www.maxitile.com | MAXILITE P7 1

www.maxitile.com | MAXILITE P7
1
MAXILITE P7
™
ROOFING INSTALLATION GUIDE
Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all
local building codes, regulations and MAXITILE written application may lead to personal injury, affect system performance,
violate local building codes, and void the product warranty.
We suggest that you read these instructions at least twice.
STORAGE:
MAXITILE products must be stored flat and off ground prior to
installation. Protect products from direct weather exposure.
To prevent damage, keep roofing products in the original packaging
until it is ready to install. Use the plastic bonnet provided to keep the
product dry and to prevent moisture from setting on the surface. If
MAXITILE products are stored outside, they should be protected
with an additional waterproof covering.
MAXILITE P7, RAKE TILE, HIP AND RIDGE TILE:
Field tiles, rake tiles, hip and ridge tiles must be installed with a
minimum 4 inches head lap. Twenty one pieces of field tile cover
one square (100 sq. ft.), 5 squares per pallet. 216 rake, hip or ridge
tiles per pallet, covers 360 lineal feet.
2
BIRD STOP, HIP AND RIDGE SEAL:
The MAXILITE P7 bird stop is 37 inches long and made of metal. Install only one bird stop at a time. If there is an
alignment problem, the next piece can be slid or right to get the proper fit with the tile. The bird stop can also be cut
in shorter lengths to further ease alignment. Hip and ridge seals are plastic and come in black only.
CUTTING:
Refer to the Material Safety Data Sheet (MSDS) for important safety practices prior to using any roofing product.
•
MAXITILE recommends that all cutting of products be performed outdoors. Use mechanical ventilation
when possible.
•
For irregular cuts and holes, use a jig saw or a hole saw with a masonry blade. Special round openings can
be made by drilling several holes around the circumference of the desired opening and tapping out center.
Always cut over the top of a barrel of tile.
•
For score-and snap cutting, use a carbide tipped
scoring tool or a sharp knife:
Using a straight edge as a guide, carefully draw
the scoring tool several times towards yourself,
applying even pressure.
Bend upwards and break.
•
A HEPA vacuum should be used when cleaning up dry debris and dust from cutting area. Do not use
compressed air, broom or brush. If you consider sweeping, wet down the floor and debris with a fine
mist to suppress dust during sweeping. All scrap, cutoffs and debris should be disposed of in a covered
container protected from the elements according to local codes. No special handling is required.
WARNING: AVOID BREATHING SILICA DUST.
MAXITILE roofing products may contain trace amount (<0.5%) of crystalline silica, which is known to the State of California to cause cancer and is considered by IARC and
NIOSH to be a cause from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called
silicosis, and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling: (1) work in outdoor areas with ample
ventilation; (2) use fiber cement shears for cutting or, where not feasible, use a dust-reducing circular saw attached to a HEPA vacuum; (3) warn others in the immediate area;
(4) wear a properly-fitted, NIOSH-approved dust mask or respirator (e.g. N-95) in accordance with applicable government regulations and manufacturer instructions to further
limit respirable silica exposures. During clean-up, use HEPA vacuums or wet methods, never dry sweep. For further information, refer to our installation guide and Material
Safety Data Sheet available at www.maxitile.com or by calling (800) 338-8453 . FAILURE TO ADHERE TO OUR WARNINGS, MSDS, AND INSTALLATION GUIDES MAY
CAUSE SERIOUS PERSONAL INJURY OR DEATH.
www.maxitile.com | MAXILITE P7
3
PITCH:
3:12 minimum, 21:12 maximum. For pitches below 3:12, MAXILITE P7 must be installed over an approved
waterproof covering (including battens and counter battens) complying with the applicable building code.
ROOF DECK:
MAXILITE P7 must be installed over code complying solid wood sheathing. Minimum ½ inch rated plywood
decking is recommended for use with standard roof. See ICC Evaluation Report for fire classification.
UNDERLAYMENT:
Class “A” fire rating (new construction): one layer of non-perforated
Type II (commonly called No. 30) felt in according with ASTM D 226 and
one layer of 72-pound mineral-surfaced non-perforated cap sheet
complying with ASTM D 3909.
Class “B” fire rating (new construction): a minimum one layer of
non-perforated Type II (commonly called No. 30) felt complying
with ASTM D 226 shall be installed.
