TABLE OF CONTENTS-REPAIR / DAMAGE AXLE BEAM BOTTOM RAIL COMBINATION FRONT, Refrigeration Unit Opening CORNER POST CROSSMEMBER, Intermediate CROSSMEMBER, Over Landing Gear CROSSMEMBER, Over Suspension CROSSMEMBER, Pintle Hook Mounting DIAMOND PLATE, Floor, Diamond Plate Overlay DIAMOND PLATE, Threshold Plate DOOR FRAME, Side Door DOOR HEADER, Rear Door DOOR HEADER, Side Door DOOR KIT, Side Door DOOR POST DOOR POST, Side Door – Hinge Side DOOR POST, Side Door – Latch Side DOOR SILL, Rear Bolster DOOR SILL, Threshold – Side Door DOOR THRESHOLD, Rear Bolster DOOR THRESHOLD, Side Door 1 FLATBED / REPAINT FLOOR--ALUMINUM FLOOR--APITONG (PLATFORM) FLOOR--DIAMOND PLATE OVERLAY FLOOR--LAMINATED HARDWOOD FLOOR--REEFER GUTTER FLOOR--STEEL HAT FOAM FOAM INSULATION FRAME, Rear FRAME, Refrigeration Unit Reinforcement FRAME, Side Door FRONT OPENING, Refrigeration Unit Opening FRONT PANEL FRONT POST FRONT RAIL HAT SECTION, Floor, Steel Hat HEADER, Rear HEADER, Side Door INSULATION, Foam LOWER SILL, Rear Bolster MAIN RAIL, Sub frame MOUNTING CROSSMEMBER, Pintle Hook NOSE OPENING, Refrigeration Unit NOSE PANEL NOSE POST NOSE RAIL OPENING, Refrigeration Unit 2 PAINT PANEL, Front PANEL, Nose PANEL, Quarter, Top Rail PANEL, Radius PANEL, Rear Door PANEL, Roof PANEL, Side PLATE, Threshold PLATFORM / REPAINT POST, Front POST, Nose POST, Rear Corner POST, Side POST, Side Door / Hinge Side POST, Side Door / Latch Side QUARTER PANEL, Top Rail RADIUS PANEL RAIL, BODY RAIL, BOTTOM RAIL, BOTTOM/REPAINT RAIL, FRONT RAIL, NOSE RAIL, SECTION, Bottom Rail RAIL, SECTION, Top Rail RAIL, SPLICE, Bottom Rail RAIL, SPLICE, Top Rail RAIL, SUBFRAME RAIL, TOP RAIL, TOP NOSE RAIL, TOP/REPAINT REAR BOLSTER REAR CORNER POST REAR DOOR FRAME REAR DOOR POST REAR FRAME REAR HEADER 3 REAR PLATE REAR SILL REEFER GUTTER REEFER OPENING REFRIGERATION UNIT FRAME REFRIGERATION UNIT OPENING REFRIGERATION UNIT REINFORCEMENT REFRIGERATION UNIT REINFORCEMENT REINFORCEMENT, SIDE DOOR BOTTOM REINFORCEMENT, SIDE DOOR TOP REPAINT ROOF PANEL ROOF SHEET SECTION, Bottom Rail SECTION, Top Rail SHEET SIDE DOOR BOTTOM REINFORCEMENT SIDE DOOR FRAME SIDE DOOR HEADER SIDE DOOR KIT SIDE DOOR POST / HINGE SIDE SIDE DOOR POST / LATCH SIDE SIDE DOOR TOP REINFORCEMENT SIDE PANEL SIDE POST SIDE SHEET SIDE THRESHOLD SILL, Rear SILL, Side SLIDER RAIL SPLICE, Bottom Rail SPLICE, Top Rail SPRING HANGER SPRING SEAT STEEL VAN COMPONENTS/REPAINT SUBFRAME RAIL SUSPENSIONS THRESHOLD PLATE THRESHOLD, REAR 4 THRESHOLD, SIDE TOP NOSE RAIL TOP RAIL ULTRA PLATE PANEL UNIT OPENING UNIT UPPER COUPLER UPPER FIFTH WHEEL 5 OPERATION 001-100 FRAME RATE MAIN RAIL - FIXED SUBFRAME - REPLACE Includes: Hoist trailer, R & R suspension and air brake control components, cut off rail; reinstall 001-100 001-101 All Vans Dolly 18.0 10.0 *Tools Required-jack stands, impact, sockets, wrench set, cutting torch, grinder, tape measure, welding unit 001-110 MAIN RAIL - SLIDER SUBFRAME - REPLACE Includes: Hoist trailer, remove slider assembly, carbon arc weld and remove rail; reinstall 001-110 001-111 Long Vans Short Vans 18.0 12.0 *Tools Required-jack stands, impact, sockets, wrench set, cutting torch, grinder, tape measure, welding unit 001-120 MAIN SLIDER RAIL - REPLACE Includes: Hoist trailer, remove slider assembly and ICC