver, British Columbia, this 10th day of June, 1996.
M.P. Dickson, P.Eng.