Tenements - Scotland’s most sustainable housing? Matt Bridgestock Director / Architect Tenement Types Post-war and modern - 40% Sandstone (Pre-1919) - 38% 40% = 4 storey or more 4 in a block type - 20% Mainly inter-war Pre-1919 Tenements 23% 100+ years old Low embodied energy Hard to treat High proportion fuel poverty 77% Pre-1919 Tenements Other Scottish Houses Tenements deteriorate.. Physical issues Resident Agreement Costs and VAT Climate: wind, rain, temperature Exacerbated by Climate Change Indoor climate, humidity, heating, ventilation Poor previous repair or specification error Wear, Tear and Weathering Plant Growth Vandalism, theft, abuse, noise Requirements change... Lifestyle Technology Aspirations Heating in Tenements Heating in Tenements Heating in Tenements How to help? L] f] fl e] dYl ^ Km g ]J O` m gJ d] \ a\] ] \ a n` g m k g^ 7 j Yb g e Y add go & o 2` k mjk o j a Zg dY ` hY q _ ] l a j h] fJ f] eg f hj g qgm j e a \ ;g _] Yf Yf m g ` [ q ][l Y ^^ ` kl Z% =p %[g [ad mf dYl > % %af ¾ mj [c ½ >g % Z d g Y ]jfl g\ E le]f Yj Yh Under One Roof • Launch April 2016 • Website based manual • Requires user testing • Requires input into issues • Contact [email protected] Milnbank HA Can we modernise Tenements? Can we modernise Tenements? • 35% Milnbank Housing Associations stock • Feature highly in MHA’s fuel poverty statistics • Subject to both incremental and major refurbishments over 100 years • Not listed but still important character Staged Strategy • BRONZE – 30% reduction in energy • SILVER – 50% reduction in energy • GOLD – Passivhaus (EnerPHIT) standard refurbishment These strategies will consider physical refurbishment such as insulation, heating systems, window replacement and draught proofing. Airtightness • Achieved: • 17.13 ACH • 14.62 m3/h/m2 Thermal Imaging • Floor zone • Windows / mullions • Close doors • Eaves Literature Review • Historic Scotland • Changeworks • Retrofit for the Future • Passivhaus Institute • Scottish Ecological Design Association members Strategies • Airtight construction • Renewed heating system • Internal and external insulation • Use of natural materials • Ceiling / roof insulation • Reducing thermal bridges • Windows and doors • Mechanical ventilation with heat recovery Variety of types Type B - Top Floor 47m2 with 1 bedroom Type C - Mid floor 83m2 with 3 bedrooms Type A - Ground Floor 65m2 with 2 bedrooms Roof Existing insulation lifted, airtightness membrane installed and lapped in to head of wall. 350mm warmcell insulation relaid. U-value - 0.12 Build up: - 680mm existing stone wall - Plaster parge coat - 100mm Woodfibreboard - 10mm insulated plaster finish Joists carefully sealed with airtightness tape and lapped into plaster parge coat Insulation carefully installed round joist ends Maintain ventilation of roof space Deadening reinstalled as floor is relaid Plasterboard ceiling Front wall detail U-value - 0.30 Rear wall detail U-value - 0.80 Build up: - Existing stone wall - 20mm insulated plaster finish Refer to individual sheets for internal works. Plaster carefully installed round joist ends Deadening reinstalled as floor is relaid Plasterboard ceiling Lead flashing along top of string course to avoid excessive moisture build up Lift floor finishes on ground floor. Install 50mm mineral wool on net between joists. Lay airtightness membrane, lap into internal walls and external plaster. Lay 18mm OSB and relay floor finishes. Uvalue 0.6 Client Project Title Scale at A3 Drawing No Milnbank HA PassivTEN Research Bronze Strategy 1:100, 1:20 [PP]01 Bronze John Gilbert Architects 201 White Studios, 62 Templeton Street, Glasgow, G40 1DA | 0141 551 8383 | www.johngilbert.co.uk Close actions Wall stripped back to stonework, plater parge coat applied, 100mm wood fibre board fitted with mechanical fixings, finished internally with 10mm insulated plaster and organic paint. New lowered ceiling in hallway MVHR unit fitted in ceiling of kitchen, new suspended ceiling in kitchen and hall. Ducts to each room. Airtightness tape between windows and new plaster MVHR intake and extract on rear wall Lift floor Insulation and plaster airtight barrier continued through floor zone. Wall stripped back to stonework, 20mm insulating plaster applied Lift floor Further investigation of solar thermal panels on roof required Airtightness target of 3ach Plaster continued through floor zone TC-BRONZE Type C Bronze Standard Bronze 1:20 Flat actions Client Project Title Scale at A3 Drawing No Milnbank HA PassivTEN Research Type C Bronze Strategy 1:200, 1:500 [PP]04 John G 201 White Studios, 6 New communal boiler in roof space, supplying hot water and heating to each flat via duct in close. Fire proof utility cupboard formed from timber frame and supalux. Build up: 10mm render system 250mm EPS insulation Existing stone wall 20mm insulated plaster finish Solar thermal panels mounted on south facing roof Plaster carefully installed round joist ends Roof Existing insulation lifted, airtightness membrane installed and lapped in to