ATTACHMENT 2 Agreement No. XXXX Firm Name Rider A, Page 1 of 2 Rider A SURVEY SPECIFICATIONS FOR REDWOOD BOWL TRACK REPLACEMENT PROJECT A. Field survey (boundary, topographical and site elements) the University-owned property associated with the Redwood Bowl Track Replacement Project as shown and delineated on Attachment 4, all items as specified herein. B. All topographic features and referenced to the Campus Coordinate System, established survey monuments, and/or California State plan coordinate system zone 1: 1. Exterior walls of the buildings and structures including doors for all facilities immediately adjacent to the track and within the area of the survey are to be field located to a hundredth of a foot at the scale of 1”= 20’. Include name, type of construction and number of stories for each building/structure. 2. Structures, manholes, catch basins, curbs, gutters, walks, concrete and asphalt paving, stairs including steps, fences, gates, walls, signs, lighting poles, flag poles, fire hydrants, trees and utility poles are to be field located to a hundredth of a foot at the scale of 1”=20’. 3. Locate the horizontal and vertical position of all major sport amenities within the project area including, but not limited to: the running track, the long jump/triple jump pit and run up lane, the pole vault pit and run up lane, the high jump area, the steeplechase area and pit, track and field event areas, bleachers, walkways, fences, utility boxes, utility valve covers, drain grates, scoreboards, timing clocks, etc.. Locate all radius monuments for the track. All such features shall be field located to a hundredth of a foot at the scale of 1”=20’. 4. Trees, shrubs and planting areas are to be field located to a hundredth of a foot at the scale of 1”=20. 5. Provide grade contours at one foot intervals. Contours to be augmented by spot elevations at 50’ intervals each direction. Elevations to be shown in hundredths of a foot on paved surfaces and to tenths of a foot on unpaved surfaces. Additional shots to hundredths of a foot to be shown at all grade breaks in streets, curbs and gutters and paved areas. Floor elevations and door entry elevations of existing building to be given to hundredths of a foot. C. Additional data required on map: 1. Coordinate System Grid at 100’ intervals each direction using the California State Grid as the basis of the coordinate system. 2. Identify type of surface (i.e., concrete, lawn, asphalt, play yard fill, paving, etc.). Agreement No. XXXX Name of Service Provider Rider A, Page 2 of 2 3. Underground utility identification (within the boundary of property owned by the University regardless of entity owning said utility) including domestic and fire water lines, gas lines, power and telephone ducts, tunnels, sewers, storm drains, including all appurtenances, such as valves and meters. Give depth of pipes and ducts, and elevation at grade of all covers. a. All substructure information, including all underground utilities, to be developed utilizing resources provided and available from the campus, public utilities, and local government agencies. Potholing, digging or probing is not within the scope of work, unless authorized in writing by the Trustees. D. Drawing specifications: 1. Create drawings in compliance with University CAD standards. 2. Show the following in title block: a. Name of project b. Name and address of your firm c. Date of survey d. Scale: 1” = 20’ (also show graphic scale) 3. Show relationship of site to campus in key map. 4. North arrow oriented to top of sheet, or as approved by the University. 5. Legend identifying all lines and symbols on drawing. 6. Certification of accuracy by a registered civil engineer or licensed land surveyor. 7. For drawing sheet size, title block style, etc., contact the University’s designated design manager: E. Provide all service under this Agreement for an amount not to exceed the contract amount indicated on the Service Agreement regardless of Consultant’s cost in performing these services. The maximum amount indicated on the Service Agreement shall be payable as stated in the following provision which is marked with an “X”: (The provision which is not so marked shall not apply to this Agreement.) ☒ 1. Single, lump sum payment. Consultant shall be paid in a single, lump sum payment in arrears upon completion of all work under this Agreement to the satisfaction of the Trustees. ☐ 2. Progress payments. Consultant shall be paid in multiple payments in arrears for work performed to the satisfaction of the Trustees as more particularly specified in Progress Payment Attachment which by this reference is made a part of this Agreement. End of Rider A
© Copyright 2026 Paperzz