APPENDIX 1 QA INSPECTION FORM - ENVIRONMENTAL READINGS & PAINT STORAGE SHIP NAME & HULL #: LOCATION: (I): DATE/TIME: CONTRACT/TASK ORDER/CLIN/TWD: PARA NO. WORK ITEM: (V): (G): REQ'T DOCUMENT: PRODUCT BEING APPLIED.: /FY: TABLE: LINE: COLUMN: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. NOTE #1 FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN THE COMMENTS BLOCK. NOTE #2 UNLESS OTHERWISE STATED IN SPECIFICATION, SURFACE TEMPERATURE MUST BE A MINIMUM OF 50 DEG F AND AT LEAST 5 DEG F ABOVE DEW POINT. NOTE #3 ALL SPACES IN A SECTION ARE TO BE FILLED IN. IF NOT APPLICABLE, INSERT N/A. UNUSED SECTIONS SHALL BE CROSSED OUT AND MARKED N/A. ACCEPT CRITERIA: ENV: % RH: Date Time SURFACE TEMP: MIN: MAX: STORAGE TEMP: MIN: Enter Activity/Process: Cleanliness Check, Surface Preparation, Prime Application, Prime Cure, Substrate Dew Stripe Application, Stripe Cure, Intermediate Application, Intermediate Cure, Tack Application, Top Surface Point Coat Application, Top Coat Cure, etc. Temp. (°F) (°F) Gage #: Gage Cal Due Date: Gage #: Gage Cal Due Date: Condition of Reading SAT MAX: % RH Dry Bulb (Ambient Temp) (°F) Wet Bulb (°F) UNSAT Contractor (Signature): Contractor (Print): Comments: Date Time Enter Activity/Process: Cleanliness Check, Surface Preparation, Prime Application, Prime Cure, Substrate Dew Stripe Application, Stripe Cure, Intermediate Application, Intermediate Cure, Tack Application, Top Surface Point Coat Application, Top Coat Cure, etc. Temp. (°F) (°F) Gage #: Gage Cal Due Date: Gage #: Gage Cal Due Date: Condition of Reading SAT % RH Dry Bulb (Ambient Temp) (°F) Wet Bulb (°F) UNSAT Contractor (Signature): Contractor (Print): Comments: Date Time Enter Activity/Process: Cleanliness Check, Surface Preparation, Prime Application, Prime Cure, Substrate Dew Stripe Application, Stripe Cure, Intermediate Application, Intermediate Cure, Tack Application, Top Surface Point Coat Application, Top Coat Cure, etc. Temp. (°F) (°F) Gage #: Gage Cal Due Date: Gage #: Gage Cal Due Date: Condition of Reading SAT % RH Dry Bulb (Ambient Temp) (°F) Wet Bulb (°F) UNSAT Contractor (Signature): Contractor (Print): Comments: Paint Storage Date Contractor (Print): Time / Time Range Enter Product/Component & Prime, Stripe Min. & Max. Temp for 24hr Intermediate, Tack, Top Coat Period Prior to Initiation of Application --OR---OR-Storage Temp. Core Temp. After Manually Measured Component Mixed Method of Measurement Contractor (Signature): Comments: FY10 Version APPENDIX 2 QA INSPECTION FORM - SSPC CLEANLINESS CHECKPOINT SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: WORK ITEM: LOCATION: (I): (V): (G): REQ'T DOCUMENT: DATE/TIME: PARA NO. PRODUCT BEING APPLIED.: /FY: SQFT OF AREA PRESERVED: PARTIAL AREA: /FINAL: (NSTM 631, 634, PPI, NSI 009-32 FY) Accomplish degreasing/ leaning to ensure the removal of surface contaminants, such as sea salts, mud, marine growth, grease, oil, and/ or other petroleum products. Date/Time: SAT UNSAT Accomplish degreasing/cleaning a maximum of 4 hrs. prior to surface preparation, ensuring the adequate removal of surface contaminants. Date/Time: SAT UNSAT If evidence of contamination exists, accomplish degreasing/cleaning a maximum of 4 hrs. prior to the application of each coat of paint to ensure removal of surface contaminants. Date/Time: SAT UNSAT Comments: Contractor (Print): Contractor (Signature): Date/Time: Subcontractor (Print): Subcontractor (Signature): Date/Time: Govt. Insp. (Print): Govt. Insp. (Signature): Date/Time: FY10 Version APPENDIX 3 QA INSPECTION FORM - SURFACE PROFILE/PREPARATION & CLEANLINESS LOG SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: WORK ITEM: LOCATION: (I): DATE/TIME: (V): (G): PARA NO. PRODUCT BEING APPLIED.: REQ'T DOCUMENT: /FY: SQFT: PARTIAL: FINAL: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. NOTE #1 FOR PAINTS: 1 PROFILE READING REQUIRED