Overview of Activation Energy Demand Response Scheme September 2012 Activation Energy • Established in 2006 • First registered and operating Demand Side Unit (DSU) in ROI in 2012 • Participant in the Single Electricity Market • Contracted to Eirgrid as DSU • Holder of Electricity Supply License from CER • Seats on the TSC Modifications Committee and Grid Code Review Panel Demand Response Explained Demand Response Scheme Outline • Receive €30,000-€45,000/MW/year • Maximum number of events/time per Event. • Opt-out at 24 hours notice • 30 minutes response time • Penalties for non-performance cannot exceed payments due to participants Demand Response Options at Sites Option I: Direct Load Reduction of Nominated Plant Items (i.e. Motors, Compressors, Pumps, Chillers, AHU, Production Plant etc.) Option II: Use of on-site Back-Up Gensets (Typically synchronized Gensets are used to avoid interruption of Site Operations) Option III: Combination of Options I & II (current de-maximis of < 10MW) Site Setup • Monitoring Equipment • Generator Synchronisation and other electrical works • Communications/Control Systems Existing Clients • Data Centres • Generation • Day Only/Night Only • Mines • Generation and Load Reduction • Cold Storage • Load Reduction • Cement Manufacturing • Load Reduction • Stadium • • Remote Control/Text/ Call Generation • Office • • Seasonal Load Reduction • 27MW Thank you for your time Activation Energy Docklands Innovation Park 128-130 Eastwall Road Dublin 3 www.activationenergy.ie
© Copyright 2026 Paperzz