Lawrence Expressway | Fact Sheet PALO ALTO EXISTING CONDITIONS AND ACCOMPLISHMENTS MILPITAS OUNTAIN UNT NT VIEW W TOS TO 237 n Tasma Lakehaven Cent ral E x US 101 SB Ramp Duane press wa y M MOUNTAIN UNT NT VIEW W Elko r Elko D 237 Sandia US 101 NB Ramp Oakmead Arques n Tasma Lakehaven LOS ALTO ALTOS AL TO Cent ral E x US 101 SB Ramp Duane press wa y Kifer Kifer Reed SUN NNYVALE Monroe Cabrillo ALTOS Pruneridge CUPERTINO SANTA CLARA SAN Lehigh Benton Lochinvar Homestead JOSE CUPERTINO 280 Mitty Prospect Saratoga Lehigh Bollinger Westgate SARATOGA Peak Period “Levels Of Service” (LOS) LOS A-C: Minor Delays LOS D: Some Delays Westgate 2013 Conditions CAMPBE BELLL LOS E: Major Delays LOS F: Severe Delays CAMPBE BELLL Intersection LOS F MONTE SE ENO SER Improvements Completed Since 2008 MONTE SE ENO SER Expressway Characteristics • 8.7 miles long • HOV lanes 280 Moorpark Doyle Prospect Saratoga 2003 Conditions • 6-8 lanes wide, including Calvert Mitty Moorpark Doyle SARATOGA SANTA CLARA Pruneridge Calvert Bollinger Monroe Cabrillo Reed SUN NNYVALE LOS HILLS Benton Lochinvar Homestead Sandia US 101 NB Ramp Oakmead Arques LOS GATOS OSS • 23 signalized intersections • 3 freeway connections: I-280, US 101, SR 237 • 253,000 vehicle trips daily • Adjacent jurisdictions: Saratoga, San Jose, Cupertino, Santa Clara, Sunnyvale • Bicycle signal detection at all signalized intersections • Bicycle adaptive signal timing LOS GATOS OSS • Interim channelization improvement to reduce crossing conflicts at Granada Ave • Traffic responsive signal timing In the Works • Grade Separation Concept Study for Reed/ Monroe, Kifer, and Arques • Add 2nd left turn lane EB Prospect to NB Lawrence • Pavement rehabilitation from Homestead to SR 237 Expressway Plan 2040 ❖ County of Santa Clara Roads and Airports Department ❖ www.expressways.info 2008 STUDY RECOMMENDATIONS FOR LAWRENCE EXPRESSWAY 2008 Vision Statement Southern end more arterial-like; mid-section more high-end expressway with freeway-like segments; and northern end more high-end express arterial List of 2008 Expressway Study Projects Not Yet Funded Tier 1A Add 2nd left turn lane EB Saratoga to NB Lawrence (Partial funding from Apple) Widen to 8 lanes from Moorpark/ Bollinger to south of Calvert Initiate study to reconfigure Lawrence/ Calvert/ I-280 interchange area Close median at Lochinvar and right-in-and-out access at various locations Tier 1B Construct interchanges at Reed/ Monroe, Kifer and Arques Tier 1C Provide additional left-turn lanes on Saratoga, Benton, and Oakmead/ Duane Construct interim improvements at Lawrence/ Calvert/ I-280 (Partial implementation by Apple) Provide additional EB through lane on Homestead Tier 2 Realign and signalize Wildwood Avenue intersection Tier 3 Reconstruct interchange for direct access between Lawrence, I-280, and Stevens Creek and HOV direct connector ramps Construct Lawrence/ US 101 HOV Direct Connector Ramps Tier Definitions SHORTER TERM Tier 1A - Highest priority developed concepts Tier 1B - Next highest priority LONGER TERM Tier 1C - Possible future priority Tier 2 - Second level priority Limited conceptual development Tier 3 - Third level priority Undeveloped-concept only IMPROVEMENTS FOR ALL EXPRESSWAYS Bicycle Bicycle signal detection and bicycle adaptive signal timing at all signalized intersections on crossstreets and expressway Pedestrian Pedestrian sensors and pedestrian adaptive signal timing at all signalized intersections on cross-streets and expressway Sidewalks or parallel pedestrian facilities along the length of all expressways Traffic Signal System Operations Signal coordination/ interconnection between expressway signals and city/ Caltrans signals on cross streets Real-time traffic information Finishing Program Sound wall, landscaping, and street lighting improvements Operations and Maintenance Provide for cleaner and greener expressways with smooth pavement and synchronized signals 2008 PLAN PROJECT COSTS (all expressways) Capacity and Operational $2.6 billion Bicycle $17 million Pedestrian $84 million Sound Walls $77 million Landscaping $29 million Operations and Maintenance $27 million annually Expressway Plan 2040 ❖ County of Santa Clara Roads and Airports Department ❖ www.expressways.info
© Copyright 2026 Paperzz