Way Forward Areas of Containment Public Consultation First Draft MEPA February 2012 1 Contents 1 2 3 4 5 Scope and Introduction .......................................................................................... 3 Background............................................................................................................... 5 Existing Framework ................................................................................................... 6 Recommended Way Forward................................................................................ 8 APPENDICES ............................................................................................................ 16 2 1 Scope and Introduction 1.1 The Malta Environment and Planning Authority (MEPA) has been directed by Government to prepare guidelines to clarify the way forward on the Areas of Containment (AoCs). These Areas of Containment are identified in the Central Malta Local Plan (CMLP), North West Local Plan (NWLP) and the South Malta Local Plan (SMLP) and predominantly accommodate industrial or commercial related activities located outside development zone. Development within these designated areas is guided by a number of Local Plan policies which require that most of these areas are subject to further study and review on a case by case basis, and provides a general framework for the way forward. Furthermore, some areas can be developed subject to detailed planning and design criteria. This way forward merited further examination in order to give a clearer direction on the procedures to be adopted for AoC’s prior to establishing future parameters for these areas. 1.2 AoC’s are characterized by existing operations which from time to time may need to upgrade their operations in order to continue to operate in a dynamic and competitive market. The exercise is therefore intended to facilitate the continued operation of these enterprises as well as indicating AoC’s as preferred areas where development which cannot be easily located within the Development Zone should be accommodated. Moreover it gives direction and way forward on what is permissible in the short term to the longer term objective of setting out the future parameters for these AoC’s. 3 General Objectives of this Guidance 1.3 The general objectives of the exercise as communicated by government are as follows: (1) To clarify what type of development can take place within Areas of Containment (AOCs), over and above, what is considered as acceptable development within the Outside Development Zone (ODZ); (2) To direct on the procedure and the legal framework that is to be followed for the planning of each of these Areas of Containment; (3) To establish the extent of intensification that can be permitted for existing and operating enterprises with permit in the Interim Period, prior to the finalization of the planning of the respective Areas of Containment. 1.4 A primary aim of this document is therefore to look into measures to guide development proposals within AoC’s within the short term until these areas are fully planned comprehensively. In relation to Objective 1.3 (2) the following three legal procedural processes have been identified: • The current planning procedure established by the Legal Notice LN 71 of 2007 and Article 59 of Act X of 2010; and/or • The Structure Plan Review (SPR) process for those AoCs that require a SPR; and/or 4 • Specific Area of Containment policies that were approved in the Local Plans 1.5 It is not the intention of this exercise to consider the amendment of boundaries of the existing Areas of Containment as approved by the Local Plans or to consider the introduction of new Areas of Containment. The list of AoC’s designated in the approved local plans is indicated in Appendix 1, Table 5.1. 2 Background 2.1 The Policy background of AoC’s has evolved through the assessment of the differing characteristics of these Areas. Although lying outside the designated Development Zones, most of these areas have seen commitment well before the approval of the Structure Plan for the Maltese Islands in 1992. 2.2 Areas of Containment are in effect a subset of the general Outside Development Zone (ODZ) area which includes not just AoCs, but also other built-up areas ODZ such as Rural Settlements, Areas which have specific Local Plan policies associated with them, National/Institutional buildings/areas such as hospitals, schools and so forth. These built up areas within the greater ODZ are semiurbanised areas and historically contain development commitments that have evolved over a number of years and often in an ad hoc manner. Still these areas have played an important role in view of the potential neighbour compatibility issues that would have arisen had these areas been accommodated within development zones. These areas were recognized in the Structure Plan for the Maltese Islands as committed areas and the local plans sought to introduce a degree of order into how further interventions should take place in such areas. 5 2.3 A number of operational Small and Medium Enterprises (SMEs) and commercial firms operate from within these AoC’s and contribute towards the economy and employment. Some have been established for many years. These activities often face a dynamic economic scenario and need to be able to adapt, update and upgrade their operations in order to remain competitive. 