bumper, carbon arc weld and remove one rail; reinstall and realign to kingpin 001-120 Long Vans 14.0 Add 001-121 Replace second rail 10.0 *Tools Required-jack stands, impact, sockets, wrench set, cutting torch, grinder, tape measure, welding unit 6 001-125 CROSSMEMBER - INTERMEDIATE - REPLACE Includes: Remove floor screws, underpan screws, and replace 001-125 001-126 Dry Vans Replace adjacent (each) 3.0 2.0 001-127 001-128 Reefers Replace adjacent (each) 2.0 1.5 001-129 Platforms 4.0 (Center rail platform requires cutting section outer rail for R & R of C/M) 001-130 Replace adjacent (each) 3.0 *Tools required-drill, pry bar, punch, hammer, utility knife, impact and torx socket, socket set, rivet gun, rivet set, bucking bar. 001-131 CROSSMEMBER - FIVE OVER LANDING GEAR - REPLACE Includes: Remove floor screws, underpan screws and replace 001-131 001-132 Dry Vans Replace adjacent (each) 12.0 2.0 001-133 001-134 Reefers Replace adjacent (each) 10.0 1.5 Add R & R both tire protector plates 3.0 *Tools required-drill, pry bar, punch, hammer, utility knife, impact and torx socket, socket set, rivet gun, rivet set, bucking bar. 7 001-136 CROSSMEMBER - OVER SUSPENSION - REPLACE Includes: Remove floor screws, underpan screws, and replace 001-136 001-137 Dry Vans (Removing one rail) Replace adjacent (each) 16.0 2.0 001-138 Reefers (Removing one rail) Replace adjacent (each) 16.0 2.0 *Tools required-drill, pry bar, punch, hammer, utility knife, impact and torx socket, socket set, rivet gun, rivet set, bucking bar, grinder and welding unit. 002-100 UPPER COUPLER ASSEMBLY - REPLACE Includes: Remove all attachments from wall assemblies, floors, and radiuses; R & R, paint 002-100 002-101 Dry Van (with bulkhead) Reefer (less bulkhead) 20.0 24.0 Add 002-102 To cut off and reuse existing bulkhead 4.0 *Tools required-drill, impact and torx socket, socket set, rivet gun and rivet sets, wrench set, bucking bar, punch, hammer, caulking gun, screwdriver, grinder, welding unit and utility knife 002-110 UPPER FIFTH WHEEL ASSEMBLY - REAR SECTION OF UPPER COUPLER ASSEMBLYREPLACE Includes: Remove fasteners, at side assemblies, torch off rear section (UFW) at hinge, weld, and reinstall using mylar tape. 002-110 Dry Vans 28.0 002-111 Reefers 32.0 *Tools required-drill, impact and torx socket, rivet gun and rivet sets, cutting torch, welding unit, grinder, utility knife, punch and hammer. 8 OPERATION 003-150 003-150 003-151 003-152 SUSPENSIONS SPRING HANGER - REPLACE Includes: Hoist trailer, R & R hanger, paint Spring Hanger - Front Spring Hanger - Center Spring Hanger - Rear RATE 4.0 4.0 2.5 *Tools required-jack stands, impact and socket set, punch, hammer, pipe wrench, socket set, tape measure, cutting torch, grinder and welding unit. 9 OPERATION 006-210 AXLES AXLE BEAM - REPLACE RATE 12.0 Includes: Removing spring U-bolts, radius rod eye bolts, brake components, wheel end components, clean, reinstall, and adjust; paint (Note: Includes oil seals, alignment, weld axle seats, and R & R old components) *Tools required-impact and socket set, torque wrench, wrench set, welding unit, tape measure, punch and hammer, jack stands 006-230 AXLE SPRING SEAT - REPLACE (ONE) 4.0 Includes: Hoist trailer, remove wheel, remove U-bolts, R & R oil seal, spring, radius rod eye bolt, cut off seat, and reinstall; paint; check alignment; but alignment not included *Tools required-impact and socket set, torque wrench, wrench set, welding unit, tape measure, punch and hammer, cutting torch and grinder. 