head of wall. 350mm cellulose insulation laid. U-value - 0.12 Deadening reinstalled as floor is relaid Plasterboard ceiling Roof may need extending at eaves Rear wall detail U-value - 0.13 Front wall detail U-value - 0.30 - Existing stone wall - Plaster parge coat - 100mm Woodfibreboard - 10mm insulated plaster finish Refer to individual sheets for internal works. Lead flashing along top of string course to avoid excessive moisture build up Insulation to run past ground floor into ground to protect joist ends. Lift floor finishes on ground floor. Install 200mm polystyrene between joists. Lay airtightness membrane, lap into internal walls and external plaster. Lay 18mm OSB and relay floor finishes. Uvalue 0.14 Client Project Title Milnbank HA PassivTEN Research Silver Strategy Silver Close actions Scale at A3 Drawing No 1:100, 1:20 [PP]05 John Gilbert Architects 201 White Studios, 62 Templeton Street, Glasgow, G40 1DA | 0141 551 8383 | www.johngilbert.co.uk MVHR unit (Brookvent air cycle) fitted in ceiling of kitchen, new suspended ceiling in kitchen and hall. Rigid galvanised ducts to each room. Wall stripped back to stonework, plater parge coat applied, 100mm wood fibre board fitted with mechanical fixings, finished internally with 10mm insulated plaster and organic paint. Airtightness tape between windows and new plaster New lowered ceiling in hallway MVHR intake and extract on rear wall 250mm polystyrene and render applied externally. Lift floor Strip dry lining (where present) at party walls, seal any gaps and replaster. Plaster to be tied into walls in flats above and below along with being sealed to new plaster work at external walls. Insulation and plaster airtight barrier continued through floor zone. Wall stripped back to stonework, 20mm insulating plaster applied Lift floor Plaster continued through floor zone Communal heating system with solar thermal panels on roof Airtightness target of 1 ach TC-SILVER Client Type C Cutaway Silver Project Title Flat actions Scale at A3 Drawing No New communal boiler in roof space, supplying hot water and heating to each flat via duct in close. Fire proof utility cupboard formed from timber frame and supalux. Build up: 10mm render system 250mm EPS insulation Existing stone wall 20mm insulated plaster finish Solar thermal panels mounted on south facing roof Plaster carefully installed round joist ends Roof Existing insulation lifted, airtightness membrane installed and lapped in to head of wall. 350mm cellulose insulation laid. U-value - 0.12 Deadening reinstalled as floor is relaid Plasterboard ceiling Roof may need extending at eaves Rear wall detail Uvalue - 0.13 Windows all replaced with triple glazed, passivhaus certified units. Spacetherm to be used to form insulated Jambs and sills, to be sealed into airtight barrier. Installed uvalue to be 0.8 Front wall detail U-value - 0.30 - Existing stone wall - Plaster parge coat - 100mm Woodfibreboard - 10mm insulated plaster finish Refer to individual sheets for internal works. Lead flashing along top of string course to avoid excessive moisture build up Insulation to run past ground floor into ground to protect joist ends. New windows and doors in close, replaced with triple glazed, passivhaus certified units. Spacetherm to be used to form insulated Jambs and sills, to be sealed into airtight barrier. Installed uvalue to be 0.8 Lift floor finishes on ground floor. Install 200mm polystyrene between joists. Lay airtightness membrane, lap into internal walls and external plaster. Lay 18mm OSB and relay floor finishes. Uvalue 0.14 Client Project Title Milnbank HA PassivTEN Research Gold Strategy Gold Scale at A3 1:100, 1:20 Close actions [PP]09 Drawing No John Gilbert Architects 201 White Studios, 62 Templeton Street, Glasgow, G40 1DA | 0141 551 8383 | www.johngilbert.co.uk MVHR unit (Paul Focus 200) fitted in ceiling of kitchen, new suspended ceiling in kitchen and hall. Rigid galvanised ducts to each room. Passivhaus certified triple glazed windows installed and taped into airtight barrier Wall stripped back to stonework, plater parge coat applied, 100mm wood fibre board fitted with mechanical fixings, finished internally with 10mm insulated plaster and organic paint. Window reveals to be lined with Spacetherm to eliminate thermal bridging. New lowered ceiling in hallway Airtightness tape between windows and new plaster MVHR intake and extract on rear wall Passivhaus certified triple glazed windows installed and taped into airtight barrier 250mm polystyrene and render applied externally. Lift floor Insulation and plaster airtight barrier continued through floor zone. Strip dry lining (where present) at party walls, seal any gaps and replaster. Plaster to be tied into walls in flats above and below along with being sealed to new plaster work at external walls. Wall stripped back to stonework, 20mm insulating plaster applied Lift floor Plaster continued through floor zone Communal heating system with solar thermal panels on roof Airtightness target of 1 