3 Existing Framework The Concept of Containment 3.1 The boundaries of AoC’s were delineated by the approved Local Plans to establish a containment boundary beyond which development was not contemplated. These boundaries therefore served to limit the sprawl of the AoC’s. 3.2 The concept of ‘containment’ evolved from the intent to restrain upon clusters of predominantly industrial development located in areas ODZ. Most of these were in existence prior to the enactment of the Structure Plan for the Maltese Islands. The containment approach is also in line with concepts of sustainable development, especially in terms of using resources (in this case land) efficiently. This approach also takes the following into account: a) The recognition of areas where certain types of activities were taking place for a long time and where permits were awarded on an ad hoc basis; b) The desire to consider and limit specified development interventions within the designated boundary as indicated in the respective local plans; c) The acknowledgement that clear planning parameters (mainly in the form of land use zoning, appropriate development densities/height limitation and acceptable road alignments) needed to be established for such areas; d) The desire to undertake environmental and quality improvements in such areas especially to make the economic activities in such areas, including downgraded areas, more attractive and conducive to an efficient operation; 6 e) To examine the various levels of commitment in such areas, to determine the way forward and in particular whether specified interventions within each AoC were deemed to require endorsement at ministerial or parliamentary level. Existing Approved Local Plan Policies for Areas of Containment 3.3 The existing approved Local Plans have given through the following policies (refer to Table 1 below and Appendix 2) an initial direction for Areas of Containment. Table 1: Existing Approved Local Plan Policies for AOCs Local Plan Policy Local Plan Policy CG05 Areas of Containment Central Malta Local Plan (2006) Policy CG16 Comprehensive Development Areas Policy NWCM8 Areas of Containment Policy SMCM05 Areas of North West Local Plan (2006) Containment South Malta Local Plan (2006) (Industrial/Commercial) Way Forward 3.4 Following the approval of all the Local Plans by 2006 and the amendment of the relevant legal framework, MEPA has initiated the detailed planning (land-use zoning, building height limitations, road alignments and additional parameters) of a number of highly committed Areas of Containment following Local Plan Policy direction as follows: Table 2: AoCs covered by a MEPA generated PC application (situation in October 2011) PC No. Locality Comments/Status 7 PC No. Locality Comments/Status PC49/10 Bahar ic-Caghaq, Naxxar PC50/10 Hal Mann, Lija PC51/10 Tad-Daqqaq, Mosta PC52/10 Triq L-Imdina, Qormi PC53/10 Ta’ Ghar Ram, Qormi PC54/10 Triq L-Imdina, Zebbug PC55/10 Tal-Hlas, Zebbug Validated and being processed. Phase 2 Public Consultation being followed. Validated and being processed. Phase 2 Public Consultation completed. Validated and being processed. Phase 2 Public Consultation completed. Validated and being processed. Phase 2 Public Consultation being followed. Validated and being processed. Phase 2 Public Consultation completed. Validated and being processed. Phase 2 Public Consultation completed. Awaiting MEPA Board approval. Planning completed. MEPA Board approved. Awaiting ministerial endorsement. 4 Recommended Way Forward 4.1 In order to simplify and clarify the processing of development planning applications on the existing identified Areas of Containment, a proposed Way Forward is being recommended for consultation subject to the following applicability criteria. Applicability 4.2 The Way Forward shall be guided by the following: 1. The spirit behind and requirements of the existing Local Plan Policies guiding AoCs, including the relevant conditions and requirements (refer to Appendix 2) will in general continue to apply; 2. The guidance applies to Areas of Containment already identified in the Local Plans and as delineated in the respective Local Plan Policy Maps. In some instances, applicability may be interpreted to be extended to similarly designated areas in Local Plans in Areas ODZ but may not be applicable to Rural Settlements; 8 3. Development requests should be justified on environmental and planning grounds especially when this is coupled with the continued operation of an existing legitimate concern. In certain cases a more suitable but compatible replacement activity to an existing one may also be considered if it respects the uses contemplated in the relevant LP policies; 4. To consider AoC as preferential candidates in a site selection exercise for uses contemplated to be located ODZ in terms of the application of Structure Plan for the Maltese Islands Policy SET 12; 5. All Areas of Containment can be considered suitable to accommodate open air storage facilities as indicated in the policy guidance document on Open Storage or its subsequent revisions if the proposal can be fitted on site and if it is compatible with adjacent operations. Policy