See ICC Evaluation Report for fire classification.
DECK PREPARATION:
4
•
Felt must be installed in a manner to allow water to run off only at the eave. Underlayment must
be installed in accordance with the applicable building code.
•
Install the following nailers:
At gables: 2 inches X 2 inches and must be nailed approximately 1 inch from edge.
At hips: 2 inches X 6 inches on edge, holding back 6 inches from eave.
At ridge: 2 inches X 4 inches on edge plus 1 inch X 2 inches.
•
Wrap gable, hip and ridge nailers with non-perforated Type II (commonly called No. 30) felt in
accordance with ASTM D 226.
•
Install base flashing around pipes, vents, chimneys, etc. Skylights should have a 2 inches X 6 inches
curb to flash against using same type of flashing as chimneys.
•
Check to make sure that the roof is square. Apply horizontal chalk lines. The first chalk line should
be 22 inches up from the eave, 23 inches if there are gutters. Maximum spacing for the remaining
lines is 20 inches.
FASTENERS:
Nails and screws must be corrosion-resistant, preferably hot-dipped galvanized for best results, in accordance
with local building codes. MAXITILE is not responsible for corrosion resistance of fasteners.
MAXITILE products can be hand nailed using a smooth faced hammer, never use a waffle hammer, and
fastened with pneumatic tools. When hand nailing, first perforate the opening to be used for fastening in
order to avoid accidental breakage of the roofing product.
Always drive fasteners perpendicular to roofing and solid deck. Do not over-drive under drive fastener heads and
never drive fastener in at an angle. Fastener head must be flush on the surface of the product (no air space).
If fastener is countersunk, patch fastener hole and add a fastener. Repair nail-sizes holes by filling with adhesive.
•
Exposed Fastener: 4-1/2 inches long (114.3 mm), 0.175 inch shank diameter (4.44 mm), corrosion-resistant
lag screw with 0.375 inch diameter heads (9.52 mm) with 1 ½ inches X 1 ½ inches galvanized metal washer
with neoprene brushing.
•
Hidden Fastener: Ring-shank nails, a minimum of 1-3/4 inches (44.45 mm) long and having 0.130 inch diameter
(3.30 mm) shank, with a 1 inch (25.4 mm) X 1 inch (25.4 mm) galvanized cap washer (Cap-n-nail). In lieu of nails,
No. 11 gauge (3.0 mm) (0.12 inch diameter shank), 1-3/4 inches long (44.45 mm), corrosion-resistant screws
having 0.375 inch diameter heads (9.5 mm), with a neoprene-lined washer can be used.
•
Adhesive: Polyurethane construction adhesive conforming to AFG-01, ASTM D 557 or ASTM D 3498.
•
Wind Clip: Use a wire clip, 1/8 inch diameter conforming to ANSI 1075.
•
Nails: Corrosion-resistant 8d common nails.
www.maxitile.com | MAXILITE P7
5
Incorrect
Correct
INSTALLATION OF FIELD TILE FOR WIND SPEED 60-100 MPH:
MAXILITE P7 roofing tile is applied with the staggered joint installation method.
1. On gable roofs, before installing field tile, the trim tile should be installed at the gable.
2. As a general rule, begin by applying field tile at a gable and run toward a valley, hip or wall.
3. Start by installing a full width six corrugation tile at the lower edge of the gable with an overhang of 1 inch
at the gable and 2 inches at the eave (1 inch if gutters). Apply the following tiles in the first course by
side lapping one full corrugation.
4. You may start at either end of the roof.
5. Place the exposed fastener through the top of each corrugation behind the bird stop or in the eave course
(first course only) into the roof deck, a minimum 2 inches from the bottom edge. Then install the hidden fastener
through at each valley of corrugation of the each panel located 2 inches from the top edge of the tile panel.
Avoid over tightening the fasteners to prevent breakage of the panel. The fasteners should only be tightened
moderately. Cover the fastener heads with adhesive. (The exposed fastener can also be applied in last
course if desired).
6. Before laying the next course, apply a 1 inch wide dab of adhesive to the side slope of each corrugation
(horizontal side lapping), and a thick bead of adhesive on every overlapped corrugation.