10 OPERATION PINTLE HOOK RATE 016-100 MOUNTING CROSSMEMBER - PINTLE HOOK - REPLACE 5.5 Includes: Discount air line, torch off mounting crossmember, R & R pintle hook assemble, reinstall, and paint Includes: Disconnect at upper fifth wheel and relay emergency valve; replace *Tools required-cutting torch, grinder, welding unit. Impact and socket set 11 OPERATION PAINT 049-100 VAN BODY ONLY - REPAINT Includes: Wash, mask top and bottom rail, apply primer and color coat (body only) 049-102 049-100 049-101 Long Van - 53’ Long Van - 48’ Short Van - 28’ 049-103 049-104 RATE 22.0 20.0 14.0 Deduct Not masking top & bottom rails (Deduct 2.0) Top coat only (Deduct 2.0) *Tools required-utility knife, paint equipment 049-200 TOP RAIL - REPAINT Includes: Prepare metal, mask, prime, and paint 049-200 049-201 049-202 Van 28’ - both sides, nose rail Van 48’ - both sides, nose rail Van 53’ - both sides, nose rail 6.0 10.0 12.0 *Tools required-utility knife, paint equipment, blast equipment 049-210 BOTTOM RAIL - REPAINT Includes: Prepare metal, mask, prime, and paint 049-210 049-211 049-212 Van 28’ - both sides Van 48’ - both sides Van 53’ - both sides 4.0 8.0 10.0 *Tools required-utility knife, paint equipment, blast equipment 12 049-220 STEEL VAN COMPONENTS (ALL) - REPAINT 8.0 Includes: Sand, brush or sand blast; clean, mask, prime and paint 049-221 049-222 049-223 049-224 Bulkhead only Landing Legs and Brackets only Suspensions only Rear Frame only 2.0 2.0 3.0 3.0 *Tools required-utility knife, paint equipment, sander or blasting equipment 049-300 PLATFORM (ALL) - REPAINT Includes: Sand, brush, or sand blast; clean, mask, prime, and paint (including bulkhead) 049-305 049-300 049-301 049-302 049-306 049-303 049-304 53’ 48’ 28’ Bulkhead only Outer Rail only - 53’ Outer Rail only - 48’ Outer Rail only - 28’ 26.0 24.0 16.0 3.0 11.0 10.0 6.0 *Tools required-utility knife, paint equipment, blasting equipment, scraper 13 OPERATION 507-100 REFRIGERATION RATE REFRIGERATION UNIT - REPLACE Includes: Disconnect fuel lines, battery cables, air duct at evaporator; R & R mounting stud nuts and reinstall 507-100 Nose Mount 6.0 *Tools required-impact, socket set, wrench set, screwdriver, utility knife 507-200 CUT OUT REEFER TRIPLE COMBINATION FRONT FOR REFRIGERATION UNIT 507-200 507-201 507-202 507-203 507-204 507-205 Sentry Opening - aluminum Sentry Opening - stainless steel Super II Opening - aluminum Super II Opening - stainless steel SB-II/Phoenix Opening - aluminum SB-II/Phoenix Opening - stainless steel *Tools required-drill, air shears, caulking gun 14 2.0 3.0 3.0 4.0 6.0 8.0 OPERATION 508-100 FOAM INSULATION RATE FOAM INSULATION - REPLACE Includes: Remove foam, spray, and trim 508-100 508-200 508-300 10 Board Feet - 1” thick 360 Board Feet - 1” thick 720 Board Feet - 1” thick 1.0 10.0 16.0 Add 50% more time for 3” foam thickness *Tools required-scraper, foam scarfer, drill, impact with screw torx tip, caulking gun, hammer 15 OPERATION 511-100 FRONT ASSEMBLY RATE TOP NOSE RAIL - REPLACE Includes: Disconnect roof panel, radius