Guidance for Consideration of Minor Development for Legitimate Operations and Activities within AoC’s 4.3 MEPA has a number of pending requests for development within existing AoCs. Many of these requests involve new development proposals in addition to existing development. This implies that such requests would entail a substantial degree of intensification of the existing use or a considerable increase in the development density in an unplanned manner or beyond what is deemed acceptable given the extant level of commitment. In the period till the future parameters of each AoC’s are determined, these applications should be screened to check whether the development nature and extent satisfies the requisites indicated in Recommendations 1 and 2 in Section 4.8 as well as the other provisions in the rest of this Way Forward. 9 4.4 The requests indicated in Section 4.3 include a number of proposals for development that include minor interventions which either consolidate or upgrade upon existing facilities. In most cases these minor requests for development would not be deemed to compromise the future planning of the AoC, especially when the intervention is envisaged to take place within a well defined curtilage of where it involves a limited and acceptable extension over an established built footprint. From an environmental and planning point of view, consolidation of existing operations are considered to be beneficial, especially in instances where these involve the accommodation of activities which cannot be easily located within a residential environment. In the light of the above, MEPA encourages the upgrading and more efficient operation of existing concerns within AoCs as long as these are conducted in observance of existing approved legal environmental and planning requirements. General Criteria for Minor Development Proposals for the respective AoC’s 4.5 Development applications for minor development and/or modifications may be favourably considered within AoC’s if all the following conditions are observed: a) The intervention is carried out strictly within the boundary of the AoC and within the site curtilage of the existing operating concern within the respective AoC; b) Any additional parking requirements resulting from the additional development (if applicable) would need to be provided within the relevant site curtilage. Both surface and underground parking options may be considered and opportunities for creating additional onsite parking to make up for the shortfall posed by the existing development shall be encouraged. In the case of underground parking, the layout would need to adopt an open plan approach with parking spaces not being planned as individual garages. Payment of monies to the UIF or any other fund in-lieu of on-site parking will not be permitted. If parking provision is not 10 sufficient, the proposed development would need to be curtailed accordingly; c) Every opportunity should be sought to improve the general ambience of the relevant AoC. This approach does not only lead to environmental and planning benefits but also leads to a healthier and more pleasant working environment and would enhance the market appeal of the area. Therefore where possible measures should be implemented to create a more interesting design whilst reducing visual, pollution and other deleterious impacts. To this effect, better site edge treatment (including landscaping and pleasant perimeter wall treatment) and other embellishment measures would be strongly encouraged. Where a site abuts a rural area, the edge treatment should take this consideration into account to achieve a more suitable transition; d) Reduction of waste as well as re-use and recycling of materials and energy would be strongly encouraged in proposals within AoC’s. Building Height Limitation and Vertical Extensions 4.6 Until such time that the Planning parameters for the respective AoC’s are established, the following guidance for building height limitation and vertical extension considerations shall be applicable: a) The resulting overall building height shall not normally exceed the existing (2011) predominant building heights in the respective AoC unless there are overriding environmental/planning considerations and clear justifications that suggest minor departures to this effect. b) The resulting building height should not normally exceed 9.4 m from street level, and generally follow the DC 2007 Policy and Design Guidance (or its subsequent equivalent replacement document) requirements; 11 c) the use of the extension is clearly demonstrated to be essential, complementary and directly related to the main permitted underlying use; d) Separate access to vertical extensions will not be permissible; e) the design shall represent a positive aesthetic enhancement on the current situation; f) until such time that the planning parameters for the respective AoC are determined, any vertical extension awarded development permission would be a one time concession and further vertical extensions would not be entertained in the same development footprint. g) No penthouse development will be permitted. h) Stairwells, lift and plant rooms only may be considered above the height limitation as per Section 4.6 para (b) above in accordance with the relevant