22/04/2014 FRENCH RIVER DAMS - WATER MANAGEMENT 2014 SOURCE: PUBLIC WORKS AND GOVERNMENT SERVICES CANADA Monthly Precipitation at French River Dams Station (mm) Actual 125.00 54 Year Average 67.62 % of Average 184.86 196.750 196.500 34.00 60.84 55.88 51.00 67.00 76.12 74.40 72.68 102.37 0.00 82.42 0.00 SIX MONTH TOTAL 284.40 439.51 64.71 0.00 88.95 0.00 500.000 (182.705 m) LAKE NIPISSING AND FRENCH RIVER RECORDED WATER LEVEL INFORMATION AT 1-866-763-2300, OR: JAMIE GEAUVREAU, MNR AT (705) 475-5605, OR: ABBAS KHAN, PWGSC AT (416) 512-5777 WEBSITE http://www.pwgsc.gc.ca/ontario/water-eaux/levels-e.html - Lake Nipissing - The lake level is expected to rise during the next few days. Further change in lake level is dependent on the precipitation and amount of inflows. WATER LEVEL FORECAST - French River - At Dry Pine Bay, the river flow is expected to rise during the next few days. The flow will be dependent on the precipitation and amount of inflows. April 22 to April 28, 2014. THE STURGEON-NIPISSING-FRENCH-WANAPITEI WATER MANAGEMENT GROUP, as overseen by the STURGEON-NIPISSING-FRENCH CITIZENS ADVISORY GROUP, Snow converted to rain; 1cm snow = 1mm rain. Precipitation 40 450.000 (182.512 m) 20 0 196.250 400.000 (182.308 m) 350.000 (182.092 m) LAKE NIPISSING ELEVATION (m) TO GSC DATUM 196.000 335.000 (182.028 m) Optimum Minimum Elevation for start of Lake Nipissing Walleye Spawn (195.66) 195.750 300.000 (181.869 m) Optimum Minimum Elevation for start Start Range and minimum Elevation of Wasi Falls Walleye Spawning (195.30) River Elevations of the Walleye Eggs 195.500 250.000 (181.638 m) Optimal Dry Pine Bay Walleye Spawning Flow 230 m³/s (181.552m) 195.250 200.000 (181.399 m) LEGEND UPPER OPERATING LAKE RANGE LOWER OPERATING LAKE RANGE 195.000 150.000 (181.149 m) CURRENT LAKE ELEVATION Y EAR AVG. LAKE ELEV. MINIMUM LAKE LEVEL TARGETS WASI FALLS WALLEYE SPAWNING START RANGE LAKE NIPISSING WALLEYE SPAWNING START RANGE FRENCH RIVER SPAWN 194.750 100.000 (180.862 m) DRY PINE BAY UPPER OPERATING RIVER RANGE DRY PINE BAY LOWER OPERATING RIVER RANGE LAKE OUTFLOW AT DAMS DRY PINE BAY FLOW 53 Y EAR AVG. DRY PINE FLOW Y EAR AVG. LTD LAKE INFLOW 194.500 LAST THREE DAY AVG. LAKE INFLOW 3 WATER LEVEL EXTREMES FOR 2013 Lowest lake elev. 194.700 m on March 10 Highest lake elev. 196.059 m on May 3 Lowest Wolseley Bay flow 35.6 m³/s, elev. 186.27 m on August 23 September Highest Wolseley Bay flow 472 m³/s, elev. 188.181 m on May 4 Lowest Dry Pine Bay flow 36 m³/s, elev. 180.29 m on August 25 Highest Dry Pine Bay flow 507 m³/s, elev. 182.70 m on April 29 Portage Dam ‐ PD OPEN OPEN CLOSED 0.711 m 0.127 m July August 194.250 50.000 (180.476 m) PRECIPITATION (mm) GATE POSITIONS - APRIL 22, 2014 Gate 1 2 SPAWNING PERIOD FOR 2014 LAKE NIPISSING Lake Level Spawning Ranges as noted: Pike Spawn Apr XX - May XX -May XXNovember October Walleye - Wasi Falls - Apr XX - Apr XX - May XX - Lake - Apr XX - Apr XX- May XX Bass Spawn May XX - May XX - Jun XX Big Chaudiere OPEN OPEN OPEN Dam ‐ BC FULL FULL FULL FLOOD ELEVATIONS Lake Nipissing Flood Limit Elev. 196.59 m (1 in 50 yr) (100 year flood elev. 197.25 m) Wolseley Bay Flood Limit Elev. 188.20 m (477m³/s) 1985 (1 in 100 yr) Dry Pine Bay Flood Limit Elev. 182.850 m (549m³/s) 1985 (1 in 100 yr) Little Chaudiere OPEN OPEN ‐‐‐‐‐‐‐‐‐‐ FRENCH RIVER Pike Spawn April XX - April XX - May XX Walleye Spawn April 11 -April XX - May XXX Bass Spawn - May XX - Jun XX - Jun XX 35.000 EVENTS OF 2013 Pre-freshet - Feb 6 2013 Start of freshet - March 13,2013 LC dam closed - July 2,2013 Ice left lake - MM-DD-2013 End of Freshet - May 21, 2013 L C dam wide open -MM-DD-, 2013 Portage Dam wide open - Jan-30-, 2013 Big Chaudiere Dam wide open - Nov 28-2013 Ice covered the lake - MM-DD-, 2013 December 0.000 194.000 -50.000 1 5 9 JAN EDRM 1041915 13 17 21 25 29 2 6 10 FEB 14 18 22 26 2 6 10 MAR 14 18 22 26 30 3 7 11 APR 15 19 23 27 1 5 9 MAY 13 17 21 25 29 2 6 10 JUNE 14 18 22 26 30 (180.318 m) FRENCH RIVER FLOW (m³/s) AND (CORRESPONDING ELEVATION (m) AT DRY PINE BAY Navigation Season
© Copyright 2026 Paperzz