panel, nose post, side rail splice, front panel, reinforcement; R & R plywood or liner and lights. (Includes dig out foam and refoam) 511-100 511-101 511-102 Dry Van Open Top Reefer 6.0 8.0 16.0 Add 511-110 511-115 R & R Unit R & R Top Unit Reinforcement 6.0 2.0 *Tools required-drill, rivet gun, rivet set, bucking bar, utility knife, caulk gun, scraper, screwdriver, cherry huck gun Reefer: add impact, socket set, wrench set, knife to trim excess Foam 511-116 FRONT NOSE RAIL-REPLACE 511-117 DRY VAN 2.0 511-118 REEFER 2.0 511-119 OPEN TOP 2.0 16 511-200 NOSE PANEL - REPLACE Includes: Remove all fasteners, apply sealant, and reinstall aluminum panel. (Includes R & R liner/foam) 511-200 511-205 Dry Van & Open Top Reefer 6.0 12.0 Add 511-206 511-110 511-210 511-211 Stainless Steel Nose Panel R & R Unit R & R Vent Door - aluminum R & R Vent Door - stainless steel 2.0 6.0 1.0 1.5 *Tools Required-drill, rivet gun, rivet set ,bucking bar, utility knife caulk gun, scraper, screwdriver, wrench set, socket set, cherry huck gun Reefer: add impact, knife to trim excess foam 511-300 FRONT POST - REPLACE Includes: Remove liner/foam, drill out rivets at panel, top nose rail, disconnect at upper fifth wheel, remove and reinstall 511-300 511-303 Van & Open Top Reefer 3.0 8.0 NOTE: When this operation is performed in conjunction with replacing a panel, the rate is 1.0 hour for a van, open top, or reefer *Tools required-drill, hammer, punch, rivet gun, rivet set, bucking bar, cherry huck gun, impact and torx head Reefer: add knife to trim excess foam, caulking gun 17 511-400 FRAME - REFRIGERATION UNIT REINFORCEMENT - REPLACE 24.0 Includes: Remove liner, top reinforcement gusset, disconnect front panel, top rail, upper fifth wheel, remove and reinstall Add 511-110 R & R Unit 6.0 *Tools required-drill, hammer, punch, rivet gun, rivet set, bucking bar, cherry huck gun, impact and torx head, welding unit, knife to trim excess foam, caulking gun 511-500 RADIUS PANEL (ONE) - REPLACE Includes: Disconnect fasteners at top rail, upper fifth wheel, front wall, and lower rail; remove and reinstall. (Includes R & R liner and refoam) (Includes R & R corner cap and front plate if applicable) 511-500 511-510 Dry Van Reefer 8.0 16.0 Add 511-511 511-512 R & R Vent Door - aluminum R & R Vent Door - stainless steel 1.0 1.5 NOTE: When this operation is performed in conjunction with adjacent panel (front or side), deduct 2.0 hours *Tools Required-drill, rivet gun, rivet set ,bucking bar, utility knife caulk gun, scraper, screwdriver, wrench set, socket set, cherry huck gun Reefer: add impact, knife to trim excess foam 18 OPERATION REAR DOOR FRAME 512-100 REAR FRAME ASSEMBLY - REPLACE Includes: Remove door assemblies, disconnect roof panel, side panel, top and bottom rails, frame, remove and reinstall. (Includes replacement of liner, lights, ICC bumper, and repaint) 512-100 512-102 Dry Van (like-for-like rear frame) Reefer (like-for-like rear frame) RATE 24.0 40.0 Add 512-105 Roll-up Door 2.0 *Tools required-hammer, punch, welding unit, cutting torch, grinder, impact and torx head, socket set, wrench set, drill, rivet gun, rivet set, bucking bar, cherry huck gun, caulking gun, screwdriver, jack stands 512-200 REAR HEADER - REPLACE Includes: Disconnect roof