TRACK RECORD Leiv Eiriksson Derrick Removal/Refitting 5 1 2 3 4 Frontpage - Leiv Eiriksson sailing under the Bridge over the Bosporus Turkey. Picture 1 - Departure from Westcon Ølen with derrick top on deck. Picture 2 - Moored at Yard in Turkey Picture 3 - Derrick top lifted from deck and ready from skidding in place Picture 4 - Derrick top being skidded in location Picture 5 - Derrick top reinstalled and rig ready for operation Scope description When Leiv Eiriksson left the Westcon yard at the beginning of December 2009 after a one month stay the rig had been transformed. During the yardstay period the upper part of the derrick had been carefully detached, skidded over to a jacking frame, jacked down to the deck and sea fastened ready for the rig's journey down to Turkey. This operation was necessary for Leiv Eiriksson to be able to pass under the bridges in the Bosporus Straits on the way to a multiyear contract in the Black Sea. In addition to the work on the derrick also thrusters were removed, overhauled and reinstalled and the external part of the exhaust system was replaced. Further maintenance and improvement work was also performed whilst the rig was quayside. A small number of personnel were on board Leiv Eiriksson on departure from Ølensvåg and for the trip under the bridges in the Bosporus. During January 2010 the Westcon project personnel joined the rig for the reinstatement of the top of the derrick. TRACK RECORD Development Driller II Derrick Removal/Refitting 5 1 2 3 4 Frontpage - Development Driller sailing under the Bridge over the Bosporus Turkey. Picture 1 - Rope technicians at derrick split location Picture 2 - Installation of temporary reinforcement on pipe deck Picture 3 - Installation of temporary in derrick Picture 4 - Lifting towers on the pipe deck Picture 5 - Derrick top skidded off, ready to be lowered onto pipe deck. Scope description Early May Westcon received request for removal/refitting derrick of the DDII for operation in the Black Sea. First modelling started mid May and cutting of first temporary steel started end of May. Rig inspection was done in Gibraltar early June and scanning and detailed planning was done under transit. 10th of June mobilizing of workforce and equipment started. In the meantime the engineering with calculations and drawings continued in 5 different location in Norway; Stavanger, Haugesund, Florø, Ølen and in Poland, Szczecin. Temporary steel for the derrick split arrived Palermo early July, in total 80 tons of steel for temporary derrick reinforcement and 140 tons for temporary deck reinforcement. August 21th the top of the derrick was resting on the pipe deck ready for sea fastening. Total weight of derrick top, lifting towers and temp steel supported on pipe deck is 1300 tons. Early Sept, the rig sailed through the Bosporus and Sept. 10th reinstallation of the derrick commenced in Romania. Sept. 20th the derrick was reinstalled and integration testing started. This project is a showcase of the flexibility of the Westcon Group, proving the ability for all different location to work together and to swiftly respond to customers requirement ensuring successful delivery of the project.
© Copyright 2026 Paperzz