OUR TRACK RECORD Roy Humphrey Group COMPANY PROFILE Eye, Suffolk INDUSTRY The wind energy project at Roy Humphrey Group’s Eye Airfield site consists of two 2.5MW wind turbines providing clean, low cost energy to the business. ABOUT ROY HUMPHREY GROUP Roy Humphrey Group has a motoring heritage spanning more than four decades. It moved over 20 years ago from its original location in Yaxley to its current 95 acre site on the A140 Ipswich road near Eye. It is a family business run day to day by Roy Humphrey who is the sole owner. The company provides a comprehensive service including sales, servicing/MOT, parts, recovery and rental. Its clients range from local businesses to large multinationals, service industries and local authorities to all of the emergency services. Today the business is at the forefront of the industry and is one of the largest of its kind in the UK. With high cumulative energy usage across www.assessyoursite.co.uk the estate and over 150 people employed, Roy Humphrey Group is ideally placed to benefit from on-site wind generation. The wind turbines have the capacity to supply up to 80% of the company's electricity needs. COMMUNITY TRUST FUND A community trust fund has been set up to provide £5000 per year towards community projects and will be administered by Mid Suffolk District Council. The money will be used by community groups to implement measures which will help to reduce their own carbon footprints and their impact on the environment. Commercial Vehicles NO. OF EMPLOYEES 150+ SHIFT PATTERN 24/7 QUOTES ON THE ROY HUMPHREY GROUP PROJECT Carl Humphrey, on behalf of the Roy Humphrey Group, said: “The wind turbines on our site comply with Mid Suffolk District Council's request for renewable energy for the new development on our site as well as for any further developments which might arise in the future.” Matthew Clayton, Director for Triodos Renewables who own the project said: “We are delighted about the completion of the Roy Humphrey Group project which will be the fourth brownfield site in Triodos Renewables' portfolio of operational renewable energy projects and the second onsite wind generation project with Wind Direct. ” 1. 2. 3. 4. 5. 6. IMAGES: 1. Pouring concrete 2. Screeding off concrete 3. Blade delivery 4. Component delivery 5. Blade lift 6. Finished turbines Total project size Turbines 2x 2.5 Following 18 months of careful preparation and consultation Wind Direct received planning permission for two 2.5MW wind turbines in August 2010. At the time these were the largest wind turbines being proposed in the UK. 5 MW MW Predicted annual output: (MWh pa) 13,302 8,074 Carbon dioxide saved: (CO2 displacement tonnes) Average equivalent households: 3,044 NB: The above statistics were calculated using a capacity factor of 30.37%. Please contact the project manager for full methodology and reference details at [email protected]. Data calculated February 2013. Night construction in the snow THE WIND TURBINE STORY The project will contribute to Mid Suffolk District Council's aim to becoming the country's Greenest County by supplying green energy to power the equivalent of 3,044 homes. It also has the potential to offset harmful carbon emissions by over 8,074 tonnes per annum. The two 2.5MW wind turbines have been operational at Roy Humphrey Group's site since March 2013. PROJECT FACTS AND KEY CHALLENGES Ÿ With space at a premium, turbine one is located just 30m away from the building to the north and 50m from the building to the south. Ÿ Due to the site's previous incarnation as a World War II airfield, it was necessary to undertake Unexploded Ordinance Surveys of both turbine locations prior to construction. Ÿ The area beneath turbine one is used critical to incorporate protection measures into the foundation design to eliminate the risk of the turbine being damaged by reversing vehicles. Ÿ The delivery port for the turbines was originally planned to be Harwich. Transportation from here to the site would have required significant road modifications along the route. Following Wind Direct's suggestion, the port was changed to Goole which eliminated the need for road modifications. TURBINE MODEL Ÿ The wind turbines are N100 models. They were purchased by Wind Direct from German manufacturer Nordex. Ÿ The machines are 2.5MW power-rated horizontal shaft wind turbines with a total height from the base to the highest blade tip of 130 metres. FUNDING & OWNERSHIP The Wind Direct operated turbines were purchased by Triodos Renewables, a company that recognises the long-term business potential of renewable energy. Debt finance was provided by Triodos Bank. as a parking area for HGVs. It was CONTACT US:- 0845 468 0230 © Renewables Direct Ltd trading as Wind Direct [email protected] www.wind-direct.co.uk Follow Us on Twitter
© Copyright 2026 Paperzz