development control and policy guidance unless there are other strong or justified overriding reasons that preclude such development on roof. Horizontal Extensions to Existing concerns 4.7 Until such time that the Planning parameters for the respective AoC’s are established, the following guidance for horizontal extensions to existing legitimate concerns shall be applicable: a) Small scale horizontal extensions may only be considered in instances where the land use proposed is clearly demonstrated to be complimentary, ancillary and directly related to the main permitted use; b) Small scale horizontal extensions are normally interpreted to mean whichever is the lower of 500sqm or 10% of the permitted building footprint; 12 c) The development of infills and gaps between existing buildings is normally preferred where such a possibility exist as this would often lead to the screening of unsightly party walls; d) The design should represent a positive aesthetic enhancement on the current situation; e) in cases where development directly faces the AoC boundary, a minimum of 3 metre green strip would be required, provided that this can be achieved and there are no other underlying reasons for exception. Underground development below the 3 metre green strip may be considered by MEPA however this development is to be totally below surface street or site level. Recommendations 4.8 The following procedures are recommended to establish the planning parameters for AOCs: 4.8.1 Recommendation 1: Establishing Planning Parameters through the Planning Control (PC) Application Process The AoC’s listed in Table 5.2 of Appendix 1 are deemed by MEPA to be highly committed by existing / permitted buildings to the extent that they qualify to have their planning parameters established comprehensively through the provisions of Article 59 of Act X of 2010 and follow the process as set out in LN 71 of 2007 and therefore do not require to be submitted to a Structure Plan Review process. Within this group of AoCs, the planning of a totally separate sub-area within the designated AoC may only be considered if the relevant sub-area is totally bisected by an existing (schemed) road carriageway or carriageways. 13 For a number of AoCs listed in Section 3, Table 2 (p.7-8) of this document, MEPA has already generated a PC application on its own motion. For the rest of the areas which qualify under the same legal parameters, an applicant generated PC application is envisaged to be generated by the owners of the respective sites in line with the procedure and requirements set out in LN71/2007. 4.8.2 Recommendation 2: Way Forward for AoC’s qualifying for the establishment of Planning Parameters through the Structure Plan Review Process AoCs listed in Table 5.3 of Appendix 1 are identified as not being sufficiently committed to be processed as per procedure in Recommendation 1 in Section 4.8.1 above and are deemed to qualify for a Partial Structure Plan Review. However these AoCs can be recommended for: • Future land requirements for Open Air Storage facilities following the approval of the updated Open Storage Planning Guidance and its subsequent revisions; or • As preferential candidates in a site selection exercise for uses contemplated to be located ODZ in terms of Structure Plan Policy SET 12 especially in cases contemplating the provision of nationally important proposals; or • Considerations of proposals that are justified as providing benefits from the further consolidation of land uses of legitimate operating concerns or upgrading of such a legitimate operating concern. Similarly to Recommendation 1 in Section 4.8.1 above, within this group of AoCs, the planning of a totally separate sub-area area within the designated AoC may only be considered if the relevant sub-area is totally bisected by an existing (schemed) road carriageway or carriageways. If part of such a bisected area is heavily committed, then consideration may be given to whether it qualifies to have 14 its planning parameters determined under the regime indicated in Recommendation 1 in Section 4.8.1. A group of sites lying ODZ which are not AoC’s have also been delineated in Local Plans by a boundary with proposed development parameters which are not related to those for ODZ settlements. The respective local plans have stipulated that these development parameters will only come into force following a Structure Plan Review. Given that most of these sites are already heavily committed and that there would be limited value in further establishment of planning parameters, it is recommended that of the relevant provisions of this Way Forward recommendations in this document could also be applicable to the above mentioned sites provided that their application does not unduly compromise the thrust of the respective local plan policies. 