7. Cut one full corrugation of field tile and start the second course with this three-corrugation panel (only the
first tile panel). Install the tile with a minimum 4 inches head lap over the previous course. Apply adhesive
(review step 6) and place a full width panel continued until flush the rake edge.
8. The third course should be stared with a filed tile cut vertically in two full corrugations. Repeat step 7.
9. The fourth course is installed with a field tile cut vertical in half. Repeat step 7.
10. The fifth course is installed as the first course. Repeat steps 3 to 9 until reaching the edge.
11. For all field tile application, install the hidden fastener at each valley of corrugation of the panel located 2
inches from the top edge of the tile panel. Also a wind clip at the lower edge of each overlapping corrugation
may be installed.
6
INSTALLATION OF FIELD TILE FOR WIND SPEED > 110 MPH:
1. Prior to installing field tiles on gabled roofs, the trim tile should be installed at the gable.
2. As a general rule, begin by applying field tile at a gable and run toward a valley, hip or wall.
3. Start by installing a full width six-corrugation panel at the lower edge of the gable with an overhang of
1 inch at the gable and 2 inches at the eave (1 inch if there are gutters). Apply the following tiles in the
first course by side lapping one full corrugation.
4. In high wind areas, the field and ridge trim tile should be installed with the laps facing downwind of the
prevailing wind direction.
5. Place the exposed fastener through the top of each corrugation either behind the bird stop or in the
eave course (first course) into the roof deck, a minimum 2 inches from the bottom edge. Then install
the hidden fastener, secured through every other valley of corrugation of the panel located 2 inches
from the top edge of the tile panel. Avoid over tightening fasteners to prevent breakage of tile panel.
The fasteners should only be tightened moderately. Cover the fastener heads with adhesive.
Also a 1 inch wide by minimum ¼ inch thick dab of adhesive may be applied to the sides of each barrel and a thick
bead on every overlapped barrel, before laying the next course.
www.maxitile.com | MAXILITE P7
7
6. Cut one full barrel of a field tile and start the second course with this five corrugations tile (only the first tile panel).
Install the tile with a minimum 4 inches head lap over the previous course and place an exposed fastener on the first
barrel at 2 inches from the lower edge. You can apply adhesive (Review step 5) and place a full width tile continued
until flush the rake edge.
7. The third course should be started with a field tile cut vertically in two full corrugations. Repeat step 6.
8. The fourth course is installed with a field cut vertically in half. Repeat step 6.
9. The fifth course is installed the same as the first course. Repeat steps 3 to 8 until reaching the ridge.
10. For all field tiles, install the hidden fastener at every other valley of corruption of the panel located 2 inches from
the top edge of the tile panel. Also can install an exposed fastener at the top of every crown corrugation. A wind clip
must be installed at the lower edge of each overlapping corrugation.
The following is only a suggestion and is not intended to be a set of instructions. Each flashing situation will be slightly different.
Review IBC of Section 1507.3.9; IRC Section R905.3.8 for additional details for valley and flashing.
VALLEY:
Valley metal should extend 12 inches on each side of the valley. The metal should be of proper gauge
(minimum No. 26). Valley metal should have at least a 1 inch rise in the middle and be crimped back at the
outer edges. It should have a minimum 6 inches head lap. No fasteners should penetrate the metal. Where
debris may be a factor, tiles should be held back from the center of the valley to sufficiently allow run off.
RAKE INSTALLATION:
Nail 2 inches X 2 inches approximately 1 inch from edge of roof. The nailer must be covered with non-perforated
Type II (commonly called No. 30) felt in accordance with ASTM D 226. Install rake tile using two corrosion-resistant
8d common nails (top and bottom).
Starting from the eave, apply the field tile over previously installed rake tiles. In most cases, a double gable trim
system will be needed at one end of a gable roof. For an aesthetic match, plan for double rake tile at both ends.
For flared gables, use a tile pan type metal flashing under the field tile next to the 2 inches X 2 inches nailer.
For high wind areas, fasten externally through the rake tile into place utilizing three nails (one centered) or
three screws and washers at each head lap, then cover the fastener with adhesive.
www.maxitile.com | MAXILITE P7
9
HIP INSTALLATION:
Toenail a 2 inches X 6 inches nailer on the top of the hip rafter after the installation of the field tile. Hold 6
inches back from edge. Field tile should be cut as close to the nailer as possible. The hip must be covered with
non-perforated Type II (commonly called No. 30) felt in accordance with ASTM D 226. Apply mortar to the valley
corrugation or use a plastic hip seal (for pitches 4:12 to 7:12).