panel, cut off header, R & R lights, R & R lining and foam, install new header; paint 512-200 512-201 Dry Van (swing door) Reefer 8.0 12.0 Add 512-205 512-206 R & R Roll-up Door and Operator Stainless Steel (including polishing) 2.0 4.0 *Tools required-hammer, punch, welding unit, cutting torch, grinder, drill, cherry huck gun, caulking gun, screwdriver, jack stands 19 512-300 REAR BOLSTER (LOWER SILL) - REPLACE Includes: Remove threshold, filler jam, disconnect floor, cut at rear post and main frame; reinstall and paint 512-300 512-301 512-302 Dry Van Reefer Platform 16.0 24.0 16.0 Add 512-305 Stainless Steel (including polishing) 4.0 *Tools required-hammer, punch, welding unit, cutting torch, grinder, drill, cherry huck gun, caulking gun, screwdriver, impact, socket set, wrench set. 512-400 REAR CORNER POST - REPLACE Includes: Disconnect top rail, bottom rail, side panel, liner and foam; cut off at lower sill and header; reinstall and paint 512-400 512-402 Van Reefer 12.0 20.0 Add 512-405 Stainless Steel (including polishing) 4.0 *Tools required-hammer, punch, welding unit, cutting torch, grinder, impact and torx head, drill, rivet gun, rivet set, bucking bar, cherry huck gun, caulking gun, screwdriver, jack stands 512-500 THRESHOLD - INSTALL 24” PLATE Includes: Install threshold, fasteners, weld NOTE: Dry Van Only *Tools required-impact and torx head, grinder, welding unit, caulking gun 20 2.0 OPERATION 513-100 SIDE ASSEMBLY RATE TOP RAIL - REPLACE - 53’ TRAILER Includes: Remove fasteners at roof panel, side panels, nose rail splice, rear frame, R & R rail. (Includes R & R foam, liner, and moldings) 513-100 513-101 Dry Van Reefer 26.0 42.0 Add 513-105 513-106 Roof Replacement - Dry Van Roof Replacement - Reefer (glued down) 18.0 22.0 *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, hammer, punch, caulking gun, knife to trim excess foam(reefer), jack stands 513-150 TOP RAIL - SECTION (SPLICE) - REPLACE Includes: Cut rail, disconnect fasteners to roof bow, roof panel, side panels, nose rail splice, rear corner clip; remove, install and reinforce 513-150 Dry Van - 1.0 hr/ft, plus 1.0 hr/splice 513-151 Reefer - 2.5 hrs/ft, plus 2.0 hrs/splice 513-152 Meat Railer - 3.0 hrs/ft, plus 4.0 hrs/splice *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, hammer, punch, caulking gun, knife to trim excess foam (reefer), saw, tape measure, utility knife 21 513-160 BOTTOM RAIL - ALUMINUM EXTRUSION - REPLACE Includes: Hoist and support trailer, disconnect all fasteners, remove bottom rail; reinstall. (Includes R & R of plywood, lining, and scuff) Dry Van (posts on 24-inch centers) 513-162 513-160 513-161 Long Vans (53’) Long Vans (48’) Short Vans (28’) 26.0 24.0 16.0 Reefers: Same as dry vans except must pick up options for lining and scuff Add Over 48’ length, posts on 24-inch centers, per foot 513-162 513-163 513-164 48’ with posts on 12-inch centers 48’ with C/M’s on 6-inch centers 0.5 4.0 4.0 *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, hammer, punch, caulking gun, knife to trim excess foam (reefer), saw, tape measure, utility knife, jack stands 513-180 BOTTOM RAIL - SECTION 14’ - REPLACE 12.0 Includes: Remove fasteners securing rail to upper fifth wheel, crossmember, side post, radius panel; cut lower