15 5 APPENDICES Appendix 1 TABLE 5.1 List of AoC’s Area Locality Map LP Policy Triq l-Imdina Ghar Ram Tad-Daqqaq Bahar ic-Caghaq Hal Mann Handaq South Tal- Qares Triq il-Mosta Handaq North Tas-Sriedek Tal-Balal Triq Burmarrad Area of Mixed Use GH1 Triq tal-Barrani GH2 Triq tal-Barrani GH3 Triq ic-Cimiterju GH4 Triq Birzebbuga GH5 Triq Birzebbuga KI1 Triq L-Industrija LU1 Triq il-Belt Valletta, Tal-Bandieri LU2 Triq il-Belt Valletta, Tal-Bandieri MA1 Triq Valletta QR1 Triq Siggiewi SI1 Triq Hal Farrug ZA1 Triq il-Mina ta’ Hompesch ZA2 Triq San Leonardu ZG1A Triq L-Imdina ZG1D Triq L-Imdina ZG1C Triq L-Imdina ZG1B Triq L-Imdina ZG2 Triq L-Imdina ZG3 Triq Notabile ZN1 Triq tal-Barrani ZN1 Triq tal-Barrani ZU1 Triq Valletta ZU2 Triq Valletta Qormi Qormi Mosta Naxxar Lija Qormi Mosta Naxxar Qormi Mosta Iklin Burmarrad Ghaxaq Ghaxaq Ghaxaq Ghaxaq Ghaxaq Kirkop Luqa Luqa Mqabba Qrendi Siggiewi Zabbar Zabbar Zebbug Zebbug Zebbug Zebbug Zebbug Zebbug Zejtun Zejtun Zurrieq Zurrieq CMLP (2006) Map QOB2 CMLP (2006) Map QOB2 CMLP (2006) Map MOB5 CMLP (2006) Map NAB6 CMLP (2006) Map MOB5 CMLP (2006) Map QOB3 CMLP (2006) Map MOB7 CMLP (2006) Map NAB5 CMLP (2006) Map QOB3 CMLP (2006) Map MOB6 CMLP (2006) Map IKB5 NWLP (2006) Map 45A SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC1 SMLP (2006) Map AC1 SMLP (2006) Map AC1 SMLP (2006) Map AC1 SMLP (2006) Map AC3 SMLP (2006) Map AC2 SMLP (2006) Map AC3 SMLP (2006) Map AC5 SMLP (2006) Map AC2 SMLP (2006) Map AC2 SMLP (2006) Map AC2 SMLP (2006) Map AC2 SMLP (2006) Map AC3 SMLP (2006) Map AC3 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC1 SMLP (2006) Map AC1 CG05 CG05 CG05 CG05 CG05 CG05 CG05 CG05 CG05 CG05 CG05 NWCM8 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 16 Table 5.2 AoC’s whose planning parameters can be determined through Article 59 of Act X of 2010 and LN71/07 Area Locality Triq l-Imdina Ghar Ram Tad-Daqqaq Bahar ic-Caghaq Hal Mann GH4 Triq Birzebbuga GH5 Triq Birzebbuga LU2 Triq il-Belt Valletta, Tal-Bandieri ZG1C Triq L-Imdina ZG1D Triq L-Imdina ZG2 Triq L-Imdina Triq Burmarrad Area of Mixed Use 1 Qormi Qormi Mosta Naxxar Lija Ghaxaq Ghaxaq Luqa Zebbug Zebbug Zebbug Burmarrad 1. 2. Map CMLP (2006) Map QOB2 CMLP (2006) Map QOB2 CMLP (2006) Map MOB5 CMLP (2006) Map NAB6 CMLP (2006) Map MOB5 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC1 SMLP (2006) Map AC2 SMLP (2006) Map AC2 SMLP (2006) Map AC3 NWLP (2006) Map 45A Policy CG05 CG05 CG05 CG05 CG05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 NWCM8/ NWSP26 Site would require a PC application if owner opts to amend the planning parameters indicated in NWLP policy NWSP26. Site at Tas-Sriedek, Mosta required to follow Partial Local Plan Review as per article 58of Act X of 2010. 17 Table 5.3 AoC’s deemed to require a Structure Plan Review Area Locality Map Policy Handaq South Triq il-Mosta Handaq North Tal-Balal2 Tal- Qares GH1 Triq tal-Barrani GH2 Triq tal-Barrani GH3 Triq ic-Cimiterju KI1 Triq L-Industrija LU1 Triq il-Belt Valletta, Tal-Bandieri MA1 Triq Valletta QR1 Triq Siggiewi SI1 Triq Hal Farrug ZA1 Triq il-Mina ta’ Hompesch ZA2 Triq San Leonardu ZG1A Triq L-Imdina ZG1B Triq L-Imdina ZG3 Triq Notabile ZN1 Triq tal-Barrani ZN1 Triq tal-Barrani ZU1 Triq Valletta ZU2 Triq Valletta Qormi Naxxar Qormi Iklin Mosta Ghaxaq Ghaxaq Ghaxaq Kirkop Luqa Mqabba Qrendi Siggiewi Zabbar Zabbar Zebbug Zebbug Zebbug Zejtun Zejtun Zurrieq Zurrieq CMLP (2006) Map QOB3 CMLP (2006) Map NAB5 CMLP (2006) Map QOB3 CMLP (2006) Map IKB5 CMLP (2006) Map MOB7 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC1 SMLP (2006) Map AC1 SMLP (2006) Map AC1 SMLP (2006) Map AC3 SMLP (2006) Map AC2 SMLP (2006) Map AC3 SMLP (2006) Map AC5 SMLP (2006) Map AC2 SMLP (2006) Map AC2 SMLP (2006) Map AC3 SMLP (2006) Map AC4 SMLP (2006) Map AC4 SMLP (2006) Map AC1 SMLP (2006) Map AC1 CG05 CG05 CG05 CG05 CG05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 SMCM05 18 Appendix 2 AoC - Local Plan Policies Central Malta Local Plan (2006) Policies CG05 Areas of Containment MEPA designates Areas of Containment in Iklin, Lija, Mosta, Naxxar and Qormi within which permitted development will be carried out strictly within the boundaries as designated in the relevant Planning Control Maps in Volume 3; Part B of this Plan. Following the approval of this plan MEPA will on a case by case basis review industrial and commercial operations within such Areas of Containment, and identify acceptable operations within such areas together with required road layouts. Mitigation measures are to be implemented on the selected sites to reduce negative impacts in the form of comprehensive schemes to upgrade the visual elements of these areas, which would include landscaping and other embellishment measures, as well as the provision of adequate common parking areas. Pending the finalization of this review, MEPA will only consider the change of use and/or minor alterations to existing buildings within the designated Areas of Containment provided that all the following conditions are adhered to; 1. The use of the proposed development will be similar to any use already existing and permitted within the Area of Containment. However, if the proposed use is not considered to be desirable, then MEPA will consider a more acceptable alternative use; 2. Compliance with any required mitigation measures that may be identified during the assessment process of the proposed development; 3. It is demonstrated to the satisfaction of MEPA that no deleterious impacts will result from the proposed development on existing uses in the vicinity of the site; and 4. Particular attention will be given to the design of the proposed development so as to ensure that visual impacts will be mitigated. The provisions of Policy CG16 are