The hip tile must be fastened to the nailer, starting at the eave, with minimum 4 inches tile head laps, using
one corrosion-resistant 8d common nail. Apply a thick bead of adhesive along each vertical head lap.
Complete hips before starting the ridge. The lower hip tiles can be closed with mortar, a cutout of a bird
stop or a stack of cutoffs of ridge tiles with mortar between each piece.
For high wind areas, fasten externally through the hip tile into the place utilizing two nails (one centered) or
two screws and washers at each head lap and then cover the fastener with adhesive.
RIDGE INSTALLATION:
2 inches X 4 inches ridge nailer with 1 inch X 2 inches
nailer on top wrapped with non-perforated Type II
(commonly called No. 30) felt in accordance with ASTM
D 226. The top course of field tile should be snug with
the ridge nailer.
The void between the pans of the field tile and the ridge
tile must be water proofed before installing the ridge
tile. Use mortar (in accordance with IBC section 2103.7
or IRC section R607.1 as applicable) or a plastic ridge
seal (for pitches 4:12 to 7:12).
A strip of chicken wire or fiberglass webbing can be
installed along the length of the ridge and contoured
into the mortar to keep it in place. The ridge tile must
be installed with minimum 4 inches head lap and using
a nail.
The fastener must penetrate minimum 1 inch into the
nailer. For high wind areas, fasten externally through
the ridge tile into place utilizing two nails or two screws
and washer (one centered) at each head lap and then
cover the fastener with adhesive.
10
ROOF MAINTENENCE:
Normal maintenance tasks will be determined by the geographical area and the exposure of the roofing;
(before beginning refer to your paint manufacturer for washing and recoating requirements related to paint
performance); the tasks shall include but not be limited to:
•
In very humid climates, MAXILITE is subject to the growth of algae or fungus. Such growth, which is more
of an aesthetic problem rather than one of damage to the integrity of the material, can be eliminated
with the application of certain fungicides. Check with the fungicide manufacturers.
•
Clean out and repair gutters, flashing around pipes, chimneys, walls and protrusions, blocked pipes or
flashing as required.
•
In order to maintain the integrity of your roof, it is advisable to periodically clean off debris, such as leaves
and pine needles. Wash down the roofing surfaces every 6 to 12 months with a garden hose or low pressure
water spray to remove dirt and debris, or a medium bristle (nonmetal) brush that is suitable for cleaning
fiber cement products.
•
Do not clean up with high pressure water blasts or sand blasting because it may damage the surface
and/or fiber cement product.
Avoid using steam cleaners or using pressurized cleaning equipment on field tile roofing.
•
Do not apply directly acid or soda on fiber cement surface. Acid solution for washing can be use to clean primer
or painted fiber cement surfaces. If it is necessary, add 1 part of muriatic acid to 5 parts water. Always saturate
MAXILITE surfaces with water before applying cleaning agent particularly when using an acid solution.
•
A mild detergent and soft brush may be used for stubborn dirt or stains.
•
When reapplying exterior finishes, refer to your paint manufacturer.
•
Patch damaged areas with a good quality spackling compound.
•
Brush or wipe surface to remove loose fibers, dirt or efflorescence. Remove oil and grease spots.
•
Ensure that surface is thoroughly clean and dry. Then either brush or spray a coating of top quality
100% acrylic latex exterior paint.
www.maxitile.com | MAXILITE P7
11
APPROVALS: In accordance with ICC-ES Legacy report ESR-2058, MAXILITE P7 is in compliance
with the following codes: 2006 International Building Code (IBC) and 2006 International
Residential Code (IRC). MAXILITE P7 is also recognized for application in the following: Texas
Department of Insurance Product Evaluation RC-205. These documents should also be consulted
for additional information concerning the suitability of this product for specific applications.
Additional Installation Information, Warranties, and Warnings are available at www.maxitile.com
15055 Woodham Drive | Houston, Texas 77073
(800) 451-2003
[email protected]
www.maxitile.com
12