core and local output indicators and policy targets

Monitoring the LDP after adoption - core and local output indicators and policy targets
LDP Strategic Objectives
Relevant
LDP
Policies
Protecting,
Enhancing
& SP A
Managing
the
Natural SP D
Environment
DP 2
SP Dd
SP E
DP 3
SP F
SP Ff
DP 1
DP 4
DP 5
SP Ch
Core & Local Indicators
Policy Targets
Trigger Level
Core/Local?
No significant loss of
undeveloped coast
1 or more
developments resulting
in significant loss for 3
consecutive years
Area of SPA, SAC, SSSI or
RAMSAR sites lost to
development
No significant net loss
1 or more
developments resulting
in significant loss for 3
consecutive years
Change
in
areas
&
populations of biodiversity
importance
including
change in priority habits &
species (by type), and
change in designated areas
(e.g. SSSI/Natura 2000
sites)
Natural heritage and Natura
2000
improvements
via
S106/conditions or other
factors
Positive change in
terms of condition
(quality, quantity and
distribution) of such
sites
Area of undeveloped coast
3,499 ha
Increase in areas
improved
Comment [e1]: Development
would only be permitted if it was
for the management of the site or
determined to be IROPI
Comment [e2]: Changes to these
indicators may be brought about
by external non planning factors
outside land use plan control
Comment [e3]: Management
initiatives to improve N2K sites
may not require planning
permission rather they will be
brought about through changing
agricultural and forestry practices
LDP Strategic Objectives
Relevant
LDP
Policies
Protecting,
Enhancing
& SP A
Managing
the
Natural SP D
Environment
DP 2
SP Dd
SP E
DP 3
SP F
SP Ff
DP 1
DP 4
DP 5
SP Ch
Core & Local Indicators
Amount of development (by
TAN 15 category) not
allocated
in
the
LDP
permitted in the C1 and C2
floodplain not meeting the
TAN 15 tests
% of new developments
with Sustainable Drainage
Systems (SDS)
Number of new licensed
waste management
facilities permitted
Policy Targets
Trigger Level
No development
permitted that
conflicts with TAN 15
(not including those
considered exceptions
in TAN 15)
100?% of all
developments of 53 or
more houses
1 or more
developments
Area of B2
employment land (?
ha or sq m) developed
for waste
management facilities
Area
of
open
space No significant net loss
(68.5 ha) and green wedge
(54.7 ha)
30% or more of new
development of 53 or
more houses without
SDS
No new facilities
granted permission by
?2013
1 development resulting
in significant loss for 3
consecutive years or 3
developments resulting
in significant loss in 1
year
LDP Strategic Objectives
Relevant
LDP
Policies
Enhancing SP A
Historic SP G
DP 1
DP 6
DP 7
DP 8
DP 9
DP 10
Core & Local Indicators
Protecting
&
Cultural
and
Environment
Preparation & adoption of
SPG on Conservation Areas,
protection of World Heritage
Site, Historic Parks and
Gardens, sustainable
development & listed
buildings
Number of Conservation
Areas with up to date Area
Assessments (3)
Number of Conservation
Areas with up to date
Management Plans
Number of listed buildings
at risk (298323)
Number and percentage of
Historic Parks and Gardens
at risk Monitor planning
applications in and adjacent
to Historic Parks and
Gardens which may have
an impact
Policy Targets
Trigger Level
SPGs prepared and
adopted by 2012?
Complete Area
Assessments by 2012
and to be reviewed
every 25 years
CompleteAll
Management Plans to
beand reviewed every
25 years
To reduce the number
of listed buildings at
risk
To reduce the number
at risk
? number of listed
buildings at risk
? number and/or ? % at
risk
Comment [e4]: The number of
buildings at risk could increase
outside the control of the LDP
LDP Strategic Objectives
Relevant
LDP
Policies
Enhancing SP A
Historic SP G
DP 1
DP 6
DP 7
DP 8
DP 9
DP 10
Core & Local Indicators
Policy Targets
Trigger Level
Protecting
&
Cultural
and
Environment
Number of Scheduled
Ancient Monuments at risk.
Monitor planning
applications which may
have an impact on a
Scheduled Ancient
Monument
Number of archaeological
sites, Scheduled Ancient
Monuments and
Conservation Areas
preserved or enhanced by
development proposals
To reduce the number
at risk
? number at risk
All development
proposals
1 development failing
to preserve or enhance
for 3 consecutive years
or 3 developments
failing to preserve or
enhance in 1 year
(needs to link to CA
Assessments and
Management Plans as
above)
Amount of residential
development meeting at
least Code for Sustainable
Homes Level 3 and
obtaining 6 credits under
issue ENE 1 – Dwelling
Emission Rate
All developments to
meet the requirement
Comment [e5]: Is this required as
it is a national building regulations
requirement
LDP Strategic Objectives
Relevant
LDP
Policies
Enhancing SP A
Historic SP G
DP 1
DP 6
DP 7
DP 8
DP 9
DP 10
Core & Local Indicators
Policy Targets
Protecting
&
Cultural
and
Environment
Amount of non residential
All development to
development over 1000 sq
meet the requirement
m on a site over 1 ha
meeting BREEAM ‘Very
Good’ standard and
achieving mandatory credits
for Excellent under issue
ENE 7 – Reduction of C02
Emissions
Trigger Level
Comment [e6]: Is this required as
it is a national building regulations
requirement