also applicable to sites that are designated as CDAs. 19 3.3.14 The existing industrial and commercial developments designated by this policy constitute urban development which is undesirably located outside development zone. All these developments should ideally have been planned within the Limits to Development and not in their present location outside development zone. Notwithstanding this, the relocation of these areas would be too difficult and costly a task, and is therefore not considered to be a feasible option. These existing built up areas are therefore being designated as Areas of Containment in order to prevent their further outward expansion. As far as possible the boundaries of the designated areas have been delineated to provide an appropriate building depth and block layout thereby improving the current irregular layouts. CG16 Comprehensive Development Areas The Area Policy Maps covering the following Areas of Containment indicate sites within which development is to be planned as Comprehensive Development Areas (CDAs) in accordance with the provisions of this policy. The provisions of Policy CG05 are also applicable to the CDAs. Location Tal-Balal, Iklin Tal-Qares, Mosta Tal-Handaq, Qormi Planning Control Map IKB5 MOB7 QOB3 Development within each designated CDA shall be subject to the following conditions; 1) 2) 3) Comprehensive development covered by a single development application for every CDA as designated in the relevant Area Policy Maps. This comprehensive development is to be carried out on a design/build/manage binding agreement with Government. However this development can be phased subject to MEPA approval. Compliance with all existing legislation and regulations with particular reference to the Cultural Heritage Act 2002; Adequate provision within the site curtilage of every CDA for; a. b. c. d. e. f. g. Common administration and support services; Common parking areas for both employees and visitors; Adequate circulation space for heavy vehicles; Common landscaped areas complying with the MEPA’s Guidelines on Trees, Shrubs and Plants for Planting and Landscaping in the Maltese Islands (2002); Common recreational facilities e.g. canteen; Common waste management facilities e.g. waste skip area; and Adequate infrastructure services including water catchment facilities. 20 4) 5) 6) 7) 8) 9) These requirements will be applied flexibly by MEPA for sites with less than 5000 sq m site area. Maximum site coverage of 60% (excluding common facilities); In the case of development for industry, the floor space for each microenterprise unit should not be less than 120 sq m and preferably not exceed 200 sq m, depending on the nature of the activity; Compliance with any required mitigation measures that may be identified during the assessment process of particular planning applications; Before the commencement of the development archaeological field evaluation works may be carried out as approved in advance by the Superintendence of Cultural Heritage; Adequate bank guarantees will be levied to ensure compliance with permit conditions especially in relation to archaeological field evaluation works; and Reasonable financial or other material contributions for a specific project as a planning gain aimed towards environmental enhancement. 3.5.11 As highlighted during consultations with the relevant agencies, areas of containment especially those hosting industrial activities are facing a number of problems that include the haphazard provision of common services including a lack of parking provision, inadequate internal circulation and servicing areas, poor quality design of buildings, a poor working environment, a lack of pollution controls including noise and air pollution, and no attempt at screening and landscaping. 3.5.12 A major factor that has contributed to this existing situation is the piecemeal industrial development that has occurred in the past. Continued piecemeal development on relatively large industrial sites located outside development zone (ODZ) therefore needs to be checked through the implementation of CDAs. The criteria listed in this CDA policy ensures that the above-mentioned problems are avoided in major new industrial development ODZ. The need for the comprehensive planning of relatively large industrial sites is also essential to promote a higher standard in project design, layout, finishing and servicing. North West Local Plan (2006) Policy NWCM 8 Areas of Containment The Local Plan designates Areas of Containment in the following localities: Burmarrad. 21 The boundary of this Area of Containment is shown on Area Policy Maps 45 and 45A. MEPA has reviewed industrial and commercial operations within this Area of Containment and has prepared a comprehensive scheme, as indicated in policy NWSP 26, identifying the range and scale of acceptable uses, mitigation measures to reduce negative impacts, the provision of adequate common parking areas, and access improvement schemes. 