2014 Engineering Excellence Awards Special Category and Award Significant Contribution on a Project by a Small Firm About the Award The intent of this special category is to provide small firms exposure to the awards competition and the submission procedures. Small firms and prime consultants are encouraged to collaborate to celebrate the successes of small firms and their major contributions to projects. The small firm and the prime consultant on the project should work together to coordinate the logistics and preparation of entry material. Eligibility Projects that qualify will have a scope, schedule and/or budget that were impacted positively by contributions from a small firm. The project scope may fall within any of the ACEC WI 2014 Engineering Excellence Award categories as listed in the 2014 Call for Entries. Please note the special eligibility requirements: • Projects submitted into this category are not eligible for submission into the ACEC National Engineering Excellence Awards competition. This is a special category in Wisconsin. • Projects may only be entered once into the Engineering Excellence Awards; i.e. a project submitted into the Significant Contribution on a Project by a Small Firm category may not be entered again into any other category. • For the purpose of this award submission, a small firm is defined as a Wisconsin-based professional engineering firm with 30 or fewer employees. Small firms are also eligible to submit into standard Engineering Excellence Awards categories. How to Submit • Project must meet eligibility requirements as outlined in the Engineering Excellence Awards 2014 Call for Entries. • Submission requirements for the Significant Contribution on a Project by a Small Firm Category must follow the submission requirements as outlined in the Engineering Excellence Awards 2014 Call for Entries. However, a special Significant Contribution on a Project by a Small Firm Entry Form is required. The required entry form is attached. • All entry materials and fee are due to ACEC WI on October 9 by 4:00 p.m. The Significant Contribution on a Project by a Small Firm Category will be judged as outlined in the Engineering Excellence Awards Judging Criteria. Recognition Entry into this competition assists your marketing efforts and augments your firm’s business development program. Each submission is featured in the ACEC WI Engineering Excellence Awards magazine published by The Daily Reporter and distributed statewide to its subscribers. Award recipients are recognized at the ACEC WI Annual Awards Banquet, through news releases sent to the media throughout the state, in ACEC WI’s monthly e-newsletter and in the Engineering Excellence Awards section of the ACEC WI website. Fee The entry fee must accompany the entry and be made payable to ACEC WI. • ACEC WI Members $675 • Non-members $1,620 Fee Notes: • The fee follows the Engineering Excellence Awards entry fee structure. • Entry fee includes two award plaques: one for the small firm entrant and one for the client. Additional plaques may be purchased to recognize other stakeholders. • Reservations for the ACEC WI Awards Banquet are not included as part of the entry fee. Questions Please contact ACEC WI at 608-257-9223 or [email protected] with any questions. 2014 Engineering Excellence Awards Significant Contribution on a Project by a Small Firm Official Entry Form Please furnish all information requested below. Firm(s), project name and client/owner name(s) should be typed as they are to appear on the award. This entry form may be completed electronically. Electronic signatures are acceptable. Visit www.acecwi.org to download the writable form. A fee of $675 for ACEC WI members or $1,620 for non-members must be included with the entry. The deadline for submission is October 9, 2013, 4:00 p.m. Name of Project (limit 45 characters) Prime Consultant Approval I have read this Engineering Excellence Awards competition entry and believe it to be accurate. Firm Name _____________________________________ Principal’s Name Project Location (city/state) Title Signature Address Entering Firm Name (Small Firm Entrant) City State Zip State Zip State Zip Phone Principal Approval (Small Firm Entrant) I have read this Engineering Excellence Awards competition entry and believe it to be accurate. Email Client Name Firm Name Title Address Signature City Primary Contact (Small Firm Entrant) Owner (if different from client) Name Firm Name Title Address Address City City State Zip Phone Email I currently believe the work of the consulting engineer meets the intended uses and expectations for the project and hereby grant permission to enter this project into the ACEC WI 2014 Engineering Excellence Awards competition and authorize publication of its outstanding features, unique aspects or innovations. I agree the project was substantially completed and ready for use between November 1, 2011 and October 9, 2013. Marketing Contact (optional) Client Contact Name Name Title Title Address Signature City State Zip Owner Contact (if different from client) Phone Name Email Title Signature [2014 Official Small Firm Entry Form Page 1 of 2] 2014 Engineering Excellence Awards Significant Contribution on a Project by a Small Firm Official Entry Form Completion/Use Dates Scheduled completion Actual completion Budget Information (all entries complete this section, excluding Category A) If your firm was responsible for the entire project, then the entrant’s portion of the total project construction budget should be equal to the total project construction budget. If your firm was not responsible for the entire project, then the entrant’s portion of the total project construction budget should be the amount of the project construction budget your firm was responsible for. Submission Due to ACEC WI October 9, 2013 by 4:00 p.m. Deliver/ship to: ACEC WI 3 South Pinckney Street, Suite 800 Madison, WI 53703 Questions: Contact ACEC WI at 608-257-9223 or [email protected]. Total project budget $ Entrant’s design portion of total project budget $ Total project actual $ Entrant’s design portion of total project actual $ Category A Costs (Category A projects only) Budgeted Actual [2014 Official Small Firm Entry Form Page 2 of 2]
© Copyright 2025 Paperzz