rail; remove and reinstall equal section. Use adequate reinforcement and install with mylar tape. 513-181 Add To cut off and reuse existing bulkhead 4.0 *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, hammer, punch, caulking gun, knife to trim excess foam (reefer), saw, tape measure, utility knife, jack stands, scraper 22 513-200 SIDE PANEL - REPLACE Includes: Remove all fasteners at side posts and top rail; reinstall. (Includes R & R lining/foam) 513-200 513-201 513-202 513-203 513-204 513-205 ONE PANEL Dry Van - Posts 12” Centers Dry Van - Posts 24” Centers Reefer (Includes R & R first 12’ of lining) Add for Each Additional Adjacent Panel Dry Van - Posts 12” Centers Dry Van - Posts 24” Centers Reefer 8.0 6.0 16.0 5.0 4.0 8.0 Add 513-206 R & R each additional adjacent 4’ lining 2.0 *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, hammer, punch, caulking gun, knife to trim excess foam (reefer), saw, tape measure, utility knife, scraper 513-220 ULTRA PLATE PANEL - REPLACE Includes: Remove scuff band and rivets; install mylar film to lower rail, foam tape sealer to cover cap, lower rail, and upper rail. Install panel, rivets, and scuff band. 513-220 513-221 One panel Each adjacent panel 6.0 4.0 *Tools required-drill, rivet gun, rivet set, bucking bar, caulking gun, utility knife, scraper 23 513-250 SIDE POST - REPLACE Includes: Remove fasteners at panel, top rail, bottom rail, foam, and reinstall 513-250 513-251 Dry Van (Includes R & R plywood) Reefer (Does not include R & R lining) 3.0 8.0 513-255 Add for Each Additional Adjacent Post Dry Van Reefer 2.0 5.0 NOTE: When this operation is performed in conjunction with panel replacement, the rate is 1.0 hour for both dry van and reefer *Tools required-drill, rivet gun, rivet set, bucking bar, impact and torx head, cherry huck gun, utility knife, hammer, punch Reefer: add knife to trim excess foam, caulking gun 24 OPERATION ROOF ASSEMBLY 514-100 ROOF PANEL - ALUMINUM - REPLACE Includes: Remove fasteners at top rails, nose rail, rear header, heating bond to bows, remove panel, seal, re-bond to bows/glue to foam, and reinstall using roof reinforcement strip 514-100 514-101 514-102 514-105 514-106 514-107 Dry Van 28’ Dry Van 48.0 Dry Van 53’ Reefer 28’ Reefer 48’ Reefer 53’ RATE 12.0 16.0 20.0 16.0 24.0 30.0 Add 514-110 514-111 514-112 514-113 Replace One Roof Bow - Dry Van Replace All Roof Bows 48’ Dry Van Replace One Roof Bow - Reefer (includes foam) Replace All Roof Bows - 48’ Reefer (includes foam) 0.5 6.0 1.0 8.0 *Tools required-drill, rivet gun, rivet set, bucking bar, cherry huck gun, caulking gun, hammer, punch, scraper, utility knife 25 OPERATION DOOR & HARDWARE 515-100 REAR DOOR PANEL - REPLACE Includes: Remove hinge pins, one door, transfer hardware and reinstall (Includes moldings) 515-100 515-101 515-102 Van - One Door Reefer - One Door Reefer - One Door with external hat sections RATE 4.0 12.0 4.0 Add 515-105 515-106 515-110 515-115 Double Lock Rods Double Lock Rods for door with external hat sections Replace Hinge Butt Replace Cam Keeper (weld) 1.5 0.5 1.0 1.0 *Tool required-wrench set, socket set, welding unit, two piece fastener huck gun, impact with torx head, utility knife, drill, hammer, punch Note: Tools vary by type of fastener and door 515-410 