7.2.15 The existing industrial and commercial developments designated by this policy constitute urban development which is undesirably located outside development zone. All these developments should ideally have been planned within the Limits to Development and not in their present location outside development zone. Notwithstanding this, the relocation of this area would be too difficult and costly a task, and is therefore not considered to be a feasible option. This existing built up area is therefore being designated as an Area of Containment in order to prevent its further outward expansion. As far as possible the boundaries of the designated areas have been delineated to provide an appropriate building depth and block layout thereby improving the current irregular layouts. NWSP 26 1.1.1 Area of Mixed Uses In line with general policy NWCM 8 - Areas of Containment, MEPA will favourably consider development (new development, extensions and changes of use) on the site indicated on Map 45, as further detailed on Map 45A, provided that: (i) (ii) (iii) (iv) A comprehensive scheme is submitted preferably for the whole site. MEPA will consider piecemeal development for sites A, B and C, only as indicated on Map 45A; Any built structures are preferably located as indicated on Map 45A, do not, generally, exceed a height of one floor, and do not create more than 4,200 sqm of floor space above ground level distributed as follows: Site A – 2,500sqm; Site B – 1,300 sqm, Site C – 400sqm; The land uses within the built structures may include a mix of the following: vehicle repairs and maintenance, storage, and showrooms as main uses, and retail and administrative offices as an ancillary facility to the main uses, provided adequate safety and mitigation measures, as identified by MEPA, for the industrial uses are included. New residential units will not be allowed but those covered by development permission may be retained as part of the comprehensive schemes required under (i) and thresholds identified under (ii) are not exceeded; The design of the buildings must take into account the rural context of the site and seek to minimise impacts on long 22 (v) (vi) (vii) (viii) (ix) (x) (xi) 18.3.5 distance views but innovative utilisation of modern materials will be favourably considered; A landscaped green belt is included as indicated on Map 45A with a minimum width of 5m, thickening at the southern tip of the site, as part of a landscaping scheme for the site. Any solid boundary walls enclosing this green belt should not be higher than 1.20m; Landscaped car parks preferably located as indicated on Map 45A to accommodate parking requirements for visitors and employees generated by the different uses according to established parking standards; Open yards for the storage of heavy vehicles are preferably located as indicated on Map 45A and are to be well screened from views on the approach road and from views from the nearby urban and rural settlements; The current design of the junction between Triq Qannotta and Triq Burmarrad is reviewed as part of the overall scheme or as part of the scheme for Site C with the aim to safeguard existing mature trees, minimise take-up of agricultural land and achieve a suitable and safe access to Site C. The site zoned as a green area in the 1988 Temporary Provisions Scheme may be incorporated within the redesigned junction; The design of the access to Sites A and B is safe and takes into account the status of Burmarrad Road. No direct access to buildings with a frontage onto Burmarrad Road will be allowed; The current yard for heavy vehicles located opposite the Site A to the east is closed down and the site rehabilitated for agricultural use; Developers would be required to fund, in proportion to the land holdings, the implementation of the re-designed junction indicated on Map 45A as planning gain. This area (17,330sqm), located on Burmarrad road, to the north of the village of Burmarrad, has undergone an incremental transformation over an extended period of time from a rural area with a few farms to a fully fledged, predominantly commercial area. The predominant activities are a yard for heavy vehicles together with ancillary vehicles’ maintenance and small-scale retail, a building materials contractor yard and garages for vehicle repairs and maintenance. A poultry farm, a remnant of the original uses, is still operating on the site and at least three residential units are also located within the site boundary. The storage for heavy vehicles has also spread across Burmarrad Road into the open countryside. Besides the visual eyesore created by the parked heavy vehicles, cars and car parts stacked even on the roofs of the buildings and dominant boundary walls, a serious traffic hazard has been created with direct accesses into the yards from the distributor road and display 23 of vehicles for sale throughout most of the property frontage on Burmarrad Road. 18.3.6 The case history of the site, up to July 2003, revealed a complex situation of permissions dating back from 1965 related to agricultural activities, garages and boundary walls, residential blocks with ground floor industrial garages, to the most recent decision by the Planning Appeals Board in June 2003 to allow one residential unit on top of a two-storey commercial building. Additionally a considerable number of enforcement notices dating from 1996 related to changes of use to industrial, retail and office uses, excavation works and construction of new buildings for warehouses and commercial garages, have been issued on the site. 18.3.7 Following the