16/05/2014 HOBAS Big Diameter Pipe Jacking Projects Czajka and Burakowski Barbara Prommegger Sao Paulo, 140516 h Worldwide Opening of HOBAS Office in São Paulo in 2012 2 Cayu BAP 121001 1 16/05/2014 HOBAS® - Today System Supplier Pipes + Couplings + Fittings + Manholes + Special Fittings O Diameters: DN 150 – DN 3600 O Pressure Classes: PN 1 – PN 40 O Stiffness Classes: SN 2500 – SN 1000000 3 DST/BAP 120327 HOBAS protective layers structural layers outer protective layer glass fiber rich layer (strength, stiffness) inner protective layer / Liner 4 2 16/05/2014 Main Applications for HOBAS GRP Pipe System OSewage systems ODrinking water supply OIndustrial applications OPower plant pipelines OIrrigation systems OTrenchless applications (Jacking, Relining, NC....) OFittings, Manholes OStorage Tanks 5 Cayu BAP 121001 Project Czajka 3 16/05/2014 Warsaw Main Sewer to „CZAJKA” 2009 - 2010 o Pipeline to WWTP „Czajka” o DA 3000 o L=5,7 km (Right Bank) o Cover 6 - 10,5 m o Ground water level up to 5 m above the pipe DOT/LSK-HPL Czajka Trenchless Installation vs. Open cut 8 • The longest single drive 930 m • Installation advanced with average speed of 22m, at peak 36m daily, not imaginable by open-cut. • Smooth exterior surface of pipes (sections 1-3 m, wall thickness 100-117mm, weight 1.9 - 2.5t/m) assured low friction and with few exceptions no intermediate stations were applied • Contractor used merely 50% of the machines’ 18000kN-force capacity. Cayu BAP 121001 4 16/05/2014 Czajka 2009 - 2010 Warsaw Main Sewer o 16 sections o The longest single drive 930 m o 2 curves (r = 450 and 900 m) o Total of 600 pcs of SN 64000 1 m pipe sections and 1700 pcs of 3 m (SN 40000 up to 64000) o 53 inspection manholes (43 pcs of GRP) DOT/LSK-HPL International Society of Trenchless Technology Award 10 Cayu BAP 121001 5 16/05/2014 HPL Finance Project Burakowski „Bis” O OD 3270 – under Marymoncka street O e = 127 mm O SN 64000 / 3 m; 1m O 22697 kN 0,15° on straight section O 6983,6 kN o,3° on curved section O 2800 kg/m O Combined sewer + retention O Cover up to 10 m - low to no ground water O 1 curved section R=400 m / L=200m HPL - Burakowski Proj ect - March 13th, 2013 HPL Finance Project Burakowski O Start of jacking 18-03-2014 O Construction till march 2015 O Already finished First section L= 409,6 m o Straight section 208,9 m o curve 97,1 m, o straight 103,6 m o 13 m per day HPL - Burakowski Proj ect - March 13th, 2013 6 16/05/2014 HPL Finance HPL - Burakowski Proj ect - March 13th, 2013 7 16/05/2014 Installation of InterJack Station 8 16/05/2014 HPL - Burakowski Proj ect - March 13th, 2013 HPL - Burakowski Proj ect - March 13th, 2013 9 16/05/2014 HPL - Burakowski Proj ect - March 13th, 2013 HPL - Burakowski Proj ect - March 13th, 2013 10 16/05/2014 HPL - Burakowski Proj ect - March 13th, 2013 HPL - Burakowski Proj ect - March 13th, 2013 11 16/05/2014 HPL - Burakowski Proj ect - March 13th, 2013 Thank you! 12
© Copyright 2026 Paperzz