515-410 515-411 515-412 515-106 HINGE/DOOR - REPLACE Includes: R & R one door hinge and hinge pin Reefer - New Model w/external hat sections 0.5 Van Reefer Reefer - One Door with external hat sections Add Replace Hinge Butt 1.0 1.0 0.5 26 1.0 515-500 DOOR ASSEMBLY - ROLL UP - REPLACE 4.0 Includes: Remove rollers and panels, latch assembly; reinstall using drop-in door; paint. (Does not include R & R track assembly) Add 515-050 515-051 515-052 R & R Latch Assembly R & R One Track - one side complete Universal Door - cut/install hardware 1.0 2.0 2.0 *Tools required-wrench set, winding bars Track replacement requires welding unit, grinder, cherry huck gun, drill Latch assembly requires wrench set, drill, rivet gun, rivet set, bucking 27 OPERATION 516-100 SIDE DOOR RATE SIDE DOOR FRAME ASSEMBLY - REPLACE Includes: Disconnect frame from side panels, bottom rail, top reinforcement, R & R door assembly, foam and liner, reinstall; paint and adjust door 516-100 516-101 516-102 Van Reefer - aluminum Reefer - steel 16.0 24.0 30.0 *Tools required-drill, cherry huck gun, rivet gun, rivet set, bucking bar, utility knife, caulking gun, hammer, punch, welding unit, socket set, wrench set, impact, knife to trim excess foam 516-150 SIDE DOOR POST/HINGE SIDE - REPLACE Includes: Cut off at header and sill, remove fasteners, door assembly, foam and liner, post, reinstall; weld on hinge butts; paint 516-150 516-151 Van Reefer 8.0 12.0 *Tools required-drill, cherry huck gun, rivet gun, rivet set, bucking bar, utility knife, caulking gun, hammer, punch, welding unit, socket set, wrench set, impact, knife to trim excess foam 516-160 SIDE DOOR POST/LATCH SIDE - REPLACE Includes: Cut off at header and sill, remove fasteners, door assembly, foam and liner, post, reinstall; weld on keeper; paint 516-160 516-161 Van Reefer 8.0 12.0 *Tools required-drill, cherry huck gun, rivet gun, rivet set, bucking bar, utility knife, caulking gun, hammer, punch, welding unit, socket set, wrench set, impact, knife to trim excess foam 516-164 SIDE DOOR THRESHOLD - REPLACE Includes: Cut off both side posts, disconnect from bottom rail and reinstall 516-164 All Models 8.0 28 516-165 SIDE DOOR HEADER - REPLACE Includes: Remove liner/foam, cut off at side posts, remove reinforcement and header; reinstall/foam 516-165 516-166 Van Reefer 6.0 16.0 *Tools required-drill, cherry huck gun, utility knife, rivet gun, rivet set, bucking bar, welding unit, knife to trim excess foam, two piece fastener huck gun, caulking gun 516-170 SIDE DOOR TOP REINFORCEMENT - REPLACE Includes: R & R liner/foam, remove fasteners, weld to header; reinstall/foam; paint 516-170 516-171 Van Reefer 4.0 16.0 *Tools required-drill, cherry huck gun, utility knife, rivet gun, rivet set, bucking bar, knife to trim excess foam, two piece fastener huck gun, caulking gun 516-175 SIDE DOOR BOTTOM REINFORCEMENT - REPLACE 2.0 *Tools required-rivet gun, rivet set, bucking bar, welding unit, drill, hammer, punch, utility knife 516-180 SIDE DOOR KIT/ASSEMBLED INSTALL IN STANDARD LOCATION Includes: Cut opening in side panel. Install top and bottom reinforcements, install door frame and door 516-180 516-181 Van Reefer 20.0 40.0 *Tools required-drill, cherry huck gun, rivet gun, rivet set, bucking bar, utility knife, caulking