ach TC-GOLD Gold Type C Gold Strategy Flat actions 1:20 Gold Bringing it together drying out, however the product ‘GUTEX Thermoroom’ has recently been analysed by the Fraunhaufor IBP and the data from their report has been used in this simulation. For wood-based materials, moisture content should not exceed 20% mass-percent during a prolonged period. Fig 9 shows that the water content in the woodfibre reaches equilibrium in the first year at just over 14 M-% after drying out from the application of internal plaster, suggesting no significant risk of mould. Build up: - 680mm existing stone wall - Plaster parge coat - 100mm Woodfibreboard - 10mm insulated plaster finish Joists carefully sealed with airtightness tape and lapped into plaster parge coat Insulation carefully installed round joist ends Fig 8 - Water Content in the Calsitherm board over five years Deadening reinstalled as floor is relaid Plasterboard ceiling Replacement deafening to be mix of sand and finishing plaster. Aiming for u-value of 0.30 WUFI Calcs - See Appendix Thermal Bridging Fig 9 - Water Content in the woodfibre over five years kraft architecture ltd | 280 high street | Glasgow | G4 0QT t 01415522915 | f 08707061232 | [email protected] | www.kraftarchitecture.co.uk registered in scotland no. 329135 | VAT No. 982896253 | director bruce newlands bsc(hons) pgdip riba rias AECB The Sustainable Building Association | RIAS Advanced Sustainability Accreditation Client Project 201 White Studios, 62 Templeton Street, Glasgow, G40 1DA Tel: 0141 551 8383 Web: www.johngilbert.co.uk Rev. Drawing Name PassivTEN Research Ammendment Details Proposed South Wall Milnbank HA Date Drawing Status Research Drawing Scale 1:10 With moisture calcs works in the loft, an divided them between each of the 8 flats in the close. This budget per flat is included in the costs above. The overall budget for the common works for the gold (EnerPHit) strategy is £131,262.65. 2) Retrofit Cost (m The following diagram shows the cost per square meter for each of the options: 11.4. Summary Bronze Silver Gold Flat Type B Flat Type C £1,500 £1,250 £1,000 £750 £500 £250 £0 Flat Type A It is clear that the position of each flat greatly affects the cost of the work required with top and bottom flats being more expensive than middle flats. Retrofit Cost Bronze Silver EnerPHit Type A £30,544 £54,042 £79,594 Type B £18,738 £42,277 £65,468 Type C £27,060 £48,493 £82,241 Inc VAT, Fees, Prelims and Contingency this potentially includes owner occupied housing. 10.1. Heating Demand The graph below shows the output of the proposals based on the relative heating demand required for each flat type. This demonstrates how well the flat is insulated and how much heat is required to keep the home at a constant temperature throughout the year. This is all shown in kWh/m2. Heat Demand Type A Type B Type C Heat Demand (kWh/m²) 500 375 250 125 0 Unimproved Existing Bronze Silver EnerPHit It can be seen that Flat type A is the poorest performer consistently throughout the study, this is due to its ground floor location and being relatively small compared to the area of exposed walls. Flat C is the best performer as it is mid terrace with a heated flat above and below. 10.3. Annual Cost Using current standard tariffs we have made an assumption about the energy costs for each flat type with the retrofit measures in place. The graph below shows the total cost for each flat, the size of the flat makes a significant difference to the total energy cost. We have not allowed for any increase in fuel prices and over a 25 year period, price increases have been significant in the last ten years and are likely to be significant. Estimated Annual Cost Type A (65m2) Type B (47m2) Type C (83m2) 2000 Total cost (£) 1600 1200 800 400 0 Unimproved Existing Bronze Silver EnerPHit The graph below shows cost per meter square of floor area. It shows that the costs for each flat converge at the silver and gold level, giving equal cost per square meter to all residents Lessons learnt • There are few examples of very high standard retrofit in Scotland • A strategy of improving airtightness, with ventilation, has a more significant effect than insulation alone • Photovoltaic cells can be added to the roof of the properties and have a simple payback period of 9 years • The position of the flat has a significant impact on the capital cost of the refurbishment works • Communal heating has a effect on the cost of heating for tenants • Silver and Gold standard carry a very low risk of fuel poverty • It is theoretically possible to meet the EnerPHit standards with a tenement close • The costs of any of these upgrades are significant. ECO funding in its current state does not offer significant assistance. • There is a gap in the market for an effective internal insulation product for sandstone walls. Thank you Download the full report from our website - www.johngilbert.co.uk/ Or contact us for more information - Matt Bridgestock - 0141 551 8383
© Copyright 2024 Paperzz