FOR EVERY 200 SQFT (3 INDIVIDUAL TAPES FOR METHOD C) FOR THE FIRST 1000 SQFT AREA (15 INDIVIDUAL TAPES TOTAL FOR METHOD C); 2 PROFILE READINGS REQUIRED FOR EACH ADDITIONAL 1000 SQFT AREA (6 INDIVIDUAL TAPES FOR METHOD C). NOTE #2 FOR NONSKID: 1 PROFILE READINGS REQUIRED EVERY 100 SQFT (3 INDIVIDUAL TAPES FOR METHOD C) FOR THE FIRST 500 SQFT AREA (15 INDIVIDUAL TAPES TOTAL FOR METHOD C); F READINGS ARE SATISFACTORY, 1 PROFILE READING PER 1000 SQFT REMAINING (3 INDIVIDUAL TAPES FOR METHOD C). NOTE #3 FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN THE COMMENTS BLOCK. ACCEPT CRITERIA: PROFILE RANGE MILS TO: MILS Mil (Average of 3 tapes) Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS Reading: MILS TOTAL AVG: Comments: Abrasive Manufacturer: (If Applicable) Type: (If Applicable) Mesh Size (If Applicable) TYPE OF SURFACE PREPARATION: GAGE # GAGE CAL DUE DATE: Base Metal Reading (Type 1 gage) BMR SURFACE PROFILE INSP:. SAT UNSAT SURFACE PREP. INSP: SAT UNSAT Contractor (Print): Contractor (Signature): Date/Time: Subcontractor (Print): Subcontractor (Signature): Date/Time: Govt. Insp. (Print): Govt. Insp. (Signature): Date/Time: CLEANLINESS INSP: SAT UNSAT FY10 Version APPENDIX 4 QA INSPECTION FORM - SURFACE CONDUCTIVITY / CHLORIDE LOG SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: WORK ITEM: LOCATION: (I): (V): (G): DATE/TIME: PARA NO. PRODUCT BEING APPLIED.: REQ'T DOCUMENT: /FY: SQFT OF AREA PRESERVED: LINE: /FINAL: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. MAXIMUM READING (IMMERSED SURFACES): MAXIMUM READING (NON-IMMERSED SURFACES): CONDUCTIVITY (30) µS/cm CONDUCTIVITY (70) µS/cm CHLORIDE (3) µg/cm2 CHLORIDE (5) µg/cm2 1 READING REQUIRED FOR EVERY 200 SQFT FOR THE FIRST 1000 SQFT, THEN 2 READINGS PER EACH ADDITIONAL 1000 SQFT NOTE FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN THE COMMENTS BLOCK. TEST LOCATIONS CHLORIDE (µg/cm2) CONDUCTIVITY (µS/cm) SAT UNSAT UNSAT SAT Gage Cal DueGage Date:#: Condition of Reading Comments: GAGE # CONDITION OF CHECKPOINT: GAGE CAL DUE DATE: Contractor (Signature): Contractor (Print): Date/Time: Subcontractor (Signature): Subcontractor (Print): Date/Time: Govt. Insp. (Signature): Govt. Insp. (Print): SAT UNSAT Date/Time: FY10 Version APPENDIX 5 QA INSPECTION FORM - SURFACE CLEANLINESS (DUST) TAPE SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: WORK ITEM: LOCATION: (I): DATE/TIME: (V): (G): REQ'T DOCUMENT: PARA NO. PRODUCT BEING APPLIED.: /FY: SPECIFIC FEATURES OF AREA TO BE TESTED: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. NOTE #1 NOTE #2 NOTE #3 FOR UNDERWATER HULL, 1 PROFILE READING REQUIRED FOR EVERY 200 SQFT FOR THE FIRST 1000 SQFT AREA; IF READINGS ARE SATISFACTORY, 2 INDIVIDUAL READINGS REQUIRED FOR EACH ADDITIONAL 1000 SQFT AREA. FOR FLIGHT DECK NONSKID, 3 INDIVIDUAL READINGS REQUIRED EVERY 100 SQFT FOR THE FIRST 500 SQFT; IF READINGS ARE SATISFACTORY, 1 INDIVIDUAL READING PER 1000 SQFT REMAINING. FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN THE COMMENTS BLOCK. Spot Measurement Dust Quantity Rating Dust Size Class Approximate Location Spot Measurement Spot Measurement Dust Quantity Rating Dust Size Class Approximate Location Spot Measurement Spot Measurement Dust Quantity Rating Dust Size Class Approximate Location Dust Quantity Rating Dust Quantity Rating Dust Size Class Dust Size Class Approximate Location Approximate Location CONDITION OF CHECKPOINT: SAT UNSAT Comments: Contractor (Print): Contractor (Signature): Date/Time: Subcontractor (Print): Subcontractor (Signature): Date/Time: Govt. Insp. (Print): Govt. Insp. (Signature): Date/Time: FY10 Version APPENDIX 6 QA INSPECTION FORM - PAINT EQUIPMENT AND PAINT CONSUMPTION LOG SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: WORK ITEM: LOCATION: (I): DATE/TIME: (V): (G): REQ'T DOCUMENT: PARA NO. PRODUCT BEING APPLIED.: /FY: TABLE: LINE: COLUMN: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. Prime Coat Stripe Coat Intermediate Coat Stripe Coat (if applicable) (if applicable) (if applicable) Top Coat Other Airless Paint Hose Size Airless Paint Hose Length Airless Tip Orifice Diameter / Fan Width Plural Airless Airless Pump Used & Model Conventional Airless Airless Pump Ratio (if Plural Component): Fixed: Variable: If Using Inline Heater, Temp. in °F (Fahrenheit) Temp. Setting At Heater Temp. At Tip Other: Brush, Roller, Conventional Spray Product Applied Product Manufacturer Color Applied Product VOC Base Portion Batch No # (Part A) Expiration Date (Part A) Hardener Portion Batch No # (Part B) Expiration Date (Part B) Gallons Used Per Coat Square Feet Painted Start (Date/Time) Stop (Date/Time) FY10 Version APPENDIX 7 QA INSPECTION FORM - DRY FILM THICKNESS MEASUREMENTS SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: LOCATION: DATE/TIME: WORK ITEM: (I): (V): (G): PARA NO. PRODUCT BEING APPLIED.: REQ'T DOCUMENT: /FY: SQFT OF AREA PRESERVED: PARTIAL AREA: /FINAL: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. NOTE: FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN COMMENTS BLOCK. Select Type of Gage being used: Type 1: Gage #: Current Calibration Due Date: Base Metal Reading (Type 1gage): Type 2: Accuracy Adjustment (Type 1gage): ACCEPTANCE CRITERIA PRIMER COAT DFT TO MILS TOP COAT DFT TO MILS INTERMEDIATE COAT DFT TO MILS TOTAL SYSTEM DFT TO MILS STRIPE COAT (for cleanliness & holiday QA) TOTAL SPOT MEASUREMENTS REQUIRED PER SQUARE FOOT OF AREA PRESERVED 0 - 100 SQFT = 5 SPOTS REQUIRED 101 - 200 SQFT = 10 SPOTS REQUIRED Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location 201 - 1000 SQFT = 15 SPOTS REQUIRED > 1000 SQFT = 5 ADDITIONAL SPOTS REQUIRED PER 1000 SQFT AREA Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location 1 1 2 2 3 3 4 4 5 5 Average: Average: Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location 1 1 2 2 3 3 4 4 5 5 Average: Average: Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location Note: Each Spot Measurement = The AVG of Three Gage Readings. Spot DFT (Mils) AVG of 3 Gage Approximate Measurement Readings Location 1 1 2 2 3 3 4 4 5 5 Average: HOLIDAY INSP.: CLEANLINESS INSP.: Average: SAT UNSAT SAT UNSAT Comments: Contractor (Print): Contractor (Signature): Date/Time: Subcontractor (Print): Subcontractor (Signature): Date/Time: Govt. Insp. (Print): Govt. Insp. (Signature): Date/Time: FY10 Version APPENDIX 7A QA INSPECTION FORM - WET FILM THICKNESS MEASURES SHIP NAME & HULL #: CONTRACT/TASK ORDER/CLIN/TWD: LOCATION: DATE/TIME: WORK ITEM: (I): (V): (G): REQ'T DOCUMENT: PARA NO. PRODUCT BEING APPLIED.: /FY: SQFT OF AREA PRESERVED: PARTIAL AREA: /FINAL: (NSTM 631, 634, PPI, NSI 009-32 FY) MAINTAIN SEPARATE LOG FOR EACH AREA/LOCATION, PREPARED OR PAINTED SURFACE, WHEN AN AREA IS DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION. NOTE #1 FOR ANY UNSAT CONDITION FOUND, PROVIDE THE TECHNICAL ADJUDICATION AND CORRECTIVE ACTION TAKEN IN THE COMMENTS BLOCK WHERE REQUIRED IN LIEU OF DFT. Indicate Coating System Sequence Prime Coat Intermediate Coat (if applicable) Stripe Coat (if applicable) Stripe Coat (if applicable) METALLIC SURFACES 2 SPOT READINGS PER 1000 SQFT: 0 - 1000 SQFT = 2 SPOTS REQUIRED 1001 - 2000 SQFT = 4 SPOTS REQUIRED WFT Measurement Number Top Coat Other Coat (Specify) NON-METALLIC SURFACES 0 - 100 SQFT = 5 SPOTS REQUIRED 101 - 200 SQFT = 10 SPOTS REQUIRED 201 - 1000 SQFT = 15 SPOTS REQUIRED > 1000 SQFT = 5 SPOTS REQUIRED PER 1000 SQFT AREA WFT Measurement IAW ASTM D 4414 Location of Readings 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Comments: Contractor (Print): Contractor (Signature): Date/Time: Subcontractor (Print): Subcontractor (Signature): Date/Time: Govt. Insp. (Print): Govt. Insp. (Signature): Date/Time: Print Form Save As FY10 Version
© Copyright 2026 Paperzz