gun, hammer, punch, welding unit, socket set, wrench set, impact, knife to trim excess foam, air shears, saw, two piece fastener huck gun 29 OPERATION 523-100 FLOOR FLOOR/LAMINATED HARDWOOD - 48’ - REPLACE RATE 30.0 Includes: Remove screws, boards, steel hat section, clean caulk, undercoat, and reinstall Add 523-009 523-101 R & R Threshold Plate 53’ Trailer 2.0 2.0 *Tools required-drill, impact, torx head, scraper, pry bar, scraper, welding unit for rear tread plate, caulking gun, grinder FLOOR/HARDWOOD - RANDOM WIDTH AND LENGTH - REPLACE 523-120 Includes: Remove screws, board, clean, caulk, and reinstall floor boards Platform - 48’ Platform - 53’ 523-120 523-121 34.0 36.0 *Tools required-drill, impact, torx head, scraper, pry bar, welding unit for rear tread plate, grinder FLOOR/LAMINATED HARDWOOD - ONE 12” BOARD - REPLACE 523-150 Includes: Remove screws, board, clean, caulk, undercoat, and reinstall Van - 48’ Van - 53’ 523-150 523-152 8.0 9.0 Add 523-151 Replace Adjacent Board (each) 4.0 *Tools required-drill, impact, torx head, scraper, pry bar, scraper, welding unit for rear tread plate, caulking gun, grinder 30 523-200 523-200 523-201 523-202 523-205 523-206 523-207 523-220 523-221 523-222 523-223 523-224 523-225 523-226 FLOOR/ALUMINUM - REPLACE Includes: Cut and remove fasteners; cut welds on edge board, starting strip, and boards; replace. (Remove foam and replace as necessary) Van - 28’ 22.0 Van - 48’ 32.0 Van - 53’ 34.0 Reefer - 28’ (corrugated) 32.0 Reefer - 48’ (corrugated) 48.0 Reefer - 53’ (corrugated) 50.0 Add Weld Floor - 12” Boards 28’ 18.0 Weld Floor - 12” Boards 48’ 33.0 Weld Floor - 12” Boards 53’ 35.0 R & R Wood Stringer (each) 0.5 Maximum for 28’ - 6.0 hrs Maximum for 48’ - 10.0 hrs Maximum for 53’ - 12.0 hrs R & R Underpan - 28’ 6.0 R & R Underpan - 48’ 11.0 R & R Underpan - 53’ 12.0 *Tools required-drill, ¾” hole saw, impact, torx head, scraper, pry bar, scraper, aluminum welding unit, caulking gun, socket set, wire brush 523-230 523-230 523-231 523-232 523-233 523-234 523-235 523-236 523-237 523-238 FLOOR/ALUMINUM - ONE EXTRUSION - REPLACE Includes: Cut weld, remove fasteners, clean, and reinstall Van - 28’ 8.0 Van - 48’ 14.0 Van - 53’ 15.0 Reefer - 28’ 12.0 Reefer - 48’ 18.0 Reefer - 53’ 20.0 Add Reefer - 28’ - Each Additional Adjacent Board 10.0 Reefer - 48’ - Each Additional Adjacent Board 14.0 Reefer - 53’ - Each Additional Adjacent Board 16.0 *Tools required-drill, ¾” hole saw, impact, torx head, scraper, pry bar, scraper, aluminum welding unit, caulking gun, socket set, wire brush 31 523-300 FLOOR - STEEL HAT – REPLACE 12.0 Includes: Remove two boards, loosen opposite board and reinstall *Tools required-drill, impact, torx head, scraper, pry bar, scraper, welding unit for rear tread plate, caulking gun, grinder 523-350 FLOOR - REEFER GUTTER – REPLACE 16.0 Includes: Remove screws at threshold, cut off at gutter, floor and side; replace *Tools required-impact, torx head, impact, socket set, grinder, aluminum welding unit, caulking gun, scraper, wire brush 523-365 FLOOR - DIAMOND PLATE OVERLAY - REPLACE Includes: Remove fasteners, plate, clean, and reinstall 523-365 Section 4’ X 8’ 2.5 *Tools required-grinder, welder, impact and torx head, counter sink, drill 32
© Copyright 2026 Paperzz