publication of the Plan, which had not made any proposals for the area, submissions were made by the public on the need for the Plan to address the situation of this site. This policy acknowledges the current status of the site for a range of mixed uses, dominated by display of goods (vehicles), storage (heavy vehicles), and industrial (vehicle repairs and maintenance) with ancillary retail and office uses. It seeks to address the adverse impacts which the current situation has created i.e. (i) Traffic hazards; (ii) Visual impacts; (iii) Uncontrolled expansion of industrial uses onto agricultural land; by requiring comprehensive development schemes for the whole site, or large portions of it; restricting the development to the defined footprint; restricting the scale of activities (the thresholds in the policy reflect the current permitted floor space in the built structures); requiring a landscaping scheme, car-parking provision, safe access points, the rehabilitation of a site on the other side of Burmarrad Road; and planning gain for the implementation of mitigation measures. 18.3.8 MEPA prefers a comprehensive scheme for the redevelopment of the whole or of the portions identified in MAP 45A but proposals which retain, reuse and improve the existing buildings will also be considered provided the criteria set out by this policy are still complied with. The policy does not consider that residential units are compatible with the predominantly industrial and commercial character of the site and such uses are not to be included in any comprehensive redevelopment scheme for the area identified by the policy. However, should the developers opt to retain the existing buildings, as part of the comprehensive schemes, only the residential units permitted under planning applications PA 2153/97, PA 4781/98 and PA 5146/99, will be accepted, provided the residential floor space forms part of the thresholds in criterion (ii) of the policy. 24 South Malta Local Plan (2006) Policy SMCM 05 Areas of Containment (Industrial and Commercial) MEPA designates the following Areas of Containment within which permitted development will be carried out strictly within the designated boundaries as indicated in the relevant Inset Maps. Tal-Bandieri, Triq il-Belt Valletta Triq l-Industrija Triq Valletta Triq Valletta Mdina Road Triq Hal Farrug Triq is-Siggiewi Mdina Road (Ta’ Srina) Triq il-Mina ta’ Hompesch Notabile Road Triq ic-Cimiterju Tal-Barrani Road Triq Tal-Barrani Triq Birzebbuga Triq San Leonardo Luqa Kirkop Mqabba Zurrieq Zebbug Siggiewi Qrendi Zebbug Zabbar Zebbug Ghaxaq Ghaxaq Zejtun/Ghaxaq Ghaxaq Zabbar Map AC 1 Map AC 1 Map AC 1 Map AC 1 Map AC 2 Map AC 2 Map AC 3 Map AC 3 Map AC 3 Map AC 3 Map AC 4 Map AC 4 Map AC 4 Map AC 4 Map AC 5 Following the approval of this plan MEPA will on a case by case basis review industrial and commercial operations within such areas of containment, identifying acceptable operations within such areas together with required road layouts. Mitigation measures are to be implemented on the selected sites to reduce negative impacts in the form of comprehensive schemes to upgrade the visual elements of these areas, which would include landscaping and other embellishment measures, as well as the provision of adequate common parking areas. Pending the finalization of this review MEPA will only consider the change of use and/or minor alterations to existing buildings within the designated Areas of Containment provided that all the following conditions are adhered to; 1. The use of the proposed development will be similar to any use already existing and permitted within the Area of Containment. However, if the proposed use is not considered to be desirable, then MEPA will consider a more acceptable alternative use; 2. Compliance with any required mitigation measures that may be identified during the assessment process of the proposed development; 25 3. In cases of redevelopment or new development in sites fronting arterial roads or approaches to settlements a buffer of at least 8 metres from the road alignment is to be provided. 3. It is demonstrated to the satisfaction of MEPA that no deleterious impacts will result from the proposed development on existing uses in the vicinity of the site; and 4. Particular attention will be given to the design of the proposed development so as to ensure that no adverse visual impacts are created. 5.4.8 Various industrial/commercial operations, having the required development permits, have sprouted in the countryside mainly in the form of batching plants and warehousing and other industrial activity as well as showrooms. Whilst the general strategy is to direct such activity to appropriate areas, nonetheless, these areas have been granted development permits in the past that cover the use of the site for industrial and commercial related activity. Nonetheless, during subsequent years additional works have been carried out on site which might not be covered by a permit and are subject to enforcement action or development application which are still being processed. It would not be ideal for the local plan to designate such areas, however, the designation of boundaries for committed areas/uses are to be determined after a careful review of each site. 26
© Copyright 2026 Paperzz